HomeMy WebLinkAboutMFP19003571DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19003571
IVR Number: 19003571
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :06/24/2019Application Date:7227900075Parcel Number:2900 NE 10TH ST
Permit Type:07/15/2019Issue Date:Franchise
Permit Work Class:07/14/2020Expiration Date:Minor Utility
Job Number:101116916Franchise Type:Electric
Description:Bore approximately 225 LF for new electrical service. Pothole all utilities. Restoration per City of Renton standards.
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Applicant
RENTON HOUSING AUTHORITY PO BOX 2316
RENTON, WA 98056
Building
Owner
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street
տ Open Trench տ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101116916
CORRIE RYDBERG
(253) 234-6410
CORRIE.RYDBERG@PSE.COM
2900 NE 10TH ST
BORE N. FROM BP5 APPROX 90' IN ROW. FROM BP5 BORE E. APPROX 30' TO BP4 TO ACCESS
J01(318536-166771). FROM BP1 BORE S. APPROX 85' TO BP2 AND THEN SE APPROX 20' IN ROW. INSTALL NEW CABLE IN NEW CONDUIT
VIA BORE. 3 TOTAL BORE PITS IN ROW. 3: 8'X2' HS CUTS
✔✔✔
✔1'X3'
Potelco, Inc. (253) 234-6410
POTELI#227PL BL005109
Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.06.24 09:51:04 -07'00'6/24/19
MFP19003571
Nathan Janders 7/1/2019
Scott Warlick 7/8/2019
RESTORATION PER CITY OF RENTON STANDARDSPOTHOLE ALL EXISTING UTILITIES
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101116916
Potelco, Inc
CARRIE YLENNI (253) 720-9700
6905 S 228th St, Kent, WA 98032
CARRIE.YLENNI@PSE.COM
2900 NE 10TH ST
TBD
TBD
CORRIE RYDBERG
6/24/19
Corrie Rydberg Digitally signed by Corrie Rydberg
Date: 2019.06.24 09:51:28 -07'00'
MFP19003571
Monday - Friday
8:00AM - 3:00PM Scott Warlick
7/8/2019
SKETCH
I
-- NORTH --
I
NOTES:
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
•The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
•Total road closure lasting more than 24 hours is subject to the approval by the City Council.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
FOREMAN (CHECK BOX WHEN COMPLETED)
#1 Print Name ___________________________________ Date ______________
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Material VERIFIED and CHANGES noted on Paperwork.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
#1 Foreman's Signature _______________________________________________
and that all quality requirements are met.
Field Changes RED-LINED on As-built.
Total PRIMARY Cable noted on As-built.
Correct QC Checklist(s) reviewed.
OVERHEAD APPARATUS
"When performing planned work on a pole with an existing transformer or device, the Service
Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge
time.
If you are working on a pole with the pole ground connected with a hot tap, replace it. If the
transformer has split bolts on the secondary neutral or services, replace them. If the primary
neutral is connected with a hot tap, replace it. If the transformer bank has a 2-bolt connector on
the neutral bus, replace it.
#1 #2
#2 Print Name ___________________________________ Date ______________
#2 Foreman's Signature _______________________________________________
PSE GENERAL SPECIFICATIONS
General
- All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards
are available upon request.
- Work sites shall be kept clear of debris and all construction materials, equipment and
packing shall be removed daily.
- Return all unused and removed poles, transformers and hardware to PSE, storeroom. All
copper shall be coiled and returned the day it is removed from the poles. Remove all unused
pins and insulators.
- Return all Street lights, area lights and floodlights.
- All fault indicators will be maintained in their current location on the 1/0 cables upon
completion of the job. If it is noted to remove any of the indicators they shall be returned to
local PSE first response department for re-issue.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a minimum
of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in red on
Foreman's copy of work sketch.
- Return one Foreman's copy of work sketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each
work day, or as otherwise instructed by the System Operator.
Traffic /Pedestrian control notes
- Utilize flagging and other vehicle traffic control as necessary and in conformance with local
traffic regulations.
-The uniform code of traffic control shall be adhered to at all times..
-Provide signs, barricades, and traffic control in conformance with local permit regulations.
-Provide route for pedestrians when working on or near sidewalks.
-Maintain traffic flow as required by permitting agency.
NOTE: Completely rebuild terminations. EXCEPTION: DO NOT REPLACE CUTOUTS
UNLESS THEY ARE THE OLDER "BOX TYPE" OR 50 AMP "TRIP LINK" TYPE CUTOUT.
REPLACE J-BOXES IF REQUIRED. UTILIZE FEED-THRU T.U.T.s AND REMOVE
J-BOXES IF POSSIBLE. REPLACE ALL TRANSFORMER JUMPERS WITH NEW 1/0
JACKETED CABLE.
UNDERGROUND CONSTRUCTION
Additional notes to standards.
-Erosion control must be placed before construction starts. Silt bags must be installed in
downstream catch basins.
Existing Utilities:
Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point
of crossing. Protect underground utilities during excavation. Use hand excavation methods if
necessary to avoid damage to existing utilities. Fabricate and install adequate temporary
structures to support and protect underground utilities while exposed during construction.
Maintain 6" minimum clearance at crossings between existing utilities and new duct
installations. Transition trench or tunnel profile gradually as required at crossings. Maintain
24" minimum separation between new trench or tunnel and parallel existing utilities or as
required by the permit agency.
Excavation
- Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of
36" of cover for primary conductors and 24" of cover for secondary conductors.
- Road crossings and all trenches within the Right-of-way shall be of sufficient depth to
provide a minimum of 36" of cover for all conductors or as required by the permitting Agency.
- No rocks larger than 8" shall be included in backfill.
- Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or
as required by the permitting Agency.
- Restore all excavated areas to original condition.
Vaults & Hand holes
- Refer to PSE standard 6775.0040 "Vault and Hand hole Installation"
- Vaults shall be placed level and 2" above final grade in landscaped areas and flush with
final grade when placed in hard surface areas.
- A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 "PVC Conduit Installation".
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be
plumbed directly to road crossing conduits.
- Install insulating caps on all unused primary bushings.
- Civil crew to install Conduit plug on each end until new cable to be installed.
- All "spare" conduits shall be capped at each end.
Surface Restoration
Restore ground surface to original contour and original condition or better. Restore asphalt
and concrete in accordance with requirements of local permitting agency. Cold patch or plate
trench when necessary. Leave area in its original state or better at the end of construction.
SCOPE OF WORK
The general scope of this project is to remediate primary cables within the project area by the most economic
means possible using replacement, or abandonment.
The project involves replacing existing electrical cables in new conduit.
Project type : Planned
Project location :
Number of Cables : 7
Cable Footage Estimated : 1,493'
Cable Numbers Injected : 0
Cable Numbers Repaired : 0
Cable Numbers Abandoned : 0
Cable Numbers Replaced : 13641, 13642, 13643, 25923, 18673, 18674, 18675
Trench Footage Estimated : 563'
There will be an advance notice provided by the contractor
24-hour advance notice of no parking in work areas. Access will be maintained to all residences and their
driveways. When work is occurring directly in front of driveways, the contractor will work with the residence to
manage access.
Traffic Revisions
Flagging crews will maintain one lane; flaggers will assist vehicles alternating through the roadway during work
hours.
For more information on the project
24-hour project information (888) 471-7339, (360) 825-5236
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
POTELCO DESIGN AND
Signature _________________________________________
Print Name _________________________________________
This design complies with PSE
Any/all variations have been
Design/Engineering Standards.
QUALITY ASSURANCE
pre-approved/documented by the
appropriate PSE Representative.
Date _________________
JOB SITE
JOB SITE
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
Trench Method:
CABLE REPLACEMENT
Approximate Trench Footage:
Abandon Cable Segments:
Approximate New 1Ø/3Ø pri. Cable Footage:
Approximate 2"/4" SCH80 Conduit Footage:
Replaced Cable Segments:
Vaults:
BORE
545'
0
7
370'/580'
355'/550'
0
ORDER#NOTIF#PROJECT PHASE
MAINTENENCE
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
11467062 101116916
N/A
108110638
VICINITY MAP
OVERHEAD CIRCUIT: MAP # .
SCALE 6" = 1 MILE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 04/30/19
C. TOBIN 253-548-4516 04/30/19
N/A N/A N/A
C. CHAVEZ 253-234-6307 04/30/19
REQ-CITY OF RENTON
PRE-11 RENTON HOUSING AUTH 2020 CRP
CABLE REMEDIATION PROGRAM
2900 NE 10TH ST, RENTON , WA 98056
N/A N/A
N/A 101116916R1
AS NOTED 1 OF 3
KING N/A N/A QSEPRE
NE-9-23-5 N/A N/A
2305E034 2305E040 2305E034 PRE-11
5/24/19 N. COSME REVISED BORE PATH
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY 101116916R1 2900 NE 10TH ST, RENTON , WA 98056
INDEX
PAGE 1 - GENERAL NOTES
PAGE 2 - SITE PLAN, CABLE & CONDUIT DIAGRAM
PAGE 3 - CIVIL SITE DETAILED PLAN
Overflow
Filter fabric walls for
Catch Basin Grate
dewatering sedimentCollected Sediment
Catch Basin Insert
MID 9995728
Filter fabric skirt
Secured with grate.
EROSION CONTROL
NOT TO SCALE
2305E040
LEGEND
SINGLE PHASE, ONE WIRE/CABLE - 7.2 KV
THREE PHASE WIRE/CABLE - 12.5 KV
CABLE TERMINATION BUS (J-BOX)
NEW OVERHEAD TO UNDERGROUND CABLE
OVERHEAD TO UNDERGROUND CABLE TERM.
10T, 15T, 25T, 40T, 100T - INDICATES FUSE SIZE
TOTAL UNDERGROUND XFMR (T.U.T.)
NEW COMBINATION J-BOX/PADMOUNT XFMR
UNDERGROUND COMBINATION J-BOX/XFMR
N.T.S. = NOT TO SCALE
X.F.M.R. = TRANSFORMER
P.E. = POLYETHYLENE
ABBREVIATIONS
PRIMARY METERING
CABLE SPLICE
FAULT INDICATOR
WILL NOT PHASE (WNØ)
NORMAL OPEN (N.O.)
FUSED DISCONNECT:
SOLID BLADE DISCONNECT
HANDHOLE
PULL VAULT
UNDERGROUND SWITCH
UNDERGROUND J-BOX
NEW PADMOUNT XFMR
NEW UNDERGROUND XFMR
PAD MOUNT XFMR
ELECTRONIC MARKER
COMBINATION J-BOX/PADMOUNT XFMR
NEW UNDERGROUND COMBINATION J-BOX/XFMR
TERMINATION
CABLE TO REPLACE
PROPERTY LINE
RIGHT OF WAY
CENTERLINE
EASEMENT
CL
Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
(ROW) 36" MIN Cover
(PVT PROP)
36" MIN
48"
Max
Backfill
(No rocks over 8" diameter)
3" Bedding Clean Native Soil, Sand or 5/8" Minus
12" Typical
TRENCH DETAIL
NOT TO SCALE
12" Min Shading Clean Native Soil, Sand or 5/8" Minus
- A 3" layer of sand, 5/8" minus or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches
- A 12" layer of sand, 5/8" minus or clean shading is required when excavated native material contains rocks up to 8" in diameter.
FOREMAN TO CONTACT REGIONAL CONSTRUCTION MANAGER FOR COVER DEVIATIONS FROM THIS DETAIL
PHOTOS AND DETAILED NOTES SHALL BE PROVIDED BY FOREMAN
12"
MIN
48" MAX
36" MIN
EXISTING
PAVEMENT / SIDEWALK
VERTICAL SAW
CUT LINE
CRUSHED SURFACING
MATERIAL COMPACT
TO 95% MAX DENSITY.
EXCAVATION AND HARD RESTORATION DETAIL
NOT TO SCALE
12" MIN
3" Sand Bedding or 5/8" Minus
12" Min Sand Shading or 5/8" Minus
12" MIN
ASPHALT PATCH, 2" MIN
MATCH EXISTING
Conduit
(ROW) 36" MIN
(PVT PROP)
36" MIN
For contacts below dial 1-888-CALL PSE (225-5773)
Contact Information
PSE: PLANNER
22884 RYEN DR NW
POULSBO, WA 98370
DOUG JONES
360-394-6636
ABANDONING PRIMARY CABLES PSE std. 6825.6200
In a Vault if the cable is
______________________________________________________________________________________
In conduit, -Remove the cable
______________________________________________________________________________________
Not in conduit or it cannot be pulled out, -Cut the cable off approximately one foot
from the vault wall. Install a cap on the tail.
-When practical, attach the old cable
number to the cable stub.
______________________________________________________________________________________
In a Minipad hand hole
______________________________________________________________________________________
In conduit, -Remove the cable
______________________________________________________________________________________
Not in conduit or it cannot be pulled out, -Cut the cable off as much as practical. Install a cap on the tail.
-When practical, attach the old cable number to
the cable stub.
-Stuff the tail into the bottom of the
handhole. Be sure the new cables are not
trapped by the old cables or the concentric
neutrals.
______________________________________________________________________________________
At Risers if the cable is
______________________________________________________________________________________
In Conduit -Remove Cable
______________________________________________________________________________________
Direct buried or it cannot be pulled out, -Cut off the cable at the top of the riser. Install a cap on the tail.
and the pole will remain. -When practical, attach the old cable number to the cable stub.
______________________________________________________________________________________
DIRECT BURIED
Direct buried or it cannot be pulled out, -Remove the riser.
and the pole will be replaced -Cut off old cable just below grade.
-Re-fill ground back to existing grade.
______________________________________________________________________________________
DIRECT BURIED
Direct buried or it cannot be pulled out, -Cut off the cable just below grade.
and the pole will be removed
______________________________________________________________________________________
NOTE: If the pole is to be replaced, remove the abandoned riser and elbow, and stand off brackets
(unless they support other conduits).
NOTE: If the riser is made of transite material, it shall be removed following procedures in standard 0100.5000,
"Transite Pipe Removal and Disposal."
_______________________________________________________________________________________
-Remove (not abandon) aboveground transite riser when it is encountered in the field. Belowground transite may be left in
place and backfilled. (Transite is a mixture of asbestos and cement. It is nonmetallic, flame-retardant, and resistant
to moisture, low temperature, and corrosive agents).
-For removal use an approved certified abatement contractor. Call the Environmental Services Department 24-hour pager
(206-994-3186) to have a contractor dispatched.
Procedure to Abandon Primary Cables:
1. Call the Systems Operator to request a clearance.
2. Follow the directions to ensure the cable is de-energized, apply proper tags as specified in Standard Practice
0201.1011, "Switching and Clearances Handbook," and report back to the Systems Operator.
3. Obtain a clearance from the Systems Operator on the cable to be abandoned.
4. Cut the ends of the cable.
5. The cable number tag may be left on the abandoned cable.
NOTE: The cable number shall not be reused.
6. Call the Systems Operator and release the clearance.
7. Remove all "Danger Do Not Operate" tags.
8. The System Operator will then close the O# (Operations number).
Existing System:
Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable
existing system only to make cutovers and connections as directed by PSE System Operator.
MFP19003571
NE SUNSET BLVD (PAVED)NE SUNSET BLVD (PAVED)N
E
1
0
T
H
S
T
(
P
A
V
E
D
)
N
E
1
0
T
H
S
T
(
P
A
V
E
D
) INDEX AVE NE (PAVED)JEFFERSON
AVE
NE
(PAVED
)
2900
P#: 7227900075 Parcel:
0089000050
1000
1000
1000
1000
1000
2801
2804
2809
2819
P# 0089000010
2806
2800
2813
2825
P# 7227900094
P#: 7227900091
3030
2725
2801
P
A
R
K
I
N
G
L
O
T
(P
A
V
E
D
)PARKING LOT(PAVED)PARKING LOT
(PAVED)
P#
:
7
2
2
7
9
0
0
0
9
6
GATE
PARKING LOT
(PAVED)
BP-1
BP-4
BP-2
BP-3
BP-6
BP-8
BO
R
E
~
8
5
'BORE ~ 85'BORE ~ 170'B
O
R
E
~
1
1
5
'
EOP =27'
ROW =48'
EOP =58'
ROW =97'
℄
℄
℄
℄
℄
℄
℄
℄
℄
BRICK WALL
6' TALL
ROW =80'BORE ~ 50'S/WS/WS/W
PARKI
N
G
L
O
T
(PAVE
D
)
BP-7
S/
W
S/WS/WBP-5 BORE ~ 30'268.3 lbs 269.6 lbs478.9 lbs 482.6 lbs179.4 lbs 180 lbsEHY670 - AØ
EHY671 - BØ
EHY672 - CØ
EHY666 - AØ
EHY667 - BØ
EHY668 - CØ
1-4" - L______'
EHY669 - CØ
1-2", 1-4" - L______'
EHE500 - AØ
EHE501 - BØ
EHE502 - CØ
EXISTING
TO REMAIN
ABE440 - AØ
ABE441 - BØ
EXISTING
TO REMAIN
AØEHE500
BØEHE501
CØEHE502
EXISTING
TO REMAIN
AØABE440
BØABE441
EXISTING
TO REMAIN
40T
UNK
SITE PLAN
SCALE: 1:50
CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE
IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT
TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR
ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE
IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY.
CIRCUIT FEET REMOVED: 825'
CIRCUIT FEET ADDED: 905'
WIRE CREW FOREMAN NOTE:
ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT
LOCATION ON 1/0 CABLES AFTER NEW CABLE IS INSTALLED
UNLESS OTHERWISE SPECIFIED. PLEASE RED-MARK ALL FAULT
INDICATORS ON "CABLE DIAGRAM" FOR MAPPING.
CIVIL CREW FOREMAN NOTE:
MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL
WORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT
ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE.
CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE
RECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISH
PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS
(FOREMAN'S COPIES) AT THE END OF THE JOB.
PRIMARY CABLE & CONDUIT DIAGRAM
NOT TO SCALE
EXISTING UNDERGROUND MAP: # .
SCALE: 1:100
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 04/30/19
C. TOBIN 253-548-4516 04/30/19
N/A N/A N/A
C. CHAVEZ 253-234-6307 04/30/19
REQ-CITY OF RENTON
PRE-11 RENTON HOUSING AUTH 2020 CRP
CABLE REMEDIATION PROGRAM
2900 NE 10TH ST, RENTON , WA 98056
N/A N/A
N/A 101116916R1
AS NOTED 2 OF 3
KING N/A N/A QSEPRE
NE-9-23-5 N/A N/A
2305E034 2305E040 2305E034 PRE-11
5/24/19 N. COSME REVISED BORE PATH
N/A N/A N/A
N/A N/A N/A
2305E034
101116916R1FOREMAN NOTE:
CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7
BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE
TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS &
BODILY INJURY.
VAULT & EQUIPMENT TABLE
SITE GRID
NUMBER VAULT SIZE & COVER TYPE & SIZE
EQUIPMENT IN VAULT
PRIMARY
BUSHINGS TRANSFORMER
ID NUMBERS
(COMPANY ID)
REMARKS
LB DC
J01 318536
166771
EXISTING
JUNCTION BOX
J-BOX BELOW GRADE
W/ 3-4 POS. J-BUS
EXISTING
7 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
V01 318529
166767
EXISTING
VAULT
112.5kVA PM XFMR
120/240v
EXISTING
3 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
V02 318570
166767
EXISTING
VAULT
25kVA PM XFMR
120/240v
EXISTING
1 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
V03 318571
166766
EXISTING
VAULT
112.5kVA PM XFMR
120/240v
EXISTING
3 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
TOTALS :14 -
Potelco, Inc.DESIGNED BY
CIVIL CREW NOTE: ALL 2" - 90° BENDS MIN 48" RADIUS SCH-80 PVC
ALL 4" - 90° BENDS MIN 60" RADIUS SCH-80 PVC
ALL 4" - 45° BENDS SCH-80 PVC
ALL 2" - 45° BENDS SCH-80 PVC
- ALL CONDUITS SHALL BE CAPPED AT EACH END UNTIL
CABLE IS INTALLED
PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE)
LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE
(gal.)REMARKS
FROM TO SIZE
(in)QTY
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
TYPE BENDS PULL
(lbs)
PULL
REV
(lbs)
SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only
Check applicable box
DB120 HDPE SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS
BUILT
J01 V01 4 1 185 269.6 268.3 1/0 AL JKT 200 EHY666 EHY667 EHY668 1.2
J01 V02 2 1 355 179.4 180 1/0 AL JKT 370 --EHY669 1.2
J01 V03 4 1 365 478.9 482.6 1/0 AL JKT 380 EHY670 EHY671 EHY672 2.3
TOTAL 4"550'727$/580'-
TOTAL 2"355'727$/370'TOTAL LUBE 4.6
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
ABANDONED
CABLE LEFT IN
PLACE
ABANDON
CIRCUITRYFROMTO
13641 10507686 J01 V03 315 YES NO
13642 10507695 J01 V03 315 YES NO
13643 10507704 J01 V02 300 YES NO
25923 10519276 V02 V03 31 YES NO
18673 10512696 J01 V01 179 YES NO
18674 10512706 J01 V01 179 YES NO
18675 10512716 J01 V01 179 YES NO
TOTAL CIRCUIT FEET 825'
MFP19003571
NE SUNSET BLVD (PAVED)NE
1
0
T
H
S
T
(
P
A
V
E
D
) INDEX AVE NE (PAVED)JEFFERSON
AVE
NE
(PAVED
)
2900
P#: 7227900075 Parcel
: 0089000050
1000
2801
2804
2809
2819
P# 0089000010
2813
P#: 7227900091
3030
P
A
R
K
I
N
G
L
O
T
(
P
A
V
E
D
)PARKING LOT (PAVED)P#
:
7
2
2
7
9
0
0
0
9
6
GATE
PARKING LOT (PAVED)
EOP =27'
ROW =48'
℄
℄
℄
ROW =79'
S/W
S/WS/WS/WS/WS/WUTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 04/30/19
C. TOBIN 253-548-4516 04/30/19
N/A N/A N/A
C. CHAVEZ 253-234-6307 04/30/19
REQ-CITY OF RENTON
PRE-11 RENTON HOUSING AUTH 2020 CRP
CABLE REMEDIATION PROGRAM
2900 NE 10TH ST, RENTON , WA 98056
N/A N/A
N/A 101116916
AS NOTED 3 OF 3
KING N/A N/A QSEPRE
NE-9-23-5 N/A N/A
2305E034 2305E040 2305E034 PRE-11
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A 101116916CIVIL SITE DETAILED PLAN
SCALE: 1:30
CIVIL FOREMAN NOTE:
POTHOLING IS REQUIRED PRIOR TO DRILLING AND THE BORE
PROFILE SHALL BE PREPARED ON SITE AND PROVIDED TO THE
INSPECTOR FOR APPROVAL.
NEW CONDUIT SHALL BE AT 36" MINIMUM DEPTH TO THE
TOP.CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7 BEFORE
BEGINNING ANY EXCAVATION PREVENTS DAMAGE TO UNDERGROUND
FACILITIES, SERVICE INTERRUPTIONS & BODILY INJURY.
INSTALL CATCH BASIN INSERT ON ALL CB
WITH CONSTRUCTION ZONE.
WIRE CREW FOREMAN NOTE:
ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT
LOCATION ON 1/0 CABLES AFTER NEW CABLE IS INSTALLED
UNLESS OTHERWISE SPECIFIED. PLEASE RED-MARK ALL FAULT
INDICATORS ON "CABLE DIAGRAM" FOR MAPPING.
CIVIL CREW FOREMAN NOTE:
MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL
WORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT
ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE.
CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE
RECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISH
PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS
(FOREMAN'S COPIES) AT THE END OF THE JOB.
EXISTING WATER
EXISTING POWER
EXISTING TELEPHONE
EXISTING GAS
EXISTING STORM DRAIN
EXISTING SEWER
LEGEND
EXISTING FIBER OPTIC
STREET CENTER LINECL
RIGHT OF WAY
CABLE TO REPLACE
BORE PIT
BORE PIT"BP"-
NEW J-BOX VAULT
PROPERTY LINE
EASEMENT
POT HOLE
Potelco, Inc.DESIGNED BY
MAPS & RECORDS NOTE:
UPDATE THE LOCATION OF THE FOLLOWING EQUIPMENT.
J01 IS APPROX. 25' SOUTH & 13' EAST OF EXISTING PSE
MAPS LOCATION.
V01 IS APPROX. 07' SOUTH & 10' EAST OF EXISTING PSE
MAPS LOCATION.
V02 IS APPROX. 19' NORTH & 04' EAST OF EXISTING PSE
MAPS LOCATION.
V03 IS APPROX. 13' NORTH & 10' EAST OF EXISTING PSE
MAPS LOCATION.
VOLUME OF DISTURBANCE TABLE
TYPE DESCRIPTION SIZE (FT)REM CU YD
(APPX)
GRAVEL FILL
CU YD (APPX)
TYPE OF SURFACE REMARKS
BP-1 BORE PIT 2 X 8 1.8 1.8 HARD
BP-2 BORE PIT 2 X 8 1.8 1.8 HARD
BP-3 BORE PIT 2 X 8 1.8 1.8 SOFT
BP-4 BORE PIT 2 X 8 1.8 1.8 HARD
BP-5 BORE PIT 2 X 8 1.8 1.8 HARD
BP-6 BORE PIT 2 X 8 1.8 1.8 HARD
BP-7 BORE PIT 2 X 8 1.8 1.8 SOFT
TOTAL CU YDS (APPX)12.4 12.4
Electric Cable in SCH80 POLY Conduit
Final Grade
24" Typical
(6" Min)
36" Min
Cover
Backfill shall not damage the conduit.
Backfill hard surface w/
while directional drilling
36" Min
Depth
Final Grade
24" Typical
(6" Min)8' Longcrushed rock 5/8 minus
Backfill soft surface with
clean natural material
PLAN VIEWTYPICAL BORE COVER
Will maintain 36" Min. depth
BORE PIT DETAIL
NOT TO SCALE
BORE PIT
POT HOLE
*NOTE:BORE PITS, TRENCH HATCHING & POTHOLES ARE NOT
SHOWN TO SCALE FOR VISUAL PURPOSES. PLEASE SEE BORE
PIT DETAIL FOR TYP. BORE PIT & TRENCH DIMENSIONS.
4" Min Shading Clean Native
Soil, Sand or 5/8" Minus
2" Min Bedding Clean Native
Soil, Sand or 5/8" Minus
RESTORATION PER CITY OF RENTON STANDARDS
POTHOLE ALL EXISTING UTILITIES
MFP19003571
19
19
1313NE 10TH STJEFFE
R
S
O
N
A
V
E
N
E 1515INDEX AVE NE
#2900J01V01STOP
FLAGGER
STO
P
FLAGGER
W20-7
A
ROADWORKAHEADW20-1 BEPREPAREDTOSTOP
W3-4100'100'100'W20-
7
A
100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'RO
A
D
WO
R
K
AHE
A
D W20-1BEPR
E
P
A
R
E
D
TO
STO
P W3-4100'100'BUSSTOPBUSSTOPPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGFROM TOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040PSEPUGETSOUNDENERGYJOB#1011169162900 NE 10th St, Renton, WA 980566/17/2019safaa.neema@pse.com(425) 398-6077SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be comp
lete
ly c
lear un
less o
therw
ise
ind
icated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP19003571additional flaggermay be required bycity of rentoninspector.