HomeMy WebLinkAboutR-405647EQUIPMENT SCHEDULE
3
O
LJ
I
0
Z
O
Q
I
U)
0
rn
c
3
0
L
0
I
/
0
E
a)
0
0
N
00
U
v
m
0
c
O
Q
Q
0
m
J
0
0
r`
N
0
I
i
i
U
0
CL
/
W
w
/
U)
U
O
/
0
0
/
00
12
(N
N
1 � —
F
1
65.5'
GROUP II TOFA (EXISTING)
SYM REVISION
- APRON C Cl PROJECT
- RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES
A APRON C PARCEL 820
BY
APPROVED
DATE
SYM
W3441886
CASNE
CEC
12.14.15
W3441886
CASNE
DAT
12.19.16
CASNE
CEC
02.08.19
20 10 0 10 20 40
SCALE: 1:20
REVISION
APRON C
SCALE: 1 " = 20'
BY I APPROVED I DATE
L
""A,/NG`
c--
35276 y
oIST
�� `SIONAL�����
n2
70
F,
➢
z
D
W
z
0
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
ROVED BY DEPT. DATE
NAME
VOLTS
HP
FL4
�
3A
HWP-1
120
.5
3
PARTIAL LEGEND
30 EY DISCONNECT SWITCH, NON -FUSED. AMPERAGE AS SHOWN.
CB ❑J ENCLOSED CIRCUIT BREAKER; BREAKER SIZE AS SHOWN
20
0 JBOX
WP WEATHERPROOF
GENERAL NOTES
1. ALL NEW STRUCTURES AND FACILITIES ARE PARALLEL
AND PERPENDICULAR TO EAST BOEING LEASE LINE AT
BEARING N4°48'53"W.
2. PER IFC 2009, CHAPTER 11, AVIATION FACILITIES:
AIRCRAFT BEING FUELED SHALL BE POSITIONED SUCH
THAT ANY FUEL SYSTEM VENTS AND OTHER FUEL TANK
OPENINGS ARE A MINIMUM OF TWENTY-FIVE FEET (7620
MM) FROM BUILDINGS OR STRUCTURE OTHER THAN JET
BRIDGES; AND FIFTY FEET (15,240 MM) FROM AIR
INTAKE VENTS FOR BOILER, HEATER OR INCINERATOR
ROOMS.
3. REPAIR OR REPLACE ANY AND ALL PAVEMENT DISTURBED
DURING CONSTRUCTION IN ACCORDANCE WITH C501 AND
THE SPECIFICATIONS.
4. CONTRACTOR SHALL SUBMIT BORING PLANS AND
PROFILES TO DESIGN TEAM FOR APPROVAL PRIOR TO
MOBILIZING.
5. CONTRACTOR SHALL PROVIDE THOROUGH LOCATE SERVICE
FOR ALL AREA'S IN BORE OR TRENCH PATH.
6. ALL BURIED CONDUIT NOT ENCASED IN CONCRETE SHALL
BE PVC COATED RIGID. EXCEPTION: 400HZ CONDUIT
SHALL BE RIGID ALUMINUM.
7. ABOVE GRADE EXPOSED CONDUIT SHALL BE EITHER RIGID
ALUMINUM OR PVC COATED RIGID STEEL PER THE
SPECIFICATIONS.
8. ALL POWER CONDUCTORS SHALL BE XHHW.
9. PROVIDE EXPLOSION PROOF SEALOFFS ON ALL CONDUITS
ENTERING OR EXITING THE EARTH.
CONSTRUCTOR NOTES
THIS DRAWING REFLECTS THE END RESULT OF THE
DEMOLITION PROCESSES OF DRAWING E60R.
O m 00 � O ul) � r7 N O m 00 � co � � r7 N O
r-) N N N N N N N N N N
_
-14
APRONAV
""
P
.
AP
RON"'
-TON
UN
CIPA
AIR
OR
i
�{{
o l
RU
AP
-
Q
_
ECL
A
RON
"Dt'
5
20/
1
Q
-
�
AA
81/
2
0-5'
1 -80
1 -18
PAR
I
AV
NUE
-
N.
COMPLE
�
PAR
�
V)
00
00
Z
R-405647
ISSUE FOR CONSTRUCTION
FEBRUARY 08, 2019
UNAWN UAIt- SUBTITLE
C. ALLISON 07.15.15 CHECKED 208Y/120V POWER PLAN - CIS AND C7
ENGINEER TITLE APRON C PARCEL 820
CHECKED
APPROVED APRON C
scA E N of AN z
CECASNEEngineering
3545 FACTORIA BOULEVARD SE., SUITE 200
BELLEVUE, WA 98006
(425) 522-1000 WWW.CASNE.COM JOB NO. 191-027
CURRENT REVISION SYMBOL DATE
A 02.08.19
SHEET
E60 E22
JOB NO. COMP NO.
W3441886
RENTON, WArWG No. 05-APRON-C-E60
A
B
C
D
E
F
G
H
J
K
L
ELECTRICAL MASTER