HomeMy WebLinkAboutMFP19003249.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19003249
IVR Number: 19003249
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :06/12/2019Application Date:3344500006Parcel Number:1200 LAKE WASHINGTON BLVD N
Permit Type:06/20/2019Issue Date:Franchise
Permit Work Class:06/19/2020Expiration Date:Minor Utility
Job Number:101120230Franchise Type:Electric
Description:Replace existing 3030 conc HH in ROW with 3030 anti skid HH. Restoration per City of Renton standards.
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street
տ Open Trench տ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101120230
CORRIE RYDBERG
(253) 234-6410
CORRIE.RYDBERG@PSE.COM
1200 LAKE WASHINGTON DR
REPLACE EXISTING 3030 CONC HH IN ROW W/ 3030 ANTI-SKID HH
✔✔✔
✔4'X4'X4'
Potelco, Inc. (253) 234-6410
POTELI#227PL BL005109
Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.06.12 15:42:15 -07'00'6/12/19
MFP19003249
RESTORATION PER CITY OF RENTON STANDARDS
Nathan Janders
Scott Warlick 6/20/2019
6/17/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101120230
Potelco, Inc
VAL BUZUNOV (253) 395-6826
6905 S 228th St, Kent, WA 98032
VAL.BUZUNOV@PSE.COM
1200 LAKE WASHINGTON DR
TBD
TBD
CORRIE RYDBERG
6/12/19
Corrie Rydberg Digitally signed by Corrie Rydberg
Date: 2019.06.12 15:42:28 -07'00'
MFP19003249
Monday - Friday
8:00AM - 3:00PM Scott Warlick
6/20/2019
SKETCH
I
-- NORTH --
I
NOTES:
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
•The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
•Total road closure lasting more than 24 hours is subject to the approval by the City Council.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
PARCEL #
3344500006
LAKE WASHINGTON DRIVE1300
HIG
17
J
318639-166260
T77244
T77244
SLAT0173
318645-166268
318669-166263
318670-166269
750 kVA 120/208V (ABC) 3x250
318668-166268 0/5
T76097
SLAH5139
ROW
60'
PARCEL #
082305PUBL
PARCEL #
0823059027
318649-166256
SLAG6882
1200318659-166257
318688-166272
500 kVA 120/208V (ABC) 3x167
318689-166270 0/6
50 kVA 120/240V (A)
SLAH5140
318670-166270
PRELIMINARYONLYNOT FORCONSTRUCTIONOwner / Developer Contact Info
officeATTN:
WESTERN INTERNATIONAL LLC
13647 MONTFORT DRIVE
DALLAS, TX 75240
CARY FISHER (972) 934-8699 101120230GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:VALERIY BUZUNOV
(253) 395-6826
Val.Buzunov@pse.com
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
V. BUZUNOV (253) 395-6826 05/24/19
V. BUZUNOV (253) 395-6826 05/24/19
M. HAIGHT (714) 893-2405 05/24/19
N/A RENTON
RENTON MARRIOTT RESIDENCE INN
REPLACE HH
1200 LAKE WASHINGTON DRIVE RENTON, WA 98056
N/A N/A
N/A 101120230
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
SW 5-23N-05E N/A N/A
2305E019 2305E040 2305E019 HIG-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
101120230507801641
00 1"2"
00 50'100'
SITE PLAN
SCALE: 1" = 50'
OVERHEAD CIRCUIT MAP 2305E040
SCALE: 6" = 1 MILE
JOB SITE
N
Vicinity Map
N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
ASPLUNDH CONSTRUCTION CORP. - QA/QC T. Myer
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
CIRCUIT FEET ADDED: 0'
SITE SPECIFIC NOTES
AT HH1:
-REPLACE EXISTING 3030 CONC HH W/ CONC 3030 ANTI-SKID PER STD 6050.2020 (HH13350AS)
-INSTALL ANTI-SKID DOOR (MID #9997156)
-INSTALL (3) 3-POS FARGOS BARS (MID #7651004)
-CONNECT ALL EXISTING SERVICES
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-17
10/2018
180.31 111.44 112.34
0.00 0.00 0.00
180.31 111.44 112.34
108113752
SINGLE PHASE SECONDARY CONCRETE HANDHOLE
Not to scale 6050.2020-1
TOP VIEW
SIDE VIEW
2'-4"
EXCAVATION: 5-1/3 CUBIC YARDS
7'-0"
6'-0"
6" Crashed rock
2"
2'-6"
Install PVC bell endsand grout into wall
2'-6"
Handhole
820 lbs
Conduits and conductors shall enter fromends of handhole through knockouts provided
Typical customer runservice conductors in duct
Steel Door
Seal conduit
with foam
Customer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire on
the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be
removed by customer or cut off at the vault wall.
594128108
Removal
UG Maint
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point on private property.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
CUSTOMER APPROVAL
I approve the location of the trench, including road crossings,
and all electrical equipment as shown on print.
________________________
Customer's Signature
________________________
Print Name/Date
MFP19003249
RRRR
RR
RRRRRR RR
RR
12121212161212
12
12
141211COULON BEACH ACCESS RD LAKE WASHINGTON BLVDHO
U
S
E
R
W
A
Y
N
1412121212CONTRACTOR TO MAINATIN 15'
MINIMUM CLEARANCE BETWEEN
RAILS AND TRAFFIC CONES TO
MAINTAIN DYNAMIC ENVELOPE.
RO
A
D
W
O
R
K
AH
E
A
D
W20-1RI
G
H
T
SH
O
U
L
D
E
R
CL
O
S
E
D
W21-5aRW1-4L100'100'100'W1-4LROADWORKAHEADW20-1W1-4R100'100'W20
-
1ROADWORKAHEAD
BIKE
SMER
G
E
W
I
T
H
TRAF
F
I
C
W4-1Bmaintain 11' laneN PSE PUGETSOUNDENERGY
JOB#101120230
1200 LAKE WASHINGTON BLVD N, RENTON, WA 98056
06/06/19
JOHN.CROFOOT@PSE.COM
425-424-6658
SHEET 1 of 1
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
55 +
60/65
45/55
35/40
30
25
SIGN SPACING
"X"
800
500'
350'
200'
100'
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
ROW ROW
MFP19003249