Loading...
HomeMy WebLinkAboutR-4056433 Q w I c� z O Q I Lo O .3 0 0 I O E Q) 0 O N 00 U O n u 0 a Q O m J 0 CD O I m U N O a_ w U) ~` E U O N 0 0 w GENERAL MOTES 1. ALL NEW STRUCTURES AND FACILITIES ARE PARALLEL AND I GRASS PERPENDICULAR TO EAST BOEING LEASE LINE AT BEARING O'MAP _ls Pl \ _ GRASS N448 53 RAINIER AVE N TMH _ } -- ----- - - W. RIM'LL.S\- i6"MAP '.. •( DENSE BRUSH MAP 2 PER IFC 2009, CHAPTER 11, AVIATION FACILITIES: ,6MAP ,ut.• • - AIRCRAFT BEING FUELED SHALL BE POSITIONED SUCH THAT ANY FUEL SYSTEM VENTS AND OTHER FUEL TANK OPENINGS ARE A MINIMUM OF TWENTY-FIVE FEET (7620 ;ENSE TREES j!AIRPpRT PROPERTY FiL FIt ° ❑ ° i Tl,t LB 9.t; FIL FIL F W ` Y \N y. ' TLB o Wool g g W W--- -- -- -`_E m76"M=9 _ — SUBSTATION VC-1 ••• eaasx_ _ ISWALE � � � � d _— GATE V— SS— t _— — R Key -- a ° Pad nn RD— M M a3',ra b IN L N Rr 4A E5 0 LaaP o MH-C8 c° X ki c oR — o RE EaT A — BAN H o d 4 M MM) FROM BUILDINGS OR STRUCTURE OTHER THAN JET BRIDGES; AND FIFTY FEET (15,240 MM) FROM AIR INTAKE ® VENTS FOR BOILER, HEATER OR INCINERATOR ROOMS. Stalls O . 5 tos I I 3. REPAIR OR REPLACE ANY AND ALL PAVEMENT DISTURBED 30 Stals + 2 AOA w DURING CONSTRUCTION IN ACCORDANCE WITH C501 AND TfTTAL: 32 Is X a3nra 4 Stallsom% 5 Stalls _ _ T _ o THE SPECIFICATIONS. T I 4. ALL DIRECT BURIED CONDUIT SHALL BE SCHEDULE 80 dp- CONDUIT. SWEEPS WHICH ENTER THE EARTH SHALL BE PVC COATED RIGID STEEL. � y I 5. ABOVE GRADE EXPOSED CONDUIT SHALL BE EITHER RIGID ° o ALUMINUM OR PAINTED RIGID GALVANIZED STEEL. PER w THE SPECIFICATIONS LOW VOLTAGE. DIRT _ rI n - - S — — S A, , ` LF 1,0" N3aN.Tl A �Rr M M _ f �M —��' I S S T® S L S I _ -o �-n o l- o T-��-� W L O O w w - =1 _ cn l - o w W C1 2 AIRPORT LEASE IINE z 0 �I z TAXI WAY ~ 65.5' z ov SRO U2=1L=10 FATI N owf l 9 w M M z CROUP II TOFA (EXISTING) =I Q r SIGN 2 A E4A E5 1 E4A E507 I MH-C4 1 a 1 ill�ll�l■■ wool �.111111��'®II111'�� �a:►-�rwua�uiiiu _ 1► i � I I� ■I■■■■�I■I■IV��III ■i■■■■■■imi�■, mom - � 1 11 1 :±� �� 11 I)R— 1 3 C4 A. - TAXIWAY A M CONCRETE ENCASED DUCTBANK ��4"C-SPARE �(1)4"C, 3#600, #2G (VC-1/9)-480V/S1 r (1)4"C-FIBER (1)4"C-COMM SPARE 3 GRASS 2 E4A E50 1 HH-05 E4A E5 1 (COMM) '9� MH-C6 m m$ m °HH-C4 (COMM) LTO MH-B4 L (VIA-C3,C2,C1) CONCRETE ENCASED DUCT6/Al Nn 1 5"C-3 4 0 MV-105, (1)5"C-SPARE (1)4"C-FIBER RSA (174"C-COMM RARE RSA 75' RUNWAY SAFETY AREA (RSA) RSA IBRE s PARE o,1 ) CONCRETE ENCASED DUCT BANK — RSA RSA R(1)5"C-3#4/OA_MV-105, #R2G PSE #24) RSA (1)4"C-FIBER (1)4"C-COMM SPARE RUNWAY 16-34 m A r. — — — — s — — — — ss — s — — — U. CONTRACTOR SHALL PROVIDE DETAILED LOCATE SERVICE [ FOR ALL AREAS IN BORE OR TRENCH PATH. CONCRETE _L 12. 01 ' O Fw aaa- IorN3aN.z1 7. PROVIDE NYLON PULL CORDS IN ALL SPARE CONDUITS. S1S — L J 8. CONCRETE ENCASED DUCTS SHALL BE SCHEDULE 40 PVC ET CASED DU TBA K L J REFERENCE DRAWINGS YED 05-APRON-C-E110 D 05-APRON-C-E360 A 006 Epdo CONSTRUCTION NOTES o g ° g THIS DRAWING REFLECTS THE END RESULT OF THE C6 DEMOLITION PROCESSES OF DRAWING E4AR. F 3 AIRPORT LEASE UNE AIRPORT LEASE LINE Pm - +OFA TOFA TO 19T�� � � m �T A- I CONCRETE ENCASED DUCT BANK CONCRETE ENCASED DUCT BANK I (1)4"C-SPARE (1)5"C-3#4/0 MV-105, #2G (1)4"C-SPARE " - PARE (1)4"C SPARE (1)4"C-FIBER (1)4"C-COMM SPARE W41-COMM SPARE -(T)4-"& -SPARE- M (1)4"C-SPARE . � ro-A HH-C6 rD"'-'� CONCRETE ENCASED DUCTBANK (1)4"C-SPARE 4A E5 n (1)4"C-SPARE (1)4"C-SPARE MH-C10 (1)4"C-COMM SPARE mo HH-C10 � 3 E4A E5 2 log rc ozl an.zl � CONCRETE ENCASED DUCTBANK - To�1)4" C-SPARE RSA R RSA RSA RSA RSA RSA (1)4"C-FIBER (1)4"C-COMM SPARE 75' RUNWAY SAFETY AREA (RSA) I RSA RSA RSA RSA RSA RSA R A RSA RSA RSA RSA — RSA RSA RSA RSA RSA s s as -- zaS - - as C"r) as ° as TOFA TOFA • •• •gip• •• • WOMEN = . 0 m mom MO ' WSll1,51"ML—'1� OM � ]�>r - mammoi Mo IL 1011"S 80�d alm�d-ii MIEN 'T�l7�na�,�\ . II 0 a 0 \ FI-405643 KEY P LN zco Q 5 K 2 SCALE: NONE Z �-40 L 50 25 0 25 50 100 ISSUE FOR CONSTRUCTION APR0N C P�ANCCASNEEngineering 3545 FACTORIA BOULEVARD SE., SUITE 200 SCALE: 1:50 SCALE: 1 " = 50' z F E B RUARY 08, 2019 BELLEVUE, WA 98006 (425) 522-1000 WWW. CASNE. COM JOB NO. 191- 027 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE L DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL A DATE 02.08.19 C�4�' 0F WAS �� ACCEPTABILITY THIS ND R CHECKED 07.15.15 PARTIAL SITE PLAN -POWER DISTRIBUTION - APRON C CI PROJECT W3441886 CASNE CEC 12.14.15 �' '� SPECIFICATION IS APPROVED SHEET ENGINEER TITLE E4A E18 — RECORD DRAWING — 737 MAX FLIGHTLINE UTILITIES W3441886 CASNE DAT 12.19.16 ® P OVED BY DEPT. DATE JEA 07.16.15 APRON C PARCEL 820 BO�,�� CHECKED A APRON C PARCEL 820 CASNE CEC 02.08.19 35276 w�' APRON C JOB NO. COMP NO. °'�' ��CISTER �� APPROVED W3441886 �sSjONAL E11�� �I APPROVED ELECTRICAL MASTER DAT DWG NO. 05-APRON-C-E4A 2