HomeMy WebLinkAboutP_Site Plans_190606_v1.pdfFOREMAN (CHECK BOX WHEN COMPLETED)
#1 Print Name ___________________________________ Date ______________
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Material VERIFIED and CHANGES noted on Paperwork.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
#1 Foreman's Signature _______________________________________________
and that all quality requirements are met.
Field Changes RED-LINED on As-built.
Total PRIMARY Cable noted on As-built.
Correct QC Checklist(s) reviewed.
OVERHEAD APPARATUS
"When performing planned work on a pole with an existing transformer or device, the Service
Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge
time.
If you are working on a pole with the pole ground connected with a hot tap, replace it. If the
transformer has split bolts on the secondary neutral or services, replace them. If the primary
neutral is connected with a hot tap, replace it. If the transformer bank has a 2-bolt connector on
the neutral bus, replace it.
#1 #2
#2 Print Name ___________________________________ Date ______________
#2 Foreman's Signature _______________________________________________
PSE GENERAL SPECIFICATIONS
General
- All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards
are available upon request.
- Work sites shall be kept clear of debris and all construction materials, equipment and
packing shall be removed daily.
- Return all unused and removed poles, transformers and hardware to PSE, storeroom. All
copper shall be coiled and returned the day it is removed from the poles. Remove all unused
pins and insulators.
- Return all Street lights, area lights and floodlights to Sumner yard.
- All fault indicators will be maintained in their current location on the 1/0 cables upon
completion of the job. If it is noted to remove any of the indicators they shall be returned to
local PSE first response department for re-issue.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a minimum
of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in red on
Foreman's copy of work sketch.
- Return one Foreman's copy of work sketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each
work day, or as otherwise instructed by the System Operator.
Traffic /Pedestrian control notes
- Utilize flagging and other vehicle traffic control as necessary and in conformance with local
traffic regulations.
-The uniform code of traffic control shall be adhered to at all times..
-Provide signs, barricades, and traffic control in conformance with local permit regulations.
-Provide route for pedestrians when working on or near sidewalks.
-Maintain traffic flow as required by permitting agency.
NOTE: Completely rebuild terminations. EXCEPTION: DO NOT REPLACE CUTOUTS
UNLESS THEY ARE THE OLDER "BOX TYPE" OR 50 AMP "TRIP LINK" TYPE CUTOUT.
REPLACE J-BOXES IF REQUIRED. UTILIZE FEED-THRU T.U.T.s AND REMOVE
J-BOXES IF POSSIBLE. REPLACE ALL TRANSFORMER JUMPERS WITH NEW 1/0
JACKETED CABLE.
UNDERGROUND CONSTRUCTION
Additional notes to standards.
-Erosion control must be placed before construction starts. Silt bags must be installed in
downstream catch basins.
Existing Utilities:
Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point
of crossing. Protect underground utilities during excavation. Use hand excavation methods if
necessary to avoid damage to existing utilities. Fabricate and install adequate temporary
structures to support and protect underground utilities while exposed during construction.
Maintain 6" minimum clearance at crossings between existing utilities and new duct
installations. Transition trench or tunnel profile gradually as required at crossings. Maintain
24" minimum separation between new trench or tunnel and parallel existing utilities or as
required by the permit agency.
Excavation
- Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of
36" of cover for primary conductors and 24" of cover for secondary conductors.
- Road crossings and all trenches within the Right-of-way shall be of sufficient depth to
provide a minimum of 36" of cover for all conductors or as required by the permitting Agency.
- No rocks larger than 6" shall be included in backfill.
- Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or
as required by the permitting Agency.
- Restore all excavated areas to original condition.
Vaults & Hand holes
- Refer to PSE standard 6775.0040 "Vault and Hand hole Installation"
- Vaults shall be placed level and 2" above final grade in landscaped areas and flush with
final grade when placed in hard surface areas.
- A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 "PVC Conduit Installation".
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be
plumbed directly to road crossing conduits.
- Install insulating caps on all unused primary bushings.
- Civil crew to install Conduit plug on each end until new cable to be installed.
- All "spare" conduits shall be capped at each end.
Surface Restoration
Restore ground surface to original contour and original condition or better. Restore asphalt
and concrete in accordance with requirements of local permitting agency. Cold patch or plate
trench when necessary. Leave area in its original state or better at the end of construction.
EXPOSED SOIL PROTECTION NOTES:
AREAS WHERE THE GRADING ACTIVITIES, BORE PIT EXCAVATION OR UTILITY POT HOLING,
WILL BE TEMPORARILY STABILIZED BY ONE OF THE FOLLOWING METHODS WHICH ARE
BASED ON PERIOD OF EXPOSED SOILS ARE LEFT UNWORKED.
-THERE WILL BE NO EXPOSED SOILS ON SITE DURING CONSTRUCTION.
ALL SPOILS FROM EXCAVATION WILL BE VAC EXCAVATED INTO THE TRUCK.
SCOPE OF WORK
The general scope of this project is to remediate primary 1/Ø cables within the project area by the most economic
means possible using replacement, or abandonment.
The project involves replacing existing electrical cables in new conduit.
Project type : Planned
Project location :
Number of Cables : 15
Cable Footage Estimated : 2,505'
Cable Numbers Injected : 0
Cable Numbers Repaired : 0
Cable Numbers Abandoned : 0
Cable Numbers Replaced : 18140, 18139, 18599, 18605, 18606, 18607, 30405, 30406, 30407, 18604, 18603,
18602, 18138, 20045, 20046
Trench Footage Estimated : 835'
There will be an advance notice provided by the contractor
24-hour advance notice of no parking in work areas. Access will be maintained to all residences and their
driveways. When work is occurring directly in front of driveways, the contractor will work with the residence to
manage access.
Traffic Revisions
Flagging crews will maintain one lane; flaggers will assist vehicles alternating through the roadway during work
hours.
For more information on the project
24-hour project information (888) 471-7339, (360) 825-5236
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
POTELCO DESIGN AND
Signature _________________________________________
Print Name _________________________________________
This design complies with PSE
Any/all variations have been
Design/Engineering Standards.
QUALITY ASSURANCE
pre-approved/documented by the
appropriate PSE Representative.
Date _________________
JOB SITE
JOB SITE
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
Trench Method:
CABLE REPLACEMENT
Approximate Trench Footage:Abandon Cable Segments:
Approximate New 3Ø pri. Cable Footage:Approximate 4" Poly Conduit Footage:
Replaced Cable Segments:
Vaults:
BORE680'015920'750'
0
ORDER#NOTIF#PROJECT PHASE
MAINTENENCE
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
11361547 101111604R1
N/A
108105976
VICINITY MAP
OVERHEAD CIRCUIT: MAP # .
SCALE 6" = 1 MILE
ABANDONING PRIMARY CABLES PSE std. 6825.6200
In a Vault if the cable is
______________________________________________________________________________________
In conduit, -Remove the cable
______________________________________________________________________________________
Not in conduit or it cannot be pulled out, -Cut the cable off approximately one foot
from the vault wall.
-When practical, attach the old cable
number to the cable stub.
______________________________________________________________________________________
In a Minipad hand hole
______________________________________________________________________________________
In conduit, -Remove the cable
______________________________________________________________________________________
Not in conduit or it cannot be pulled out, -Cut the cable off as much as practical
-When practical, attach the old cable number to
the cable stub.
-Stuff the tail into the bottom of the
handhole. Be sure the new cables are not
trapped by the old cables or the concentric
neutrals.
______________________________________________________________________________________
At Risers if the cable is
______________________________________________________________________________________
In Conduit -Remove Cable
______________________________________________________________________________________
Direct buried or it cannot be pulled out, -Cut off riser and old cable just below grade.
-Re-fill ground back to existing grade.
and the pole will remain. -Attach the old cable number to the cable stub.
______________________________________________________________________________________
DIRECT BURIED
Direct buried or it cannot be pulled out, -Remove the riser.
and the pole will be replaced -Cut off old cable just below grade.
-Re-fill ground back to existing grade.
______________________________________________________________________________________
The cable is direct buried or it cannot be -Cut off riser and old cable just below grade.
-Re-fill ground back to existing grade.
______________________________________________________________________________________
NOTE: If the pole is to be replaced, remove the abandoned riser and elbow, and stand off brackets
(unless they support other conduits).
NOTE: If the riser is made of transite material, it shall be removed following procedures in standard 0100.5000,
"Transite Pipe Removal and Disposal."
_______________________________________________________________________________________
-Remove (not abandon) aboveground transite riser when it is encountered in the field. Belowground transite may be left in
place and backfilled. (Transite is a mixture of asbestos and cement. It is nonmetallic, flame-retardant, and resistant
to moisture, low temperature, and corrosive agents).
-For removal use an approved certified abatement contractor. Call the Environmental Services Department 24-hour pager
(206-994-3186) to have a contractor dispatched.
Procedure to Abandon Primary Cables:
1. Call the Systems Operator to request a clearance.
2. Follow the directions to ensure the cable is de-energized, apply proper tags as specified in Standard Practice
0201.1011, "Switching and Clearances Handbook," and report back to the Systems Operator.
3. Obtain a clearance from the Systems Operator on the cable to be abandoned.
4. Cut the ends of the cable.
5. The cable number tag may be left on the abandoned cable.
NOTE: The cable number shall not be reused.
6. Call the Systems Operator and release the clearance.
7. Remove all "Danger Do Not Operate" tags.
8. The System Operator will then close the Incident Number (I-number).
Existing System:
Maintain existing electrical system in service until new system is complete, tested, and ready for service.
Disable existing system only to make cutovers and connections as directed by PSE System Operator.
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 09/19/18
C. TOBIN 253-548-4516 09/19/18
N/A N/A N/A
C. CHAVEZ 253-395-7045 09/19/18
REQ-CITY OF RENTON
GRA-16 MAPLE VALLEY R 2019 CRP
CABLE REMEDIATION PROGRAM
2003 MAPLE VALLEY HWY., RENTON, WA 98057
N/A N/A
N/A 101111604R1
AS NOTED 1 OF 4
KING N/A N/A QSEPRE
SE-17-23-5 N/A N/A
2305E068 2305E088 2305E068 GRA-16
3/14/19 C. CHAVEZ UPDATED VOL. DISTURBANCE TABLE
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY 101111604R12003 MAPLE VALLEY HWY., RENTON, WA 98057
SURFACE IMPROVEMENT AND RESTORATION
1) FOLLOWING FINAL GRADING ACTIVITY, SOD SHALL BE PLACED ON EXPOSED
SOIL TO PROVIDE PERMANENT AND IMMEDIATE EROSION PROTECTION.
2) TEMPORARY COLD MIX SHALL BE PLACED ON EXPOSED GRAVEL
IN HARD SURFACE FOR IMMEDIATE EROSION PROTECTION AND HOT MIX ASPHALT
WILL BE APPLIED AT FINAL RESTORATION TO PROVIDE PERMANENT EROSION
PROTECTION.
INDEX
PAGE 1 - GENERAL NOTES
PAGE 2 - SITE PLAN
PAGE 3 - CABLE & CONDUIT DIAGRAM
PAGE 4 - CIVIL SITE PLAN
Overflow
Filter fabric walls for
Catch Basin Grate
dewatering sedimentCollected Sediment
Catch Basin InsertMID 9995728
Filter fabric skirtSecured with grate.
Gravel Check Dam
6" Min
must be higher at sides
Gravel bags (MID 9995692)
than center.
EROSION CONTROL
NOT TO SCALE
2305E088
LEGEND
SINGLE PHASE, ONE WIRE/CABLE - 7.2 KV
THREE PHASE WIRE/CABLE - 12.5 KV
CABLE TERMINATION BUS (J-BOX)
NEW OVERHEAD TO UNDERGROUND CABLE
OVERHEAD TO UNDERGROUND CABLE TERM.
10T, 15T, 25T, 40T, 100T - INDICATES FUSE SIZE
TOTAL UNDERGROUND XFMR (T.U.T.)
NEW COMBINATION J-BOX/PADMOUNT XFMR
UNDERGROUND COMBINATION J-BOX/XFMR
N.T.S. = NOT TO SCALE
X.F.M.R. = TRANSFORMER
P.E. = POLYETHYLENE
ABBREVIATIONS
PRIMARY METERING
CABLE SPLICE
FAULT INDICATOR
WILL NOT PHASE (WNØ)
NORMAL OPEN (N.O.)
FUSED DISCONNECT:
SOLID BLADE DISCONNECT
HANDHOLE
PULL VAULT
UNDERGROUND SWITCH
UNDERGROUND J-BOX
NEW PADMOUNT XFMR
NEW UNDERGROUND XFMR
PAD MOUNT XFMR
ELECTRONIC MARKER
COMBINATION J-BOX/PADMOUNT XFMR
NEW UNDERGROUND COMBINATION J-BOX/XFMR
TERMINATION
CABLE TO REPLACE
PROPERTY LINE
RIGHT OF WAY
CENTERLINE
EASEMENT
CL
For contacts below dial 1-888-CALL PSE (225-5773)
Contact Information
PSE: PLANNER
355 110TH AVE NE
BELLEVUE, WA 98004
COLLEEN FEASEL
425-456-2295
Primary Power in DB120 Conduit (ROW)
Excavated Dirt Pile
ROADSIDE
Final Grade 24" Min
(ROW) 36" Min Cover
(PVT PROP)
30" Min - 36" Preferred
48"
Max
Backfill
(No rocks over 10" diameter)
3" Sand Bedding
12" Typical
TRENCH DETAIL
NOT TO SCALE
12" Min Sand Shading
- A 3" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.12"
MIN
48" MAX
36" MIN
EXISTING
PAVEMENT / SIDEWALK
VERTICAL SAW
CUT LINE
CRUSHED SURFACING
MATERIAL COMPACT
TO 95% MAX DENSITY.
EXCAVATION AND HARD RESTORATION DETAIL
NOT TO SCALE
12" MIN
Primary Cable(S)
3" Sand Bedding
12" Min Sand Shading
12" MIN
ASPHALT PATCH, 2" MIN
MATCH EXISTING
in Conduit
(ROW) 36" MIN
(PVT PROP)
30" MIN - 36" Preferred
2205
2003
2217
2205 2205
P#1723059087
M
A
P
L
E
V
A
L
L
E
Y
H
W
Y
(
P
A
V
E
D
)
M
A
P
L
E
V
A
L
L
E
Y
H
W
Y
(
P
A
V
E
D
)
M
A
P
L
E
V
A
L
L
E
Y
H
W
Y
(
P
A
V
E
D
)
100T
X1348
25T
X1141
25T
X1112
P#: 3955901420
P#:
1
7
2
3
0
5
9
1
4
0
2439
2447
2205
B
P
-
1
B
P
-
2
BP-3
BP-4
BP-5
BP-6
BP-7
BP
-
9
BP-8BORE ~ 70'B
O
R
E
~
1
0
5
'BORE ~ 15'BO
R
E
~
1
4
0
'
BO
R
E
~
1
3
5
'BORE ~ 60'BO
R
E
~
5
5
'
P#: 1723059103
P#: 1723059087
RIVIERA APARTMENTS ACRD (PAVED) RIVIERA APARTMENTS ACRD (PAVED)P#:
1
7
2
3
0
5
9
1
4
7
P#: 1723059101OPEN TRENCH ~ 10'OPEN TRENCH ~ 10'OPEN TRENCH ~ 10'EOP =24'
EOP =42'
PARKING
LOT
PARKING
LOT
EOP =53'
ROW =170'
EOP =52'
ROW =116'
℄
℄
℄
℄
℄
℄
℄
℄
℄
SITE PLAN
SCALE: 1:50
CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE
IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT
TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR
ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE
IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY."
CIRCUIT FEET REMOVED: 769'
CIRCUIT FEET ADDED: 750'
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
CABLE
REPLACED?FROM TO
18605 UNK P01 J01 139 YES
18606 10667387 P01 J01 139 YES
18607 UNK P01 J01 139 YES
30405 10625417 J01 V01 107 YES
30406 UNK J01 V01 107 YES
30407 UNK J01 V01 107 YES
18602 UNK P02 J02 74 YES
18603 UNK P02 J02 74 YES
18604 UNK P02 J02 74 YES
18140 UNK J02 J03 365 YES
18139 UNK J02 J03 365 YES
18599 UNK J02 J03 365 YES
20046 UNK P03 J03 84 YES
20045 UNK P03 J03 84 YES
18138 UNK P03 J03 84 YES
TOTAL CIRCUIT FEET 769'
WIRE CREW FOREMAN NOTE:
ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT LOCATION ON
1/0 CABLES AFTER NEW CABLE IS INSTALLED UNLESS OTHERWISE SPECIFIED.
PLEASE RED-MARK ALL FAULT INDICATORS ON "CABLE DIAGRAM" FOR MAPPING.
CIVIL CREW FOREMAN NOTE:
MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL WORK
DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT ALL TIMES TO A PUGET
SOUND ENERGY REPRESENTATIVE.
CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE RECORDED
CONTINUOUSLY ON THESE DRAWINGS. MARK ALL UNDERGROUND UTILITIES
ENCOUNTERED DURING CONSTRUCTION ON THESE DRAWINGS. FURNISH
PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS (FOREMAN'S
COPIES) AT THE END OF THE JOB.
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 09/19/18
C. TOBIN 253-548-4516 09/19/18
N/A N/A N/A
C. CHAVEZ 253-395-7045 09/19/18
REQ-CITY OF RENTON
GRA-16 MAPLE VALLEY R 2019 CRP
CABLE REMEDIATION PROGRAM
2003 MAPLE VALLEY HWY., RENTON, WA 98057
N/A N/A
N/A 101111604R1
AS NOTED 2 OF 4
KING N/A N/A QSEPRE
SE-17-23-5 N/A N/A
2305E068 2305E088 2305E068 GRA-16
3/14/19 C. CHAVEZ UPDATED VOL. DISTURBANCE TABLE
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY 101111604R1Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
SpaceRoad Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
TOP VIEWCONDUIT RISER REPLACEMENT DETAIL @ P01
NOT TO SCALE
FOREMAN NOTE:
CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7
BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE
TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS &
BODILY INJURY.
200-foot Shoreline Jurisdiction
Ordinary High Water Mark
100T
X1348
25T
X1141
25T
X1112582.4 lbs 583.3 lbs161.0 lbs 158.3 lbs161.0 lbs 158.3 lbs277.4 lbs 277.4 lbs373.3 lbs 326.6 lbsEHY168 - AØ
EHY169 - BØ
EHY170 - CØ
1-4" - L______'
EHY171 - AØ
EHY172 - BØ
EHY173 - CØ
1-4" - L______'
EHY180 - AØ
EHY181 - BØ
EHY182 - CØ
1-4" - L______'
2-4" - L______'
EHY177 - AØ
EHY178 - BØ
EHY179 - CØ
1-4" - L______'
EHY174 - AØ
EHY175 - BØ
EHY176 - CØ
1-4" - L______'
AEG612 - AØ
AEG613 - BØ
EXISTING TO
REMAIN
30443 - AØ
30442 - BØ
30441 - CØ
EXISTING
TO REMAIN
18600 - CØ
EXISTING
TO REMAIN
18141 - CØ
EXISTING
TO REMAIN
100T
X1348
25T
X1141
25T
X1112
AØ30407
BØ30406
CØ30405
AØ18607
BØ18606
CØ18605
AØ20046
BØ20045
CØ18138
AØ18604
BØ18603
CØ18602
AØ18140
BØ18139
CØ18599
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 09/19/18
C. TOBIN 253-548-4516 09/19/18
N/A N/A N/A
C. CHAVEZ 253-395-7045 09/19/18
REQ-CITY OF RENTON
GRA-16 MAPLE VALLEY R 2019 CRP
CABLE REMEDIATION PROGRAM
2003 MAPLE VALLEY HWY., RENTON, WA 98057
N/A N/A
N/A 101111604R1
AS NOTED 3 OF 4
KING N/A N/A QSEPRE
SE-17-23-5 N/A N/A
2305E068 2305E088 2305E068 GRA-16
3/14/19 C. CHAVEZ UPDATED VOL. DISTURBANCE TABLE
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY 101111604R1CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE
IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT
TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR
ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE
IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY."
WIRE CREW FOREMAN NOTE:
ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT LOCATION ON
1/0 CABLES AFTER NEW CABLE IS INSTALLED UNLESS OTHERWISE SPECIFIED.
PLEASE RED-MARK ALL FAULT INDICATORS ON "CABLE DIAGRAM" FOR MAPPING.
CIVIL CREW FOREMAN NOTE:
MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL WORK
DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT ALL TIMES TO A PUGET
SOUND ENERGY REPRESENTATIVE.
CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE RECORDED
CONTINUOUSLY ON THESE DRAWINGS. MARK ALL UNDERGROUND UTILITIES
ENCOUNTERED DURING CONSTRUCTION ON THESE DRAWINGS. FURNISH
PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS (FOREMAN'S
COPIES) AT THE END OF THE JOB.
CIVIL FOREMAN NOTE:
POTHOLING IS REQUIRED PRIOR TO DRILLING AND THE
BORE PROFILE SHALL BE PREPARED ON SITE AND PROVIDED
TO THE INSPECTOR FOR APPROVAL.
NEW CONDUIT SHALL BE AT 36" MINIMUM DEPTH TO THE
TOP AND MAINTAIN A MINIMUM 1-FOOT VERTICAL
CLEARANCE BETWEEN OUTER SURFACE OF EXISTING
STRUCTURE AND MINIMUM 5-FOOT HORIZONTAL
SEPARATION OF WATER MAIN, STORM DRAIN AND SEWER
STRUCTURE.
CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7 BEFORE
BEGINNING ANY EXCAVATION PREVENTS DAMAGE TO
UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS & BODILY
INJURY.
INSTALL CATCH BASIN INSERT ON ALL CB
WITH CONSTRUCTION ZONE.
VAULT & EQUIPMENT TABLE
SITE GRID
NUMBER VAULT SIZE & COVER TYPE & SIZE
EQUIPMENT IN VAULT
PRIMARY
BUSHINGS TRANSFORMER
ID NUMBERS
(COMPANY ID)REMARKS
LB DC
J01 317780
166473
EXISTING
JUNCTION BOX
J-BOX BELOW GRADE
W/ 3-4 POS. J-BUS
EXISTING
6 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
J02 317724
166548
EXISTING
JUNCTION BOX
J-BOX BELOW GRADE
W/ 3-4 POS. J-BUS
EXISTING
6 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
J03 317705
166574
EXISTING
JUNCTION BOX
J-BOX BELOW GRADE
W/ 3-4 POS. J-BUS
EXISTING
6 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
V01 317778
166462
EXISTING
VAULT
112.5kVA PM XFMR
120/208v
EXISTING
3 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
TOTALS : 21 -
PRIMARY CABLE & CONDUIT DIAGRAM
NOT TO SCALE
CIVIL CREW NOTE: ALL 4" - 90° BENDS MIN 60" RADIUS SCH-80 PVC
ALL 4" - 45° BENDS SCH-80 PVC
- ALL CONDUITS SHALL BE CAPPED AT EACH END UNTIL
CABLE IS INTALLED
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT PRIMARY CABLE REMARKS
FROM TO
SIZE
(in)QTY
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
TYPE BENDS PULL
(lbs)
PULL
REV
(lbs)
CABLE
SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
CABLE NUMBERS PLEASE RECORD FOREMAN - COMPLETE
DB120 POLY SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR
P01 J01 4 1 10 158.3 161.0
1/0 AL JKT 55 EHY168 EHY169 EHY170
J01 V01 4 1 225 582.4 583.3 1/0 AL JKT 240 EHY171 EHY172 EHY173
P02 J02 4 1 10 158.3 161.0
1/0 AL JKT 55 EHY174 EHY175 EHY176
J02 J03 4 1 360 277.4 277.4
1/0 AL JKT 380 EHY177 EHY178 EHY179
P03 J03 4 1 145 326.6 373.3
1/0 AL JKT 190 EHY180 EHY181 EHY182
TOTAL 4"750'TOTAL 3Ø 920'
QTS OF GLUE 2.3 GALS OF LUBE 4.7
SURFACE IMPROVEMENT AND RESTORATION
1) FOLLOWING FINAL GRADING ACTIVITY, SOD SHALL BE PLACED ON EXPOSED SOIL TO
PROVIDE PERMANENT AND IMMEDIATE EROSION PROTECTION.
2) TEMPORARY COLD MIX SHALL BE PLACED ON EXPOSED GRAVEL
IN HARD SURFACE FOR IMMEDIATE EROSION PROTECTION AND HOT MIX ASPHALT WILL
BE APPLIED AT FINAL RESTORATION TO PROVIDE PERMANENT EROSION PROTECTION.
2"/4" POLY
Electric Cable in Conduit
Final Grade
24" Typical
(6" Min)
36" Min
Cover
Backfill shall not damage the conduit.
Backfill w/
while directional drilling
36" Min
Depth
Final Grade
24" Typical
(6" Min)8' Longcrushed rock 5/8 minus
PLAN VIEWTYPICAL BORE COVER
Will maintain 36" Min. depth
BORE PIT DETAIL
NOT TO SCALE
BORE PIT
POT HOLE
*NOTE:BORE PITS, TRENCH HATCHING & POTHOLES ARE NOT
SHOWN TO SCALE FOR VISUAL PURPOSES. PLEASE SEE BORE
PIT DETAIL FOR TYP. BORE PIT & TRENCH DIMENSIONS.
4" Min Sand Shading
2" Sand Bedding
VOLUME OF DISTURBANCE TABLE
TYPE DESCRIPTION SIZE (FT)REM CU YD
(APPX)
GRAVEL FILL
CU YD (APPX)
TYPE OF SURFACE REMARKS
BP-1 BORE PIT 2 X 8 1.8 1.8 HARD
BP-2 BORE PIT 2 X 8 1.8 1.8 HARD
BP-3 BORE PIT 2 X 8 1.8 1.8 HARD
BP-4 BORE PIT 2 X 8 1.8 1.8 HARD
BP-5 BORE PIT 2 X 8 1.8 1.8 HARD
BP-6 BORE PIT 2 X 8 1.8 1.8 HARD
BP-7 BORE PIT 2 X 8 1.8 1.8 HARD
BP-8 BORE PIT 2 X 14 3.1 3.1 HARD
BP-9 BORE PIT 2 X 8 1.8 1.8 HARD
OPEN TRENCH ROW 1 X 15 1.7 1.7 SOFT
OPEN TRENCH PVT PROP 1 X 10 1.1 1.1 HARD
OPEN TRENCH PVT PROP 1 X 5 0.6 0.6 SOFT
TOTAL CU YDS (APPX)20.7 20.7
EXISTING UNDERGROUND MAP: # .
SCALE: 1:100
2305E068
CONSTRUCTION NOTES
P01
-CUT OFF 1- 4" L _____' RISER JUST BELOW GRADE
-CUT OFF BARE CONCENTRIC CABLE L_____' JUST BELOW GRADE
-REFILL GROUND BACK TO GRADE
-REMOVE OLD C/O & TERM
-INST 3Ø LI C/O TERM F:100T STD 6043.1000 (TSU3L1F)
-INST 1-4" L_____' RISER ON STAND-OFF BRKTS STD 6042.1000 (RIS4CSS)
-INST SW# X1348
CONSTRUCTION NOTES
P02
-CUT OFF 1- 4" L _____' RISER JUST BELOW GRADE
-CUT OFF BARE CONCENTRIC CABLE L_____' JUST BELOW GRADE
-REFILL GROUND BACK TO GRADE
-REMOVE OLD C/O & TERM
-INST 3Ø LB C/O TERM F:25T STD 6043.1000 (TSU3C1F)
-INST 1-4" L_____' RISER ON STAND-OFF BRKTS STD 6042.1000 (RIS4CSS)
-INST SW# X1141
CONSTRUCTION NOTES
P03
-CUT OFF 1- 4" L _____' RISER JUST BELOW GRADE
-CUT OFF BARE CONCENTRIC CABLE L_____' JUST BELOW GRADE
-REFILL GROUND BACK TO GRADE
-REMOVE OLD C/O & TERM
-INST 3Ø LB C/O TERM F:25T STD 6043.1000 (UTSU3C1)
-INST 1-4" L_____' RISER ON STAND-OFF BRKTS STD 6042.1000 (RIS4CSS)
-INST SW# X1112
2205
2003
2217
2205 2205
P#1723059087
M
A
P
L
E
V
A
L
L
E
Y
H
W
Y
(
P
A
V
E
D
)
M
A
P
L
E
V
A
L
L
E
Y
H
W
Y
(
P
A
V
E
D
)
M
A
P
L
E
V
A
L
L
E
Y
H
W
Y
(
P
A
V
E
D
)
100T
X1348
25T
X1141
25T
X1112
P#: 3955901420
P#:
1
7
2
3
0
5
9
1
4
0
2439
2447
2205
P#: 1723059103
P#: 1723059087
RIVIERA APARTMENTS ACRD (PAVED) RIVIERA APARTMENTS ACRD (PAVED)P#:
1
7
2
3
0
5
9
1
4
7
P#: 1723059101
PARKING
LOT
PARKING
LOT
℄
℄
℄
℄
℄
℄
℄
℄
℄
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 09/19/18
C. TOBIN 253-548-4516 09/19/18
N/A N/A N/A
C. CHAVEZ 253-395-7045 09/19/18
REQ-CITY OF RENTON
GRA-16 MAPLE VALLEY R 2019 CRP
CABLE REMEDIATION PROGRAM
2003 MAPLE VALLEY HWY., RENTON, WA 98057
N/A N/A
N/A 101111604R1
AS NOTED 4 OF 4
KING N/A N/A QSEPRE
SE-17-23-5 N/A N/A
2305E068 2305E088 2305E068 GRA-16
3/14/19 C. CHAVEZ UPDATED VOL. DISTURBANCE TABLE
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY
CIVIL SITE DETAILED PLAN
SCALE: 1:50
EXISTING WATER
EXISTING POWER
EXISTING TELEPHONE
EXISTING GAS
EXISTING STORM DRAIN
EXISTING SEWER
LEGEND
EXISTING FIBER OPTIC
STREET CENTER LINECL
RIGHT OF WAY
CABLE TO REPLACE
BORE PIT
BORE PIT"BP"-
- --
SCALE: 1"=___'
NEW J-BOX VAULT
PROPERTY LINE
EASEMENT
POT HOLE
101111604R1CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE
IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT
TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR
ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE
IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY."
WIRE CREW FOREMAN NOTE:
ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT LOCATION ON
1/0 CABLES AFTER NEW CABLE IS INSTALLED UNLESS OTHERWISE SPECIFIED.
PLEASE RED-MARK ALL FAULT INDICATORS ON "CABLE DIAGRAM" FOR MAPPING.
CIVIL CREW FOREMAN NOTE:
MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL WORK
DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT ALL TIMES TO A PUGET
SOUND ENERGY REPRESENTATIVE.
CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE RECORDED
CONTINUOUSLY ON THESE DRAWINGS. MARK ALL UNDERGROUND UTILITIES
ENCOUNTERED DURING CONSTRUCTION ON THESE DRAWINGS. FURNISH
PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS (FOREMAN'S
COPIES) AT THE END OF THE JOB.
100T
X1348
25T
X1141
25T
X1112
AØ30407
BØ30406
CØ30405
AØ18607
BØ18606
CØ18605
AØ20046
BØ20045
CØ18138
AØ18604
BØ18603
CØ18602
AØ18140
BØ18139
CØ18599
FOREMAN MAP: U MAP # / UG MAP # .
SCALE: 1" = 100'
2305E068 2305E068