HomeMy WebLinkAboutWAR306230-20180301-CSWGP.pdfSTATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47600 • Olympia, WA 98504-7600 • 360-407-6000
711 for Washington Relay Service • Persons with a speech disability can call 877-833-6341
March 1,2018
Stawant Singh
Cedar Ridge, LLC
24419 105th PI SE
Kent, WA 98030
RE: Coverage under the Construction Stormwater General Permit (CSWGP)
Permit number: WAR306230
Site Name: Cedar Ridge
Location: 13609 156th Ave SE
Renton, WA County: King
Disturbed Acres: 1.67
Dear Mr. Singh:
The Washington State Department of Ecology (Ecology) received your Notice of Intent for
coverage under Ecology's Construction Stormwater General Permit (CSWGP). This is your
permit coverage letter. Your permit coverage is effective March 1, 2018. Please retain this
permit coverage letter as the official record of permit coverage for your site.
Ecology has approved use of electronic formats as long as they are easily produced on your
construction site. A mobile friendly copy of the CSWGP permit, permit forms, and information
related to your permit can be viewed and downloaded at www.ecology.wa.gov/eCoverage-
packet. Please contact your Permit Administrator, listed below, if you would like to receive a
hard copy of the CSWGP.
Please take time to read the entire permit and contact Ecology if you have any questions.
Electronic Discharge Monitoring Reports (WQWebDMR)
This permit requires that Permittees submit monthly discharge monitoring reports (DMRs) for
the full duration of permit coverage (from issuance date to termination). DMRs must be
submitted electronically using Ecology's secure online system, WQWebDMR. To sign up for
WQWebDMR go to www.ecy.wa.gov/programs/wq/permits/paris/webdmr.html. If you have
questions, contact the portal staff at (360) 407-7097 (Olympia area), or (800) 633-6193/option 3,
or email WQWebPortaleecy.wa.gov.
0
Stawant Singh
March 1,2018
Page 2
Appeal Process
You have a right to appeal coverage under the general permit to the Pollution Control Hearing
Board (PCHB). Appeals must be filed within 30 days of the date of receipt of this letter. Any
appeal is limited to the general permit's applicability or non-applicability to a specific
discharger. The appeal process is governed by chapter 43.21B RCW and chapter 371-08 WAC.
"Date of receipt" is defined in RCW 43.21B.001(2). For more information regarding your right
to appeal, go to https://fortress.wa.gov/ecy/publications/SummarvPages/1710007.html to see
Ecology's Focus Sheet: Appeal of General Permit Coverage.
Ecology Field Inspector Assistance
If you have questions regarding stormwater management at your construction site, please contact
Evan Dobrowslci of Ecology's Northwest Regional Office in Bellevue at
evan.dobrowski@ecy.wa.gov, or (425) 649-7276.
Questions or Additional Information
Ecology is committed to providing assistance. Please review our web page at
www.ecologv.wa.goviconstructionstormwaterpermit. If you have questions about the
Construction Stormwater General Permit, please contact your Permit Administrator, RaChelle
Stane at rcla461@ecy.wa.gov or (360) 407-6556.
Sincerely,
Vincent McGowan, Manager
Program Development Services Section
Water Quality Program