Loading...
HomeMy WebLinkAboutMFP19003571DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19003571 IVR Number: 19003571 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :06/24/2019Application Date:7227900075Parcel Number:2900 NE 10TH ST Permit Type:07/15/2019Issue Date:Franchise Permit Work Class:07/14/2020Expiration Date:Minor Utility Job Number:101116916Franchise Type:Electric Description:Bore approximately 225 LF for new electrical service. Pothole all utilities. Restoration per City of Renton standards. APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant RENTON HOUSING AUTHORITY PO BOX 2316 RENTON, WA 98056 Building Owner Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101116916 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 2900 NE 10TH ST BORE N. FROM BP5 APPROX 90' IN ROW. FROM BP5 BORE E. APPROX 30' TO BP4 TO ACCESS J01(318536-166771). FROM BP1 BORE S. APPROX 85' TO BP2 AND THEN SE APPROX 20' IN ROW. INSTALL NEW CABLE IN NEW CONDUIT VIA BORE. 3 TOTAL BORE PITS IN ROW. 3: 8'X2' HS CUTS ✔✔✔ ✔1'X3' Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.06.24 09:51:04 -07'00'6/24/19 MFP19003571 Nathan Janders 7/1/2019 Scott Warlick 7/8/2019 RESTORATION PER CITY OF RENTON STANDARDSPOTHOLE ALL EXISTING UTILITIES CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101116916 Potelco, Inc CARRIE YLENNI (253) 720-9700 6905 S 228th St, Kent, WA 98032 CARRIE.YLENNI@PSE.COM 2900 NE 10TH ST TBD TBD CORRIE RYDBERG 6/24/19 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.06.24 09:51:28 -07'00' MFP19003571 Monday - Friday 8:00AM - 3:00PM Scott Warlick 7/8/2019 SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). FOREMAN (CHECK BOX WHEN COMPLETED) #1 Print Name ___________________________________ Date ______________ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Material VERIFIED and CHANGES noted on Paperwork. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures #1 Foreman's Signature _______________________________________________ and that all quality requirements are met. Field Changes RED-LINED on As-built. Total PRIMARY Cable noted on As-built. Correct QC Checklist(s) reviewed. OVERHEAD APPARATUS "When performing planned work on a pole with an existing transformer or device, the Service Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge time. If you are working on a pole with the pole ground connected with a hot tap, replace it. If the transformer has split bolts on the secondary neutral or services, replace them. If the primary neutral is connected with a hot tap, replace it. If the transformer bank has a 2-bolt connector on the neutral bus, replace it. #1 #2 #2 Print Name ___________________________________ Date ______________ #2 Foreman's Signature _______________________________________________ PSE GENERAL SPECIFICATIONS General - All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. - Work sites shall be kept clear of debris and all construction materials, equipment and packing shall be removed daily. - Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. - Return all Street lights, area lights and floodlights. - All fault indicators will be maintained in their current location on the 1/0 cables upon completion of the job. If it is noted to remove any of the indicators they shall be returned to local PSE first response department for re-issue. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of work sketch. - Return one Foreman's copy of work sketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. Traffic /Pedestrian control notes - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. -The uniform code of traffic control shall be adhered to at all times.. -Provide signs, barricades, and traffic control in conformance with local permit regulations. -Provide route for pedestrians when working on or near sidewalks. -Maintain traffic flow as required by permitting agency. NOTE: Completely rebuild terminations. EXCEPTION: DO NOT REPLACE CUTOUTS UNLESS THEY ARE THE OLDER "BOX TYPE" OR 50 AMP "TRIP LINK" TYPE CUTOUT. REPLACE J-BOXES IF REQUIRED. UTILIZE FEED-THRU T.U.T.s AND REMOVE J-BOXES IF POSSIBLE. REPLACE ALL TRANSFORMER JUMPERS WITH NEW 1/0 JACKETED CABLE. UNDERGROUND CONSTRUCTION Additional notes to standards. -Erosion control must be placed before construction starts. Silt bags must be installed in downstream catch basins. Existing Utilities: Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage to existing utilities. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 6" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the permit agency. Excavation - Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for primary conductors and 24" of cover for secondary conductors. - Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for all conductors or as required by the permitting Agency. - No rocks larger than 8" shall be included in backfill. - Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. - Restore all excavated areas to original condition. Vaults & Hand holes - Refer to PSE standard 6775.0040 "Vault and Hand hole Installation" - Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 "PVC Conduit Installation". - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - Civil crew to install Conduit plug on each end until new cable to be installed. - All "spare" conduits shall be capped at each end. Surface Restoration Restore ground surface to original contour and original condition or better. Restore asphalt and concrete in accordance with requirements of local permitting agency. Cold patch or plate trench when necessary. Leave area in its original state or better at the end of construction. SCOPE OF WORK The general scope of this project is to remediate primary cables within the project area by the most economic means possible using replacement, or abandonment. The project involves replacing existing electrical cables in new conduit. Project type : Planned Project location : Number of Cables : 7 Cable Footage Estimated : 1,493' Cable Numbers Injected : 0 Cable Numbers Repaired : 0 Cable Numbers Abandoned : 0 Cable Numbers Replaced : 13641, 13642, 13643, 25923, 18673, 18674, 18675 Trench Footage Estimated : 563' There will be an advance notice provided by the contractor 24-hour advance notice of no parking in work areas. Access will be maintained to all residences and their driveways. When work is occurring directly in front of driveways, the contractor will work with the residence to manage access. Traffic Revisions Flagging crews will maintain one lane; flaggers will assist vehicles alternating through the roadway during work hours. For more information on the project 24-hour project information (888) 471-7339, (360) 825-5236 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POTELCO DESIGN AND Signature _________________________________________ Print Name _________________________________________ This design complies with PSE Any/all variations have been Design/Engineering Standards. QUALITY ASSURANCE pre-approved/documented by the appropriate PSE Representative. Date _________________ JOB SITE JOB SITE MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages Trench Method: CABLE REPLACEMENT Approximate Trench Footage: Abandon Cable Segments: Approximate New 1Ø/3Ø pri. Cable Footage: Approximate 2"/4" SCH80 Conduit Footage: Replaced Cable Segments: Vaults: BORE 545' 0 7 370'/580' 355'/550' 0 ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 11467062 101116916 N/A 108110638 VICINITY MAP OVERHEAD CIRCUIT: MAP # . SCALE 6" = 1 MILE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP C. YLENNI 253-720-9700 04/30/19 C. TOBIN 253-548-4516 04/30/19 N/A N/A N/A C. CHAVEZ 253-234-6307 04/30/19 REQ-CITY OF RENTON PRE-11 RENTON HOUSING AUTH 2020 CRP CABLE REMEDIATION PROGRAM 2900 NE 10TH ST, RENTON , WA 98056 N/A N/A N/A 101116916R1 AS NOTED 1 OF 3 KING N/A N/A QSEPRE NE-9-23-5 N/A N/A 2305E034 2305E040 2305E034 PRE-11 5/24/19 N. COSME REVISED BORE PATH N/A N/A N/A N/A N/A N/A Potelco, Inc.DESIGNED BY 101116916R1 2900 NE 10TH ST, RENTON , WA 98056 INDEX PAGE 1 - GENERAL NOTES PAGE 2 - SITE PLAN, CABLE & CONDUIT DIAGRAM PAGE 3 - CIVIL SITE DETAILED PLAN Overflow Filter fabric walls for Catch Basin Grate dewatering sedimentCollected Sediment Catch Basin Insert MID 9995728 Filter fabric skirt Secured with grate. EROSION CONTROL NOT TO SCALE 2305E040 LEGEND SINGLE PHASE, ONE WIRE/CABLE - 7.2 KV THREE PHASE WIRE/CABLE - 12.5 KV CABLE TERMINATION BUS (J-BOX) NEW OVERHEAD TO UNDERGROUND CABLE OVERHEAD TO UNDERGROUND CABLE TERM. 10T, 15T, 25T, 40T, 100T - INDICATES FUSE SIZE TOTAL UNDERGROUND XFMR (T.U.T.) NEW COMBINATION J-BOX/PADMOUNT XFMR UNDERGROUND COMBINATION J-BOX/XFMR N.T.S. = NOT TO SCALE X.F.M.R. = TRANSFORMER P.E. = POLYETHYLENE ABBREVIATIONS PRIMARY METERING CABLE SPLICE FAULT INDICATOR WILL NOT PHASE (WNØ) NORMAL OPEN (N.O.) FUSED DISCONNECT: SOLID BLADE DISCONNECT HANDHOLE PULL VAULT UNDERGROUND SWITCH UNDERGROUND J-BOX NEW PADMOUNT XFMR NEW UNDERGROUND XFMR PAD MOUNT XFMR ELECTRONIC MARKER COMBINATION J-BOX/PADMOUNT XFMR NEW UNDERGROUND COMBINATION J-BOX/XFMR TERMINATION CABLE TO REPLACE PROPERTY LINE RIGHT OF WAY CENTERLINE EASEMENT CL Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min (ROW) 36" MIN Cover (PVT PROP) 36" MIN 48" Max Backfill (No rocks over 8" diameter) 3" Bedding Clean Native Soil, Sand or 5/8" Minus 12" Typical TRENCH DETAIL NOT TO SCALE 12" Min Shading Clean Native Soil, Sand or 5/8" Minus - A 3" layer of sand, 5/8" minus or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches - A 12" layer of sand, 5/8" minus or clean shading is required when excavated native material contains rocks up to 8" in diameter. FOREMAN TO CONTACT REGIONAL CONSTRUCTION MANAGER FOR COVER DEVIATIONS FROM THIS DETAIL PHOTOS AND DETAILED NOTES SHALL BE PROVIDED BY FOREMAN 12" MIN 48" MAX 36" MIN EXISTING PAVEMENT / SIDEWALK VERTICAL SAW CUT LINE CRUSHED SURFACING MATERIAL COMPACT TO 95% MAX DENSITY. EXCAVATION AND HARD RESTORATION DETAIL NOT TO SCALE 12" MIN 3" Sand Bedding or 5/8" Minus 12" Min Sand Shading or 5/8" Minus 12" MIN ASPHALT PATCH, 2" MIN MATCH EXISTING Conduit (ROW) 36" MIN (PVT PROP) 36" MIN For contacts below dial 1-888-CALL PSE (225-5773) Contact Information PSE: PLANNER 22884 RYEN DR NW POULSBO, WA 98370 DOUG JONES 360-394-6636 ABANDONING PRIMARY CABLES PSE std. 6825.6200 In a Vault if the cable is ______________________________________________________________________________________ In conduit, -Remove the cable ______________________________________________________________________________________ Not in conduit or it cannot be pulled out, -Cut the cable off approximately one foot from the vault wall. Install a cap on the tail. -When practical, attach the old cable number to the cable stub. ______________________________________________________________________________________ In a Minipad hand hole ______________________________________________________________________________________ In conduit, -Remove the cable ______________________________________________________________________________________ Not in conduit or it cannot be pulled out, -Cut the cable off as much as practical. Install a cap on the tail. -When practical, attach the old cable number to the cable stub. -Stuff the tail into the bottom of the handhole. Be sure the new cables are not trapped by the old cables or the concentric neutrals. ______________________________________________________________________________________ At Risers if the cable is ______________________________________________________________________________________ In Conduit -Remove Cable ______________________________________________________________________________________ Direct buried or it cannot be pulled out, -Cut off the cable at the top of the riser. Install a cap on the tail. and the pole will remain. -When practical, attach the old cable number to the cable stub. ______________________________________________________________________________________ DIRECT BURIED Direct buried or it cannot be pulled out, -Remove the riser. and the pole will be replaced -Cut off old cable just below grade. -Re-fill ground back to existing grade. ______________________________________________________________________________________ DIRECT BURIED Direct buried or it cannot be pulled out, -Cut off the cable just below grade. and the pole will be removed ______________________________________________________________________________________ NOTE: If the pole is to be replaced, remove the abandoned riser and elbow, and stand off brackets (unless they support other conduits). NOTE: If the riser is made of transite material, it shall be removed following procedures in standard 0100.5000, "Transite Pipe Removal and Disposal." _______________________________________________________________________________________ -Remove (not abandon) aboveground transite riser when it is encountered in the field. Belowground transite may be left in place and backfilled. (Transite is a mixture of asbestos and cement. It is nonmetallic, flame-retardant, and resistant to moisture, low temperature, and corrosive agents). -For removal use an approved certified abatement contractor. Call the Environmental Services Department 24-hour pager (206-994-3186) to have a contractor dispatched. Procedure to Abandon Primary Cables: 1. Call the Systems Operator to request a clearance. 2. Follow the directions to ensure the cable is de-energized, apply proper tags as specified in Standard Practice 0201.1011, "Switching and Clearances Handbook," and report back to the Systems Operator. 3. Obtain a clearance from the Systems Operator on the cable to be abandoned. 4. Cut the ends of the cable. 5. The cable number tag may be left on the abandoned cable. NOTE: The cable number shall not be reused. 6. Call the Systems Operator and release the clearance. 7. Remove all "Danger Do Not Operate" tags. 8. The System Operator will then close the O# (Operations number). Existing System: Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by PSE System Operator. MFP19003571 NE SUNSET BLVD (PAVED)NE SUNSET BLVD (PAVED)N E 1 0 T H S T ( P A V E D ) N E 1 0 T H S T ( P A V E D ) INDEX AVE NE (PAVED)JEFFERSON AVE NE (PAVED ) 2900 P#: 7227900075 Parcel: 0089000050 1000 1000 1000 1000 1000 2801 2804 2809 2819 P# 0089000010 2806 2800 2813 2825 P# 7227900094 P#: 7227900091 3030 2725 2801 P A R K I N G L O T (P A V E D )PARKING LOT(PAVED)PARKING LOT (PAVED) P# : 7 2 2 7 9 0 0 0 9 6 GATE PARKING LOT (PAVED) BP-1 BP-4 BP-2 BP-3 BP-6 BP-8 BO R E ~ 8 5 'BORE ~ 85'BORE ~ 170'B O R E ~ 1 1 5 ' EOP =27' ROW =48' EOP =58' ROW =97' ℄ ℄ ℄ ℄ ℄ ℄ ℄ ℄ ℄ BRICK WALL 6' TALL ROW =80'BORE ~ 50'S/WS/WS/W PARKI N G L O T (PAVE D ) BP-7 S/ W S/WS/WBP-5 BORE ~ 30'268.3 lbs 269.6 lbs478.9 lbs 482.6 lbs179.4 lbs 180 lbsEHY670 - AØ EHY671 - BØ EHY672 - CØ EHY666 - AØ EHY667 - BØ EHY668 - CØ 1-4" - L______' EHY669 - CØ 1-2", 1-4" - L______' EHE500 - AØ EHE501 - BØ EHE502 - CØ EXISTING TO REMAIN ABE440 - AØ ABE441 - BØ EXISTING TO REMAIN AØEHE500 BØEHE501 CØEHE502 EXISTING TO REMAIN AØABE440 BØABE441 EXISTING TO REMAIN 40T UNK SITE PLAN SCALE: 1:50 CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY. CIRCUIT FEET REMOVED: 825' CIRCUIT FEET ADDED: 905' WIRE CREW FOREMAN NOTE: ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT LOCATION ON 1/0 CABLES AFTER NEW CABLE IS INSTALLED UNLESS OTHERWISE SPECIFIED. PLEASE RED-MARK ALL FAULT INDICATORS ON "CABLE DIAGRAM" FOR MAPPING. CIVIL CREW FOREMAN NOTE: MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL WORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE. CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE RECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISH PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS (FOREMAN'S COPIES) AT THE END OF THE JOB. PRIMARY CABLE & CONDUIT DIAGRAM NOT TO SCALE EXISTING UNDERGROUND MAP: # . SCALE: 1:100 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP C. YLENNI 253-720-9700 04/30/19 C. TOBIN 253-548-4516 04/30/19 N/A N/A N/A C. CHAVEZ 253-234-6307 04/30/19 REQ-CITY OF RENTON PRE-11 RENTON HOUSING AUTH 2020 CRP CABLE REMEDIATION PROGRAM 2900 NE 10TH ST, RENTON , WA 98056 N/A N/A N/A 101116916R1 AS NOTED 2 OF 3 KING N/A N/A QSEPRE NE-9-23-5 N/A N/A 2305E034 2305E040 2305E034 PRE-11 5/24/19 N. COSME REVISED BORE PATH N/A N/A N/A N/A N/A N/A 2305E034 101116916R1FOREMAN NOTE: CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7 BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS & BODILY INJURY. VAULT & EQUIPMENT TABLE SITE GRID NUMBER VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) REMARKS LB DC J01 318536 166771 EXISTING JUNCTION BOX J-BOX BELOW GRADE W/ 3-4 POS. J-BUS EXISTING 7 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS V01 318529 166767 EXISTING VAULT 112.5kVA PM XFMR 120/240v EXISTING 3 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS V02 318570 166767 EXISTING VAULT 25kVA PM XFMR 120/240v EXISTING 1 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS V03 318571 166766 EXISTING VAULT 112.5kVA PM XFMR 120/240v EXISTING 3 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS TOTALS :14 - Potelco, Inc.DESIGNED BY CIVIL CREW NOTE: ALL 2" - 90° BENDS MIN 48" RADIUS SCH-80 PVC ALL 4" - 90° BENDS MIN 60" RADIUS SCH-80 PVC ALL 4" - 45° BENDS SCH-80 PVC ALL 2" - 45° BENDS SCH-80 PVC - ALL CONDUITS SHALL BE CAPPED AT EACH END UNTIL CABLE IS INTALLED PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)REMARKS FROM TO SIZE (in)QTY DESIGN LENGTH (ft) ACTUAL LENGTH (ft) TYPE BENDS PULL (lbs) PULL REV (lbs) SIZE DESIGN LENGTH (ft) ACTUAL LENGTH (ft) CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only Check applicable box DB120 HDPE SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS BUILT J01 V01 4 1 185 269.6 268.3 1/0 AL JKT 200 EHY666 EHY667 EHY668 1.2 J01 V02 2 1 355 179.4 180 1/0 AL JKT 370 --EHY669 1.2 J01 V03 4 1 365 478.9 482.6 1/0 AL JKT 380 EHY670 EHY671 EHY672 2.3 TOTAL 4"550'727$/‘580'- TOTAL 2"355'727$/‘370'TOTAL LUBE 4.6 ABANDONED / REMOVE / REPLACED CABLE SCHEDULE CABLE NO. SAP EQUIP LOCATIONS CABLE (LF) EST EXISTING CABLE MFG. NAME EXISTING CABLE MFG. DATE ABANDONED CABLE LEFT IN PLACE ABANDON CIRCUITRYFROMTO 13641 10507686 J01 V03 315 YES NO 13642 10507695 J01 V03 315 YES NO 13643 10507704 J01 V02 300 YES NO 25923 10519276 V02 V03 31 YES NO 18673 10512696 J01 V01 179 YES NO 18674 10512706 J01 V01 179 YES NO 18675 10512716 J01 V01 179 YES NO TOTAL CIRCUIT FEET 825' MFP19003571 NE SUNSET BLVD (PAVED)NE 1 0 T H S T ( P A V E D ) INDEX AVE NE (PAVED)JEFFERSON AVE NE (PAVED ) 2900 P#: 7227900075 Parcel : 0089000050 1000 2801 2804 2809 2819 P# 0089000010 2813 P#: 7227900091 3030 P A R K I N G L O T ( P A V E D )PARKING LOT (PAVED)P# : 7 2 2 7 9 0 0 0 9 6 GATE PARKING LOT (PAVED) EOP =27' ROW =48' ℄ ℄ ℄ ROW =79' S/W S/WS/WS/WS/WS/WUTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP C. YLENNI 253-720-9700 04/30/19 C. TOBIN 253-548-4516 04/30/19 N/A N/A N/A C. CHAVEZ 253-234-6307 04/30/19 REQ-CITY OF RENTON PRE-11 RENTON HOUSING AUTH 2020 CRP CABLE REMEDIATION PROGRAM 2900 NE 10TH ST, RENTON , WA 98056 N/A N/A N/A 101116916 AS NOTED 3 OF 3 KING N/A N/A QSEPRE NE-9-23-5 N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A 101116916CIVIL SITE DETAILED PLAN SCALE: 1:30 CIVIL FOREMAN NOTE: POTHOLING IS REQUIRED PRIOR TO DRILLING AND THE BORE PROFILE SHALL BE PREPARED ON SITE AND PROVIDED TO THE INSPECTOR FOR APPROVAL. NEW CONDUIT SHALL BE AT 36" MINIMUM DEPTH TO THE TOP.CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7 BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS & BODILY INJURY. INSTALL CATCH BASIN INSERT ON ALL CB WITH CONSTRUCTION ZONE. WIRE CREW FOREMAN NOTE: ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT LOCATION ON 1/0 CABLES AFTER NEW CABLE IS INSTALLED UNLESS OTHERWISE SPECIFIED. PLEASE RED-MARK ALL FAULT INDICATORS ON "CABLE DIAGRAM" FOR MAPPING. CIVIL CREW FOREMAN NOTE: MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL WORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE. CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE RECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISH PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS (FOREMAN'S COPIES) AT THE END OF THE JOB. EXISTING WATER EXISTING POWER EXISTING TELEPHONE EXISTING GAS EXISTING STORM DRAIN EXISTING SEWER LEGEND EXISTING FIBER OPTIC STREET CENTER LINECL RIGHT OF WAY CABLE TO REPLACE BORE PIT BORE PIT"BP"- NEW J-BOX VAULT PROPERTY LINE EASEMENT POT HOLE Potelco, Inc.DESIGNED BY MAPS & RECORDS NOTE: UPDATE THE LOCATION OF THE FOLLOWING EQUIPMENT. J01 IS APPROX. 25' SOUTH & 13' EAST OF EXISTING PSE MAPS LOCATION. V01 IS APPROX. 07' SOUTH & 10' EAST OF EXISTING PSE MAPS LOCATION. V02 IS APPROX. 19' NORTH & 04' EAST OF EXISTING PSE MAPS LOCATION. V03 IS APPROX. 13' NORTH & 10' EAST OF EXISTING PSE MAPS LOCATION. VOLUME OF DISTURBANCE TABLE TYPE DESCRIPTION SIZE (FT)REM CU YD (APPX) GRAVEL FILL CU YD (APPX) TYPE OF SURFACE REMARKS BP-1 BORE PIT 2 X 8 1.8 1.8 HARD BP-2 BORE PIT 2 X 8 1.8 1.8 HARD BP-3 BORE PIT 2 X 8 1.8 1.8 SOFT BP-4 BORE PIT 2 X 8 1.8 1.8 HARD BP-5 BORE PIT 2 X 8 1.8 1.8 HARD BP-6 BORE PIT 2 X 8 1.8 1.8 HARD BP-7 BORE PIT 2 X 8 1.8 1.8 SOFT TOTAL CU YDS (APPX)12.4 12.4 Electric Cable in SCH80 POLY Conduit Final Grade 24" Typical (6" Min) 36" Min Cover Backfill shall not damage the conduit. Backfill hard surface w/ while directional drilling 36" Min Depth Final Grade 24" Typical (6" Min)8' Longcrushed rock 5/8 minus Backfill soft surface with clean natural material PLAN VIEWTYPICAL BORE COVER Will maintain 36" Min. depth BORE PIT DETAIL NOT TO SCALE BORE PIT POT HOLE *NOTE:BORE PITS, TRENCH HATCHING & POTHOLES ARE NOT SHOWN TO SCALE FOR VISUAL PURPOSES. PLEASE SEE BORE PIT DETAIL FOR TYP. BORE PIT & TRENCH DIMENSIONS. 4" Min Shading Clean Native Soil, Sand or 5/8" Minus 2" Min Bedding Clean Native Soil, Sand or 5/8" Minus RESTORATION PER CITY OF RENTON STANDARDS POTHOLE ALL EXISTING UTILITIES MFP19003571 19 19 1313NE 10TH STJEFFE R S O N A V E N E 1515INDEX AVE NE #2900J01V01STOP FLAGGER STO P FLAGGER W20-7 A ROADWORKAHEADW20-1 BEPREPAREDTOSTOP W3-4100'100'100'W20- 7 A 100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'RO A D WO R K AHE A D W20-1BEPR E P A R E D TO STO P W3-4100'100'BUSSTOPBUSSTOPPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGFROM TOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040PSEPUGETSOUNDENERGYJOB#1011169162900 NE 10th St, Renton, WA 980566/17/2019safaa.neema@pse.com(425) 398-6077SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be comp lete ly c lear un less o therw ise ind icated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP19003571additional flaggermay be required bycity of rentoninspector.