HomeMy WebLinkAboutR-404704- - - - - - - - - - - - - - - -
� o
i
L----------- I I I I %2 AD9 PIPE \\"Pb \�
O WETLAND BOUNDARY r.
W
/ BIO-SWALE (DESIGN) � / I \ I CATCH BASIN FILTERS A \
------------------------------------ (TYP.) ES2 •
I \ \ 24"ADS SD NEW CURB (TYP.) / / / I \ I -SDMH 50' WETLAND BUFFER -
---------------------------- I (48 DIA) J \
I P L _ _ _ , � � I \ � � -- _ _ PROTECT EX CURB
12" ADS SD 12" SD
i��������1�� 1•it•1.1•tiii�>•>•>•il■1■>•ii ��- - - - - - - - - - - - - - - - - - - - - - - - - - - ---
3I0
I I--I---I- - LA U C B
r� II�------- 18" ADSD ,SMH I 5 P.S.11 �.s EX CURB TO BE - -- I -I----�"
(48r DIA) Ir�-------------VNWW t--1
REMOVED (TYP.) ------- ____8 s_ PROTECT EX 1 116 P.S.FIRE HYDRANT
AREA FOR PALLET STORAGE �
II
LIMITS OF NEW ABOVE -GROUND SHED
I I STRAW WATTLES AS NECESSARY TO I STRUCTURE
I B I
NI PREVENT CONSTRUCTION STORMWATER-------------------------------------
of ES2 FROM LEAVING CONSTRUCTION AREA
Q, � I
15' SANITARY SEWER I 01
EASEMENT, REC. NO.
9012061035 I I I I , ASPr,,,,
� �-rrIHLT I I
I-- I�-10-W-
I 10"W - - -
- 10"W
10
"W
R I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
CONC.
,` •.. I I I I
I I .. • ..:, •`'•.a .,�'.., >' '.�:� I I I I I I I 128 P.s.l I I I I I I I I I I
I DO NOT
. I I I I I
ENTER SIGN .�.� : `�;� •<��: •• .: •`; °. I I I I I I I I I I I I
•'�• I I I I I I I I I I I I I I I I I I
I I •: cortc �i'U�� . ':
S. MH y• i• vi
--r- I - ----- f :
lit
:r.. :.. PRO-TEC-T -EX -S-TRIF( "DIA) A/C IPQR{RAMP DRAINS W/ FILTER
--I --I --
II II II III �I 11 P.sI6"PVC TO STRIP DRAIN FABRIC (TYP.) 11 IP.s. IwSTRI DRAIr
DRAIN�-I--L--1--LA
9 Sti
I I I 7 I
DAIM
TRIP
S.
19 !
STRIP DRAIN
I
1c�i 0 R D /
I
C NI L I
X X-X-XCHAIN LINK____f F1 -I-
� T S O T P E N (T .) p•
L.
FENCE GATE I I I 11
GENERAL CONSTRUCTION SEQUENCE:
1. HOLD THE PRE -CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED WITH
THE REQUIRED NOTICE OF CONSTRUCTION SIGN).
3. FLAG OR FENCE CLEARING LIMITS.
4. INSTALL CATCH BASIN PROTECTION, IF REQUIRED.
5. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
6. CONSTRUCT SEDIMENT TRAP.
7. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) CALLED
OUT ON THE PLAN SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT.
8. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX 'D' OF THE 2017 RENTON
STORMWATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS.
9. RELOCATE EROSION CONTROL MEASURES, OR INSTALL NEW MEASURES SO THAT AS SITE
CONDITIONS CHANGE, THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE
CITY OF RENTON EROSION AND SEDIMENT CONTROL STANDARDS.
10. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY
SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST,
PLASTIC SHEETING, OR EQUIVALENT.
11. STABILIZE ALL AREAS WITHIN SEVEN DAYS OF REACHING FINAL GRADE.
12. SEED, SOD, STABILIZE, OR COVER ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
13. USE PERMENANT STORMWATER DETENTION AND WATER QUALITY FACILITIES TO CONTROL CONSTRUCTION
STORMWATER ON -SITE FOR THE REMAINDER OF THE CONSTRUCTION SCHEDULE.
14. UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND REMOVE BMPS IF
APPROPRIATE.
St H' rch'i
0
R,9� tip,
SEAL z
C
1969
�gSl�1NG��
ST� 1
�`SSIONAL '00 _ b
EROSION CONTROL NOTES:
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF
RENTON, PUBLIC WORKS DESIGN ENGINEER.
2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED IN
THE FIELD AND OBSERVED DURING CONSTRUCTION.
3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING
AND/OR CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION
AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR
CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT
AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO
MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE
SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND
RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER
QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
5. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM
DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
6. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH APRIL 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER THAN 5,000
SQUARE FEET, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC
COVERING.
7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD 30 DAYS OR
MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION
CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF
APRIL THROUGH SEPTEMBER, INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT IS IN THE INTEREST OF THE PERMITEE, BUT
MUST BE AUGMENTED WITH MULCHING, NETTING OR OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SPECIFIED
TIME PERIOD.
8. FOR ALL EROSION/SEDIMENTATION CONTROL PONDS WHERE THE DEAD STORAGE DEPTH EXCEEDS 6 INCHES, A FENCE IS REQUIRED WITH
A MINIMUM HEIGHT OF THREE (3) FEET, 3:1 SIDE SLOPES.
9. IF NECESSARY, A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE, 24 FEET X 50 FEET X 8 INCHES OF 4 TO 8 INCH QUARRY SPALLS
SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS TO THE CONSTRUCTION SITE.
10. DEVELOPER TO REMOVE ALL SEDIMENT CONTROL DEVICES AFTER CONSTRUCTION IS COMPLETE.
BUSH, ROED & HITCHINGS, INC.
LAND SURVEYORS & CIVIL ENGINEERS
2009 MINOR AVE. EAST (206) 323-4144
ORN SEATTLE, Washington 1-800-935-0508
98102-3513 FAX# (206) 323-7135
w
REVISION
SURVEYED:
JMH
DESIGNED:
ZJE
DRAWN:
ZJE
CHECKED:
TFD
BY DATE APPR APPROVED:
TFD
CONTRACTOR NOTES:
1. CONTRACTOR TO PREVENT ALL CONCRETE WASH FROM ENTERING STORMWATER
SYSTEM. ALL CONCRETE WASH SHALL BE DIRECTED TO FORMED AREAS AWAITING
CONCRETE OR ASPHALT.
2. CONTRACTOR SHALL LIMIT DUST GENERATION AND SPRINKLE UNCOVERED AREAS AS
NEEDED.
3. THIS PROJECT IS SUBJECT TO RAINY SEASON REQUIREMENTS. SPECIAL APPROVAL
FROM THE CITY OF RENTON IS REQUIRED TO BEGIN OR CONTINUE CLEARING AND
GRADING ACTIVITIES DURING THE RAINY SEASON (OCTOBER 1 THRU APRIL 30)
4. ALL SLOPES ON SITE SHALL BE MAINTAINED AT MAXIMUM 2H:1V
5. SEE LANDSCAPE PLAN L1.0 FOR TREE RETENTION PLAN
LEGEND:
STRAW WATTLE
CATCH BASIN PROTECTION
LIMITS OF CLEARING
FOUNDATION EXCAVATION LIMITS
-7
I I I SDM I �
(soUD
LID)
X
20 10 0 20 40
SCALE IN FEET
1 "=20'
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
Justin Johnson 01/09/2019 0
SCALE: DATE
VERTICAL*
AS SHOWN HOR NTAL ND1983/11991 CITY OF TESC PLAN 12/6/18
`+ RENTON PALLET STORAGE FIRE SERVICE EXTENSION FIELDBOOK:
800 SW 27TH STREET PAGE.
ONE INCH DATUM • DRAWING N0:
AT FULL SCALE Planning/Building/Public works Dept. RENTON, WASHINGTON 98057 ES 1
IF NOT ONE INCH
SCALE ACCORDINGLY TROJAN LITHO - UNDEGROUND SHEET: 4 OF: 8
R-404704