Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R-405632
Ln O Lu v 0 w I U Z O of tZ Q I 0 rn c 3 0 L I / O E (3) 0 O N 00 N U L 0 11 U c O a Q N O m J 0 0 N O I rn i U 0 L IL / Ld w / c E U O 1-11 0 0 / U- N N N rn N 65.5' GROUP II TOFA (EXISTING) SYM REVISION BY APPROVED DATE SYM - APRON C Cl PROJECT W3441886 CASNE CEC 12.14.15 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES W3441886 CASNE DAT 12.19.16 A APRON C PARCEL 820 CASNE CEC 02.08.19 20 10 0 10 20 40 SCALE: 1:20 REVISION APRON C PLAN SCALE: 1 " = 20' BY I APPROVED I DATE L TAXIWAY A y�� of waste C) 116 35276is w� IONAL�����Q EQUIPMENT SCHEDULE NAME VOLTS HP FLA � 3A HWP-1 120 .5 3 GENERAL NOTES 1. ALL NEW STRUCTURES AND FACILITIES ARE PARALLEL AND PERPENDICULAR TO EAST BOEING LEASE LINE AT BEARING N4°48'53"W. 2. PER IFC 2009, CHAPTER 11, AVIATION FACILITIES: AIRCRAFT BEING FUELED SHALL BE POSITIONED SUCH THAT ANY FUEL SYSTEM VENTS AND OTHER FUEL TANK OPENINGS ARE A MINIMUM OF TWENTY-FIVE FEET (7620 MM) FROM BUILDINGS OR STRUCTURE OTHER THAN JET BRIDGES; AND FIFTY FEET (15,240 MM) FROM AIR INTAKE VENTS FOR BOILER, HEATER OR INCINERATOR PARTIAL LEGEND ROOMS. 3. REPAIR OR REPLACE ANY AND ALL PAVEMENT DISTURBED ❑J DISCONNECT SWITCH, NON -FUSED. AMPERAGE AS SHOWN. DURING CONSTRUCTION IN ACCORDANCE WITH C501 AND THE SPECIFICATIONS. ❑J ENCLOSED CIRCUIT BREAKER; BREAKER SIZE AS SHOWN 4. CONTRACTOR SHALL SUBMIT BORING PLANS AND O JBOX PROFILES TO DESIGN TEAM FOR APPROVAL PRIOR TO MOBILIZING. WP WEATHERPROOF 5. CONTRACTOR SHALL PROVIDE THOROUGH LOCATE SERVICE FOR ALL AREA'S IN BORE OR TRENCH PATH. 6. ALL BURIED CONDUIT NOT ENCASED IN CONCRETE SHALL BE PVC COATED RIGID. EXCEPTION: 400HZ CONDUIT SHALL BE RIGID ALUMINUM. D DEMOVAL W D DRAWN DATE SUBTITLE ACCEPTABILITY C. ALLISON 07.15.15 THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED ENGINEER TITLE '. ROVED BY I DEPT. I DATE 7. ABOVE GRADE EXPOSED CONDUIT SHALL BE EITHER RIGID ALUMINUM OR PVC COATED RIGID STEEL PER THE SPECIFICATIONS. 8. ALL POWER CONDUCTORS SHALL BE XHHW. 9. PROVIDE EXPLOSION PROOF SEALOFFS ON ALL CONDUITS A ENTERING OR EXITING THE EARTH. CONSTRUCTION NOTES REMOVE STRUT STAND AND RECEPTACLES, AND CAMERA CONTROLLERS, LEAVING ONLY THE CONDUIT STUB -UP. REMOVE CONDUCTORS FROM UNDERGROUND CONDUITS. PROVIDE PULL STRINGSIN THE CONDUITS. TERMINATE THE STUB -UPS AS SHOWN ON DETAIL 3 ON DRAWING E526R. REMOVE CONDUCTORS SUPPLYING TURNSTYLE ASSEMBLY, SO THAT IT MAY BE REMOVED BY OTHERS. PROVIDE PULL STRING IN THE CONDUIT. TERMINATE THE STUB -UPS AS SHOWN ON DETAIL 3 ON DRAWING E526R. ® REMOVE DISTRIBUTION STANDS C6 & C7, AND POWER STANDS C6 & C7. SALVAGE THE EQUIPMENT TO BOEING. COORDINATE WITH THE BOEING CONSTRUCTION MANAGER. REMOVE 120V OR 208V CONNECTIONS TO BATTERY CHARGERS (2 LOCATIONS), CREW SHELTERS (2 LOCATIONS), TOOL CABANAS (2 LOCATIONS), SHOWER HEAT TRACE, WATER HEATER CIRCULATION PUMP, VAULT HEAT TRACING (3 LOCATIONS), AND SHOWER HEAT TRACE. © REMOVE CONDUCTORS FROM UNDERGROUND CONDUIT. PROVIDE PULL STRINGS IN THE CONDUITS. TERMINATE THE STUB -UPS AS SHOWN ON DETAIL 3 ON DRAWING E526R. N N N N N N N N N N U U U U U U U U U U U U U U U U U U U U U - APRON „„ AV P al APRON ----- B TON MUN CIPA MR PORT -- RE N RUN- '� Z d p o RO »D» / 4 20/ � 1 � o ao 00 to qN AID 81/2 0-5 ff 0 1 -80 4, 6 r7 1 G -LJ COMPLE PAR I Q 00 z r'' R-405632=_ ISSUE FOR CONSTRUCTION FEBRUARY 08, 2019 208Y/120V POWER PLAN - C6 AND C7 APRON C PARCEL 820 n nnn� i n ELECTRICAL MASTER KEY PLAN z SCALE: NONE n C D E F G J K L CECA SNEEngineering 3545 FACTORIA BOULEVARD SE., SUITE 200 BELLEVUE, WA 98006 (425) 522-1000 WWW. CA SNE. COM JOB NO. 191- 027 CURRENT REVISION SYMBOL DATE A 02.08.19 SHEET E60R E7_ APRON C JOB NO. COMP NO. W3441886 RENTON, WA DWG NO. 05-APRON-C-E60R