HomeMy WebLinkAboutRS_TrafficStudy_190628_v1.pdf TENW Transportation Engineering NorthWest Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 MEMORANDUM DATE: June 28, 2019 TO: Matt Herrera, Senior Planner City of Renton FROM: Curtis Chin, P.E. TENW SUBJECT: Parking Study for the proposed Renton Industrial Building – Renton, WA (PRE19-000031) TENW Project #5937 This memorandum documents the parking study completed for the proposed change in use associated with the Renton Industrial Building project located at 1415 Maple Avenue SW in Renton, Washington. This memo includes a project description and a parking demand assessment for the proposed change in use. Project Description The Renton Industrial Building project site is located at 1415 Maple Avenue SW in Renton, WA as shown in the Attachment A site vicinity map. The project proposes to convert an existing 40,059 square foot (SF) data center building into warehouse use. On-site parking would be provided by 27 surface parking stalls. Vehicular access to the site would be provided via the two existing driveways on Maple Avenue SW. No changes to existing vehicular access or building area are proposed with the project. A preliminary site plan is provided in Attachment B. 1415 Maple Ave SW – Parking Study TENW June 28, 2019 Page 2 Parking Assessment Background An assessment of the estimated parking demand for the proposed warehouse use was completed based on your email response to Lisa Morrell Ehli, Synthesis PLLC (dated June 6, 2019) shown below: Parking Demand The peak parking demand for the proposed warehouse use was estimated based on parking generation rates documented in the Institute of Transportation Engineers (ITE) Parking Generation (5th Edition). Specifically, Land Use Code (LUC) 150 (Warehousing) was used in the parking analysis. The following Table 1 summarizes the estimated peak parking demand for the project. Table 1 Parking Demand Land Use Building Area (SF) Parking Demand Rate 1 Parking Demand (vehicles) Warehousing 40,059 SF 0.39 stalls/1,00 SF 16 1. Per Institute of Transportation Engineers (ITE) Parking Generation (5th Edition). As shown in the table above, the peak parking demand for the proposed 40,059 SF warehouse use, is 16 vehicles. The estimated peak parking demand would be accommodated by the 27 stall on-site parking supply. As a result, no parking spillover is anticipated with the proposed change in use. If you have any questions regarding the information presented in this memo, please call me at 425-250- 5003 or email at chin@tenw.com. Renton Industrial Building – Parking Study ATTACHMENT A Vicinity Map Renton Industrial Building – Parking Study ATTACHMENT B Site Plan