Loading...
HomeMy WebLinkAboutR-405647EQUIPMENT SCHEDULE 3 O LJ I 0 Z O Q I U) 0 rn c 3 0 L 0 I / 0 E a) 0 0 N 00 U v m 0 c O Q Q 0 m J 0 0 r` N 0 I i i U 0 CL / W w / U) U O / 0 0 / 00 12 (N N 1 � — F 1 65.5' GROUP II TOFA (EXISTING) SYM REVISION - APRON C Cl PROJECT - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES A APRON C PARCEL 820 BY APPROVED DATE SYM W3441886 CASNE CEC 12.14.15 W3441886 CASNE DAT 12.19.16 CASNE CEC 02.08.19 20 10 0 10 20 40 SCALE: 1:20 REVISION APRON C SCALE: 1 " = 20' BY I APPROVED I DATE L ""A,/NG` c-- 35276 y oIST �� `SIONAL����� n2 70 F, ➢ z D W z 0 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED ROVED BY DEPT. DATE NAME VOLTS HP FL4 � 3A HWP-1 120 .5 3 PARTIAL LEGEND 30 EY DISCONNECT SWITCH, NON -FUSED. AMPERAGE AS SHOWN. CB ❑J ENCLOSED CIRCUIT BREAKER; BREAKER SIZE AS SHOWN 20 0 JBOX WP WEATHERPROOF GENERAL NOTES 1. ALL NEW STRUCTURES AND FACILITIES ARE PARALLEL AND PERPENDICULAR TO EAST BOEING LEASE LINE AT BEARING N4°48'53"W. 2. PER IFC 2009, CHAPTER 11, AVIATION FACILITIES: AIRCRAFT BEING FUELED SHALL BE POSITIONED SUCH THAT ANY FUEL SYSTEM VENTS AND OTHER FUEL TANK OPENINGS ARE A MINIMUM OF TWENTY-FIVE FEET (7620 MM) FROM BUILDINGS OR STRUCTURE OTHER THAN JET BRIDGES; AND FIFTY FEET (15,240 MM) FROM AIR INTAKE VENTS FOR BOILER, HEATER OR INCINERATOR ROOMS. 3. REPAIR OR REPLACE ANY AND ALL PAVEMENT DISTURBED DURING CONSTRUCTION IN ACCORDANCE WITH C501 AND THE SPECIFICATIONS. 4. CONTRACTOR SHALL SUBMIT BORING PLANS AND PROFILES TO DESIGN TEAM FOR APPROVAL PRIOR TO MOBILIZING. 5. CONTRACTOR SHALL PROVIDE THOROUGH LOCATE SERVICE FOR ALL AREA'S IN BORE OR TRENCH PATH. 6. ALL BURIED CONDUIT NOT ENCASED IN CONCRETE SHALL BE PVC COATED RIGID. EXCEPTION: 400HZ CONDUIT SHALL BE RIGID ALUMINUM. 7. ABOVE GRADE EXPOSED CONDUIT SHALL BE EITHER RIGID ALUMINUM OR PVC COATED RIGID STEEL PER THE SPECIFICATIONS. 8. ALL POWER CONDUCTORS SHALL BE XHHW. 9. PROVIDE EXPLOSION PROOF SEALOFFS ON ALL CONDUITS ENTERING OR EXITING THE EARTH. CONSTRUCTOR NOTES THIS DRAWING REFLECTS THE END RESULT OF THE DEMOLITION PROCESSES OF DRAWING E60R. O m 00 � O ul) � r7 N O m 00 � co � � r7 N O r-) N N N N N N N N N N _ -14 APRONAV "" P . AP RON"' -TON UN CIPA AIR OR i �{{ o l RU AP - Q _ ECL A RON "Dt' 5 20/ 1 Q - � AA 81/ 2 0-5' 1 -80 1 -18 PAR I AV NUE - N. COMPLE � PAR � V) 00 00 Z R-405647 ISSUE FOR CONSTRUCTION FEBRUARY 08, 2019 UNAWN UAIt- SUBTITLE C. ALLISON 07.15.15 CHECKED 208Y/120V POWER PLAN - CIS AND C7 ENGINEER TITLE APRON C PARCEL 820 CHECKED APPROVED APRON C scA E N of AN z CECASNEEngineering 3545 FACTORIA BOULEVARD SE., SUITE 200 BELLEVUE, WA 98006 (425) 522-1000 WWW.CASNE.COM JOB NO. 191-027 CURRENT REVISION SYMBOL DATE A 02.08.19 SHEET E60 E22 JOB NO. COMP NO. W3441886 RENTON, WArWG No. 05-APRON-C-E60 A B C D E F G H J K L ELECTRICAL MASTER