Loading...
HomeMy WebLinkAboutAdden 07 CAG-16-063,Adden#7-19 Washington State �F Department of Transportation Supplemental Agreement Organization and Address N umber 7 _ Parametrix,Inc. Original Agreement Number _ m — 1019 39th Avenue SE,Suite 100 Puyallup,WA 98374 CAG-16-063 Phone: 253-604-6739 Project Number Execution Date Completion Date TIB-8-1-102(037) 06/21/2016 12/31/2019 Project Title New Maximum Amount Payable Duvall Avenue NE $1,048,720(this supplement increased by$266,421.95) Description of Work Engineering services for design improvements on Duvall Ave NE to restore paved surfaces,and fill in missing non-motorized facilities such as sidewalks,bicycle lanes,illumination,and channelization. As outlined in Exhibit A-1,this Supplemental Agreement No.7 will include the sidewalk on the east side of Duvall Avenue between NE 9th Street and NE 10th Street(Schedule F),and sidewalk between NE 7th Place and NE 9th Street(Schedule G). The Local Agency of Cito of Renton desires to supplement the agreement entered in to with Parametrix.Inc. and executed on 06/21/2016 and identified as Agreement No. CAG-16-063 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: The underlying scope of work in the original contract and Supplements No. 1-5 will be considered complete and all remaining unfinished project design work and unspent budget will be transferred into new tasks in this Supplement No.7.Supplement No.6 includes sub effort to obtain property easements and acquisitions and continues to be in effect. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No Chan2e. III Section V, PAYMENT, shall be amended as follows: Additional services added by this Supplemental Agreement No.7 will increase the maximum amount payable by$266,421.95.This is the estimated budget of$305,674 to complete the project minus the unspent budget from Phases 1 and 2 of$39,252.05 making a new maximum amount payable of$1,048,720. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By:Parametrix.Inc. By: nis Law, May r ��ss Consultant Signature \,0 `"'"11" _ANiov u onty Signature /` l G`` ; � '- = Date DOT Form 140-063 i � kiL 4L i A.Seib.CMG.Cky Cleric '',,„"'�AORATE°S*e'''' Exhibit "A" Summary of Payments Basic Supplement Reallocate Total Agreement* #7 ** Unspent Phi & Ph2 Budgets Direct Salary Cost 181,945.78 89,650.00 19,917.25 291,513.03 Overhead (Including Payroll 342,019.28 162,440.00 21,839.92 526,289.20 Additives) Direct Non-Salary 198,347.83 24,000.00 (101,887.81) 120,460.02 Costs*** Fixed Fee (Profit) 59,985.16 29,584.00 20,878.59 110,447.75 Total 782,298.05 305,674.00 (39,252.05) 1,048,720.00 *Basic Agreement figures include Supplemental Agreement Nos. 1 through 6. **See attached Exhibit A-1. ***Direct Non-Salary costs include Management Reserve. DOT Form 140-063 ER Revised 10/97 Parametrix ENGINEERING PLANNING.ENVIRONMENTAL.SCIENCES AMU EXHIBIT A-1 SCOPE OF WORK SUPPLEMENT NO. 7 City of Renton Duvall Avenue NE, NE 10th Street to Sunset Boulevard Improvements PROJECT OVERVIEW The City of Renton Transportation Systems Division (AGENCY), as part of its Capital Improvement Program, has identified improvements on Duvall Avenue NE, NE 10th Street to Sunset Boulevard to restore the paved surface, and fill in missing non-motorized facilities, such as pervious sidewalks and bicycle lanes, illumination,and channelization. The AGENCY has hired Parametrix(CONSULTANT) to provide design services. Since the time of the AGREEMENT, signed June 21, 2016, several key scope items have changed. SUPPLEMENT NOs. 1, 2 3,4, 5 and 6 include these changes to the scope and schedule.At the time of the preparation of this SUPPLEMENT, the project design is at an approximate 90% level. However,two new sections of roadway are now being proposed to have sidewalk and other improvements: 1. The AGENCY recently secured a Transportation Improvement Board (TIB) grant that will fund sidewalk on the east side of Duvall Avenue between NE 9th Street and NE 10th Street. This will be known as Schedule F. 2. The AGENCY will fund a new sidewalk on the east side between NE 7th Place and NE 9th Street.This will be known as Schedule G. In addition, the proposed sidewalk, illumination, and other improvements along the west side between NE 10th Street and NE 12th Street will now be removed from the design plans, due to future construction of a new school along this frontage. It is assumed that the new school will provide these frontage improvements. Also,field infiltration testing has resulted in the infeasibility for pervious sidewalks. All proposed sidewalks will now be changed to cement concrete, and the drainage analysis will be redone. NOTE: Based on discussions with the City of Renton on April 19, 2019, this SUPPLEMENT NO. 7 will include two major assumptions: • The underlying scope of work in the original contract and Supplements 1 through 5 will be considered complete and all remaining unfinished project design work and unspent budget will be transferred into new tasks in this Supplement No. 7. Supplement No. 6 includes subconsultant effort to obtain property easements and acquisitions and continues to be in effect. • This SUPPLEMENT NO. 7 will include the design effort for the new elements listed above, as well as the removal of the improvements due to the new school development, and to bring all unfinished project City of Renton 214-1779-045 Duvall Avenue NE,NE 10th Street to Sunset Boulevard Improvements 1 May 2019 Scope of Work SCOPE OF WORK (continued) design work to completion through final bid documentation. In addition,the duration of the project has increased,so this SUPPLEMENT NO. 7 also includes additional time to manage the project. SUPPLEMENT NO. 7 will be tracked under two new phases. Phase 3 will contain all elements to complete the improvements that are not funded by the Department of Ecology(DOE). Phase 4 will contain all elements to complete the improvements that are funded by DOE. SCOPE OF SERVICES The CONSULTANT will assist the AGENCY by providing the following services: • Design of a new east-side sidewalk,curb, gutter, and possible walls along the east side of Duvall Avenue between NE 9th Street and NE 10th Street. • Design of a new east-side sidewalk,curb, gutter, and possible walls along the east side of Duvall Avenue between NE 7th Place and NE 9th Street. • Removal of the west-side improvements between NE 10th Street and NE 12th Street. • Revised stormwater analysis and design,as the new sidewalk will trigger flow control and water quality facilities for the project. • Other out-of-scope items that have taken place, including: Preparation of a basic traffic signal design at NE 12th Street to ensure adequate right-of-way acquisition is proposed. Additional project duration of 12 months. Recutting/revising current plan sheets due to new project limits. Meetings with the AGENCY. Assumption(s) • The project schedule assumes that this design will be complete by September 30, 2019,and the right-of-way acquisition phase of the project will be completed by November 30, 2019. However,the overall completion date of this AGREEMENT is December 31, 2019,to account for future supplements to the AGREEMENT which may include construction assistance. PHASE 3 — FINAL DESIGN WORK(NON-DOE ELEMENTS) Task 3.1 — Project Management(Notice to Proceed [NIP]through December 31, 2019) Work will include extending the project duration by one additional year by providing the tools for tracking the project schedule, budget,and status of deliverables;coordination with Subconsultants;and management of internal staff, as follows: • Preparation and update of a design schedule in Microsoft Project format. • Coordination with the AGENCY through emails,conference calls,and meetings. • Preparation of AGENCY-provided Monthly Progress Reports spreadsheets to be included in invoicing. • Continued coordination with SUBCONSULTANT for right-of-way and easement acquisition. City of Renton 214-1779-045 Duvall Avenue NE,NE 10th Street to Sunset Boulevard Improvements 2 May 2019 Scope of Work SCOPE OF WORK (continued) Assumption(s) • The project schedule assumes that this design and bidding phase of the project will be completed by December 2019.Therefore,the hours estimated in the budget are for project management costs to extend the project 12 additional months. Project management costs beyond those dates, including during the construction phase,will be included in a future supplement. • A total of six additional meetings between the CONSULTANT AND AGENCY will take place during the project at the AGENCY'S office. • Conference calls or emails between AGENCY and CONSULTANT project managers on a weekly basis will average approximately 1/2 hour in project manager time.The CONSULTANT project manager will document conference calls with an email, if applicable. • Eighty percent of this task is tracked under this phase and task, and 20 percent is tracked under Phase 4/Task 4.1 DOE. Deliverable(s) • Project Schedule, with two updates. • Miscellaneous correspondence to document project management issues, in email format. • Monthly Progress Report and invoice(one hard copy to be mailed to the AGENCY each month). • Project meeting agendas and minutes, in Microsoft Word format.Agenda will be submitted 2 days before the meeting, and minutes will be submitted 2 days after the meeting. Task 3.2—Survey and Basemapping (NTP through 1 month post-NTP) Goal(s) Work will include providing additional survey of the northwest corner of Duvall Avenue at NE 7th Place and the driveway area near NE 4th Street,to refine the driveway profile. Assumption(s) • Pavement markings and potholing is not included. Deliverable(s) • Deliverable will include an updated Autodesk C3D base file at 1"=20' scale mapping(unless otherwise specified), and will include all information listed above. Task 3.3—Stormwater Analysis (1 month post-NTP through 5 months post-NTP) Work will include revisions to the Technical Information Report(TIR)that reflects the stormwater management approach for project improvements on Duvall Avenue NE between NE 7th Place and NE 10th Street and associated access restoration on adjacent properties,the removal of the west sidewalk between NE 10th Street and NE 12th Street,and the switch from pervious concrete to impervious concrete throughout the project limits. City of Renton 214-1779-045 Duvall Avenue NE,NE 10th Street to Sunset Boulevard Improvements 3 May 2019 Scope of Work SCOPE OF WORK (continued) The CONSULTANT will coordinate with the AGENCY to review copies of stormwater TIRs for: • AGENCY-owned stormwater management facilities within Duvall Avenue NE right-of-way. • AGENCY-owned stormwater management facilities within the NE 10th Street and NE 12th Street right-of-way. • Private stormwater management facilities within the adjacent properties. Review the basis of design of the facility(ies)for the contributing area, level of treatment, and level of flow control.Confirm if the facility(ies)was designed for any new impervious surface within the project area. The CONSULTANT will meet with the AGENCY up to one time to discuss the approach, on or around May 8, 2019. Proceed with final design and analysis of the option selected by the AGENCY. The CONSULTANT will prepare the updated draft TIR based on Section 2.3.1.1 of the 2017 City of Renton Surface Water Design Manual. The CONSULTANT will meet with the AGENCY to discuss comments on the updated draft TIR, on or around May 31, 2019,and prepare the final TIR. Assumption(s) • The project improvements will fall within four threshold discharge areas(TDAs), each having more than 2,000 square feet of new or redeveloped impervious surface and will require Full Drainage Review. • Stormwater mitigation within AGENCY right-of-way could be applied to an equivalent area rather than the actual new or redeveloped impervious areas. • Basic water quality treatment will be required. • Stormwater mitigation for the targeted areas will be provided. • The project is located in Aquifer Protection Zone 2. • Because of the roadway profile grades and the Zone 2 Aquifer Protection Zone, pervious pavement will • not be used for any new or redeveloped roadway and will no longer be used for sidewalk construction. • There may be more than 0.1 cubic feet per second (cfs) increase in the runoff rate for the 100-year flow frequency between existing and proposed conditions. • The flow control duration standard for forested conditions will be required. • Any existing AGENCY-owned stormwater management facility will not be modified for any new or redeveloped impervious surfaces. • Existing storm system components will be added to the base map as part of the survey services. • New stormwater management facilities will be constructed within public right-of-way; however,the CONSULTANT will design the facilities to avoid the traveled way if possible. City of Renton 214-1779-045 Duvall Avenue NE,NE 10th Street to Sunset Boulevard Improvements 4 May 2019 Scope of Work SCOPE OF WORK (continued) Deliverable(s) • One unbound copy of the updated draft TIR including an electronic copy(Microsoft [MS) Word) of the report text and in PDF format. (Delivered to the AGENCY within 3 months post-NTP.) • Two bound copies and one unbound copy of the final TIR. Submittal of the final TIR will include an electronic copy(MS Word and PDF format)of the final report,graphs,tables,and electronic versions of other information contained in the final TIR.Submittal of the final TIR will also include an electronic copy of all computer modeling files used in the analysis including input and output files. (Delivered to the AGENCY within 2 weeks after receipt of AGENCY comments and/or review meeting with the AGENCY.) • The updated draft and final TIR will include the Downstream Analysis Technical Memorandum as an appendix. Task 3.4— PMX— PMX ROW ASSISTANCE (NTP through November 30, 2019) Additional work will include: • The CONSULTANT shall assist their SUBCONSULTANT in obtaining dedication of right-of-way and easements for the following Parcels identified under Supplement No. 6. Assumption(s) • The CONSULTANT will be responsible for preparing legal descriptions and exhibits for all permanent acquisitions and easements. • Task 3.4 PMX accounts for the Parametrix portion of the acquisition effort.The effort completed by the SUBCONSULTANT, Real Estate Services Northwest, was included under SUPPLEMENT No. 6. Deliverable(s) Deliverables are modified as follows: • Legal Descriptions and accompanying exhibits(3) in PDF format. Task 3.5—Bid Documents(NTP through 6 months post-NTP) Goal(s) To provide a complete package of bid-ready documents. First effort will include a comprehensive review of all plan design to date against project history, documentation, and decisions made. Assumption(s) • Revise up to 33 plan sheets to include new sidewalk between NE 7th Place and NE 10th Street for the 90%, 100%,and Mylar submittals,and the addition of 10 new plan sheets.The updated plans include: Typical Sections(one new sheet). Right-of-Way,Alignment, and Site Preparation Plans(two new sheets). Plan and Profile Sheets(one new sheet). Storm Drainage Plans and Details(one new sheet,one revised sheet). City of Renton 214-1779-045 Duvall Avenue NE,NE 10th Street to Sunset Boulevard Improvements S May 2019 Scope of Work SCOPE OF WORK (continued) Wall Plan (no new sheets). Wall Profiles(no new sheets). Roadway and Wall Details(one new sheet). Channelization, Signing, and Illumination (one new sheet). Intersection Grading Details and Driveway Profiles(one new sheet) Franchise Utility Conflict Plans(one new sheet). Planting Schedule, Plan,and Details(one new sheet). • The Franchise Utility Conflict Plans will be prepared for the AGENCY to forward to all franchise utility companies within the project area.The AGENCY shall be responsible for coordination with these companies for relocation efforts, if necessary.Two utility coordination meetings are included.The meeting shall be at City Hall and arranged by the AGENCY.The CONSULTANT will facilitate the meeting and address conflicts in design, if necessary. • The AGENCY shall be responsible for all review submittals to be sent to the Department of Ecology,the Transportation Improvement Board, and any other agencies requiring approval. Deliverable(s) The deliverables remain the same as the previous scope of work and include: • 90%Review Plans—PDF(CD) and five sets of half-size plans for AGENCY review. (Delivered to the AGENCY within 5 months post-NTP.) • 90%Review Project Bid Documents—PDF(CD) and five paper copies for AGENCY review. (Delivered to the AGENCY within 5 months post-NTP.) • 90%Review Opinion of Cost—PDF(CD) and five paper copies for AGENCY review. (Delivered to the AGENCY within 5 months post-NTP.) • Submittal list to assist the AGENCY with project submittals during construction. (Delivered to the AGENCY within 6 months post-NIP.) • 100% Plans—One set of full-size paper plans and AutoCAD files for AGENCY's project manager check print review. (Delivered to the AGENCY within 3 weeks after receipt of the AGENCY review comments.) • 100% Bid Documents—One set of photo-ready specifications for AGENCY's project manager check print review. (Delivered to the AGENCY within 3 weeks after receipt of the AGENCY review comments.) • Bid Documents—Upload to online Builders Exchange of Washington (BXWA) (plans/specifications in PDF format). (Delivered to the AGENCY within 3 weeks after receipt of the AGENCY review comments.) Task 3.6—Environmental Assistance (Notice to Proceed through November 30, 2019) To provide information to the AGENCY's Environmental Consultant(under a separate contract) for completion of a State Environmental Policy Act(SEPA) checklist. City of Renton 214-1779-045 Duvall Avenue NE,NE 10th Street to Sunset Boulevard Improvements 6 May 2019 Scope of Work SCOPE OF WORK (continued) Approach Under a separate contract,the Environmental Consultant shall prepare a SEPA environmental checklist for the AGENCY's use in obtaining SEPA approvals.The CONSULTANT shall assist this effort by providing information for the checklist.The CONSULTANT shall coordinate with the Environmental Consultant to determine the method and timing of the delivery of project information. Assumption(s) • A determination on non-significance is anticipated for this project. • The Environmental Consultant shall notify the CONSULTANT of what information is needed for the Environmental Consultant to complete the SEPA checklist.Ten hours of Project Engineer and 4 hours for Project Manager effort are included in the scope. • Ten hours for graphics for the Environmental Consultant are included in the Scope. • The AGENCY will be responsible for obtaining all environmental documentation and permits if required by the project. Deliverable(s) • Graphic and project information support for the Environmental Consultant. (Delivered to the Environmental Consultant within 4 weeks of their request.) Task 9—Bidding Assistance(Nine months post-NTP through December 31, 2019) To provide assistance to the AGENCY during the biding phase of the project. Assumption(s) • Up to four RFI responses (via email) and two Addenda will be prepared during the bidding phase. • The bidding phase will last three weeks between Construction Advertisement and Bid Opening. Deliverable(s) • Four email responses to Contractor request for information. (Delivered to the AGENCY within ten months post-NTP) • Two addenda in PDF format(Delivered to the AGENCY within ten months post-NTP) • Bid tabs, debarment, analyze for unbalanced bids PHASE 4 — FINAL DESIGN WORK(DOE ELEMENTS) Task 4.1— DOE— Project Management(Notice to Proceed [NTP]through December 31. 2019) Work will include extending the project duration by one additional year by providing the tools for tracking the project schedule, budget,and status of deliverables, coordination with subconsultants, and management of internal staff, as follows: • Preparation and update of a design schedule in Microsoft Project format. • Coordination with the AGENCY through emails, conference calls, and meetings. City of Renton 214-1779-045 Duvall Avenue NE,NE 10th Street to Sunset Boulevard Improvements 7 May 2019 Scope of Work SCOPE OF WORK (continued) • Preparation of AGENCY-provided Monthly Progress Reports spreadsheets to be included in invoicing. • Continued coordination with the SUBCONSULTANT for right-of-way and easement acquisition. Assumption(s) • The project schedule assumes that this design and bidding phase of the project will be completed by December 2019.Therefore,the hours estimated in the budget are for project management costs to extend the project 12 additional months. Project management costs beyond those dates, including during the construction phase, will be included in a future supplement. • A total of six additional meetings between the CONSULTANT AND AGENCY will take place during the project at the AGENCY'S office. • Conference calls between the AGENCY and CONSULTANT project managers on a weekly basis will average approximately 1/2 hour in duration.The CONSULTANT project manager will document the weekly conference calls with an email including an updated copy of the issues log, if applicable. • Twenty percent of this task is tracked under this phase and task,and 80 percent is tracked under Phase 3/Task 3.1. Deliverable(s) • Project Schedule,with two updates. • Miscellaneous correspondence to document project management issues, in email format. • Monthly Progress Report and invoice (one hard copy to be mailed to the AGENCY each month). • Project meeting agendas and minutes, in MS Word format.Agenda will be submitted 2 days before the meeting and minutes will be submitted 2 days after the meeting. Task 4.2— DOE— Design Report (NTP through 4 months post-NTP) Department of Ecology Documentation Task Description:The CONSULTANT shall ensure the following items are completed and provide the associated deliverables to the AGENCY: • The CONSULTANT will update the current project Design Report. Projects must be designed in accordance with the 2017 City of Renton Surface Water Design Manual.The CONSULTANT will submit one hard copy and one digital copy of the items listed below to DOE for review.The CONSULTANT agrees to respond to DOE's comments.The CONSULTANT must receive DOE Design Report Acceptance Letter prior to proceeding to 90-percent design. Assumption(s) The Design Report will be approximately 10 pages in length, not including graphics and appendices. Three phone calls, one meeting,and 10 emails to the Department of Ecology is included for coordination effort. Deliverable(s) • Draft Predesign Report—PDF format. (Delivered to the AGENCY within 3 months post-NTP.) City of Renton 214-1779-045 Duvall Avenue NE,NE 10th Street to Sunset Boulevard Improvements 8 May 2019 Scope of Work SCOPE OF WORK (continued) • Final Predesign Report—PDF format. (Delivered to the AGENCY within 2 weeks after receipt of AGENCY and DOE review comments.) Task 4.3— DOE — Bid Documents(NTP through 6 months post-NTP) Goal(s) To provide a complete package of bid-ready documents.The first effort will include a comprehensive review of all plan design to date against project history, documentation, and decisions made. Assumption(s) • Revise up to 33 plan sheets to include DOE elements for the 90%, 100%, and Mylar submittals,and the addition of 10 new plan sheets.The updated plans include: Typical Sections(one new sheet). Right-of-Way,Alignment, and Site Preparation Plans(two new sheets). Plan and Profile Sheets(one new sheet). Storm Drainage Plans and Details(one new sheet,one revised sheet). Wall Plan (no new sheets). Wall Profiles(no new sheets). Roadway and Wall Details(one new sheet). Channelization, Signing, and Illumination (one new sheet). Intersection Grading Details and Driveway Profiles(one new sheet) Franchise Utility Conflict Plans(one new sheet). Planting Schedule, Plan,and Details(one new sheet). • All work will be constructed within the existing right-of-way,except for the three parcels located north of NE 12th Street on the west side of Duvall Avenue. • The Franchise Utility Conflict Plans will be prepared for the AGENCY to forward to all franchise utility companies within the project area.The AGENCY shall be responsible for coordination with these companies for relocation efforts, if necessary. One utility coordination meeting is included.The meeting shall be at City Hall and arranged by the AGENCY.The CONSULTANT will facilitate the meeting and address conflicts in design, if necessary. • The AGENCY shall be responsible for all review submittals to be sent to the Department of Ecology,the Transportation Improvement Board, and any other agencies requiring approval. Deliverable(s) The deliverables remain the same as the previous scope of work and include: • 90%Review Plans—PDF(CD) and five sets of half-size plans for AGENCY review. (Delivered to the AGENCY within 5 months post-NTP.) City of Renton 214-1779-045 Duvall Avenue NE,NE 10th Street to Sunset Boulevard Improvements 9 May 2019 Scope of Work SCOPE OF WORK (continued) • 90%Review Project Bid Documents—PDF(CD)and five paper copies for AGENCY review. (Delivered to the AGENCY within 5 months post-NTP.) • 90%Review Opinion of Cost—PDF(CD) and five paper copies for AGENCY review. (Delivered to the AGENCY within 5 months post-NTP.) • Submittal list to assist the AGENCY with project submittals during construction. (Delivered to the AGENCY within 6 months post-NTP.) • 100% Plans—One set of full-size paper plans and AutoCAD files for AGENCY's project manager check print review. (Delivered to the AGENCY within 3 weeks after receipt of the AGENCY review comments.) • 100% Bid Documents—One set of photo-ready specifications for AGENCY's project manager check print review. (Delivered to the AGENCY within 3 weeks after receipt of the AGENCY review comments.) • Bid Documents—Upload to online Builders Exchange of Washington (BXWA) (plans/specifications in PDF format). (Delivered to the AGENCY within 3 weeks after receipt of the AGENCY review comments.) Task 4.4— DOE— HWA— Final Report Assumption(s) • The CONSULTANT's SUBCONSULTANT(HWA) will provide a final geotechnical report, summarizing all analysis conducted along the corridor. Deliverable(s) • One final geotechnical report for records documentation. • City of Renton 214-1779-045 Duvall Avenue NE,NE 10th Street to Sunset Boulevard Improvements 10 May 2019 Scope of Work N N Q G O k O wE U ,a6 1ue;noaov mm m m m o 0 0 o o a m o 0 ,nyuamae,o laarol‘u, oi N 4e,eS ro 0 0 U C ..paw a or au6u32 n o 0 0 o n a e m o a el � 0 � FaNan4S of 0 '0) �" ^ 0 U CY E JB p uof,oleu,00pa,o v o, a v 0 o 0 o m m n _ n o ,nel Pa(0d o m a 0. ^» seam 6uissaood a,0 n 0 o o o `p m v 0 o .0 ,e .. 0 0ePuewv P�ow0- IFPug4' wu0u3voi_4 s o 0 0 o a v o 0 0 0 0 uw ,00S ri . tt >IMO s40 nl,aue,sa0 o r,.. o 0 o P. ry » 0 0 0 O saadS III,a.,vnSo,n , 0 a o 0 0 0 0 0 woos A ad,.4S Pealgaayr m . m m 0 0 0 0 04 a 0 0 anals aa�,ns� . aiuway ,o4a 0 0 0 ry_ o o a o 0 0 0 Pa,eC S o m ou0Pues laal!w,v 0 0 0 o a ry 0 0 0 0 0 000e0 adeasPua1 r, XP 1,00w4e11 ,aa.bu3 v,o n:0 0 «ri 0 f v v v v v 0 0 o ,r s,oof. MS o o aa g W6WWJJyy ,wu0bu30''.'" _ 0 r. v 0 $ o o 04 o l uqo ,5 of m ., ry -, v. oogn0 wubrsap m m n r`^.ry �. 0 0 o ry r.r� ._.., v m 0 0 ., h 0 e0I Peal o N c« .° g. noyirynS aaupu3m0e0a r,H o o 22 7 02 mmr0,o r, _ ...0 9 0 o ed 4w0 uts.0 rl 0 pea1,»n w uayOS .aauibu3 n o m o 0 0 0r.,v _r. ry o o ' o n4 4aJ ,S o o. aontoLS H y.IJ Fpo 0 v uaau,6u39i aN 0 R 0 0 c rv. .- 0 ry m m r,v 0 v v o ,s ry ", Aa m 0 ,a6eueyy mi w of Palma X 0 rc i.1E 2.7.Xi v_. X nv o. a c. n, v— .,_ .mv40 0132._ Iei 0 0v r+V yak q8� 8^m8� a8�8 88e 88gh88 q0h 8fa88 rn « W iln mm ih « mho «fie t 0. H o G 3 3 Q. 1 3 " . Z c } C C W = N 52 i 5y S 1 " i o•a .. �w a e i,- 0 C o g' a A S13 m "c'a `-8 �.g y e `> > -`s e dQa > 'O a c t „� " 01 Taos . ba ' 4 p o "Aq Ie R 2 Q m j� z`'� n a P rar a tt< �i- 8 .' -$g'`$ 4cE-„qze :�_s -M o m' s`" ®fgWsm-�3i�mEP:� a Nwj a¢` i <c WiP: o ea u y >b" II 0 am azz �+m eb oLL Jh 2, ot a� 2Sa u°Aa $ a p 0.03 u yam :Ito ^ .a �^ A ^ ., n IS a N le Q O r wE o 06 exeunaaavmm a m U ,nquaax,p -wato,d,d i Vl 4e,es »fa » O U m001/aor ,uu�6u3 m n,�v 1. ti ,z74 » C O C1 N uor,olelp,000< E !alai paro,d m a »» » sewn BussanO,d ry •- r., epuewy P,aM N 11.0ay ...Bug2 en, ,owaSN Lri » 'ono suLD Al,auBsap co 2 2 m e scads 111 040,3 r r adre4S Peal 4oa1 ry m 8 ana1S ,(an,nS n n » zeuwae 10..131,m r, g paler ,S m » Ouapues 3oa1.00'm a,A 8 ua„ea ade.puelr;' » pOom4e0 ,aam6u3e _^ OOA MS m 346 u(�,+ ,aau5u ry T �, o I lugor Si ng� N macro ,auCisap'm e m m m m N reo pea' ti ^,00ng 00weu32, ^ e m m ^ P5 !A wwp sap,8 Pedl» n L » d E 33o4Os ,aau�6u3N o r,—^.,N e 0 4000 S o m DC MO4 n 7 .0 S 0 015euen w),1 Fr, CO CIPolak, » C C 0 n W a3 mSo . 8828e82 288 7 n N oo 8 08 `0o.1 7" N = N»is»$w»»» » » » » �» ~»-N »M » » ucc•os- • 0--aE/ N w J 2 N w ' L 0. w N x z a, 8 € a,m 7 t `0 >y Q gz l is«a oas S a»� 3 LF q U ..W = 06 u� g5S5'3®=iTir� 58 � WaJ Z ~ "I c go CI U. 8&',-.8a 33`ua38 !P a^Q a o= c Z ate+ E o 0 2= L ^ 0 0 J a a y ~ UO.m C Zcgl ai "t » x w" U) 02 Z 3i c 23 ar §. 6 u O 0-Es 3 0 3 m 2> .O W co P. Q J L 3 3 K a L if NNaSN Od,a 31�a¢ d