Loading...
HomeMy WebLinkAboutPN_Project_Narrative_190710_v1.pdf#5 Project Narrative We are looking to build an auto repair facility for our dealership. It will include vehicle lifts and a car washing area. All car washing will be done over a drain that is attached to an oil/water separator. The separator will not be visible as it will be partially below ground and the top portion encased in a cement wall. All other improvements will be done inside the building. There is no water near the site. There are no changes being made that will effect drainage. The total construction and equipment installation cost will be around $250,000. There will be no trees removed or changes made to the landscaping. There will be no offsite improvements. Road access off of Lind Ave sw will not change. The Land use permit application has already been submitted to City of Renton and we have been granted TUP by City of Renton. The property was used before as a warehouse and was zoned commercial and will remain the same.