HomeMy WebLinkAboutR-405633a
0
w
I
U
Z
O
a
a
I
L
O
i
W
C
3
a
0
I
0
0
E
a�
0
O
N
co
N
i
O
a-
U
0
a
a
a�
0
m
J
O
N
O
I
i
rn
i
Q
U
.21
a-
U)
w
c
E
U
O
0
4
65.5'
GROUP II TOFA (EXISTING)
SYM REVISION BY APPROVED DATE SYM
- APRON C Cl PROJECT W3441886 CASNE CEC 12.14.15
- RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES W3441886 CASNE DAT 12.19.16
A APRON C PARCEL 820 CASNE CEC 02.08.19
20 10 0 10 20 40
SCALE: 1:20
REVISION BY
APRON C PLAN
SCALE: 1 " = 20'
APPROVED I DATE
TAXIWAY A
QL BOE/NG 0
c�—
✓,�4ti`� of waste ltr�j
16 35276 c�4
ois
�,� S ONA�E'����,�
2
REMOVAL
DRAWN DATE SUBTITLE
ACCEPTABILITY C. ALLISON 07.15.15
THIS DESIGN AND/OR CHECKED
SPECIFICATION IS APPROVED
ENGINEER TITLE
'kROVED BY I DEPT. I DATE
0
GENERAL NOTES
1. ALL NEW STRUCTURES AND FACILITIES ARE PARALLEL
AND PERPENDICULAR TO EAST BOEING LEASE LINE AT
BEARING N4°48'53"W.
2. PER IFC 2009, CHAPTER 11, AVIATION FACILITIES:
AIRCRAFT BEING FUELED SHALL BE POSITIONED SUCH
THAT ANY FUEL SYSTEM VENTS AND OTHER FUEL TANK
OPENINGS ARE A MINIMUM OF TWENTY—FIVE FEET (7620
MM) FROM BUILDINGS OR STRUCTURE OTHER THAN JET
BRIDGES; AND FIFTY FEET (15,240 MM) FROM AIR
INTAKE VENTS FOR BOILER, HEATER OR INCINERATOR
ROOMS.
3. REPAIR OR REPLACE ANY AND ALL PAVEMENT DISTURBED
DURING CONSTRUCTION IN ACCORDANCE WITH C501 AND
THE SPECIFICATIONS.
4. CONTRACTOR SHALL SUBMIT BORING PLANS AND
PROFILES TO DESIGN TEAM FOR APPROVAL PRIOR TO
MOBILIZING.
5. CONTRACTOR SHALL PROVIDE THOROUGH LOCATE SERVICE
FOR ALL AREA'S IN BORE OR TRENCH PATH.
6. ALL BURIED CONDUIT NOT ENCASED IN CONCRETE SHALL
BE PVC COATED RIGID. EXCEPTION: 400HZ CONDUIT
SHALL BE RIDIG ALUMINUM.
7. ABOVE GRADE EXPOSED CONDUIT SHALL BE EITHER RIGID
ALUMINUM OR PVC COATED RIGID STEAL. PER THE
SPECIFICATIONS LOW VOLTAGE.
8. ALL POWER CONDUCTORS SHALL BE XHHW.
9. ALL CONDUITS ENTERING OR EXITING THE EARTH
SHALL HAVE EXPLOSION PROOF SEALOFFS.
05—APRON—C—E4A
.CONSTRUCTION NOTES
REMOVE POWER STANDS AND DISTRIBUTION STANDS,
LEAVING ONLY THE CONDUIT STUB —UPS. SALVAGE ALL
EQUIPMENT TO BOEING. COORDINATE WITH THE
BOEING CONSTRUCTION MANAGER.
REMOVE CONDUCTORS FROM UNDERGROUND
CONDUITS. PROVIDE PULL STRING IN THE CONDUITS.
TERMINATE THE STUB —UPS AS SHOWN ON DETAIL 3
ON DRAWING E526R.
REMOVE CONNECTION TO EXISTING WATER HEATER.
®REMOVE CONDUCTORS FROM UNDERGROUND
CONDUITS. PROVIDE PULL STRING IN THE CONDUITS.
TERMINATE THE STUB —UPS AS SHOWN ON DETAIL 3
ON DRAWING E526R.
O m m r- GO Lo � rl-) N O m m r— CO Lo 'd- rl) N O
N") N N N N N N N N N N
-
APR
N "C"
-14
TAXI
A
AR
ORT
Q
_
RE
TON
MUN
CIPA
�
Q
z
RU
W
=
Ft1
CLI
Q
E
-
�o
— A
RON
"D"
co
cj
20/
1
a
'O
AN
-
81/
2
0-5
- [ 1 -80
1 -18
—`� PARK
MPI
EX
AVENUE
N.
I
-
COMPIL
'
v'
PARKING-
LO
6Al�
z
co
�_405
Z
KEY PLAN z
SCALE: NONE
R-405633__]
ISSUE FOR CONSTRUCTION CE CASNEEngineering
3545 FACTORIA BOULEVARD SE., SUITE 200
FE B R U A RY 08 2019 BELLEVUE, WA 98006
f 1 1 (425) 522-1000 WWW.CASNE.COM JOB NO. 191-027
480Y/277V POWER PLAN - C6 AND C7 CURRENT REVISION SYMBOL A DATE 02.08.19
SHEET
APRON C PARCEL 820 E110R E8_
APRON C JOB NO. COMP NO.
ELECTRICAL MASTER
W3441886
RENTON, Wq DWG No. 05—APRON—C—El1OR
A
B
C
D
E
F
G
H
J
K
L