HomeMy WebLinkAboutR-4056433
Q
w
I
c�
z
O
Q
I
Lo
O
.3
0
0
I
O
E
Q)
0
O
N
00
U
O
n
u
0
a
Q
O
m
J
0
CD
O
I
m
U
N
O
a_
w
U)
~`
E
U
O
N
0
0
w
GENERAL MOTES
1. ALL NEW STRUCTURES AND FACILITIES ARE PARALLEL AND
I GRASS PERPENDICULAR TO EAST BOEING LEASE LINE AT BEARING
O'MAP _ls Pl \ _ GRASS
N448 53
RAINIER AVE N TMH _ } -- ----- - -
W.
RIM'LL.S\- i6"MAP '.. •(
DENSE BRUSH MAP 2 PER IFC 2009, CHAPTER 11, AVIATION FACILITIES:
,6MAP ,ut.• • - AIRCRAFT BEING FUELED SHALL BE POSITIONED SUCH
THAT ANY FUEL SYSTEM VENTS AND OTHER FUEL TANK
OPENINGS ARE A MINIMUM OF TWENTY-FIVE FEET (7620
;ENSE TREES j!AIRPpRT PROPERTY
FiL FIt ° ❑ °
i Tl,t
LB 9.t; FIL FIL F W ` Y
\N y. '
TLB o Wool
g g W W--- -- -- -`_E m76"M=9
_ — SUBSTATION VC-1 ••• eaasx_ _
ISWALE � � � � d
_— GATE V— SS— t
_— — R
Key
-- a ° Pad
nn
RD—
M M
a3',ra b IN L
N Rr
4A E5 0
LaaP o MH-C8 c° X
ki c
oR — o RE EaT
A — BAN
H o
d
4 M MM) FROM BUILDINGS OR STRUCTURE OTHER THAN JET
BRIDGES; AND FIFTY FEET (15,240 MM) FROM AIR INTAKE
® VENTS FOR BOILER, HEATER OR INCINERATOR ROOMS.
Stalls O
.
5 tos
I I 3. REPAIR OR REPLACE ANY AND ALL PAVEMENT DISTURBED
30 Stals + 2 AOA w DURING CONSTRUCTION IN ACCORDANCE WITH C501 AND
TfTTAL: 32 Is X a3nra
4 Stallsom% 5 Stalls _ _ T _ o THE SPECIFICATIONS.
T I 4. ALL DIRECT BURIED CONDUIT SHALL BE SCHEDULE 80
dp- CONDUIT. SWEEPS WHICH ENTER THE EARTH SHALL BE
PVC COATED RIGID STEEL.
� y I
5. ABOVE GRADE EXPOSED CONDUIT SHALL BE EITHER RIGID
° o ALUMINUM OR PAINTED RIGID GALVANIZED STEEL. PER
w THE SPECIFICATIONS LOW VOLTAGE.
DIRT _ rI n - - S — — S A, ,
`
LF
1,0" N3aN.Tl A �Rr M M _ f
�M —��'
I S S T® S L S
I _ -o �-n o
l-
o
T-��-�
W L O O
w
w -
=1 _
cn l - o
w
W C1 2
AIRPORT LEASE IINE
z
0
�I
z TAXI WAY
~ 65.5'
z
ov SRO U2=1L=10 FATI N
owf
l
9
w M M
z CROUP II TOFA (EXISTING)
=I
Q r SIGN
2 A
E4A E5 1 E4A E507
I
MH-C4
1 a 1 ill�ll�l■■ wool
�.111111��'®II111'��
�a:►-�rwua�uiiiu _ 1► i � I I�
■I■■■■�I■I■IV��III
■i■■■■■■imi�■, mom
- � 1 11 1 :±� �� 11 I)R— 1
3 C4
A. -
TAXIWAY A
M
CONCRETE ENCASED DUCTBANK
��4"C-SPARE
�(1)4"C, 3#600, #2G (VC-1/9)-480V/S1
r
(1)4"C-FIBER
(1)4"C-COMM SPARE 3 GRASS
2 E4A E50 1
HH-05
E4A E5 1 (COMM) '9� MH-C6
m m$ m
°HH-C4 (COMM)
LTO MH-B4
L
(VIA-C3,C2,C1) CONCRETE ENCASED DUCT6/Al Nn
1 5"C-3 4 0 MV-105,
(1)5"C-SPARE
(1)4"C-FIBER
RSA (174"C-COMM RARE RSA
75' RUNWAY SAFETY AREA (RSA)
RSA
IBRE s
PARE o,1 )
CONCRETE ENCASED DUCT BANK
— RSA RSA R(1)5"C-3#4/OA_MV-105, #R2G PSE #24)
RSA
(1)4"C-FIBER
(1)4"C-COMM SPARE
RUNWAY 16-34
m A
r.
— — — — s — — — — ss — s — — — U. CONTRACTOR SHALL PROVIDE DETAILED LOCATE SERVICE
[ FOR ALL AREAS IN BORE OR TRENCH PATH.
CONCRETE
_L
12. 01 ' O
Fw aaa- IorN3aN.z1 7. PROVIDE NYLON PULL CORDS IN ALL SPARE CONDUITS.
S1S —
L J 8. CONCRETE ENCASED DUCTS SHALL BE SCHEDULE 40 PVC
ET CASED DU TBA K L J REFERENCE DRAWINGS
YED 05-APRON-C-E110
D 05-APRON-C-E360 A
006
Epdo CONSTRUCTION NOTES
o
g ° g THIS DRAWING REFLECTS THE END RESULT OF THE
C6 DEMOLITION PROCESSES OF DRAWING E4AR.
F 3
AIRPORT LEASE UNE AIRPORT LEASE LINE
Pm
- +OFA TOFA TO 19T�� � � m �T A-
I
CONCRETE ENCASED DUCT BANK
CONCRETE ENCASED DUCT BANK I (1)4"C-SPARE
(1)5"C-3#4/0 MV-105, #2G (1)4"C-SPARE
" - PARE (1)4"C SPARE
(1)4"C-FIBER (1)4"C-COMM SPARE
W41-COMM SPARE
-(T)4-"& -SPARE- M
(1)4"C-SPARE
. � ro-A
HH-C6
rD"'-'� CONCRETE ENCASED DUCTBANK
(1)4"C-SPARE
4A E5 n (1)4"C-SPARE
(1)4"C-SPARE
MH-C10 (1)4"C-COMM SPARE
mo
HH-C10
� 3
E4A E5 2
log rc ozl an.zl �
CONCRETE ENCASED DUCTBANK
- To�1)4" C-SPARE
RSA R RSA RSA RSA RSA RSA
(1)4"C-FIBER
(1)4"C-COMM SPARE
75' RUNWAY SAFETY AREA (RSA)
I
RSA RSA RSA RSA RSA RSA R A RSA RSA RSA RSA — RSA RSA RSA RSA RSA
s s as -- zaS - - as C"r) as ° as
TOFA TOFA
• •• •gip• •• •
WOMEN
=
.
0
m
mom
MO
'
WSll1,51"ML—'1�
OM
�
]�>r
- mammoi
Mo
IL
1011"S 80�d
alm�d-ii
MIEN
'T�l7�na�,�\
.
II
0
a
0
\
FI-405643 KEY P LN zco
Q 5 K
2
SCALE: NONE Z �-40 L
50 25 0 25 50 100 ISSUE FOR CONSTRUCTION
APR0N C P�ANCCASNEEngineering
3545 FACTORIA BOULEVARD SE., SUITE 200
SCALE: 1:50 SCALE: 1 " = 50' z F E B RUARY 08, 2019 BELLEVUE, WA 98006
(425) 522-1000 WWW. CASNE. COM JOB NO. 191- 027
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE L DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL A DATE 02.08.19
C�4�' 0F WAS �� ACCEPTABILITY THIS ND R CHECKED
07.15.15 PARTIAL SITE PLAN -POWER DISTRIBUTION
- APRON C CI PROJECT W3441886 CASNE CEC 12.14.15
�' '� SPECIFICATION IS APPROVED SHEET
ENGINEER TITLE E4A E18
— RECORD DRAWING — 737 MAX FLIGHTLINE UTILITIES W3441886 CASNE DAT 12.19.16 ® P OVED BY DEPT. DATE JEA 07.16.15 APRON C PARCEL 820
BO�,�� CHECKED
A APRON C PARCEL 820 CASNE CEC 02.08.19 35276 w�' APRON C JOB NO. COMP NO.
°'�' ��CISTER �� APPROVED W3441886
�sSjONAL E11�� �I
APPROVED ELECTRICAL MASTER DAT DWG NO. 05-APRON-C-E4A
2