Loading...
HomeMy WebLinkAboutComplete RFQ Document IIIIIIII�I Illllllp �uui V City of Renton Request for Qualifications For the Renton 2019 Sanitary Sewer Rehabilitation and Replacement Project Including Survey, Geotechnical, and Civil Design Submittal Deadline: 4:00 p.m., August 15, 2019 The City of Renton Wastewater Utility(city) is soliciting statement of qualifications (SOQs)from engineering consulting firms interested in providing engineering,geotechnical, and surveying services for the Renton 2019 Sanitary Sewer Rehabilitation and Replacement Project.The work shall include evaluation of the existing trenchless rehabilitation standards for the Wastewater Utility, development of trenchless rehabilitation standard specifications, standard drawings, and Design and Construction Manual for the trenchless rehabilitation standards and specifications. Consultant shall also develop plans and specifications for the 2019 Capital Project for sanitary sewer rehabilitation and replacement, including survey,geotechnical, design, and construction services for the capital project.The successful firm will have experience in providing professional engineering design services for wastewater rehabilitation and replacement projects. The detailed RFQ, background information, consultant selection criteria, and instructions for submittal of Qualifications may be obtained at the City of Renton website, http://rentonwa.gov/bids/in the RFQ section, or by contacting Dave Christensen, City of Renton Wastewater Utility at 425-430-7212, or by email at dchristensendchristensen@rentonwagov. BACKGROUND The City of Renton Wastewater Utility implements an annual sanitary sewer rehabilitation and replacement project(Project) as part of its ongoing capital improvement program. For the 2019 Project, the Utility desires to engage the services of an engineering consultant to review its trenchless rehabilitation methods and specifications as well as develop project specific plans and specifications for the identified rehabilitation and replacement projects. SCOPE OF WORK/PROPOSAL Anticipated work for this project includes: • Evaluate the city's current use of trenchless technologies as they apply to rehabilitation of sanitary sewer mains, sewer laterals, private side sewers, and manholes. • Review existing trenchless technical specifications and update the city specifications to include additional methods and techniques for trenchless technologies determined to be beneficial to the city. • Develop standard details as needed to support the updated trenchless technical specifications. C:\Users\lili-wong\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\V5AGRVS3\Consultant Selection—RFQ FINAL.DOCX/AFIp Page 1 of 4 • Develop standard specifications and details to support private system upgrades using trenchless rehabilitation technologies. • Generate a Design and Construction Manual, applicable to both public and private infrastructure,for implementation of the trenchless rehabilitation specifications, details, and methods developed as part of the Project. • Recommend training/education opportunities/requirements for both engineering and inspection staff to be properly trained/certified to design and inspect the various types of trenchless rehabilitation technology and techniques. Include any potential certifications that would be beneficial or needed. • Prepare plans and specifications for the 2019 rehabilitation and replacement projects based upon improvements identified by the city. It is anticipated that the work will be separated into two separate construction projects, a rehabilitation project and a replacement project. • Provide geotechnical and survey services to go along with the general civil engineering. • The developed specifications for trenchless technologies shall include specific testing, minimum in-ground performance of products, minimum qualifications for installers/contractors (years of experience/minimum footages of trenchless improvements installed, etc.), and warranty requirements for all approved methods and materials. We anticipate this work will be exempt from SEPA. Anticipated permitting is a Public Works Construction permit. All work is expected to take place within existing right of way or easements. CONSULTANT SELECTION AND EVALUATION PROCESS The City of Renton's Wastewater Utility Staff will evaluate the consultants' SOQs/ proposals based on each firm's project approach, engineering/technical skills and resources, project team's engineering/technical skills, history of performance, and knowledge. After the SOQs/ proposals have been evaluated,the highest ranked firms may be interviewed.The city reserves the right to make a selection of the recommended consultant team based solely upon the SOQs/ proposals. If the city determines it wishes to perform final selection through an interview process,the successful consultant will be based upon those interviews only. DISCLAIMERS • SOQs that do not include all of the submittal requirements outlined herein may not be considered or may be downgraded. • At the city's discretion,the city may amend the Selection Process and Schedule at any time. • The city may revise the evaluation and scoring criteria at any time without providing notice to the Consultants. • At the city's discretion,the city may choose to republish the RFQ. • The execution of the Consultant Agreement is subject to budgeted funds. • Until such time a Consultant Agreement is executed,there are no express or implied obligations or commitments on the part of either the city or the Consultant concerning either this RFQ or any Proposal associated with it. • All materials submitted for the Proposal will become property of the city and will not be returned. • By submitting materials to the city for consideration for this RFQ,the Consultant is waiving any claim of confidentiality,trade secrets,or privilege with respect to materials submitted.All C:\Users\lili-wong\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\V5AGRVS3\Consultant Selection—RFQ FINAL.DOCX/AFIp Page 2 of 4 submitted materials are subject to public records disclosure under the State of Washington Public Records Act. • Consultant will be notified of Addenda,however it is the Consultant's responsibility to verify whether any Addenda were issued. • Fax or e-mail submittals will not be accepted or considered. SUBMITTAL REQUIREMENTS To be considered responsive,the respondent must include the information listed below. Proposals that do not fully comply with these instructions may not be considered.To facilitate evaluation the Statement of Qualifications must be organized in the order of the outline below. Do not exceed 30 pages total for sections A, B, C and D. Resumes should be limited to one to two pages for each person. A. PROJECTAPPROACH 1. Describe your proposed approach to the project and the specific tasks that would be included in a proposed Scope of Work for the project as follows: TASK No. TITLE TASK LEAD: SUBCONSULTANTS(if used): RATIONALE: ACTION OUTLINE (Approach/Actions/Results): 2. Provide a preliminary time schedule for carrying out various tasks. 3. Prepare time estimates and availability for key team members used in each of the major tasks. B. PROJECT MANAGEMENT 1. Provide a description of your approach to organize and carry out the work. 2. Provide an organizational chart indicating how the firm's management will interface with this project. Identify the overall Project Manager and task leaders/key team members. C. PROJECTTEAM MEMBERS 1. Identify the Project Manager, each task leader, and key team members. Describe their expertise and their role in this project. Provide their office location,technical expertise, and other pertinent information. Provide a professional resume for each member of the proposed team. 2. Identify sub consultants that you will use on this project, indicate their specific roles, and provide their experience on similar related projects. 3. Describe two to three projects that your firm has completed that are similar to the proposed project. Describe how the projects performed in terms of desired outcome, budget, and schedule. Describe the work that your firm's project team members performed for those projects. D. REFERENCES 1. Provide three recent references (within last ten years)that may be contacted concerning your firm's performance on a project of this type. 2. Provide three recent references (within last ten years)that may be contacted concerning the performance of your firm's proposed Project Manager on projects of this type. C:\Users\lili-wong\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\V5AGRVS3\Consultant Selection_RFQ FINAL.DOCX/AFIp Page 3 of 4 E. INSURANCE, RECORDKEEPING,AGREEMENT, AND OTHER REQUIREMENTS The firm that is selected for this project will be required to obtain, at its own expense, professional liability insurance of$1,000,000 per occurrence and $2,000,000 aggregate for Commercial General Liability(CGL)for the term of the contract and other insurance as required by the city(see informational documents).The firm selected will be required to sign the City of Renton Consultant Agreement. All firms working on the project will be required to obtain a city Business License. Indicate if you can meet these requirements. F. SUBMITTAL DEADLINE The deadline for submittals is 4:00 p.m.,August 15, 2019. If mailed,the submittal must be postmarked no later than August 15, 2019. Five (5) paper copies and one (1) electronic copy of the Proposal in PDF format on a CD, DVD, or jump drive, shall be mailed or delivered to the following address: City of Renton City Clerk's Office—71" Floor Attn: RFQ Renton 2019 Sanitary Sewer Rehabilitation and Replacement Proj./Dave Christensen 1055 South Grady Way Renton,WA 98057 G. CITY CONTACT PERSON All questions regarding this request for RFQ should be directed to: City of Renton Attn: Dave Christensen,Wastewater Utility 1055 South Grady Way, 51" Floor Renton,WA 98057 Phone:425-430-7212, Email: dchristensen@rentonwa.gov INFORMATIONAL DOCUMENTS • Insurance Guidelines for the City of Renton • RFQ Consultant Evaluation Criteria C:\Users\lili-wong\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\V5AGRVS3\Consultant Selection—RFQ FINAL.DOCX/AFIp Page 4 of 4