Loading...
HomeMy WebLinkAboutCO 1 CAG-18-240, CO#1-19 Community Services Facilities Division CONTRACT NO: CAG- B18002996 CO NO. 1 CONTRACT CHANGE ORDER(CO) PROJECT TITLE: CITY OF RENTON PW-SIGN SHOP EXPANSION TO: OPTIMUS CONSTRUCTION (CONTRACTOR) The following mutually agreed to and Owner approved Change Order Proposal(s)are hereby incorporated by reference into the contract. Description Amount COP: $ 9,110.94 CHANGES TO SIDE SEWER. SEE ATTACHMENT $FOR REFERENCE. $ - CONTRACT SUM: C NO CHANGE C INCREASE OF: $ 10,022.03 DECREASE (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: LI NO CHANGE C INCREASE OF: 0 I✓ DECREASE CALENDAR DAYS The foregoing amount covers everything required in connection with the change.All other provisions of the contract remain in full force and effect. CONTRACT SUMMARY(Internal Use Only) ORIGINAL CONTRACT SUM $ 627,386.03 PREVIOUS ADDITIONS/DELETIONS $ - PREVIOUS TOTAL $ 627,386.03 CHANGE AMOUNT THIS CHANGE ORDER $ 10,022.03 REVISED CONTRACT TOTAL $ 637,408.06 PERCENT TOTAL CHANGE FROM ORIGINAL 1.60% NOTICE TO PROCEED DATE January 1, 2019 PREVIOUS CONTRACT CALENDAR DAYS PREVIOUS SUBSTANTIAL COMPLETION DATE anuary 1, 2019 REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 0 ./� CURRENT SUBSTANTI L COMPLETIO J a 1, 2019 111, t -3 _/I/? Architect Ackno I L'�` dgement ate Contractor Acknowle gem t Date The City of Renton hereby accepts the foregoing Change Order Proposal(s).This formal acceptance constitutes a Change to the contract only when authorizing signature is affixed.Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection with this Change Order. 7// //t AUTHORIZIN IGNA RE DATE S P -1 PROPOSAL and CONTRACT 8812 CANYON ROAD EAST • PUYALLUP,WA 98371 Telephone(253)535-2590 • Fax(253)535-2746 • www.asphaltpatchsystems.com Attention Cell Phone Email Ricky 206-778-5838 Contracting Party Telephone Date Optimus Construction 206-243-2000 6-3-19 Address Job Name Renton Sign Shop Expansion City,State,&Zip Job Location City of Renton We hereby submit specifications and estimates for: Additional Patching on Finished Grade Prepared by Others: (approximately 60 square feet) 1) Patch trench 2'X 30'with 4" of HMA Class ' " Quote:$1,000.00 Thanks, Doug looker 253-219-1149 doug@iasphaltpatchsystems.com All engineering,permitting,layout,and landscape restoration to be completed by others unless otherwise specified. *AH priees arc based on 2"depth and one mobilization unless etherwiseneted, StanJa�J rie*ee) ,planing;trafficseet-Feirpeneits-rberidifig *Pr subject to change upon if scope is increased. The contract price is only good for 30 days and is arc not the fault or responsibility of the contractor. ACCEPTANCE OF PROPOSAL: I as the Not terms,and conditions are satisfactory and arc hereby accepted. You ate Asphalt Patch Systems,Inc.Representative Approved Customer Signature READ NOTICE ON BACK. ARMS 4i.GONDMM ONS DISPUTES AND REMEDY«_I4 any dispute arises between the parties,the parties will make a resort to litigation.Asa condition precedent to any claim in complete the ^ �nnot be resolved between the parties,then-either-party may contractor a reasonable opportunity____..�_ .I€,a file suit in an-appropriate court of jurisdiction.If suit is filed in a Superior Court,the dispute will be decided according to the mandatary arbitration rules of the county in which-the Suit is filed, in dispute,and ach the dollar lints currently in effect arbitration rules of the county in which suit is filed.The arbitrator shall validity and enforceability of a lien.The parties each waive their right to file d in Superior Court an the arbitrator's award-as final and-binding.In the event a dispute-arises and-either-party-seeks and receives legal counsel for which a fee is charged,the in all cases be awarded his fees regardless of whether the dispute is resolved through settlement or arbitration. completion of job,the contractor and-e stomer shall jointly inspect the work and a single list shall be-prepared identifying all work to be completed or corrected.There shall list incorrect,and the list shall be-signed by the-customer-and given to the contractor.The-contracter shall t'en e e'do sl all is responsible under the terms of ' • performance or completion this agreement,nor shall the customer claim a completing any iteem stated on the writ« h lists nor shall shall have first given reasonable notice or list referred to above.If the customer does contract with an alternate contractor to perform the pickup work or to the contractor to do so,or if the customer commences customer then agrees to accept all work"as is"and thereby waives any claim warranty claims,Fen correction of list,any retainage or amount final payment shall be paid within the next three days to the contractor. WARRANTi�The contractor,Asphalt Patch Systems,Inc.,warrants that all work will be performed in-a there will be ne defects in workmanship and will by suppliers,manufacturer;-and subcontractors to theextent-that-theauppliers-W-manufacturers-af-these-preaucts-provide a warranty.This warranty is far a period-ef t5 months-from the lie.also warrants that it will perform all necessary labor to repair or replace all defective work-at ne cost to the customer,and will expeditiously-act in warranty of others,as stated above.Th4 ashy-errdcs } , expressed Be-implied warranties el frtncss,aieteheatability et habitability,It also-exclude; personal injury loss.Asphalt atch Systems Inc.will net by not substantially impair structural element.Any elai filed in-a court of competent jurisdiction within 4 mpg peried.Any a br ach of contract or is not se-filed within this-per-Mel-of-time shall by the contractor does any-further-than what in terms of months or years from the date of contract. This warranty is void ife person or company other than the contractor .This warranty is nontransferable. DISCLAIMERS:Asphalt Patch Systems InE for thy, sting,,handling;er or toxic materials unless it-is addressed in the specifications.We can wily Patch Systems Inc.shall net-be liable fer damage faeIIity except that which is directly attributable to negligence on the part of Asphalt Patch Systems Inc Asphalt Patch Systems,Ine,cannot be Soil sterilization,if included in the-specifications,wIN be applied at rates specified by the manufact ph It o t h,Systems Inc.will not be responsible for any subsequent ids which Asphalt I\Itch Systems Inc.is registered with the State ASPHAPS000BP,as a with the state a bond in the amount of$12,000.00 for the purpose of satisfying breach of contract in the conduct of the contractor's business.The expiration-date of this contractor's registration is January 17th of each year.You may contact the Washington State Department of Labor has,in fact,been renewed. bend is not for your exclusive use because it covers all work per armed by this contractor.The band is intended to pay valid claims up to$12,000.00 thatnd ethe sto may-withheld a as retainage for a will be completed as required by yeurcentract, ^lie of m als ed in your or subcontractors is net paid liened to force payment and you could pay . contractor is required lien release documents if you request it:General information is also Labor and Industries. I., , CONSTRUCTION RNO ❑EVELOPMENT INC PORT OF SEATTLE General Contractor Change Order Rquest Date 4/24/2019 Project Name: City of Renton-Sign Shop Expansion cop# 1 PR# Project# 2019-01 RFI# Description: Provide&install complete side sewer per attached. LABOR COST (OPTIMUS Work Force Only) Employee Name Hr Rate Hour Extension Description Journeyman $ 81.93 0 $ $ - Journeyman $ 81.93 0 $ $ - Superintendent Dick McCullough $ 84.38 2 $ $ 168.76 Labor $ 68.03 0 $ $ GC Labor Cost $ 168.76 P&022% $ 37.13 GC Labor Total Cost $ 205.89 MATERIAL COST Material Cost Suppliers Material Cost $ - EQLIIPTMENT COST Small Tools Cost $0.00 Rental Equipment Owned Equipment Equipment Cost $ - SMALL TOOLS Material Equipment&Tools Cost $ - OH&P@22% $ - Material&Equipment Total Cost $ - Backup documentation is Attached. Subcontractors Cost Name Item Sub-Profit Subs Cost Less Profit Precision Exc. $1,236.02 $ 5,618.25 Asphalt Patch Systems $180.33 $ 819.67 $0.00 $0.00 $0.00 $0.00 Subcontractor Cost(less profit) 6,437.92 Subcontractor Profit 1,416.34 Subcontract Cost Total 7,854.26 GC Labor, Material&Equipment Total Cost $ 168.76 GC OH& P@22% $ 37.13 Subcontractors Total Cost $ 7,854.26 GC OH& PonSub@10% $ 785.43 GC&Sub's Total Cost $ 8,845.58 Insurance @ 1% $ 88.46 Bond@2% $ 176.91 Total Cost $ 9,110.94 -'RECISION .' ExcAVATION NORTHWEST, LLC Change Order Proposal #01 Date: 4/14/19 Project: City of Renton Sign Shop Expansion RE: Side Sewer Not Shown on Plans Scope of Work Sawcut and remove asphalt for new sewer line trench zone Pothole&locate connection to existing Install 4"gasketed SDR 35 PVC pipe and fittings. Install 1 EA 4"cleanout. Connect to existing sewer pipe stub Prep for new asphalt. Import backfill for trench line as needed Exclusions Bonds, WSST,fees,permits;surveying,layout;compaction/materials testing Excavation,disposal,and replacement of yielding or otherwise nonperforming soil Water pumping/filtering/treatment/storage All work associated with hazardous/regulated material Excavations over 4' in depth Work inside existing buildings Removal of pavement markings;asphalt planing/grinding Installation of:concrete,asphalt,pavement markings, trench drains, fencing,signage Change Cost Proposal Amount $6,854.26 1Il .t s ; Side Sewer not Shown on Plans Summery Report Description QTY UNIT Direct Cost Demo Asphalt 1 LS $ 1,102.78 Pothole Connection 17 TN $ 294.81 Install 4" PVC Pipe & Fittings 35 LF $ 3,089.54 Install Cleanout 1 EA $ 303.41 Connect to Existing Sewer 1 EA $ 326.81 Prep for New Asphalt 1 LS $ 439.06 $ 5,556.41 Cost Breakdown With Mark-up Total Labor $ 1,509.07 22% Labor Mark-up $ 332.00 5% Small Tools $ 75.45 Total Equipment $805.28 22% Equipment Mark-up $177.16 Total Materials $2,419.55 22% Material Mark-up $532.30 Total Subcontractors $822.50 _ 22% Sub Markup-up $180.95 Grand Total $ 6,854.26 Side Sewer not Shown on Plans Direct Cost Report Description QTY Unit Labor Equipment Materials Sub Totals Demo Asphalt 212 SF Operator 72.63 0.5 HR 36.32 Pipe Layer 56.78 0.5 HR 28.39 Laborer 55.74 1 HR 55.74 Cat 308 Excavator 91.66 0.5 HR 45.83 Crew Truck 18 0.5 HR 9 Export Asphalt 21 5 TN 105 Saw cutter 750 1 L5 750 Trucking 145 0.5 HR 72.5 120.445 54.83 105 822.5 1102.78 Description QTY Unit Labor Equipment Materials Sub Totals Pothole Connection 1 EA Operator 72.63 1 HR 72.63 Pipe Layer 56.78 1 HR S6.78 Laborer 55.74 1 HR 55.74 Cat 308 Excavator 91.66 1 HR 91.66 Crew Truck 18 1 HR 18 185.15 109.66 0 0 294.81 Description QTY Unit Labor Equipment Materials Sub Totals Install 4"PVC SDR 35 45 LF Operator 72.63 4 HR 290.52 Pipe Layer 56.78 4 HR 227.12 Laborer 55.74 4 HR 222.96 Cat 308 Excavator 91.66 4 HR 366.64 4"SDR Pipe&Fittings 5,34 45 LF 240.3 5/8 Crushed Minus 28.85 40 TN 1154 Export Spoils 21 28 CY 588 740.60 366.64 1982.30 0.00 3089.54 Description QTY Unit Labor Equipment Materials Sub Totals Cleanout 1 EA Operator 72.63 0.5 HR 36.315 Pipe Layer 56.78 0.5 HR 28.39 Labor 55.74 0.5 HR 27.87 Crew Truck 18 0.5 HR 9 Cat 308 Excavator 91.66 0.5 HR 45.83 Fittings 32 3 EA 96 Cleanout Ring&Cover 60 1 EA 60 92.575 54.83 156 0 303.41 Description QTY Unit Labor Equipment Materials Sub Totals Connectto existing line 1. .._. Operator 72.63 1 HR 72.63 Pipe Layer 56.78 1 HR 56,78 Labor 55.74 1 HR 55.74 Crew Truck 18 1 HR 18 Cat 308 Excavator 91.66 1 HR 91.66 Fittings 32 1 EA 32 185.15 109.66 32 0 326.81 Description QTY Unit Labor Equipment Materials Sub Totals Prep for new asphalt 212 SF Operator 72.63 1 HR 72.63 Laborer 56.78 1 HR 56.78 Labor 55.74 1 HR 55.74 Crew Truck 18 1 HR 18 Cat 308 Excavator 91.66 1 HR 91.66 5/8 Crushed Minus 28.85 5 TN 144.25 185..15 109.66 144.25 0 439.06 Labor Equipment Materials Sub Totals 1509.07 805.28 2419.55 822.50 3556.40 - 1 ADDITION TRENCH i DRAIN PROVIDE NEW CLEANOUT, VERIFY TYPE AND LOCATION WITH PUBLIC WORKS SWEEP PER CITY STANDARDS PROVIDE 4"ASTM 3034 SS LINE TO CONNECT TO EXISITNG SS AT CLEANOUT VERIFY LOCATION AND DIMENSIONS EXISTING PROVIDE ASBUILTS VEHICLE BAY INVERT AT EXISTING CLEANOUT APPROX 48" SWEEP PER CITY `, STANDARDS ':1 REPLACE EXISTING EXISTING BROKEN 6"LINE CLEANOUT RENTON SIGN SHOP CHANGE AT SEWER LINE N ��- SCALES 1i8 -1-0' RECESSED Not to Scale LIFT POCKET t j 3/4" LETTERING "SEWER" 2�-0., FRAME --- DIAMETER 2'-0" 1 [ iTt - t i _ r i SEWER Q (2) BOLT SOC. (ALLEN HEAD) e=-,vz -7iiii- •Gi 5/8" — 11 X 1.5 STAINLESS ..; / ' '/ t t t I STEEL 0 REF. PART #00981177 '! • ri• t t t ; - um 1-3/16" " 8" CLASS "B", 10-1/2 - SANQ OR 5/8" (IIIII7 \' ASPHALT EXPANDABLE FOAM 1/4 12-1/2 I J— 1" V \�\������\t��\������M -r1-1/8" 7 2-1/4" BOLT DETAIL 45' (1/8) BEND 11 14" 12-3/4" '11 1-1/8" 8" •*P- ,-P 4G 11" 4, 12-1/4" -2- oJ CAST IRON RING AND COVER (P. PIPE MATERIAL AS SPECIFIED Gi' BY THE ENGINEER --,,,`' 45" (1/8) BEND NOTES: 1. 8" AND 6" CLEAN-OUT RINGS AND COVERS ON SEWER MAINS SHALL BE EAST JORDAN IRON WORKS, INC. No. 3698 (PRODUCT NO. 00369803) OR APPROVED EQUAL. CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY. 2. IN UNIMPROVED AREAS, POUR A 1'-0" THICK, 2'-0" SQUARE CONCRETE, CLASS 3000, PAD AROUND THE RING AND COVER, z Y °, STD.PLAN-403.1 PUBLIC WORKS DEPARTMENT W' OR 6" CLEANOUT APPROVED FOR SANITARY SEWER MAIN &4(44131/9/19MIL /14-4,6 ON' - W (SEE NOTE 7) LIMITS OF PIPE ZONE / . / f/ / // BEDDING MATERIAL FOR ,-, //.;/ � SANITARY SEWER PIPE f /'/ / %% / O.D. OF PIPE (SEE NOTE ) /; ��' j/ FOUNDATION LEVEL '//, �';,/! A/://' :,/"/// ,•,/,;/;,',/ , A BEDDING FOR SANITARY SEWER PIPE NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT BEDDING MATERIAL TO 95% MAX. DENSITY EXCEPT DIRECTLY OVER PIPE. HAND TAMP ONLY. 4. PIPE INSTALLATION SHALL BE PER SECTION 7-08 OF THE STANDARD SPECIFICATIONS. 5. PIPE ZONE MATERIAL SHALL BE PER SECTION 9-03.12(3)' OF THE STANDARD SPECIFICATIONS OR PEA GRAVEL. 6. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED. 7. TRENCH WIDTH SHALL BE PER SECTION 2-09.4 OF THE STANDARD SPECIFICATIONS. 01`"'cr STD.PLAN•405 0PIPEPUBLIC WORKS BEDDING APF OVEP. 4 r� DEPARTMENT FOR SANITARY SEWERS J11J h4 F tJiO• , hek www OATS --- EX. SEWER MAIN PROPERTY LINE -SPOOL (LENGTH AS NEEDED) ? 1 o3'-0" 1 6" SEWER STUBE I FUTURE 4" SIDE SEWER CC f2"x 4" STUD MARKING POST PAINTED SEWER MAIN TEE X 6" TEE I 6" CAP 1 WHITE WITH THE WORD "SEWER" STENCILED IN 3" HIGH BLACK LETTERS AND #6 WIRE i 1 WRAPPED AROUND THE STUD AND EXTENDED TO THE TOP OF THE STUD. COUPLING (TYP.) a I tI o • (-6"X6"X6" SURFACE CLEANOUT WITH CAST IRON RING AND COVER _ ( (EAST JORDAN IRON WORKS PRODUCT NO. 00367502 OR APPROVED EQUAL, SPECIFY "SEWER" ON LID), I (SEE STD. PLAN 403.1 FOR INSTALLATION) r� _-� 4___I JM EAGLE THREADED CLEAN-OUT ADAPTER HUB BEND AS- & PLUG (OR APPROVED EQUAL) REQUIRED EXISTING SANITARY SEWER MAIN ---2.0% MIN. SLOPE :3 FUTURE 4" SIDE SEWER \-6" SEWER STUB 6"X6"X6" WYE FUTURE 6"x 4" REDUCER SEWER MAIN SIZE X 6" TEE ACCEPTABLE PROCEDURES FOR SIDE SEWER CONNECTIONS TO EXISTING SEWER MAIN A. VITRIFIED CLAY MAIN - CUT IN A NEW PVC "TEE" USING "STRONG-BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL). B. CONCRETE MAIN - CUT IN A NEW PVC "TEE" USING "STRONG-BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL). C. PVC & C900 PVC MAIN - CUT IN NEW TEE USING RIGID COUPLINGS OR CORE-DRILLEO WITH A ROMAC SADDLE (OR APPROVED EQUAL). D. DUCTILE IRON MAIN - CORE-DRILLED WITH A ROMAC SADDLE (OR APPROVED EQUAL) E. MANHOLE CONNECTION - ALL CONNECTIONS TO MANHOLES SHALL BE AT MANUFACTURED KNOCK-OUTS OR THE STRUCTURE SHALL BE CORE-DRILLED. t 3000 PSI MIXVhN CONCRETE BLOCKING ‘1k M 25 0 tb‘0 04. (73, C 11' 27G MIN SLOPE 6" TEE HORIZONTAL 6" MIN. SEWER MAIN `SEWER MAIN CONCRETE BLOCKING ANGLE OF TEE AT MAIN BETWEEN 25' AND 45' TYPICA I__SIDF_SFYF$ NOTE; UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE A MINIMUM 2.5' COVER AT PROPERTY UNE OR 3-5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER. STANDARD SIDE SEWER STD.PLAN-406.1 ,•.� PUBLIC WORKS INSTALLATION APP VEO. 3j1 DEPARTMENT ,J }/ y „ O's (SEWER MAIN TO PROPERTY LINE) del � ` r.1+s Ma+ka�mi OA R f.,5 Is i-i 4 E_ EL ACCC,;-`-r7LiSi.'17D • BY 3f ii ANf, AN 4 Yli'E. '4',II i 1,,E.4.N.r;i .-•0 dr r„fif. i iry;:f 4 i., RE IvOS SH AI i Hits dis OUP,rf.1, I4J1,It -,, A:CU'!ACI.I.,-.: I11,,F C,i.Aillr..1L iffr DIPPC.fie.ff Cif C.RADE 'i, 45 EEN2- r's'i,L1 PI rf,C I,,i,.. RECIJ,,,E: A ScRf ACL \ i;i11-i.It 1,1)1E 1') 1 11..11.,EAtIOUT 1,',11f1:-. (SEE N11.)7f," 11, ,,, i hs, - , ',MUSE f iRo5.1 IOt I Ht- !ii t P,: • a i et i 7 f •• , i i.f.._ ', . - ' -11 1'. - • i _;. _ 4' SEWER 4ictE ' 1 i StriAr ACE_ CLE1-0.,CUl - / , -; -'-' ' '''''--- ,/ IT 1Pi.....eL.; • Pi913, SEE PICriES 2 611:f.6. WYE •• ,,,I ' U ,,V likl AND 3. filiff iff Of 1 LINE EIZE FOR ispi S1f10 49 AN - 40,';\, 1 PROPER IN L'NE [ PROPEPly ...if.r.E: 11Ci1Lf-11 T 0:t,i11. 1111 1 ,\\,,, 11TYPIC1-1111 1‘,',a • , ,.,. fdf r.f,i Et '-- b ,i, 4 tst i.e..,:•...1 q .,.,, 1.fir1• f1'1 i AT---11 (1 triet3A:.) f". 1 tif Ai ki SL'AJEF LINE i..., x.. 1\!P'i • r- C:. I— H ir 7,7 ING Ci SPF.IAPS ANY Fl\Tier H A VI N C 1 'r'-' i.., ta, in.sfailodo, of c spe,itoet sefwEr cote-is:A:lion, b side-se wor 00D ,Ir.VE L Fr it4S L OCA A1 .,E O ER 114,I iOts pet'mit eient most be chos,,,,,,i ',on-, the C't,,, of Renta, le..b.Itt Yiforits ,,, M.1,,N)H.O C ,,, OA THL tr PuB_IC. SEVrEP SrETEM, 4 BACIA,FLOY PREI3iENTION Depor DEVICE ASCII AS CIE AN CHECR EXTENDABLE ..' 9 ilArKw;,.lie' 'AA.L VP CR APPROVED ABUSE 'tii'A.I.I. 9E 2. 1 ypes of oirre and fittings ;had co, be t serf tor sr2nil cry 0,,,weis ]N"--,1,1,,,_LEL1,. ::?,hal1 he hpproved b, 1.1-1E. Depo,ii-iiiir!. of Fug Works Rubber or cr. 4" FLEXIBLE f;011P-LIrd0 (EF RNCO AR EOCAL'i r,coorene cc:hi.kehs ,.. : spec,Ho by the --,ou,fac I u-ef, ,hal, b€ \ \ Z 0 u-,,,drrom oracle of 221 (1/4" per foot.) met be inern tug ee fef ,. s' U.19'ACE CLEANCiti I iF„ • \ 4-r: 4""4' VirE: ,,tit.h 41' pipe I, I he event a 2% et'ace cannot be n-,c,r,toinel, the , owner most sign o City at Renton grgoc releose form and t.nun ! •. ce.:J Ustal: A Wort: of d ty.t.-du of IA PLAN ltdir DV; i:),RA;N! FOR4 Far inspection of a cu sewer, ccii 24 hours ir, ddvorlie.o ;fie ,..C.IAI E.LEVA ON HOUSL inspection phone nt.,0bc,,, i,F, 0,, th,, side sewer permit Ate 'Cool ;re ready fof tn sD,z.:t ion and repfesentetif.e on site when rnsbeetof orriveb at cocain tea trete. Side sewer and slut> Ccffl Di, tested per City specifications Iv'afie the connection ot the MAIN 10 PROPERTY LINE f.O'-0- 5*-0- housu Da, not ic adkiiii the oi f cn until opprovoi is (I've, by the n--",FRC:PRT' LINE i FROV THE. HOUSE BU'LLIlfsiC DP!RN_1 ins:debtor. Fihoi o>prova! vidli be grantee oft er the eiitistind sestic ' 11 li SID( SI_WFR. Pli,LCINC SEMI P, 2'-6- 1 tank HIS been po,oped cut and filled with sanH d i 1 i P3 .V 10.- "--0".,,,,,N----.1 1 km_.____...- 5. Inst di side sewer with 2' miromurn cover 15" cuve, 1'..: o-,ok,bd 1 - ---- el In,' house !if outiot is shoilovr 1A- ,d1; -_74.:1 .1111:11.11.:111'..-'3 SI"BIN gel - TiTrx if --': \f 1 / 1\ N \‘..,, \I '. \ \ 1 6 if side sewer stub Its not c VCIICD16. The owner shall be I „, , . , 1f '1 d `ii 1 i I ' 1 responsible for- ,t 5 in 3 lc:diction per _stontiord arov:ing 406.1. Ali --,i, 0.1 9'I' -Ai* -11 fr'i A- ''12.i ...i 1,2 •--; '11s '1,1' , it. , >.„.,,, , ft,:,..„, a, work with7b st-eet right-of-woy shcil be dt..-,-,e by a ficcrised cad i L., An,;3-0 i:f.";.:1 f1-7 1'-j•- ,g-',' i-, ''' z :.c-1-f -0 -n 4f.-in , :- v1 bonded c asitsciA tor ,2 F,1,2,_,- :;-_,, 4,..=6 4`.. , :5;1>,',P, ;5,, .c.'. 2 rn ., 2 i; ,i'r---o P--. ,,,c7- - ,ri ...7 x: .r..1-6 o?5 r.t 0 ; :r, ,x, _ . t„, 7., p--.., ' .,,,. ',=-..; 1-..-...... ,, a A 71 , Ad work t.ifetili! ste bovsrppi.S'It."C ;,' ccr.ci-JilfiCe with twe 'Noshing t on ..d c 0 to_, ,..., „ft:,f7.Rf. 7 F.: be , r:4,7,,f,.., .e..„,re ;:p..., r,c1i4str,c, Sofcty and: Hedito i-st irrif45.I.--ili) - -4 r- a e, tA::...: --+..--, ,..- P5 de 2: '1) H '"----,. (-), ...: '•'j:. r,C) .,, ,g ,--) 0, 'LI,-7 CO "'° • -.-.2, •'''2!i 7i. - CI 7; -t'.':.) ....a c:: c 5 PI trench resirorotrior tor side' sewers ro Inc rabic rich t-of--way _., c, '.'E C ,? 7 a E'- '''.''''ACr- H i"-- r-) , 3, bed; ,:or born to trie most coefent trench restoration ,.,„,r--•. r,i-. 6,,14-I d f,C' ,.,:.:',-: fdt redurrements os in I he ken.ton Stan:bard Drawrogs I a, * ..... re , cp, ..7.:.A,: 2. .(7' r: , , d) to 9. i:,,!1 hi'Or g sewer Und aide- sewers anal' nave briddidiro is it i113 2)e.fr, i - f H C_,..„1 n ; as c.ordonce with std,dare, arcwrac 405 --:>, rrb '2f-c H e rfd IC !here shall be a minimum IC foot fidri7or,tal separation net?:eer- -6 11 sonitar y side sewbrs and water •.,erv•',:;ez m mm ono a iniu C rout ,orizohtd seporalion between sceitory sfde sewers and all ,ilhet- r7n3 141''''' Utilities. PC Tife deancuf f.",-. the Riuht-o"-Way sho be ,hEtoFec per Cftl, 1 r-----OR 1 ocATioNc 9RTOP.,;-. YOU [AC Stor.dord Plan 4,07 The czcanout at the build;-9 ..,i-,01 r..:-t. 481-1P ! CCATORc. 1-800 '424-5555 riste!:ecl to s:Jrfocr--,: C,Odb. Ali Cher deur-outs shall to irstciIc-a to ir.,Ifhin 12° of the tirf-,,-;,e-e, , TYPICAL BUILDING SEWER STD. PLAN — 406.2 L5 PUBLIC WORKS 1 FROM PROPERTY LINE TO 2,;!iiiiNt . DEPARTMEN'r „..; BUILDING CONNECTION AUGUST 2013 R/W SURFACE CLEANOUT WITH CAST IRON RING AND COVER `1 (EAST JORDAN IRON WORKS PRODUCT NO, 00367502 OR APPROVED EQUAL. SPECIFY "SEWER" ON LID), (SEE STD. PLAN 403.1 FOR INSTALLATION) I I T^J �_ Ai EAGLE L-""-J THREADED BEND AS--'''Ar'' CLEAN-OUT EXISTING 6" SEWER STUB REQUIRED ADAPTER HUB (REMOVE TO RNA PLUG OR EXISTING SANITARY SEWER MAIN APPROVED EQUAL /- (REMOVE) _ ---_ - 40 ` r——_ _ 6"X6`X6" WYE 6"x 4" REDUCER BEND AS REQUIRED EXISTING 4" SIDE SEWER (NOT TO EXCEED 45) Ot PROPOSED 6" SEWER STUB N-SEWER MAIN SIZE X 6" TEE PROPOSED SEWER MAIN NOT TO SCAt t:' 'Y 0, STD.PLAN-407 PUBLIC WORKS TYPICAL SIDE SEWER CONNECTION A e, DEPARTMENT FOR SEWER MAIN REPLACEMENT P '7,iQ . • De +as.woo. m. '!. ATE J.