Loading...
HomeMy WebLinkAboutR-405646wlz R 65.5' GROUP II TOFA (EXISTING) SYM REVISION Y - APRON C CI PROJECT N - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES N A APRON C PARCEL 820 BY APPROVED DATE SYM W3441886 CASNE CEC 12.14.15 W3441886 CASNE DAT 12.19.16 CASNE CEC 02.08.19 REVISION 10 E5 5 i (TYP) I 3/4"C, 2# 10, #10G I 3/4"C, 2# 10 APRON C PLAN SCALE: 1 " = 20' BY I APPROVED I DATE ORANGE PAINT STRIP 7 Ij I j 5 Stalls .5U Stalls + TOTAL: 32 3/4"C, 2# 10, # 10G TAXIWAY A L BOE/NG` c-- y4`� of WAS L�Th .d� 35276 IST IONA 3/4"C, 2# 10, # 10G n +30' (TYP) PARTIAL LEGEND IO LED, OUTDOOR RATED I-) LED, OUTDOOR RATED, SURFACE MOUNT, 208V, 1 �, WITH INTEGRAL PHOTOCELL • CONCRETE LIGHT POLE, 30' FO LED, OUTDOOR, POLE MOUNT FIXTURE, 480V, 1 �, WITH INTEGRAL PHOTOCELL IN APRON LIGHT ASSEMBLY, 480V, 1 �, (5) FIXTURES PER POLE (AFF = DISTANCE TO BOTTOM OF LOWEST FIXTURE) UNDERGROUND CONDUIT C B EP 20 ENCLOSED CIRCUIT BREAKER, SIZE AS SHOWN. NEMA 4X *�If'm PORTABLE LIGHTS STAND 3/4"C, 2# 10, # 10G GENERAL NOTES 1. ALL NEW STRUCTURES AND FACILITIES ARE PARALLEL AND PERPENDICULAR TO EAST BOEING LEASE LINE AT BEARING N4°48'53"W. 2. PER IFC 2009, CHAPTER 11, AVIATION FACILITIES: AIRCRAFT BEING FUELED SHALL BE POSITIONED SUCH THAT ANY FUEL SYSTEM VENTS AND OTHER FUEL TANK OPENINGS ARE A MINIMUM OF TWENTY-FIVE FEET (7620 MM) FROM BUILDINGS OR STRUCTURE OTHER THAN JET BRIDGES; AND FIFTY FEET (15,240 MM) FROM AIR INTAKE VENTS FOR BOILER, HEATER OR INCINERATOR ROOMS. 3. REPAIR OR REPLACE ANY AND ALL PAVEMENT DISTURBED DURING CONSTRUCTION IN ACCORDANCE WITH C501 AND THE SPECIFICATIONS. 4. CONTRACTOR SHALL SUBMIT BORING PLANS AND PROFILES TO DESIGN TEAM FOR APPROVAL PRIOR TO MOBILIZING. 5. CONTRACTOR SHALL PROVIDE THOROUGH LOCATE SERVICE FOR ALL AREA'S IN BORE OR TRENCH PATH. 6. ALL DIRECT BURIED CONDUIT SHALL BE SCHEDULE 80 CONDUIT. SWEEPS WHICH ENTER THE EARTH SHALL BE PVC COATED RIGID STEEL. 7. ABOVE GRADE EXPOSED CONDUIT SHALL BE EITHER RIGID ALUMINUM OR PAINTED RIGID GALVANIZED STEEL. PER THE SPECIFICATIONS LOW VOLTAGE. E:w_1I I1Pi9I:ZKl]I1ILola 0]som' 'i7/.11■:1WZI:IImF13 CONSTRUCTON NOTES THIS DRAWING REFLECTS THE END RESULT OF THE DEMOLITION PROCESSES OF DRAWING E10R. O M 00 r- Gfl Ln I- N7 N O On 00 I-, Gfl Ln � N7 N O N7 N N N N N N N N N U U U U U U U U U U U U U U U U U U U U U - „ =� R N CIPA AIRPORT RE ON MUN _ �— 0 RU W APRON — o - I o 0-— - 4= A— Z Q E 0 " APRON »D° 201 _ (n 81/ 2- 10-71 0-5 A, —alp, 1 —80 1 —18 — L PAR AVENUE N. I COMPLE , v' PARKING L01 6 00 _ 1-405 KEY PLAN z SCALE: NONE 20 10 0 10 20 40 R-405646 Em Em N�I Emm SCALE: 1 20 ISSUE rno A C D E F G W J K L CONSTRUCTION ISSUE FOR CONSTRUCTION LF CASNEEngineering 3545 FACTORIA BOULEVARD SE., SUITE 200 F E B RUARY 083 2019 BELLEVUE, WA 98006 (425) 522-1000 WWW CASNE COM JOB NO 191-027 UAWN ACCEPTABILITY CK ALLISON U07.15.15 SUBTITLE THIS DESIGN AND/OR CHECKED LIGHTING PLAN - NORTH PARCEL SPECIFICATION IS APPROVED ENGINEER TITLE APRON C PARCEL 820 ROVED BY DEPT. DATE CHECKED APPROVED I APRON C CURRENT REVISION SYMBOL A DATE 02.08.19 SHEET E10 E21- JOB NO. COMP NO. W3441886 RENTON, WA °wc No. 05-APRON-C-El0 ELECTRICAL MASTER