Loading...
HomeMy WebLinkAboutAdmin Report CITY OF EXECUTIVE DEPARTMENT 1_���,,,,....�Rent 11 � 0 M E M O R A N D U M DATE: April 3, 2017 TO: Armondo Pavone, Council President Members of the Renton City Council FROM: Denis Law, Mayor Jay Covington, Chief Administrative Officer SUBJECT: Administrative Report • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.�ov/trafficimpacts. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations: ✓ Monday,April 3rd through Friday,April 7th. Frequent ramp and lane closures and restrictions related to the I-405/SR 167 Interchange Direct Connector Project are in effect. More detailed information about upcoming lane and on-ramp restrictions and closures is available tonight on the back table. ✓ Monday, April 3rd through approximately Tuesday, April 25th. The northbound I-405 on-ramp improvements at NE 30th Street and NE 44th Street project is not yet complete. Construction crews will be on site conducting work in preparation of repaving the affected lanes. More detailed information about upcoming lane closures and restrictions is available tonight on the back table. Questions may be directed to WSDOT Project Manager Mike Askarian at 206-768-5861 or the 24-hour project hotline at 206-440-4368 or visit the project website at http://www.wsdot.wa.�ov/news/2016/11/02/northbound-i-405-ramp-widenin�- proiect-renton-will-brin�-relief-city-streets. ✓ Monday,April 3rd through Friday, April 7th,8:30 a.m.to 3:30 p.m. Intermittent lane closures at Lake Washington Blvd just north of Houser Way North/Gene Coulon Park due to utility installation and possible road restoration. Questions may be directed to Brad Stocco at 425-282-2373. ✓ Monday, April 3rd through Friday,April 7th, 8:30 a.m. to 3:30 p.m. Impacts to intersection at South 43rd Street and Talbot Road South due to hauling activity from the Valley Medical Center Improvements. Questions may be directed to Tom Main at 206- 999-1833. ✓ Monday,April 3rd through Friday, April 7th,8:30 a.m.to 3:30 p.m. Single lane closures along with alternating traffic due to grinding and asphalt overlay of the roadway for the 116th Avenue SE Sidewalk project. Questions can be directed to Flora Lee at 425-430- 7303 or Todd Freih at 206-999-1832. Armondo Pavone, Council President Members of Renton City Council Page 2 April 3, 2017 ✓ Monday, April 3rd through Friday,April 7th, 8:30 a.m. to 3:30 p.m. Intermittent lane closures due to road construction for the 2nd and Main Capital Improvement Project. Questions can be directed to Keith Wooley at 425-430-7318 or Mark Wetherbee at 206- 999-1829. ✓ Monday, April 3rd through Sunday, April 9th. Road Closure on South 14th Street between Smithers Avenue South through Davis Avenue South for utility construction. Open to local access only. Questions may be directed to Patrick DeCaro at 425-207- 6013. ✓ Monday, April 3rd through Sunday, April 9th. The two west lanes on Main Street between 2nd and 3rd will be closed for project improvements while the east lanes will be open for traffic flow. The on-site inspector is Todd Freih, 206-999-1832. ✓ Monday, April 3rd through approximately Friday, June 30th. South 2nd Street, east of and adjacent to the intersection of Main Avenue South and South 2nd Street, is tentatively scheduled to close beginning Monday, April 3rd for a period not to exceed two months. A map showing alternative routes through this area is available tonight on the back table. ✓ Monday, April 10th through approximately Friday, July 14th. The intersection of NE 10th Street and Harrington Avenue NE will be closed to accommodate construction of the Sunset Neighborhood Park and surrounding area. A map showing alternative routes through this area is available tonight on the back table. ✓ Monday, April 3rd through approximately Friday,July 28th. Complete road closure of Harrington Avenue NE, Sunset Lane NE, and Glennwood Avenue NE for approximately one year to accommodate the Sunset Lane NE Roadway Improvements Project. Detours are in place. Questions may be directed to Keith Woolley at 425-430-7318. ✓ Monday, April 3rd through Friday, September 29th. Full road closure on Harrington between Sunset Lane NE and Harrington Avenue NE as well as a full road closure on Harrington Avenue NE between NE 10th Street and Sunset Lane NE will be in place as part of the Sunset Lane Capital Improvement Project. Questions can be directed to Keith Wooley at 425-430-7318 or Mark Wetherbee at 206-999-1829.