HomeMy WebLinkAboutR-405604GENERAL NOTES:
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST
EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS. A SET OF
APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION.
2. ALL WORK THAT MAY IMPACT UTILITIES, INCLUDING BUT NOT LIMITED TO
SAWCUTTING, DEMOLITION, POTHOLING, AND TRENCHING, SHALL BE SUBJECT TO
THE BOEING SHUTDOWN COMMITTEE PROCESS PRIOR TO ANY SITEWORK. CONTACT
CONSTRUCTION MANAGER FOR SPECIFIC REQUIREMENTS. THE HOURS OF WORK IN
THE STREET RIGHT-OF-WAY OR AIRPORT TAXIWAYS SHALL BE COORDINATED WITH
RENTON AIRPORT MANAGER AND BE LIMITED TO 8:30 AM TO 3:30 PM ON
WEEKDAYS, UNLESS OTHERWISE APPROVED IN WRITING BY THE AIRPORT MANAGER
(425) 430-7471 AND DEPARTMENT OF PUBLIC WORKS AT (425) 430-7394. ALL
STREETS CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE BOEING
SHUTDOWN COMMITTEE, RENTON AIRPORT MANAGER, AND DEPARTMENT OF PUBLIC
WORKS A MINIMUM OF 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, BOEING
AND RENTON FIRE DEPARTMENTS, AND 911 SHALL BE NOTIFIED 24 HOURS IN
ADVANCE.
3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION
SO AS TO AVOID DAMAGE OR DISTURBANCE. CONTRACTOR SHALL PROVIDE ALL
FIELD UTILITY LOCATION SERVICES AND VERIFY ALL UTILITY LOCATIONS WITH THE
PROPER BOEING FACILITIES PERSONNEL PRIOR TO THE START OF EXCAVATION
WORK. FOR WORK LOCATED ON THE CITY OF RENTON PROPERTY, THE
CONTRACTOR SHALL CONTACT UTILITY LOCATE AT 1-800-424-5555.
4. A PRECONSTRUCTION CONFERENCE IS REQUIRED PRIOR TO ANY CONSTRUCTION. A
MINIMUM OF 3 (THREE) WORKING DAYS NOTICE IS REQUIRED FOR SCHEDULING.
PRIOR TO SCHEDULING THE PRECON, A PERMIT INFORMATION SHEET MUST BE
SUPPLIED TO THE UTILITY ENGINEER'S OFFICE. 24 HOUR NOTICE WILL BE
REQUIRED PRIOR TO STARTING NEW CONSTRUCTION.
5. THE CONTRACTOR SHALL COORDINATE WITH BOEING TO VERIFY THAT ALL
APPLICABLE LOCAL, STATE AND FEDERAL PERMITS HAVE BEEN OBTAINED PRIOR TO
CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY AND ALL
PERMITS UNLESS OTHERWISE DIRECTED BOEING.
6. THE CONTRACTOR SHALL PREPARE AND HAVE APPROVED ALL REQUIRED TRAFFIC
CONTROL PLANS PRIOR TO IMPLEMENTING ANY TRAFFIC CONTROL. THE
CONTRACTOR SHALL COORDINATE WITH BOEING REPRESENTATIVE FOR ALL TRAFFIC
CONTROL REQUIREMENTS WITHIN BOEING PROPERTY, TRAFFIC CONTROL REQUIRED
ON AIRPORT PROPERTY OR WITHIN CITY RIGHT OF WAY SHALL BE SUBMITTED AND
APPROVED BY THE AIRPORT AND CITY OF RENTON PRIOR TO IMPLEMENTATION.
7. CONTRACTOR IS TO HAVE UTILITY LOCATOR SERVICE LOCATE UTILITIES AND SHOW
THEM ON CONSTRUCTION DRAWINGS FOR REVIEW AND APPROVAL BY RENTON
FACILITIES SHUTDOWN COMMITTEE PRIOR TO SAWCUTTING AND EXCAVATION.
8. ALL UNDERGROUND PIPING SHALL BE IDENTIFIED BY THE USE OF SURFACE
LOCATED MARKERS, PER TYPICAL DETAIL ON SHEET C502. MARKERS SHALL BE
LOCATED AT MAXIMUM INTERVALS OF 150 FT, AT ALL CHANGES OF DIRECTION,
WITHIN 5 FT OF A WALL, AT ALL MANHOLES AND VALVE BOXES, AND ADJACENT TO
ROADS. MARKERS SHOULD INDICATE SERVICE, PIPE SIZE, DIRECTION OF FLOW,
PIPE MATERIAL AND PIPE DEPTH. MARKER INSTALLATION LOCATIONS SHALL BE
INDICATED ON THE CONTRACTOR PROVIDED AS -BUILT INFORMATION IN THE FORM
OF RED -MARKED DRAWINGS.
9. EXISTING MONITORING WELLS SHALL BE PROTECTED UNLESS NOTED ON THE
DRAWINGS. DO NOT DISTURB MONITORING WELLS WITHOUT WRITTEN DIRECTION
FROM BOEING ENVIRONMENTAL, HEALTH AND SAFETY (EHS). DISTURBED WELLS
SHALL BE REPLACED AT THE DIRECTION OF BOEING PROJECT REPRESENTATIVE.
ALL WELLS THAT WILL BE DISTURBED SHALL BE ABANDONED BY BOEING (EHS).
TWO WEEKS NOTICE SHALL BE GIVEN TO BOEING (EHS) PRIOR TO DISTURBING THE
WELL.
BOEING EROSION CONTROL NOTES.--
1. EROSION CONTROL MEASURES SHOWN ON THE PLANS ARE CONSIDERED AN ABSOLUTE
MINIMUM, AND CONTRACTOR SHALL BE REQUIRED TO PROVIDE ADDITIONAL EROSION
CONTROL MEASURES AS NEEDED. IN ADDITION TO MEASURES SHOWN, CONTRACTOR
SHALL COVER DIRT PILES AND MAY REQUIRE BAKER TANK(S) FOR GROUND WATER.
2. ON -SITE EROSION MEASURES AND STORM WATER POLLUTION PREVENTION SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR. ANY PROBLEMS OCCURRING BEFORE FINAL
ACCEPTANCE OF THE STORM SEWER BY THE OWNER SHALL BE CORRECTED BY THE
CONTRACTOR.
3. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHOWN ON THESE DRAWINGS
SHALL BE INSTALLED PRIOR TO OR AS THE FIRST STAGE OF SITE PREPARATION.
4. SHOULD THE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS SHOWN
IN THE DRAWINGS OR SPECIFIED IN THE NOTES NOT PROVE ADEQUATE TO CONTROL
EROSION AND SEDIMENTATION, THE CONTRACTOR SHALL INSTALL SILT FENCE OR
ADDITIONAL FACILITIES AS NECESSARY TO PROTECT ADJACENT PROPERTIES, SENSITIVE
AREAS, NATURAL WATER COURSES AND/OR STORM DRAINAGE SYSTEMS.
5. ALL NECESSARY FACILITIES SHALL BE MAINTAINED ON -SITE TO PREVENT DEBRIS, DUST
AND MUD FROM ACCUMULATING ON THE PUBLIC RIGHT-OF-WAY AND BOEING PROPERTY.
6. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE SITE'S
CONSTRUCTION STORMWATER GENERAL PERMIT OR FOR CONSTRUCTION PROJECTS LESS
THAN AN ACRE THE SITE'S INDUSTRIAL STORMWATER GENERAL PERMIT.
7. THE CONTRACTOR SHALL COORDINATE WITH BOEING EHS ON WHO WILL OBTAIN ANY
REQUIRED STORMWATER SAMPLES.
8. THE CONTRACTOR SHALL COMPLETE AN EROSION CONTROL CHECKLIST, CAREFULLY
REVIEW IT, AND MAINTAIN ALL STORMWATER POLLUTION PREVENTION MEASURES DAILY.
BOEING EROSION CONTROL NOTES (CONTINUED):
9. CONTRACTOR SHALL PROVIDE A CERTIFIED EROSION AND SEDIMENT CONTROL LEAD
(CESCL) TO MANAGE IMPLEMENTATION OF STORMWATER CONSTRUCTION PERMIT (IF
APPLICABLE), INCLUDING INSPECTIONS, SAMPLING (COORDINATED WITH BOEING) AND BMP
MANAGEMENT.
10. CONTRACTOR SHALL BE REQUIRED TO PREPARE FOREIGN OBJECT DEBRIS (FOD) PLAN.
11. CONTRACTOR TO COORDINATE WITH BOEING FOR DISPOSITION OF EXCAVATED DIRT.
12. CONTRACTOR SHALL COORDINATE DEWATERING WITH BOEING AND CITY OF RENTON.
STOCKPILE NOTES:
1. STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER
APPROVED DEVICE) DAILY BETWEEN NOVEMBER 1 AND MARCH 31.
CB PROTECTION NOTES:
1. CATCH BASIN INSERTS SHALL BE PROVIDED IN THE CATCH BASINS TRIBUTARY TO AREA
WHERE CONTRACTORS CONSTRUCTION ACTIVITIES OCCUR.
2. CATCH BASIN INSERTS SHALL BE REMOVED FOLLOWING COMPLETION OF CONSTRUCTION
AND STABILIZATION OF ALL CLEARED AREAS.
POLLUTION PREVENTION NOTES:
1. PREVENT OIL AND FUELS FROM ENTERING THE STORM DRAINAGE SYSTEM WITH PROPER CONTAINMENT
DEVICES.
2. SWEEP DIRT FROM PAVING DAILY OR AS NEEDED. THE INTENT IS TO PREVENT DIRT AND DEBRIS FROM
VEHICLES AND EQUIPMENT FROM BEING DEPOSITED ON BOEING OWNED STREET AND CITY STREET PAVEMENT.
3. THE CONTRACTOR SHALL PREVENT ALL MATERIAL USED OR GENERATED ON -SITE FROM ENTERING THE STORM
DRAINAGE SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE CONTAINMENT/SEPARATION
AT ALL TIMES. ALL STORMWATER POLLUTION PREVENTION MEASURES SHALL BE COORDINATED WITH
ENVIRONMENTAL ENGINEERING TO ENSURE COMPLIANCE WITH APPLICABLE STORMWATER PERMITS.
4. THE CONTRACTOR SHALL CONDUCT DAILY STORMWATER/ENVIRONMENTAL INSPECTION OF THE CONSTRUCTION
SITE. SCOPE OF THE INSPECTION WILL BE COORDINATED WITH SITE ENVIRONMENTAL ENGINEERING.
CONSTRUCTION DEWATERING:
IF NEEDED THE CONTRACTOR SHALL PREPARE AND SUBMIT A DEWATERING PLAN TO THE CITY OF RENTON
PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES. WORK SHALL NOT COMMENCE UNTIL THE PLAN IS
APPROVED BY THE CITY.
SHOULD DEWATERING OF EXCAVATION BECOME NECESSARY, CONTRACTOR SHALL PROVIDE DEWATERING PLAN,
LABOR AND EQUIPMENT. COORDINATE DEWATERING WITH OWNER AND THEIR GEOTECHNICAL ENGINEER.
BOEING SHALL TEST GROUNDWATER FOR CONTAMINANTS AND PROVIDE DIRECTION FOR DEWATERING.
UNCONTAMINATED GROUNDWATER/STORMWATER WATER LESS THAN 25,000 GALLONS PER DAY MAY BE
DISCHARGED TO THE SANITARY SEWER UNDER BOEING WASTE DISCHARGE PERMIT 7630 IF APPROVED BY
BOEING ENVIRONMENTAL ENGINEERING. INITIAL AND DAILY SAMPLING WILL BE REQUIRED. DISCHARGES
DIRECTLY INTO THE MUNICIPAL SEWER SYSTEM REQUIRE ADDITIONAL PERMITTING THROUGH THE CITY OF
RENTON.
DEWATERING VOLUMES GREATER THAN 25,000 GALLONS PER DAY WILL BE DISCHARGED AS FOLLOWS:
a) UNCONTAMINATED WATER WILL BE TREATED THROUGH A CHITOSAN SYSTEM AND DISCHARGED TO THE
STORM SEWER. BOEING WILL WORK WITH THE CONTRACTOR TO OBTAIN THE APPROPRIATE ECOLOGY
APPROVAL TO DISCHARGE INTO THE STORM SEWER SYSTEM.
b) CONTAMINATED WATER WILL BE TREATED DEPENDING ON CONTAMINANTS AND DISCHARGED TO THE
SANITARY SEWER SYSTEM. A WASTE DISCHARGE AUTHORIZATION WILL BE OBTAINED BY BOEING
ENVIRONMENTAL ENGINEERING FOR THIS TYPE OF DISCHARGE. 4-6 WEEKS ARE NECESSARY TO
OBTAIN THIS PERMIT.
THESE SYSTEMS WILL BE THE CONTRACTORS RESPONSIBILITY TO MAINTAIN AND OPERATE.
IN rrCr M ;D1.IAN L; F Vyl 1 A CITY OF RENTON $TANE)ARE)$
OPMENT ENGINEERINGir
E
04/26/2019
WATER UTILITY NOTES AND SPECIFICATIONS:-
1. ALL WORK MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE
CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE
WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON
IN THE RENTON STANDARD PLANS & SPECIFICATIONS. A SET OF APPROVED PLANS SHALL BE KEPT
ON SITE AT ALL TIMES DURING CONSTRUCTION.
2. NOT APPLICABLE.
3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID
DAMAGE OR DISTURBANCE. FOR UTILITY LOCATES CALL 48-HOUR LOCATORS 800-424-5555.
4. NOT APPLICABLE.
5. NOT APPLICABLE.
6. ALL WATERMAIN PIPE IS TO BE CEMENT LINED DUCTILE IRON PIPE CONFORMING TO AWWA Cl 10
AND Cl 11 OR LATEST REVISION, THICKNESS CLASS 52. CEMENT MORTAR LINING AND SEAL COATING
SHALL CONFORM TO AWWA C104 OR LATEST REVISION. PIPE JOINTS TO BE PUSH -ON OR
MECHANICAL JOINT. BEDDING TO BE CLASS C. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE
POLYETHYLENE WRAPPED PER ANSI/AWWA C105/A21.5-93 STANDARDS.
7. CAST IRON AND DUCTILE IRON FITTINGS SHALL BE CEMENT LINED, PRESSURE RATED AS NOTED ON
PLANS, AND IN ACCORDANCE WITH ANSI/AWWA C110/A21.10-87. CEMENT LINING SHALL BE IN
ACCORDANCE WITH ANSI/AWWA C104/421/4-90. IF FITTINGS ARE 3 TO 12 INCHES IN DIAMETER AND
HAVE MECHANICAL JOINTS, THE FITTINGS SHALL IN ACCORDANCE WITH EITHER ANSI/AWWA
C110-A21.10-87 OR ANSI/AWWA C153/A21.53-94. THREE (3) INCH TO 12 INCH DIAMETER FITTINGS,
WHICH HAVE MECHANICAL JOINTS AND/OR FLANGED JOINTS, SHALL BE IN ACCORDANCE WITH
ANSI/AWWA C110/A21.10.87 OR A COMBINATION OF ANSI/AWWA C110/A21.10.87 AND ANSI/AWWA
C153/A21.53-94 SUCH THAT THE PORTION OF THE FITTING WITH A MECHANICAL JOINTS) MAY BE
WITH ANSI/AWWA C153/A21.53-94 AND THAT PORTION OF THE FITTING WITH FLANGED JOINTS)
SHALL BE IN ACCORDANCE WITH AWWA C110/A21.10-87. ACCEPTANCE TESTING IN ACCORDANCE WITH
SECTION 53.53 OF ANSI/AWWA SECTION 10-4.3 OF ANSI/AWWA C110/A21.10-87 SHALL BE
OBTAINED BY THE CONTRACTOR AND TRANSMITTED TO THE OWNER.
8. GATE VALVES SHALL BE IRON BODY, BRONZED -MOUNTED, DOUBLE DISC WITH BRONZE WEDGING
DEVICE AND 0-RING STUFFING BOX (AWWA C500) OR OF RESILIENT SEATED TYPE (AWWA C509).
VALVES SHALL BE DESIGNED FOR A MINIMUM WATER OPERATING PRESSURE OF 200 PSI. GATE
VALVES SHALL BE CLOW LIST 14, MUELLER COMPANY NO. A2380 OR M & H.
9. FIRE HYDRANTS SHALL BE COREY TYPE (OPENING WITH THE PRESSURE) OR COMPRESSION TYPE
(OPENING AGAINST PRESSURE) CONFORMING TO AWWA C-502-85 WITH A 6 INCH MECHANICAL JOINT
INLET AND A MAIN VALVE OPENING (M.V.O.) OF 5-1/4 INCH, TWO 2-1/2 INCH HOSE NOZZLES WITH
NATIONAL STANDARD THREADS 7-1/2 THREADS PER INCH AND ONE 4 INCH PUMPER NOZZLE WITH
THE NEW SEATTLE PATTERN 6 THREADS PER INCH, 60 DEGREES V. THREADS: OUTSIDE DIAMETER OF
MALE THREAD 4.875 AND ROOT DIAMETER 4.6263. HYDRANTS SHALL HAVE A 1-1/4 INCH PENTAGON
OPERATING NUT OPENED BY TURNING COUNTER CLOCKWISE (LEFT).
10. THE TWO 2-1/2 INCH HOSE NOZZLES SHALL BE FITTED WITH CAST IRON THREADED CAPS WITH
OPERATING NUT OF THE SAME DESIGN AND PROPORTIONS AS THE HYDRANT STEM NUT. CAPS SHALL
BE FITTED WITH SUITABLE NEOPRENE GASKETS FOR POSITIVE WATER TIGHTNESS UNDER TEST
PRESSURES.
11. THE 4 INCH PUMPER NOZZLE SHALL BE FITTED WITH A STORZ ADAPTER, 4 INCH SEATTLE THREAD X
5 INCH STORZ. STORZ ADAPTER SHALL BE FORGED AND/OR EXTRUDED 6061-T6 ALUMINUM ALLOY,
HARDCOAT ANODIZED. THREADED END PORTION SHALL HAVE NO LUGS AND TWO SET SCREWS 180
DEGREES APART. STORZ FACE TO BE METAL, NO GASKET TO WEATHER. STORZ CAP TO HAVE
SYNTHETIC MOLDED RUBBER GASKET, AND SHALL BE ATTACHED TO HYDRANT ADAPTER WITH 1 /8
INCH, COATED, STAINLESS STEEL, AIRCRAFT CABLE.
12. FIRE HYDRANTS SHALL BE PAINTED WITH TWO COATS OF PAINT. PRESERVATIVE PAINT NUMBER 43-
655 SAFETY YELLOW OR APPROVED EQUAL.
13. PUMPER CONNECTION TO FACE ROADWAY ASSEMBLY.
SANITARY SEWER NOTES AND SPECIFICATIONS:
ALL WORK AND WORK MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SPECIFICATIONS OF THE CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT AND THE
LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED
BY THE CITY OF RENTON IN THE RENTON STANDARD PLANS & SPECIFICATIONS. A SET OF
APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION.
1. NOT APPLICABLE.
2. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID
DAMAGE OR DISTURBANCE.
3. A PRE -CONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO
STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL
NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY
A REPRESENTATIVE OF THE CITY OF RENTON.) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
NOTIFY THE PUBLIC WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL
CONSTRUCTION.
4. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE.
14. FIRE HYDRANTS SHALL BE INSTALLED PER CITY OF RENTON STANDARD DETAIL FOR FIRE HYDRANTS,
LATEST REVISION.
15. ALL WATERMAINS 10 INCHES AND SMALLER TO MAINTAIN A MINIMUM COVER OF 36 INCHES BELOW
FINISH GRADE. ALL WATERMAIN 12 INCHES AND LARGER SHALL BE AT A MINIMUM OF 48 INCHES
BELOW FINISH GRADE. WHERE UTILITY CONFLICTS OCCUR, WATERMAINS ARE TO BE LOWERED TO
CLEAR.
16. ALL WATERMAINS 6 INCHES AND LARGER IN DIAMETER SHALL BE CLEANED WITH PIPE CLEANING
"PIGS" PRIOR TO DISINFECTION. THE "POLY PIGS" SHALL BE GIRARD INDUSTRIES AQUA SWAB -AS OR
APPROVED EQUAL, 2 LB/CU. FT. DENSITY FOAM WITH 90A DUROMETER URETHANE RUBBER COATING
ON THE REAR OF "PIG" ONLY.
17. "PIGS" SHALL BE CYLINDER SHAPED WITH BULLET NOSE OR SQUARE END. THE CONTRACTOR WILL
PERFORM THE CLEANING OPERATION.
18. ALL WATERMAINS AND SERVICES SHALL BE PRESSURE TESTED TO A MINIMUM OF 200 PSI OR 150
PSI OVER OPERATING PRESSURE, IN ACCORDANCE WITH THE SPECIFICATIONS OF THE CITY OF RENTON
AND THE WASHINGTON STATE HEALTH DEPARTMENT. ALL PRESSURE TESTING SHALL BE DONE IN THE
PRESENCE OF A REPRESENTATIVE OF THE CITY OF RENTON. THE QUANTITY OF WATER LOST FROM
THE MAIN SHALL NOT EXCEED THE NUMBER OF GALLONS PER HOUR AS LISTED IN CITY OF RENTON
STANDARD PLANS & SPECIFICATIONS 7-11.3(11). THE LOSS IN PRESSURE SHALL NOT EXCEED 5 PSI
DURING THE 2 HOUR TEST PERIOD.
19. ALL WATERMAINS AND SERVICES SHALL BE DISINFECTED BY THE INJECTION OF A 50 PPM (MINIMUM
CONCENTRATION) CHLORINE/WATER SOLUTION. DRY CALCIUM HYPOCHLORITE SHALL NOT BE PLACED IN
THE PIPE AS LAID. CHLORINE SHALL BE METERED/INJECTED IN ACCORDANCE WITH SECTION 7-
11.3(12)E OR 7-11.3(12)F OF THE STANDARD SPECIFICATIONS REFERENCED ABOVE.
20. A PRE -CONSTRUCTION CONFERENCE IS REQUIRED PRIOR TO ANY CONSTRUCTION. A MINIMUM OF FIVE
(5) WORKING DAYS NOTICE IS REQUIRED FOR SCHEDULING.
21. TWENTY-FOUR (24) HOURS NOTICE WILL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION.
22. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO
STARTING CONSTRUCTION.
23. INSTALLATION OF CORPORATE STOPS, WATER SERVICES, LINES AND METERS SHALL NOT BE DONE
UNTIL ALL SERVICE AGREEMENTS, METER APPLICATIONS, CONSTRUCTION PERMITS, AND PAYMENT OF
FEES HAVE BEEN MADE TO THE CITY OF RENTON.
24. ALL CONNECTION TO EXISTING MAINS IS TO BE ACCOMPLISHED BY THE CITY OF RENTON, EXCEPT
WET TAPS, WHICH MAY BE MADE BY APPROVED WET TAP CONTRACTORS WITH PRIOR APPROVAL FROM
THE PUBLIC WORKS DEPARTMENT. ALL NECESSARY EXCAVATION AND MATERIALS ARE TO BE SUPPLIED
BY THE CONTRACTOR AND BE ON -SITE PRIOR TO CITY NOTIFICATIONS.
25. INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON. IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY DEVELOPMENT SERVICES TWENTY FOUR (24) HOURS IN
ADVANCE OF BACKFILLING ALL CONSTRUCTION. THE CONTRACTOR, AS WELL AS THE ENGINEERS,
SHALL KEEP AS -BUILT DRAWINGS.
26. CONTRACTOR TO PROVIDE PLUGS AND TEMPORARY BLOW -OFF ASSEMBLIES FOR TESTING AND PURITY
ACCEPTANCE PRIOR TO FINAL TIE-IN.
27. ALL JOINT RESTRAINT SYSTEMS (SHACKLE RODS, NUTS, BOLTS, ETC.) SHALL BE AS MANUFACTURED
BY THE STAR MANUFACTURING COMPANY OF COLUMBUS OHIO, OR EQUAL, APPROVED IN WRITING BY
THE PUBLIC WORKS DEPARTMENT.
28. NOT APPLICABLE.
29. A TEMPORARY COLD MIX ASPHALT PATCH SHALL BE PLACED ON THE DAY OF INITIAL EXCAVATION
WITH A PERMANENT, SEALED PATCH TO BE PLACED, TO CITY OF RENTON POLICY, WITHIN 10 DAYS.
CALL FOR SUBGRADE INSPECTION PRIOR TO PLACEMENT OF FINAL PATCH.
30. NOT APPLICABLE.
8. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE
SANITARY SEWER SYSTEM, WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL
ENGINEER OR LICENSED PROFESSIONAL SURVEYOR.
9. NOT APPLICABLE.
10. NOT APPLICABLE.
11. NOT APPLICABLE.
12. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE
SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE
COMPLETION OF CONSTRUCTION.
13. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN
ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA
STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON IN THE
RENTON STANDARD PLANS & SPECIFICATIONS. THIS SHALL INCLUDE NECESSARY LEVELING OF THE
TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND
COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH
OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE.
5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER 14. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034,
RELATED PERMITS PRIOR TO ANY CONSTRUCTION. SDR 35, OR DUCTILE IRON CLASS 50, UNLESS OTHERWISE APPROVED BY THE WASTEWATER
UTI LITY.
6. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE
OVER ALL OTHER PLANS. 15. NOT APPLICABLE. R-405604
7. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER IFIC SUBMITTAL
CONSTRUCTION IS IN PROGRESS.
FEBRUARY 8 2019
� 41"D
SYM
REVISION
BY
APPROVED
DATE
SYM
REVISION
BY
APPROVED
DATE
®
LA
Z 5 W
�, pg SNI
4 �� WA
4 4
�'�.���`'E(;ISTER��1$,�p\°�
s.91ONALE� ��I
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
DRAWN
R. TEMPLADO
DATE
02.08.19
SUBTITLE
CIVIL NOTES
CURRENT REVISION
W3441886
SYMBOL
DATE
-
APRON C Cl PROJECT -SITE DCN-04
RT
TWN
03.09.16
-
APRON C Cl PROJECT -SITE DCN-09
RT
TWN
05.11.16
CHECKED
T. NEU
02.08.19
SHEET
C2
cl
-
APRON C Cl PROJECT -SITE DCN-05
RT
TWN
03.28.16
-
APRON C Cl PROJECT -SITE DCN-10
RT
TWN
06.06.16
ENGINEER
T. NEU
02.08.19
TITLE
BOEING APRON C PARCEL 820 PROJECT
SITE 05-YD
CIVIL MASTER RENTON, WA
APPROVED BY
DEPT.
DATE
-
APRON C Cl PROJECT - SITE DCN-06
RT
TWN
04.05.16
-
-
APRON C Cl PROJECT SITE DCN-11
RT
TWN
07.05.16
CHECKED
D. MURATA
02.08.19
JOB N0.
W3441886
CO MP N0.
-
APRON C Cl PROJECT - SITE DCN-07
RT
TWN
04.12.16
-
RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES
RT
TWN
10.17.16
APPROVED
-
-
APRON C Cl PROJECT - SITE DCN-08
RT
TWN
04.22.16
APRON C PARCEL 820
RT
TWN
02.08.19
APPROVED
DWG NO. 05-APRON-C-C2