Loading...
HomeMy WebLinkAboutR-405621-70 D N � D - - 0 lI - - ❑ 0 - 0 0 0 0 0 0 0 cV LiJ =1 cI wl w cn ►z� — � BLDG 800 RAINIER FLIGHT SERVICE 12" DIW x x x FW FW n 12 DI w FW FW AIRPORT LEASE LINE I I FW FW- ASPHAL RAMP 0 0 0 w � m� �_ Ln U � 1 JIM O � O � O 0 0 0 0 o n ❑ I ❑ I ° I ° I ❑ O J ❑ 1 ❑ I ° I ❑ ❑ ❑ I ❑ I ❑ I ❑ I ❑ C x x x x x x x 1 ° I X 1 TEMP TEMP RSTRM STRM X ❑ El 0 I X ° I I I A = �/ X ❑ x x x 6'CLF GATE I -Ti I � I I I I 71 '14 1:�� -1 -1. I RAMP w SG W// • a 3 m ]Elm n, °° Ln' 1 TOFA (E)T®FA ((E)T®IFA ((�)) T®IFA ((E)T®IFA ((E))T®IFA ((E))T®F-A (E) T®IFA ((E)—TOFA ((E))—TOFA ((Q) FA (�)) 20 10 0 10 20 40 SYM REVISION - APRON C CI PROJECT - SITE DCN-05 - APRON C CI PROJECT - SITE DCN-06 - APRON C CI PROJECT - SITE DCN-07 - APRON C CI PROJECT - SITE DCN-08 - APRON C CI PROJECT - SITE DCN-09 � SCALE: 1:20 BY APPROVED DATE SYM REVISION BY APPROVED DATE RT TWN 03.28.16 - APRON C CI PROJECT - SITE DCN-10 RT TWN 06.06.16 RT TWN 04.05.16 - APRON C CI PROJECT - SITE DCN-11 RT TWN 07.05.16 RT TWN 04.12.16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES RT TWN 10.17.16 RT TWN 04.22.16 - APRON C PARCEL 820 RT TWN 02.08.19 RT TWN 05.11.16 A APRON C PARCEL 820 PERMIT COMMENT REVISION RT TWN 03.29.19 TOFA ((E) FW FW O D TOFA ((E) TOFA ((E)) - APRON C PLAN SCALE: 1 " = 20' L BOE/iVG° C'- J SG AIRPORT LEASE LINE TGFA (E) TOFA ((E) bF vrASk . �va� o;A� 45379 Z>�/ R� TOFA ((E) > m r TUFA ((E) TOFA ((E) FW CONSTRUCTION NOTES REMOVE FIRE HYDRANT ASSEMBLY AND BOLLARDS. DELIVER FIRE HYDRANT ASSEMBLY TO THE CITY OF RENTON MAINTENANCE SHOP. PLUG FIRE WATER MAIN WITH CONCRETE TO ABANDON IN PLACE PER WSDOT SPECIFICATION 7-08.3(4). REMOVE 6" GATE VALVE AT 12" TEE PROVIDE 6" MJ PLUG TO BE INSTALLED BY CITY OF RENTON FORCES THE CONTRACTOR SHALL PROVIDE ALL MATERIALS AND RESTORE FINAL SURFACE PAVING. ® REMOVE 2-2" REDUCED PRESSURE BACKFLOW PREVENTERS AND CAP REMAINING LINE IN VAULT. REMOVE 2" VALVE, CAP REMAINING LINE. ©REMOVE 1.5" VALVE, CAPE REMAINING LINE. v GENERAL NOTES 1. SEE CIVIL PLANS C220R - C223R FOR PAVEMENT REMOVAL ITEMS. 2. SEE MECHANICAL PLANS M111R & M113R FOR AIR REMOVAL ITEMS. 3. SEE ELECTRICAL PLANS E111R - E113R FOR ELECTRICAL REMOVAL ITEMS. 4. ALL REMOVED WATERLINE VALVES, HYDRANTS AND REDUCED PRESSURE BACKFLOW PREVENTERS SHALL BE RETURNED TO BOEING AND DELIVERED TO LOCATION DIRECTED BY BOEING CONSTRUCTION MANAGER. 5. ALL EXISTING AND PROPOSED UTILITY LINES EXPOSED FOR CONNECTION SHALL BE TEMPORARILY CAPPED AT ALL TIMES DURING CONSTRUCTION TO PREVENT CONTAMINATION. LEGEND 1IIIIIIHHH1RHIIIIIIHH+H 8" FIRE WATER MAIN ABANDONED X FIRE HYDRANT REMOVAL IN C PLI-I L; P 'ti 4 I H C1TY OF RENTON STANDARE)$ OPMENT ENGINEERING Ernair 04/26/2019 WATER UTILITY agafour 04/26/2019 WW ' I Masao � 1 os�_wwnmw. W� I��'1■JIIIR7 . � 11IN 11-3- UNIO oil low% w NNEI��Hi�ifiii_� !on���GTr7'Sy�,�''1 1 El00111`Koo0T-, 2 ' INe IFC SUBMITTAL R-405621 MARCH 22,2019 ��OWL DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE ACCEPTABILITY R. CHECKED W3441886 DO 03.22.19 FIRE PROTECTION AND WATER REMOVAL PLAN THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED T. NEU 03.22.19 SHEET ENGINEER TITLE BOEING APRON C PARCEL 820 PROJECT M261 R M APPROVED BY DEPT. DATE T. NEU 03.22.19 CHECKED �/ ,- 3 D. MURATA 03.22.19 SITE 05- I D APPROVED JOB N0. COMP N0. W3441886 APPROVED DWG N0. �g MECHANICAL MASTER RENTON, WA 05-APRON-C-M261 R