HomeMy WebLinkAboutC_On_Hold_Ltr_190717July 17, 2019
Thomas Wolderdorp
21923 NE 11th St
Sammamish, WA 98074
SUBJECT: "On Hold" Notice
Tran Short Plat / LUA19-000113, SHPL-A
Dear Mr. Woldendorp,
The Planning Division of the City of Renton accepted the above master application for review on May 24, 2019. During our review, staff has determined that additional information is
necessary in order to proceed further.
The following information will need to be submitted before October 17, 2019 so that we may continue the review of the above subject application:
Submit copies of Soos Creek Certificates of Availability for both water and sewer.
Amend TIR per comments below:
Update the flow control model calculations to reflect all impervious areas created by this project (combined), including frontage improvements. The full WWHM PDF Report Shall be provided
along with the TIR.
Address all 9 Core Requirements and all 6 Special Requirements.
Follow guidelines for Full Drainage Report on Section 2.3.1.1 of the 2017 RSWDM.
All calculated areas in the report must match areas shown on Civil and Survey Plans.
New storm drainage conveyance systems are required along the SE 168th St. and 113th Ave SE frontage. Storm drainage improvements along public street frontages are required to conform
to the City’s street standards. Any new storm drain installed on or off-site shall be designed and sized in accordance with standards found in Chapter 4 of the 2017 RSWDM. Calculations
and models used for design of any conveyance systems shall be provided in this TIR. The Civil plans do not address this condition. New storm drainage conveyance systems are required
along the SE 168th St. and 113th Ave SE frontage.
Amend Geotechnical Report per comment below:
Provide infiltration rates.
Provide sidewalk connection at the east end. Change in direction requires an ADA compliant landing
(max slope 1.5%).
The landscape strip must be behind the curb and the sidewalk at back of planter strip per RMC 4-6-
060. End sidewalk at north property line; sidewalk must match existing grade at north property line.
The driveways shall have triangular wings and shall follow the latest iteration of STD. Plan 104.3. You can request a copy of this STD plan from Jonathan Chavez, Development Engineering
at jchavez@rentonwa.gov.
At this time, your project has been placed “on hold” pending receipt of the requested information. The maximum time for resubmittal shall be within ninety (90) days of this notice.
Please contact me at (425) 430- if you have any questions.
Sincerely,
/
Alex Morganroth
cc: Sang Tran / Owner(s
Eleanor Ramirez / Party(ies) of Record