Loading...
HomeMy WebLinkAboutMFP19002558.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19002558 IVR Number: 19002558 Permit Informaon Permit Name:Century Link Permits Address/Locaon :05/14/2019Application Date:9154600005Parcel Number:800 S GRADY WAY Permit Type:05/17/2019Issue Date:Franchise Permit Work Class:05/18/2020Expiration Date:Minor Utility Job Number:N.539173Franchise Type:Telephone Description:Century Link to access MH207. All other work to take place on private property. Restoration per City of Renton standards. REVISION: Century Link to access MH207, MH293, and PED1703. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling C/O QWEST CORP 1801 CALIFORNIA ST #4600 Denver, CO 80202 Applicant Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Heather Binkly Dycom Industries dba North Sky 11770 Us Hwy 1, SUITE 101 Palm Beach Gardens, FL 33408 B: (360) 254-6920 O: (360) 450-3287 Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 7850 S TRAFTON St TACOMA, WA 98409 Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov REVISION - FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Only Current Issued Permits Qualify for a Revision. For any work related to an expired or finaled permit, a new Franchise Permit Application shall be required. Submit an electronic copy of the plans with the Revision Franchise Permit Application to franchisepermits@rentonwa.gov. Permit # Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Approved Description of Work: Proposed Description of Work: Reason for change of work: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP19002558 Qwest Corp d/b/a CenturyLink N.539173 Austin Sweeney 253-766-7549 austin.sweeney@centurylink.com 800 S Grady Way Century Link to access MH207. All other work to take place on private property. Restoration per City of Renton standards. CenturyLink to access MH207, MH293, and Ped1703. Original path found not viable once in field. New path required to bring service to customer 6/10/2019Austin Sweeney RESTORATION PER CITY OF RENTON STANDARDS Scott Warlick 6/14/2019 Holly Powers 6/28/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: N.539173 North Sky Communications 206-962-5116 Austin Sweeney 253-766-7549 23315 66th Ave S Kent, WA 98032 austin.sweeney@centurylink.com 800 S Grady Way Reset FormPrint Form Austin Sweeney Austin Sweeney 05/14/2019 MFP19002558 Scott Warlick 5/15/2019Monday - Friday 9:00am - 3:00pm SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). Comments: SIGN SPACING MPH "X"45+ 500' 35 350'30 200' 25 100'150' Seattle 200' Sea Tac Comments: CHANNELIZATION SPACING MPH TAPER TANGENT35 / 45 30' 60'25 / 30 20' 40' ONE LANE TWO WAY TAPER 50' TO 100' max TRAFFIC CONTROL PLAN JOB # N.539173 C.45 PERMIT # UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM: SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com Date:06/07/2019 Author:Sharon Martos, Traffic Control Supervisor Project:N.539173 C.45 CERT:TCS # 010745 CENTURYLINK:Certified Traffic Control Plan (DO NOT ALTER) Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements. 2. Channelizing devices are 28" traffic cones with retroreflective material. 3. All signs are 48" x 48" B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum of 11' for lane width. 6. Work hours will be ____am to ____pm. Comments: MERGING TAPER LENGTH TAPER ('L') LANE WIDTH L MPH 10' 11' 12' SHIFTING 20 70 75 80TAPER 25 105 115 165 1/2 L 30 150 165 180 35 205 225 245SHOULDER 40 270 295 320 TAPER 45 450 495 540 1/3 L Sharon Martos Project # N.539173 C.45 Designed for CenturyLink by Sharon Martos Approved 06/07/2019 Traffic Control SupervisorTCS # 010745 Expires: 5/30/2021 Phone 253-737-5198 sharon.martos@gmail.com Not to scaleNOT TO SCALE S 7TH ST @ TALBOT RD S MH 293 RIGHT LANE CLOSURE Comments: ACCESS MH 293 SOUTH SIDE OF S 7TH ST, WEST OF TALBOT RD S. RIGHT LANE CLOSURE. SIDEWALK IS ACCESSIBLE. SPOTTER WILL ASSIST PEDESTRIANS. N ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEAD W20-1 ROADWORKAHEADW20-1S 7TH ST TALBOT RD SSMITHERS AVE SBURNETT AVE SSPEED LIMIT25 RIGHT LANECLOSEDAHEADW20-5W4-2MH 293 WORK AREA 10 X 150 100'100'100'105' Legend Arrowboard (Chevron) Cone Not to scale Scale Marker Spotter Work Area Work Truck 423 S 7TH ST www.invarion.com MFP19002558 Comments: SIGN SPACING MPH "X" 45+ 500'35 350'30 200'25 100'150' Seattle200' Sea Tac Comments: CHANNELIZATION SPACING MPH TAPER TANGENT35 / 45 30' 60'25 / 30 20' 40'ONE LANE TWO WAYTAPER 50' TO 100' max TRAFFIC CONTROL PLAN JOB # N.539173 C.45 PERMIT # UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM: SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com Date:06/07/2019 Author:Sharon Martos, Traffic Control Supervisor Project:N.539173 C.45 CERT:TCS # 010745 CENTURYLINK:Certified Traffic Control Plan (DO NOT ALTER) Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements. 2. Channelizing devices are 28" traffic cones with retroreflective material. 3. All signs are 48" x 48" B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum of 11' for lane width. 6. Work hours will be ____am to ____pm. Comments: MERGING TAPER LENGTH TAPER ('L') LANE WIDTH L MPH 10' 11' 12' SHIFTING 20 70 75 80 TAPER 25 105 115 1651/2 L 30 150 165 180 35 205 225 245SHOULDER 40 270 295 320 TAPER 45 450 495 540 1/3 L Sharon Martos Project # N.539173 C.45 Designed for CenturyLink bySharon Martos Approved 06/07/2019 Traffic Control SupervisorTCS # 010745 Expires: 5/30/2021 Phone 253-737-5198sharon.martos@gmail.com Not to scaleNOT TO SCALE TALBOT RD S @ S 7TH ST PED 1703 RIGHT LANE CLOSURE Comments: ACCESS PED 1703 WEST SIDE TALBOT D S, SOUTH OF S 7TH ST. RIGHT LANE CLOSURE SIDEWALK IS ACCESSIBLE. SPOTTER WILL ASSIST PEDESTRIANS.S 7TH STTALBOT RD S SMITHERS AVE S BURNE T T A V E S SPEEDLIMIT25 WORK AREA 10 X 40 PED 1703 ROADWORKAHEADW20-1ROADWORKAHEAD W20-1 ROA DWORKAHEADW20- 1 ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2100'100'100'105' Legend Arrowboard (Chevron) Cone Not to scale Scale Marker Spotter Work Area Work Truck N 423 S 7TH ST www.invarion.com MFP19002558 TRAFFIC CONTROL PLAN JOB # N.539173. C.45 PERMIT #ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEA DW20-1ROADWORKAHEADW20-1ROADWORKAHEAD W20-1 RIGHT LANECLOSEDAHEADW20-5RIGHT L A N ECLOSEDAHEADW20-5 W4-2ROADWORKAHEADW20-1S GRADY WAY @ TALBOT RD S MH 207 RIGHT LANE CLOSURE DWY S GRADY WAY TALBOT RD SWILLIAMS A V E S MH 207 RIGHT LANEMUSTTURN RIGHT R3-7r Comments: THIS IS TO ACCESS THE MH 207 LOCATED AT THE NE CORNER OF TALBOT RD S & S GRADY WAY. THIS IS A RIGHT LANE CLOSURE WESTBOUND. NOTIFY METRO PRIOR TO START OF WORK REGARDING ACCESSTO BUS STOP DURING WORK HOURS. RIGHT LANE NORTHBOUND TALBOT RD S IS CLOSED TO THRU TRAFFIC. RIGHT TURN ONLY PERMITTED. CROSSWALKS REMAIN ACCESSIBLE. SPOTTER WILL ASSIST PEDESTRIANS AT WORK AREA. Legend Arrowboard (Chevron) CONES SPOTTER WORK AREA THRUTRA F F I C MER G E LEFTW4- 1 a RIGHT LANEMUSTTURN RIGHT R3-7r Designed For: CENTURYLINK Project # N. 539173.C.45 Kathy HubbardTraffic Control SupervisorTCS # 011905 Approved 5/7/2019 Phone 253-737-5198tcpnd@comcast.net _______________________Kathy Hubbard UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TOALTER THIS CERTIFIED TRAFFIC CONTROL PLANIN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM: KATHY HUBBARD, TCS# 011905, tcpnd@comcast.net ONE LANE TWO WAY TAPER 50' MIN/100' MAX NOT TO SCALE CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60Date:5/7/19 Author:Kathy Hubbard, Traffic Control Supervisor Project:N.539173.C.45 CERT:TCS # 011905 Designed for CenturyLink:(DO NOT ALTER) Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements. 2. Channelizing devices are 28" traffic cones with retro reflective material. 3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum of 11' for lane width. 6. Work hours will be ____am to ____pm. SPEEDLIMIT 35N 350'+/-350'+/-350'+/- 225'+/- WORK AREA 10' X 275' www.invarion.com MFP19002558 MFP19002558 MFP19002558 MFP19002558