HomeMy WebLinkAboutMFP19002558.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19002558
IVR Number: 19002558
Permit Informaon
Permit Name:Century Link Permits
Address/Locaon :05/14/2019Application Date:9154600005Parcel Number:800 S GRADY WAY
Permit Type:05/17/2019Issue Date:Franchise
Permit Work Class:05/18/2020Expiration Date:Minor Utility
Job Number:N.539173Franchise Type:Telephone
Description:Century Link to access MH207. All other work to take place on private property. Restoration per City of Renton
standards.
REVISION: Century Link to access MH207, MH293, and PED1703. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
C/O QWEST CORP 1801 CALIFORNIA ST #4600
Denver, CO 80202
Applicant
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Heather Binkly
Dycom Industries dba North Sky
11770 Us Hwy 1, SUITE 101
Palm Beach Gardens, FL 33408
B: (360) 254-6920
O: (360) 450-3287
Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 7850 S TRAFTON St
TACOMA, WA 98409
Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
REVISION - FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Only Current Issued Permits Qualify for a Revision. For any work related to an expired or
finaled permit, a new Franchise Permit Application shall be required. Submit an electronic copy of the plans
with the Revision Franchise Permit Application to franchisepermits@rentonwa.gov.
Permit #
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Approved Description of Work:
Proposed Description of Work:
Reason for change of work:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP19002558
Qwest Corp d/b/a CenturyLink
N.539173
Austin Sweeney
253-766-7549
austin.sweeney@centurylink.com
800 S Grady Way
Century Link to access MH207. All other work to take place on private property.
Restoration per City of Renton standards.
CenturyLink to access MH207, MH293, and Ped1703.
Original path found not viable once in field. New path required to bring service to customer
6/10/2019Austin Sweeney
RESTORATION PER CITY OF RENTON STANDARDS
Scott Warlick 6/14/2019
Holly Powers 6/28/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
N.539173
North Sky Communications 206-962-5116
Austin Sweeney 253-766-7549
23315 66th Ave S Kent, WA 98032
austin.sweeney@centurylink.com
800 S Grady Way
Reset FormPrint Form
Austin Sweeney
Austin Sweeney 05/14/2019
MFP19002558
Scott Warlick
5/15/2019Monday - Friday
9:00am - 3:00pm
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
Comments:
SIGN SPACING
MPH "X"45+ 500'
35 350'30 200'
25 100'150' Seattle
200' Sea Tac
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT35 / 45 30' 60'25 / 30 20' 40'
ONE LANE TWO WAY
TAPER 50' TO 100' max
TRAFFIC CONTROL PLAN
JOB # N.539173 C.45
PERMIT #
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON
TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com
Date:06/07/2019 Author:Sharon Martos, Traffic Control Supervisor Project:N.539173 C.45
CERT:TCS # 010745 CENTURYLINK:Certified Traffic Control Plan (DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTON
requirements.
2. Channelizing devices are 28" traffic cones with retroreflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum of 11' for lane width.
6. Work hours will be ____am to ____pm.
Comments:
MERGING TAPER LENGTH
TAPER ('L') LANE WIDTH
L MPH 10' 11' 12'
SHIFTING 20 70 75 80TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245SHOULDER 40 270 295 320
TAPER 45 450 495 540
1/3 L
Sharon Martos
Project # N.539173 C.45
Designed for CenturyLink by
Sharon Martos
Approved 06/07/2019
Traffic Control SupervisorTCS # 010745
Expires: 5/30/2021
Phone 253-737-5198
sharon.martos@gmail.com
Not to scaleNOT TO SCALE
S 7TH ST @ TALBOT RD S
MH 293
RIGHT LANE CLOSURE
Comments:
ACCESS MH 293
SOUTH SIDE OF S 7TH ST, WEST OF
TALBOT RD S.
RIGHT LANE CLOSURE.
SIDEWALK IS ACCESSIBLE.
SPOTTER WILL ASSIST PEDESTRIANS.
N
ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEAD
W20-1 ROADWORKAHEADW20-1S 7TH ST
TALBOT RD SSMITHERS AVE SBURNETT AVE SSPEED
LIMIT25
RIGHT LANECLOSEDAHEADW20-5W4-2MH 293
WORK AREA
10 X 150
100'100'100'105'
Legend
Arrowboard (Chevron)
Cone
Not to scale Scale Marker
Spotter
Work Area
Work Truck
423
S 7TH ST
www.invarion.com
MFP19002558
Comments:
SIGN SPACING
MPH "X"
45+ 500'35 350'30 200'25 100'150' Seattle200' Sea Tac
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT35 / 45 30' 60'25 / 30 20' 40'ONE LANE TWO WAYTAPER 50' TO 100' max
TRAFFIC CONTROL PLAN
JOB # N.539173 C.45
PERMIT #
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON
TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com
Date:06/07/2019 Author:Sharon Martos, Traffic Control Supervisor Project:N.539173 C.45
CERT:TCS # 010745 CENTURYLINK:Certified Traffic Control Plan (DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTON
requirements.
2. Channelizing devices are 28" traffic cones with retroreflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum of 11' for lane width.
6. Work hours will be ____am to ____pm.
Comments:
MERGING TAPER LENGTH
TAPER ('L') LANE WIDTH
L MPH 10' 11' 12'
SHIFTING 20 70 75 80
TAPER 25 105 115 1651/2 L 30 150 165 180
35 205 225 245SHOULDER 40 270 295 320
TAPER 45 450 495 540
1/3 L
Sharon Martos
Project # N.539173 C.45
Designed for CenturyLink bySharon Martos
Approved 06/07/2019
Traffic Control SupervisorTCS # 010745
Expires: 5/30/2021
Phone 253-737-5198sharon.martos@gmail.com
Not to scaleNOT TO SCALE
TALBOT RD S @ S 7TH ST
PED 1703
RIGHT LANE CLOSURE
Comments:
ACCESS PED 1703 WEST SIDE TALBOT D S, SOUTH
OF S 7TH ST.
RIGHT LANE CLOSURE
SIDEWALK IS ACCESSIBLE.
SPOTTER WILL ASSIST PEDESTRIANS.S 7TH STTALBOT RD S SMITHERS AVE S
BURNE
T
T
A
V
E
S
SPEEDLIMIT25
WORK AREA
10 X 40
PED 1703 ROADWORKAHEADW20-1ROADWORKAHEAD
W20-1
ROA
DWORKAHEADW20-
1 ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2100'100'100'105'
Legend
Arrowboard (Chevron)
Cone
Not to scale Scale Marker
Spotter
Work Area
Work Truck
N
423
S 7TH ST
www.invarion.com
MFP19002558
TRAFFIC CONTROL PLAN
JOB # N.539173. C.45
PERMIT #ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEA
DW20-1ROADWORKAHEADW20-1ROADWORKAHEAD
W20-1 RIGHT LANECLOSEDAHEADW20-5RIGHT L
A
N
ECLOSEDAHEADW20-5 W4-2ROADWORKAHEADW20-1S GRADY WAY @ TALBOT RD S
MH 207
RIGHT LANE CLOSURE
DWY
S GRADY WAY
TALBOT RD SWILLIAMS
A
V
E
S
MH 207
RIGHT LANEMUSTTURN RIGHT
R3-7r
Comments:
THIS IS TO ACCESS THE MH 207 LOCATED AT THE
NE CORNER OF TALBOT RD S & S GRADY WAY.
THIS IS A RIGHT LANE CLOSURE WESTBOUND.
NOTIFY METRO PRIOR TO START OF WORK REGARDING ACCESSTO BUS STOP DURING WORK HOURS.
RIGHT LANE NORTHBOUND TALBOT RD S IS CLOSED TO THRU
TRAFFIC. RIGHT TURN ONLY PERMITTED.
CROSSWALKS REMAIN ACCESSIBLE.
SPOTTER WILL ASSIST PEDESTRIANS AT WORK AREA.
Legend
Arrowboard (Chevron)
CONES
SPOTTER
WORK AREA
THRUTRA
F
F
I
C
MER
G
E
LEFTW4-
1
a
RIGHT LANEMUSTTURN RIGHT
R3-7r
Designed For: CENTURYLINK
Project # N. 539173.C.45
Kathy HubbardTraffic Control SupervisorTCS # 011905
Approved 5/7/2019
Phone 253-737-5198tcpnd@comcast.net
_______________________Kathy Hubbard
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TOALTER THIS CERTIFIED TRAFFIC CONTROL PLANIN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
KATHY HUBBARD, TCS# 011905, tcpnd@comcast.net
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
NOT TO
SCALE
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60Date:5/7/19 Author:Kathy Hubbard, Traffic Control Supervisor Project:N.539173.C.45
CERT:TCS # 011905 Designed for CenturyLink:(DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum of 11' for lane width.
6. Work hours will be ____am to ____pm.
SPEEDLIMIT
35N
350'+/-350'+/-350'+/-
225'+/-
WORK AREA
10' X 275'
www.invarion.com
MFP19002558
MFP19002558
MFP19002558
MFP19002558