Loading...
HomeMy WebLinkAboutR-405617DATUM NOTE: PLANS PREPARED USING NGVD 29 AS THE VERTICAL DATUM. TO CONVERT TO NAVD 88 ADD 3.556 FEET TO ALL ELEVATIONS. SYM REVISION — APRON C Cl PROJECT — SITE DCN-04 — APRON C Cl PROJECT — SITE DCN-05 — APRON C Cl PROJECT — SITE DCN-06 — APRON C Cl PROJECT — SITE DCN-07 — APRON C Cl PROJECT — SITE DCN-08 12" WIDE TRAFFIC YELLOW COLLAR TEXT 4" HIGH BLACK COVER EAST JORDAr WORKS 819i AND GRATE WITH LIETH VAULT No. 504-BL PSE #7663900 2,950 lbs. SAFE DRA UNIT TO BE REMO` CONTRACTOR UP BBBOB 1PBBBOPBBBP OB BB �� e° 0° B ULPL� el f I 1 ei� e O bbb e BOP D 9 B B BBB °ylbl{'0 0° 0 0 0 O 0 0l�l�b b090� bOBb b 0 dOP 9B B�0 0 088° ° 0 0B0 D 0 U 0bb OAP oBe�BOo b°0 b9 0004b0000b0bbb000b 0 0b 4' 8" �' 4'-8„ N N 4 8" 4'2" (4) 3/4" Dia. Lift Inserts w/ U.V. Caps ,OBBBBO OBBBBOBBBB BOBS �� BBB BBB \�L1 �1B8��LJB l-1�/d �O BOO d8 b 0 00 9 bBU BBB 0 B Q ADO b 0 0 DDbO�b bU9 * BBB Be �A rb . ri°e do°e°e°ey o e° N 00 b°841.�1j'09bb90°9bb BBB B8BB00 0Q ��� @9eB °8 0 9U0 BOO B B��BO B9 b°b o �B BOO B�A,�IOO o O b°b � o aooaaaoaaaaoa� �1; 09 0099b080b0b00b0b9 Vb00 b°0 PLAN VIEW EAST JORDAN IRON WORKS 8197 FRAVE AND GRATE WITH HINGE & LIFT ASSIST Galvanized "C" Channel, 3'-0" Lg 1 Each Side, 4 Sides 4 3/4" Dia. Knockout 8 Each Side, 4 Sides p D QD ,00 0 Optional Pulling Iron 1 E h C 4 C 8" Dia. Sump D 2 1/2" �Dia. Ground Rod Knockout 2 Places In FLoor SECTION AA N 1 1 /2" Dia. Lift Hole 1 Each Side, 2 Sides -8-1-�7'Jl 2'-2" ----�-7" END VIEW cc orner, orners Typical All Sides OLDCASTLE PRE —CAST VAULT 504—LA WITH EAST JORDAN IRON WORKS FRAME & GRATE ASSEMBLY NTS MANUAL SKYDROL CONTAINMENT W TH SAFE DRA N REMOVAL NTS BY APPROVED DATE SYM REVISION BY APPROVED DATE 03.09.16 — APRON C Cl PROJECT — SITE DCN-09 05.11.16 03.28.16 — APRON C Cl PROJECT — SITE DCN-10 06.06.16 04.05.16 — APRON C Cl PROJECT — SITE DCN-11 07.05.16 04.12.16 — RECORD DRAWING — 737 MAX FLIGHTLINE UTILITIES 10.17.16 04.22.16 APRON C PARCEL 820 RT TWIN 02.08.19 Q� ""AIIIISA&AW"° C'— NAL C292RIC511 ACCEPTABILITY R. TEMPLADO 02.08.19 THIS DESIGN AND/OR CHECKED oG SPECIFICATION IS APPROVED J. SHROPE 02.08.19 y ENGINEER APPROVED BY DEPT. DATE T. NEU 02.08.19 CHECKED D. MURATA 02.08.19 IFIC SUBMITTAL FEBRUARY 8, 2019 SUBTITLE STORM DRAINAGE DETAILS TITLE BOEING APRON C PARCEL 820 PROJECT CIVIL MASTER SITE 05-YD JOB NO. RENTON, WA I DWG No. R-405617 41tDowe C511 C14 COMP N0. W3441886 05—YD—APRC—0511 r