Loading...
HomeMy WebLinkAboutR-4056080 0 0 0 0 ❑0 00 0 14 AIRPORT LMAINTENANCE I Ix �I c"41 cV cV U w w c=n I ❑ w1 w cn on QI Im z� 0 z o m U � — 12" DI N o Q LL x w w z >� D 0 =1 m m U � C� �o GI CD � 12" DI ----------- ) BLDG 800 RAINIER FLIGHT SERVICE ►E ,_, 0 ASPHAL RAMP P. 0 0 Z Fill DISCHARGE POINT/MONITORING LOCATION Q---------- ■— — — — — — — — — — — — x x 0 0 o x x � 0 0 0 0 0 0 0 ❑ o o < ❑,°1°1 ° ❑ ❑o ° ❑ ❑ U EJ C# x ❑ N H ❑❑❑ D w 0 CONSTRUCTION ACCESS ROUTE r -a x 0 El El El El El El I o 1 I x .� x xTF x x _x_ ❑ I I X T TEMPORARY CONSTRUCTION ACCESS X ❑ I X � ❑ J I i"I _TlEl x 1 CDI ❑-� � I � 0 j g I � 0 3 ❑ I 3 4 %E3 x Da 6'CLF GATE I 3 � I mI ❑ Lo U ) C2 v= 3 3 ASPHALT Jz O • ' n m IWM Io U �� G 3 m 3 m m CONTRACTOR LAYDOWN AND STAGING AREA PROVIDE FLASHING RED ARTICULA LIGHT AND PI OTOVOLT IC LIGHT ­ CONSTRUCTION NOTES 1�PROVIDE FOD FENCE PER DETAIL 2�SPRAY WHITE PAINT AROUND EDGE OF CONCRETE PANELS TO BE REMOVED AND REPLACED. 3�PROVIDE CATCH BASIN FILTER PER CIOF RENTON STANDARD PLAN 216.30. SEE DETAIL 2 224 3 R,_.�-PROVIDE ASPHALT SEDIMENT DAM PER DETAIL GENERAL NOTES: 1. SEE TESC PLAN NOTES AND CONSTRUCTION SEQUENCE ON SHEETS C2 & C3 2. LIGHTS SHALL BE MOUNTED ON FENCES PER MANUFACTURER'S SPECIFICATIONS. LIGHTS SHALL BE OPERATED BETWEEN SUNSET AND SUNRISE, AND DURING PERIODS OF LOW VISIBILITY. 3. LIGHTS SHALL BE PROVIDED ON ALL FENCES ADJACENT TO TAXIWAY A OR AS NEEDED BY BOEING CONSTRUCTION MANAGEMENT. 0 LEGEND z LF —13-13— ASPHALT SEDIMENT DAM TF TEMPORARY FOD FENCE ® CATCH BASIN FILTER IN C04APILIANCE W1 I P �;I I.7 011�- :I-N 1 1 AN I rARI)S DEVELOPMENT ENGINEERING ff % 4 IL rnair 04/26/2019 W)l �.❑■..., ��.. r7 wWE on most IN Nw- Egg • M_ ' _wj a IF, M4 �, M"Mr.-�� �� s0" 1111 Falls Li- F - III aI AYW 1�a O EM Alp,Slim �l��Y �110: 10 11111 - W_ �%laslxnm AIRP RT LEAK LINE AIRPORT LEASE LINE REM OVALJ KEY PLAN z SCALE: NONE -TOFA (E) TOFA (E) TOFA (E) � TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) 20TOFA 1(0) O TOFA 1 O (E) 2O OFA (E) TOFA ( APRON C PLAN IFIC SUBMITTAL R"4 O 5 6 O 8 D 65.5' SCALE: 1 " = 20' Z ❑ GROUP II TOFA (EXISTING) SCALE: 1:20 FEBRUARY 8 2019 7 BOWL SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE z 5 w ACCEPTABILITY R. TEMPLADO 02.08.19 TESC PLAN W3441886 of sgl d' APRON C Cl PROJECT —SITE DCN-04 RT TWIN03.09.16 — APRON C Cl PROJECT —SITE DCN-09 RT TWIN05.11.16 ��� WATHIS DESIGN AND/OR CHECKED �' =1CATION IS APPROVED T. BURTON 02.08.19 SHEET G GINEER — APRON C Cl PROJECT — SITE DCN-05 RT TWIN03.28.16 — APRON C Cl PROJECT — SITE DCN-10 RT TWIN06.06.16 M® _ o� ED BY DEPT. DATE TN NEU 02.08.19 TITLE BOEING APRON C PARCEL 820 PROJECT CHECKED C223R C 5 APRON C Cl PROJECT SITE DCN-06 RT TWIN 04.05.16 APRON C Cl PROJECT SITE DCN-11 RT TWIN 07.05.16 D. MURATA 02.08.19 SITE 05- i - APRON C Cl PROJECT - SITE DCN-07 RT TWIN04.12.16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES RT TWIN10.17.16 "0� 4 �� APPROVED JOB NO. COMP No. �.t+ ISTE�'� t��' I- - APRON C Cl PROJECT - SITE DCN-08 RT TWIN04.22.16 APRON C PARCEL 820 RT TWIN 02.08.19 �sstONAL E�01 APPROVED ]CIVIL MASTER RENTON, WA DWG NO. 05-APRON-C-C223R 0) 0 t0) V .z 00 N Of