HomeMy WebLinkAboutCO 1 CITY OF RENTON CAG-19-034, CO #1-19 Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Lift Station and Force Main Improvements,Phase 1A-CAG-19-034 C.O,# 1 CONTRACTOR: Equity Builders,LLC SUMMARY OF PROPOSED CHANGE: Provide all labor,equipment,subcontracting,bonding,insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Qty. Unit Price Total Price 006. Additional Quantities: SF 400 $9.00 $3,600.00 Asphalt Restoration—Additional estimated quantity 032. NEW ITEM: LS 1 $5,901.43 $5,901.43 Cost for additional saw cutting of pavement as directed by the City. 033. NEW ITEM: SF 4,500 $2.78 $12,510.00 Additional cost for asphalt patch at two 2"lifts instead of one 3"lift as specified in the bid. Sub Total $22,011.43 Sales Tax (10.0%) $2,201.14 Total $24,212.57 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $996,545.00 $996,545.00 $24,212.57 $1,020,757.57 SIGNATURES: /� / 1 ) / (j Contractor: /4- — (�) , e' /`fY=�'/..5.-�,'-, �u-t,cr/tee li 4,(''.. -,-Date: /` t tll Project Engineer: ` - -__--._ Date: ^7—Z - 1 7 Approved By: Date: Shane Moloney,Renton City Attorne Approved By: gorAskf Date: 7-2^I 1 Ronald .Straka, a Systems Director ) Approved By: A t � Date: 7l2 f/9 Gregg Zimmer r`y�a9PW nisfrat H:\File Sys\WWP-WasteWater\WWP-27-03954 Lift Station Improvements PH lA(Spring 2019)\Pay Estimates\Change Order#1 CAG 19-034.doc\MB