HomeMy WebLinkAboutR-4056080 0 0
0
0 ❑0
00 0
14 AIRPORT LMAINTENANCE
I Ix
�I
c"41
cV
cV
U
w
w
c=n I ❑
w1
w
cn
on
QI
Im
z�
0
z
o
m
U �
— 12" DI
N o
Q
LL
x
w
w
z >�
D
0
=1 m m
U �
C� �o
GI CD �
12" DI
-----------
)
BLDG 800
RAINIER FLIGHT SERVICE
►E
,_,
0
ASPHAL
RAMP
P.
0
0
Z
Fill
DISCHARGE POINT/MONITORING LOCATION
Q----------
■— — — — — — — — — —
— —
x x
0 0 o x x �
0 0
0 0 0 0 0 ❑ o o <
❑,°1°1
° ❑ ❑o °
❑ ❑ U EJ
C# x ❑
N H
❑❑❑ D w
0 CONSTRUCTION ACCESS ROUTE
r
-a
x
0 El El El El El El
I
o
1 I
x
.� x xTF x x _x_ ❑ I
I
X
T TEMPORARY CONSTRUCTION ACCESS X ❑
I
X � ❑ J I
i"I
_TlEl
x 1 CDI
❑-� � I � 0 j g
I �
0 3 ❑ I
3 4 %E3
x Da
6'CLF GATE
I
3 � I
mI ❑
Lo U ) C2
v= 3 3 ASPHALT
Jz
O • ' n
m IWM Io
U �� G
3
m 3
m
m
CONTRACTOR LAYDOWN
AND STAGING AREA
PROVIDE FLASHING RED ARTICULA
LIGHT AND PI OTOVOLT IC LIGHT
CONSTRUCTION NOTES
1�PROVIDE FOD FENCE PER DETAIL
2�SPRAY WHITE PAINT AROUND EDGE OF CONCRETE PANELS
TO BE REMOVED AND REPLACED.
3�PROVIDE CATCH BASIN FILTER PER CIOF RENTON
STANDARD PLAN 216.30. SEE DETAIL 2
224 3
R,_.�-PROVIDE ASPHALT SEDIMENT DAM PER DETAIL
GENERAL NOTES:
1. SEE TESC PLAN NOTES AND CONSTRUCTION SEQUENCE
ON SHEETS C2 & C3
2. LIGHTS SHALL BE MOUNTED ON FENCES PER
MANUFACTURER'S SPECIFICATIONS. LIGHTS SHALL BE
OPERATED BETWEEN SUNSET AND SUNRISE, AND
DURING PERIODS OF LOW VISIBILITY.
3. LIGHTS SHALL BE PROVIDED ON ALL FENCES ADJACENT
TO TAXIWAY A OR AS NEEDED BY BOEING
CONSTRUCTION MANAGEMENT.
0
LEGEND
z
LF —13-13— ASPHALT SEDIMENT DAM
TF TEMPORARY FOD FENCE
® CATCH BASIN FILTER
IN C04APILIANCE W1 I P �;I I.7 011�- :I-N 1 1 AN I rARI)S
DEVELOPMENT ENGINEERING ff % 4
IL
rnair 04/26/2019 W)l
�.❑■...,
��..
r7
wWE
on
most
IN Nw-
Egg
•
M_
'
_wj
a IF,
M4
�,
M"Mr.-��
��
s0"
1111
Falls
Li-
F -
III
aI
AYW
1�a
O
EM
Alp,Slim
�l��Y
�110:
10
11111
- W_
�%laslxnm
AIRP RT LEAK LINE AIRPORT LEASE LINE
REM OVALJ
KEY PLAN z
SCALE: NONE
-TOFA (E) TOFA (E) TOFA (E) � TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) 20TOFA 1(0) O TOFA
1 O (E) 2O OFA (E) TOFA ( APRON C PLAN IFIC SUBMITTAL R"4 O 5 6 O 8
D 65.5' SCALE: 1 " = 20' Z
❑ GROUP II TOFA (EXISTING) SCALE: 1:20 FEBRUARY 8 2019
7 BOWL
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE
z 5 w ACCEPTABILITY R. TEMPLADO 02.08.19 TESC PLAN W3441886
of sgl d'
APRON C Cl PROJECT —SITE DCN-04 RT TWIN03.09.16 — APRON C Cl PROJECT —SITE DCN-09 RT TWIN05.11.16 ��� WATHIS DESIGN AND/OR CHECKED �' =1CATION IS APPROVED T. BURTON 02.08.19 SHEET
G
GINEER
— APRON C Cl PROJECT — SITE DCN-05 RT TWIN03.28.16 — APRON C Cl PROJECT — SITE DCN-10 RT TWIN06.06.16 M® _ o� ED BY DEPT. DATE TN NEU 02.08.19 TITLE BOEING APRON C PARCEL 820 PROJECT
CHECKED C223R
C 5
APRON C Cl PROJECT SITE DCN-06 RT TWIN 04.05.16 APRON C Cl PROJECT SITE DCN-11 RT TWIN 07.05.16 D. MURATA 02.08.19 SITE 05- i
- APRON C Cl PROJECT - SITE DCN-07 RT TWIN04.12.16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES RT TWIN10.17.16 "0� 4 �� APPROVED JOB NO. COMP No.
�.t+ ISTE�'� t��' I-
- APRON C Cl PROJECT - SITE DCN-08 RT TWIN04.22.16 APRON C PARCEL 820 RT TWIN 02.08.19 �sstONAL E�01 APPROVED ]CIVIL MASTER RENTON, WA DWG NO. 05-APRON-C-C223R
0)
0
t0)
V
.z
00
N
Of