Loading...
HomeMy WebLinkAboutT-397403I— n INI— ..L TO V I LU 0 N� I..L I..L Q 0 LU U r , o�� z F a 3. O O 4 J 4 ° .4 4 STREET LIGHT POLE —� PLAN VIEW JUNCTION BOX -0 4" DEEP SIDE VIEW LIGHTING STANDARD & JUNCTION BOX PLAN VIEW NDIVIDUAL JUNCTION BOX NOTE: CLASS `B' CONCRETE TO BE USED IN CONSTRUCTION OF PAD STY O n� + PUBLIC WORKS DEPARTMENT CONCRETE PAD DETAILS PLAN - 120 DVEM 0 TE III I� aq� got wot I < om `zx f CZ7 0 �m Ut w O o O OLLJ iS $ i 3w - N Ofaf W d >U i of UN wa 7 WW w wU ZsFw zg(--(° �¢x WQ Of ODW O& �o 0 h S! Ey ~ i< aon:F s o of '~"a Ubs a O U O—O of Dim ZmB o3y'cig 'app^aoF O—O O j0ryI 5r OlUi l0mi aib4 gmo�y0"yl`FE1< zi" w�iNm3=U`0 oT a3 ��So o : ' <o Dw yAI'� W10 ggBffi's 9E $ 3 DU SH $'gtn �G o W �hUwY m ar g Ow J M�i"idr m m S0iH 03 a ao f O 0 wi > z mi z b a IN I LTI m �:4 L L W Q � la 122.1 — e PUBLIC WORKi9 SERVICE CAB9M. PLAN INET DEPARTMENT WITHOUT BBS API} 00 t� Call 2 Working Days Before You Dig 811 Jtilities Underground Location Cente (ID,MT,ND,OR,WA) REFER TO WSDOT LOCKING LID STANDARD DUTY JUNCTION BOX TYPES 1 & 2 STANDARD PLAN J-40.10-03 SPLICE KITS CLEAR EPDXY —1 SWIPRE RUNS ON ALL THRU CONCRETE PAD .11 r #8 BARE COPPER — GROUND WIRE 1 —#B RE/L.Ulr FROM SCREEN INSULATION FROM SERVICE CABINET 2 — LIGHTING SYSTEM — WIRES TO CONTACTOR (SIZED AS REO'D.) 5/B"aB' COPPER CLAD GROUND ROD 4" 2' MIN. LUMINAIRE WIRES WILL BE A CONTINUOUS RUN FROM FUSE HOLDER TO FIXTURE WITH NO SPUCES. GROUND RDO FUSE KITS QUICK DISCONNECT TO LUMINAIRE 3 AMP IN LINE FUSE KITS LUMINAIRE WIRES WILL BE N12 S.E.C. OR EQUAL AWG IN A JACKETED CAB #B GREEN INSULATED WIRE TO FIXTURE GROUND LUG GROUND LUG DRAM HOLE 2" MIN. GROUT UNDER POLE BA I 1�;11�AAA�\ 1 11 I —GROUND CLAMP I I i 4' I; 2" PVC CONDUIT''..i I� SYSTEM cJit CONCRETE FOUNDATION 3' SO. OR DIA. NOTES: 1. EQUIPMENT GROUND WIRE & BARE WIRE SHALL BE SECURELY FASTENED TO THE GROUND LUG INSIDE THE POLE HANDHOLE. ALL BONDING & GROUNDING CONNECTIONS SHALL REMAIN ACCESSIBLE FOR INSPECTION AND MAINTENANCE. 2. IF THE FIXTURE MANUFACTURER HAS MADE PROVISION FOR THE ATTACHMENT OF A GROUND WIRE A GREEN INSULATED WIRE OF THE SAME SIZE SHALL BE RUN FROM THE FIXTURE TO THE GROUND LUG INSIDE THE POLE HANDHOLE. IF THE FIXTURE MANUFACTURER HAS A GROUND LUG A #B GREEN INSULATED WIRE SHALL BE RUN FROM THE FIXTURE GROUND LUG TO THE POLE GROUND LUG. n.-CIF-AR). PUBLIC WORKS TYPICAL LIGHTING DEPARTMENT UNDERGROUND SYSTEM �ONWAsO /VL7RTH WEST Ln -O � TIFA FF/C EXPER Ts 30251 0 �� 11410 NE 124th St., #590, Kirkland, WA 98034 FSS��/STER��G� 2• ANAL 1 Phone: 425.522.4118 Fax: 425.522.4311 ''1111,111111' " N0. OF CONCRETE FOUNDATION TO LEVEL PATH TOP OF SIDEWALK CURB. 1. STD. PLAN — 119 APPROVED: REVISED PER BASE PLANS REVISED PER CITY COMMENTS REVISION SPLICE KIT FUSE KIT WYE SPLICE FUSE KIT & SPLICE KIT DETAILS Y O� ADOPTED CITY OF RENTON UK 1W Standard plans N `O� LST DATE: 1 1 /5/96 DWG. NAME: JR-12 SP PAGE: J013 STREET LIGHTING CONTACTOR CABINET WIRING SCHEMATIC TYPE III SERVICE 120/240 VOLT 100 A MAIN BREAKER (MIN.) 2 POLE 240 VOLT m UBRJAN BREAKERS w 40 VOLTz TEST POLE SWITCH FF E A I� TERMINAL B C BLOCK UTILITY PLUG (GFI) STREET LIGHTING CONTACTORS CIRCUIT WIRES TO LIGHTING RUNS PHOTO —CELL TO GROUND MOUNTED ON ROD NEAREST LUMINAIRE WIRING COLOR CODE A. WHITE JACKET (NEUTRAL) B. BLACK JACKET (LINE) C. GREEN JACKET (GROUND) D. RED JACKET (LOAD) E. GREEN OR BARE WIRE (GROUND) o — PUBLIC WORKS STREET LIGHTING CONTACTOR STD. PLAN g�^PROVEp. DEPARTMENT CABINET SCHEMATIC Vl..si ltw/MMtui_ SURVEYED: DESIGNED: VJG VJG 11/8/17 LDH DRAWN: VJG VJG 10/17/17 LDH CHECKED: LDH BY DATE AP P R APPROVED: SCALE: AS NOTED VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M CONDUIT ENTR. AREA 4 o�o 'a PLAN VIEW SIZE TO FIT SIZE TO FIT CABINET CABINET e —Grade Level 41 J4 N , N < 4 ' FRONT VIEW SIDE VIEW Shim to plumb Shim to plumb See Note 3 s See Note 3 +I #4 hoops +I #4 hoops o #4 bar each corner b f— #4 bar each corner VOL 6" MIN 1" to 2" ZB" MIN 3/8" diameter plastic drain 3/6" diameter plastic drain a �3 S 0 V SIDE VIEW 1'-6" Cabinet depth 1'-6" + 2" + #4 hoops SIDE VIEW 1'-6" Cabinet depth 1'-6" + 2" #4 bar each r corner .. N m + 0 0 tJ #4 bar each corner u� PLAN VIEW PLAN VIEW PAD MOUNT PAD MOUNT CONTROLLER CABINET FOUNDATION BATTERY BACKUP SYSTEM (BBSS) FOUNDATION For NOTES see Std. Plan 126.2 STD. PLAN - 126.1 w_®+ PUBLIC WORKS CABINET FOUNDATION DETAILS ROVE DEPARTMENT 1� FxO T CITY OF RENTON Planning/Building/Public Works Dept. u- I— nJ T-397403 I� IN COMPLIANCE WITH CITY OF RENTON STANDARDS Qf 0 TRANSPORTATION OPERATION DEVELOPMENT ENGINEERING cbarnes 07/27/2018 rnair 07/30/2018 W C� 0 DATE: CEDAR RIDGE SHORT PLAT 11/8/17 Q FIELDBOOK: ILLUMINATION DETAILS PAGE: 0 DRAWING NO: LL, 156TH AVE SE/SE 2ND PL IL3 U RENTON, WASHINGTON 98056 SHEET:3 OF:3