Loading...
HomeMy WebLinkAboutR-405633a 0 w I U Z O a a I L O i W C 3 a 0 I 0 0 E a� 0 O N co N i O a- U 0 a a a� 0 m J O N O I i rn i Q U .21 a- U) w c E U O 0 4 65.5' GROUP II TOFA (EXISTING) SYM REVISION BY APPROVED DATE SYM - APRON C Cl PROJECT W3441886 CASNE CEC 12.14.15 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES W3441886 CASNE DAT 12.19.16 A APRON C PARCEL 820 CASNE CEC 02.08.19 20 10 0 10 20 40 SCALE: 1:20 REVISION BY APRON C PLAN SCALE: 1 " = 20' APPROVED I DATE TAXIWAY A QL BOE/NG 0 c�— ✓,�4ti`� of waste ltr�j 16 35276 c�4 ois �,� S ONA�E'����,� 2 REMOVAL DRAWN DATE SUBTITLE ACCEPTABILITY C. ALLISON 07.15.15 THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED ENGINEER TITLE 'kROVED BY I DEPT. I DATE 0 GENERAL NOTES 1. ALL NEW STRUCTURES AND FACILITIES ARE PARALLEL AND PERPENDICULAR TO EAST BOEING LEASE LINE AT BEARING N4°48'53"W. 2. PER IFC 2009, CHAPTER 11, AVIATION FACILITIES: AIRCRAFT BEING FUELED SHALL BE POSITIONED SUCH THAT ANY FUEL SYSTEM VENTS AND OTHER FUEL TANK OPENINGS ARE A MINIMUM OF TWENTY—FIVE FEET (7620 MM) FROM BUILDINGS OR STRUCTURE OTHER THAN JET BRIDGES; AND FIFTY FEET (15,240 MM) FROM AIR INTAKE VENTS FOR BOILER, HEATER OR INCINERATOR ROOMS. 3. REPAIR OR REPLACE ANY AND ALL PAVEMENT DISTURBED DURING CONSTRUCTION IN ACCORDANCE WITH C501 AND THE SPECIFICATIONS. 4. CONTRACTOR SHALL SUBMIT BORING PLANS AND PROFILES TO DESIGN TEAM FOR APPROVAL PRIOR TO MOBILIZING. 5. CONTRACTOR SHALL PROVIDE THOROUGH LOCATE SERVICE FOR ALL AREA'S IN BORE OR TRENCH PATH. 6. ALL BURIED CONDUIT NOT ENCASED IN CONCRETE SHALL BE PVC COATED RIGID. EXCEPTION: 400HZ CONDUIT SHALL BE RIDIG ALUMINUM. 7. ABOVE GRADE EXPOSED CONDUIT SHALL BE EITHER RIGID ALUMINUM OR PVC COATED RIGID STEAL. PER THE SPECIFICATIONS LOW VOLTAGE. 8. ALL POWER CONDUCTORS SHALL BE XHHW. 9. ALL CONDUITS ENTERING OR EXITING THE EARTH SHALL HAVE EXPLOSION PROOF SEALOFFS. 05—APRON—C—E4A .CONSTRUCTION NOTES REMOVE POWER STANDS AND DISTRIBUTION STANDS, LEAVING ONLY THE CONDUIT STUB —UPS. SALVAGE ALL EQUIPMENT TO BOEING. COORDINATE WITH THE BOEING CONSTRUCTION MANAGER. REMOVE CONDUCTORS FROM UNDERGROUND CONDUITS. PROVIDE PULL STRING IN THE CONDUITS. TERMINATE THE STUB —UPS AS SHOWN ON DETAIL 3 ON DRAWING E526R. REMOVE CONNECTION TO EXISTING WATER HEATER. ®REMOVE CONDUCTORS FROM UNDERGROUND CONDUITS. PROVIDE PULL STRING IN THE CONDUITS. TERMINATE THE STUB —UPS AS SHOWN ON DETAIL 3 ON DRAWING E526R. O m m r- GO Lo � rl-) N O m m r— CO Lo 'd- rl) N O N") N N N N N N N N N N - APR N "C" -14 TAXI A AR ORT Q _ RE TON MUN CIPA � Q z RU W = Ft1 CLI Q E - �o — A RON "D" co cj 20/ 1 a 'O AN - 81/ 2 0-5 - [ 1 -80 1 -18 —`� PARK MPI EX AVENUE N. I - COMPIL ' v' PARKING- LO 6Al� z co �_405 Z KEY PLAN z SCALE: NONE R-405633__] ISSUE FOR CONSTRUCTION CE CASNEEngineering 3545 FACTORIA BOULEVARD SE., SUITE 200 FE B R U A RY 08 2019 BELLEVUE, WA 98006 f 1 1 (425) 522-1000 WWW.CASNE.COM JOB NO. 191-027 480Y/277V POWER PLAN - C6 AND C7 CURRENT REVISION SYMBOL A DATE 02.08.19 SHEET APRON C PARCEL 820 E110R E8_ APRON C JOB NO. COMP NO. ELECTRICAL MASTER W3441886 RENTON, Wq DWG No. 05—APRON—C—El1OR A B C D E F G H J K L