Loading...
HomeMy WebLinkAboutR-404704- - - - - - - - - - - - - - - - � o i L----------- I I I I %2 AD9 PIPE \\"Pb \� O WETLAND BOUNDARY r. W / BIO-SWALE (DESIGN) � / I \ I CATCH BASIN FILTERS A \ ------------------------------------ (TYP.) ES2 • I \ \ 24"ADS SD NEW CURB (TYP.) / / / I \ I -SDMH 50' WETLAND BUFFER - ---------------------------- I (48 DIA) J \ I P L _ _ _ , � � I \ � � -- _ _ PROTECT EX CURB 12" ADS SD 12" SD i��������1�� 1•it•1.1•tiii�>•>•>•il■1■>•ii ��- - - - - - - - - - - - - - - - - - - - - - - - - - - --- 3I0 I I--I---I- - LA U C B r� II�------- 18" ADSD ,SMH I 5 P.S.11 �.s EX CURB TO BE - -- I -I----�" (48r DIA) Ir�-------------VNWW t--1 REMOVED (TYP.) ------- ____8 s_ PROTECT EX 1 116 P.S.FIRE HYDRANT AREA FOR PALLET STORAGE � II LIMITS OF NEW ABOVE -GROUND SHED I I STRAW WATTLES AS NECESSARY TO I STRUCTURE I B I NI PREVENT CONSTRUCTION STORMWATER------------------------------------- of ES2 FROM LEAVING CONSTRUCTION AREA Q, � I 15' SANITARY SEWER I 01 EASEMENT, REC. NO. 9012061035 I I I I , ASPr,,,, � �-rrIHLT I I I-- I�-10-W- I 10"W - - - - 10"W 10 "W R I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I CONC. ,` •.. I I I I I I .. • ..:, •`'•.a .,�'.., >' '.�:� I I I I I I I 128 P.s.l I I I I I I I I I I I DO NOT . I I I I I ENTER SIGN .�.� : `�;� •<��: •• .: •`; °. I I I I I I I I I I I I •'�• I I I I I I I I I I I I I I I I I I I I •: cortc �i'U�� . ': S. MH y• i• vi --r- I - ----- f : lit :r.. :.. PRO-TEC-T -EX -S-TRIF( "DIA) A/C IPQR{RAMP DRAINS W/ FILTER --I --I -- II II II III �I 11 P.sI6"PVC TO STRIP DRAIN FABRIC (TYP.) 11 IP.s. IwSTRI DRAIr DRAIN�-I--L--1--LA 9 Sti I I I 7 I DAIM TRIP S. 19 ! STRIP DRAIN I 1c�i 0 R D / I C NI L I X X-X-XCHAIN LINK____f F1 -I- � T S O T P E N (T .) p• L. FENCE GATE I I I 11 GENERAL CONSTRUCTION SEQUENCE: 1. HOLD THE PRE -CONSTRUCTION MEETING. 2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN). 3. FLAG OR FENCE CLEARING LIMITS. 4. INSTALL CATCH BASIN PROTECTION, IF REQUIRED. 5. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 6. CONSTRUCT SEDIMENT TRAP. 7. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) CALLED OUT ON THE PLAN SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. 8. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX 'D' OF THE 2017 RENTON STORMWATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 9. RELOCATE EROSION CONTROL MEASURES, OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY OF RENTON EROSION AND SEDIMENT CONTROL STANDARDS. 10. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING, OR EQUIVALENT. 11. STABILIZE ALL AREAS WITHIN SEVEN DAYS OF REACHING FINAL GRADE. 12. SEED, SOD, STABILIZE, OR COVER ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 13. USE PERMENANT STORMWATER DETENTION AND WATER QUALITY FACILITIES TO CONTROL CONSTRUCTION STORMWATER ON -SITE FOR THE REMAINDER OF THE CONSTRUCTION SCHEDULE. 14. UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND REMOVE BMPS IF APPROPRIATE. St H' rch'i 0 R,9� tip, SEAL z C 1969 �gSl�1NG�� ST� 1 �`SSIONAL '00 _ b EROSION CONTROL NOTES: 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER. 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION. 3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE. 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 5. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 6. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH APRIL 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER THAN 5,000 SQUARE FEET, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. 7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER, INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT IS IN THE INTEREST OF THE PERMITEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING OR OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SPECIFIED TIME PERIOD. 8. FOR ALL EROSION/SEDIMENTATION CONTROL PONDS WHERE THE DEAD STORAGE DEPTH EXCEEDS 6 INCHES, A FENCE IS REQUIRED WITH A MINIMUM HEIGHT OF THREE (3) FEET, 3:1 SIDE SLOPES. 9. IF NECESSARY, A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE, 24 FEET X 50 FEET X 8 INCHES OF 4 TO 8 INCH QUARRY SPALLS SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS TO THE CONSTRUCTION SITE. 10. DEVELOPER TO REMOVE ALL SEDIMENT CONTROL DEVICES AFTER CONSTRUCTION IS COMPLETE. BUSH, ROED & HITCHINGS, INC. LAND SURVEYORS & CIVIL ENGINEERS 2009 MINOR AVE. EAST (206) 323-4144 ORN SEATTLE, Washington 1-800-935-0508 98102-3513 FAX# (206) 323-7135 w REVISION SURVEYED: JMH DESIGNED: ZJE DRAWN: ZJE CHECKED: TFD BY DATE APPR APPROVED: TFD CONTRACTOR NOTES: 1. CONTRACTOR TO PREVENT ALL CONCRETE WASH FROM ENTERING STORMWATER SYSTEM. ALL CONCRETE WASH SHALL BE DIRECTED TO FORMED AREAS AWAITING CONCRETE OR ASPHALT. 2. CONTRACTOR SHALL LIMIT DUST GENERATION AND SPRINKLE UNCOVERED AREAS AS NEEDED. 3. THIS PROJECT IS SUBJECT TO RAINY SEASON REQUIREMENTS. SPECIAL APPROVAL FROM THE CITY OF RENTON IS REQUIRED TO BEGIN OR CONTINUE CLEARING AND GRADING ACTIVITIES DURING THE RAINY SEASON (OCTOBER 1 THRU APRIL 30) 4. ALL SLOPES ON SITE SHALL BE MAINTAINED AT MAXIMUM 2H:1V 5. SEE LANDSCAPE PLAN L1.0 FOR TREE RETENTION PLAN LEGEND: STRAW WATTLE CATCH BASIN PROTECTION LIMITS OF CLEARING FOUNDATION EXCAVATION LIMITS -7 I I I SDM I � (soUD LID) X 20 10 0 20 40 SCALE IN FEET 1 "=20' IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING Justin Johnson 01/09/2019 0 SCALE: DATE VERTICAL* AS SHOWN HOR NTAL ND1983/11991 CITY OF TESC PLAN 12/6/18 `+ RENTON PALLET STORAGE FIRE SERVICE EXTENSION FIELDBOOK: 800 SW 27TH STREET PAGE. ONE INCH DATUM • DRAWING N0: AT FULL SCALE Planning/Building/Public works Dept. RENTON, WASHINGTON 98057 ES 1 IF NOT ONE INCH SCALE ACCORDINGLY TROJAN LITHO - UNDEGROUND SHEET: 4 OF: 8 R-404704