HomeMy WebLinkAboutContract CAG-19-199
NT
2019-2021 Landscape Maintenance AGREEMENT
THIS AGREEMENT("Agreement") is made as of the first (1st)day of August, 2019, (the "Effective
Date") by and between the City of Renton, a non-charter code city under RCW 35A, and a
municipal corporation under the laws of the State of Washington ("Renton"), through its
Community Services Department and Canber Corp, ("Contractor"), a limited liability company,
who are collectively referred to as the "Parties", to provide landscape maintenance services,
Renton and Contractor agree as set forth below.
1. Scope of Services: Contractor will provide all material and labor necessary to perform all
work described in the Proposal which is attached and fully incorporated into this
Agreement by reference as Attachment "A" - the "Frequency Schedule." The Costs
associated with each site and service frequencies are referenced in this Agreement as
Attachment"B" "Section 8-B, 2019- Cost Per Task".
2. Changes in Scope of Services: Renton, without invalidating this Agreement, may order
changes to the Scope of Services consisting of additions, deletions or modifications, the
Agreement Sum being adjusted accordingly by Parties mutual agreement. Such changes
in the work shall be authorized by written Change Order signed by the Parties.
3. Time of Performance: Contractor shall commence performance of the Agreement no later
than 30 calendar days after the Agreement's Effective Date.
4. Term of Agreement:The Term of this Agreement shall end at completion of the Scope of
Services, no later than 29 months from the Effective Date, on December 31sY, 2021. This
Agreement may be extended to accomplish change orders, if required, upon mutual
written agreement of Renton and Contractor.
Termination:
a. The City reserves the right to terminate this Agreement at any time, with or
without cause by giving ten (10)calendar days' notice to the Contractor in writing.
b. In the event this Agreement is terminated by the City, the Contractor shall be
entitled to payment for all hours worked to the effective date of termination, less all
payments previously made. If the Agreement is terminated by the City after partial
performance of Work for which the agreed compensation is a fixed fee,the City shall pay
the Contractor an equitable share of the fixed fee.This provision shall not prevent the City
from seeking any legal remedies it may have for the violation or nonperformance of any
of the provisions of this Agreement or from withholding payment for reasonably disputed
charges. No payment shall be made by the City for any expenses incurred or work done
following the effective date of termination unless authorized in advance in writing by the
City.
5. Agreement Sum: The total amount of this Agreement is the sum of$556,003.80 which
includes Washington State Sales Tax. This amount may be adjusted to a mutually agreed
amount based on changes to the Scope of Services.
6. Consideration: In exchange for Contractor's performance of the items and responsibilities
identified in the Scope of Services, Renton agrees to make payment of the amount
identified as the Agreement Sum.
7. Method of Payment: Payment by Renton for the Services will only be made after the
Services have been performed and a voucher or invoice is submitted in a form acceptable
to Renton. Payment of the initial 95% will be made in the next pay cycle of the Renton
Finance Department after receipt of such voucher or invoice (pay cycles are bi-weekly).
The remaining 5% will be retained for the purpose of completion of the project and
fulfillment of claims and liens. Renton shall have the right to withhold payment to
Contractor for any work not completed in a satisfactory manner until such time as
Contractor modifies such work so that the same is satisfactory.
8. Hold Harmless: Contractor shall indemnify, defend and hold harmless Renton, its elected
officials, officers, agents, employees and volunteers, from and against any and all claims,
losses or liability, or any portion of the same, including but not limited to reasonable
attorneys'fees, legal expenses and litigation costs,arising from injury or death to persons,
including injuries, sickness, disease or death of Contractor's own employees, agents and
volunteers, or damage to property caused by Contractor's negligent act or omission,
except for those acts caused by or resulting from a negligent act or omission by Renton
and its officers, agents, employees and volunteers.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, (Validity of agreement to indemnify against liability for negligence relative to
construction,alteration,improvement, etc., of structure or improvement attached to real
estate...)then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the
contractor and Renton, its officers, officials, employees and volunteers, Contractor's
liability shall be only to the extent of Contractor's negligence.
It is further specifically and expressly understood that the indemnification provided in this
Agreement constitute Contractor's waiver of immunity under the Industrial Insurance Act,
RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually
negotiated and agreed to this waiver. The provisions of this section shall survive the
expiration or termination of this Agreement.
PAGE 2 OF 8
9. Insurance: Contractor shall secure and maintain:
a. Commercial general liability insurance in the minimum amounts of$1,000,000 for each
occurrence/$2,000,000 aggregate for the Term of this Agreement.
b. Professional liability insurance, in the minimum amount of $1,000,000 for each
occurrence, shall also be secured for any professional services being provided to
Renton that are excluded in the commercial general liability insurance.
c. Workers' compensation coverage, as required by the industrial Insurance laws of the
State of Washington, shall also be secured.
d. It is agreed that on Contractor's commercial general liability policy,the City of Renton
will be named as an Additional Insured on a non-contributory primary basis. Renton's
insurance policies shall not be a source for payment of any Contractor liability.
e. Subject to Renton's review and acceptance, a certificate of insurance showing the
proper endorsements, shall be delivered to Renton before executing the work of this
Agreement.
f. Contractor shall provide Renton with written notice of any policy cancellation, within
two (2) business days of their receipt of such notice.
10. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational
qualification,the Contractor agrees as follows:
a. Contractor, and Contractor's agents, employees, representatives, and volunteers with
regard to the services performed or to be performed under this Agreement, shall not
discriminate on the basis of race,color,sex, religion, nationality,creed, marital status,
sexual orientation or preference, age (except minimum age and retirement
provisions), honorably discharged veteran or military status, or the presence of any
sensory, mental or physical handicap, unless based upon a bona fide occupational
qualification in relationship to hiring and employment, in employment or application
for employment, the administration of the delivery of services or any other benefits
under this Agreement,or procurement of materials or supplies.
b. The Contractor will take affirmative action to insure that applicants are employed and
that employees are treated during employment without regard to their race, creed,
color, national origin, sex, age, sexual orientation, physical, sensory or mental
handicaps, or marital status. Such action shall include, but not be limited to the
following employment, upgrading, demotion or transfer, recruitment or recruitment
PAGE 3 OF 8
advertising, layoff or termination, rates of pay or other forms of compensation and
selection for training.
c. If Contractor fails to comply with any of this Agreement's non-discrimination
provisions, Renton shall have the right,at its option,to cancel the Agreement in whole
or in part.
d. Contractor is responsible to be aware of and in compliance with all federal, state and
local laws and regulations that may affect the satisfactory completion of the project,
which includes but is not limited to fair labor laws and worker's compensation.
11. Independent Contractor: Contractor's employees, while engaged in the performance of
any of Contractor's services under this Agreement, shall be considered employees of the
Contractor and not employees,agents,representatives of Renton and as a result,shall not
be entitled to any coverage or benefits from the City of Renton. Contractor's relation to
Renton shall be at all times as an independent contractor. Any and all Workman's
Compensation Act claims on behalf of Contractor employees,and any and all claims made
by a third-party as a consequence of any negligent act or omission on the part of
Contractor's employees, while engaged in services provided to be rendered under this
Agreement, shall be the solely Contractor's obligation and responsibility.
12. City of Renton Business License: The Consultant shall obtain a City of Renton Business
License prior to performing any Work and maintain the business license in good standing
throughout the term of this agreement with the City.
Information regarding acquiring a city business license can be found at:
https://rentonwa.gov/cros/one.aspx?pageld=9824882.
Information regarding State business licensing requirements can be found at:
https://dor.wa.gov/doing-businessJregister-my-business
13. Prevailing Wage Rates: Contractor must comply with the State of Washington prevailing
wage requirements. Contractor must file an Intent To Pay Prevailing Wage at the
beginning of the project and an Affidavit of Wages Paid at the end of the project with the
Washington State Department of Labor and Industries.
The State of Washington prevailing wage rates applicable for this project,which is
located in King County, may be found at the following website address of the
Department of Labor and Industries:
http://www.lni.wa.gov/TradesLicensingJPrevWage/default.asp
http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp
PAGE 4 of 8
Pursuant to WAC 296-127-011,the applicable effective date for prevailing wage rates
paid for the duration of this contract shall be the date the contract is executed as
reflected in the "Effective Date"identified at the top of the first page of this Agreement.
Upon request,the City will provide a copy of the applicable prevailing wages for this
project.Alternatively,the rates may be viewed at the City of Renton City Hall by making
an appointment with the contact person identified herein or prior to contract award with
the contact person identified as the City of Renton contact in Paragraph 16 Notices of
this agreement.
14. Record Keeping and Reporting: Contractor shall maintain accounts and records, which
properly reflect all direct and indirect costs expended and Services provided in the
performance of this Agreement. The Contractor agrees to provide access to and copies of
any records related to this Agreement as required by the City to audit expenditures and
charges and/or to comply with the Washington State Public Records Act (Chapter 42.56
RCW).
15. Public Records Compliance. To the full extent the City determines necessary to comply
with the Washington State Public Records Act,Contractor shall make a due diligent search
of all records in its possession, including, but not limited to, e-mail, correspondence,
notes, saved telephone messages, recordings, photos, or drawings and provide them to
the City for production. In the event Contractor believes said records need to be protected
from disclosure, it shall,at Contractor's own expense, seek judicial protection. Contractor
shall indemnify, defend, and hold harmless the City for all costs, including attorneys'fees,
attendant to any claim or litigation related to a Public Records Act request for which
Contractor has responsive records and for which Contractor has withheld records or
information contained therein, or not provided them to the City in a timely manner.
Contractor shall produce for distribution any and all records responsive to the Public
Records Act request in a timely manner,unless those records are protected by court order.
16. Other Provisions:
a. Administration and Notices. Each individual executing this Agreement on behalf of
Renton and Contractor represents and warrants that such individuals are duly
authorized to execute and deliver this Agreement on behalf of Renton or Contractor.
Any notices required to be given by the Parties shall be delivered at the addresses set
forth below. Any notices may be delivered personally to the addressee of the notice
or may be deposited in the United States mail, postage prepaid, to the address set
forth below. Any notice so posted in the United States mail shall be deemed received
three(3)calendar days after the date of mailing. This Agreement shall be administered
by and any notices should be sent to the undersigned individuals or their designees.
PAGE S0F8
CITY OF RENTON CONTRACTOR
Ian Gray, Urban Forestry& Natural Resources Jeff Candler, Owner
1055 South Grady Way Canber Corps
Renton, WA 98057 P.O.Box 2668
Phone: (425)430-6601 Renton,WA 98056
igray@rentonwa.gov jeff@canberlandscaping.com
Fax: (425)430-7300 425-271-8272
b. Amendment and Modification. This Agreement may be amended only by an
instrument in writing,duly executed by both Parties.
c. Assignment and Subcontract. Contractor shall not assign or subcontract any portion
of this Agreement without the City of Renton's prior express written consent.
d. Compliance with Laws. Contractor and all of the Contractor's employees shall perform
the services in accordance with all applicable federal,state,county and city laws,codes
and ordinances. A copy of this language must be made a part of any contractor or
subcontractor agreement.
e. Conflicts. In the event of any inconsistencies between contractor proposals and this
contract, the terms of this contract shall prevail.
f. Governing Law. This Agreement shall be made in and shall be governed by and
interpreted in accordance with the laws of the State of Washington.
g. Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared
by the joint efforts of the Parties and shall not be construed against one party or the
other as a result of the preparation, substitution, submission or other event of
negotiation, drafting or execution.
h. Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or
interpret this Agreement or any of its terms or covenants shall be brought in the King
County Superior Court for the State of Washington at the Maleng Regional Justice
Center in Kent, King County,Washington,or its replacement or successor.
Severability. A court of competent jurisdiction's determination that any provision or
part of this Agreement is illegal or unenforceable shall not cancel or invalidate the
remainder of this Agreement, which shall remain in full force and effect.
PAGE 6 of 8
j. Sole and Entire Agreement. This Agreement contains the entire agreement of the
Parties and any representations or understandings, whether oral or written, not
incorporated are excluded.
k. Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be
construed to give any rights or benefits in the Agreement to anyone other than the
Parties, and all duties and responsibilities undertaken pursuant to this Agreement will
be for the sole and exclusive benefit of the Parties and no one else.
I. Waivers. All waivers shall be in writing and signed by the waiving party. Either party's
failure to enforce any provision of this Agreement shall not be a waiver and shall not
prevent either Renton or Contractor from enforcing that provision or any other
provision of this Agreement in the future. Waiver of breach of any provision of this
Agreement shall not be deemed to be a waiver of any prior or subsequent breach
unless it is expressly waived in writing.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of Effective
Date.
CITY OF ENTON CONTRACTOR
By:
Denis Law Jeff Candler
Mayor, City of Renton Owner, Canber Corp.
1055 South Grady Way P.O. Box 2668
Renton, WA 98057 Renton, WA 98056 27707/
Datess,
Attest ,. ��'� �,�,�%�������,,�,rv)„,
'44, ,,�
f * f SEAL
on A. Seth °4,0
City Clerk
Approved as to Legal Form
By: ...Ate �/% �'�7�t- •...-
Shane Moloney
City Attorney, City of Renton
PAGE 7 OF 8
Non-standard 6/21/19 clb(137-2019)
8
PAGE 8 OF 8
ATTACHMENT A
2019-2021 Landscape Maintenance Agreement
SCOPE OF WORK – FREQUENCY SCHEDULES
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 1: Park Ave. N. Frontage
(From North 1st Street to North 6th Street, both sides of street. Clean sidewalks, curblines and tree grates. Remove litter, leaves,
and weeds. Keep debris from entering private property.)
Section 10
Frequency Schedule
Tree Wells Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Trunk Sprouts 1
Weeding
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1 1
Fertilize
Mulch - wood chip 1
Leaf Removal 1 2 4
Clean out wells 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 2 2 2 2 2 2 2 2 2 2 2
Litter 4 4 4 4 4 4 4 4 4 4 4
Site 2: North 3rd Street Frontage
(From Burnett Avenue North to Factory Avenue North, both sides of street. Clean sidewalks and curblines. Mow turf
and edge. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering private
property. Protect homeowner flower plantings.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 2 2 2 2 2 2 2 2 2 2
Fertilize 1 1 1 1
Herbicide 1 1
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 2 2 2 2 2 2 2 2 2 2
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge avoid applying to planted plants 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 4 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow Section 9, Trim/Edge Applies Here
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 3: Northeast Park Drive Frontage
(From Logan Avenue North to 400 feet east of I-405, north side of street only. Clean sidewalks and curblines. Remove
litter, leaves and weeds. Mow turf north of sidewalk. Lightly prune shrubs and groundcovers to keep within planting
strips. Add wood chip mulch. Keep debris from entering streets.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1 1 1 1 1 1 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1 1
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 2 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 1 1 1 1 1 1 1 1 1 1
Litter 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 4: Boeing Frontage
(Park Avenue North from North 6th Street to North 7th, only boulevards on north and south side of Boeing pedestrian bridge.
From North 7th Street to North 8th Street, both sides of street and boulevards. North 8th Street, south side only, from Garden
Avenue North to Logan Avenue North. Logan Avenue North, east side only, from North 6th Street to North 8th Street. Mow and
edge planting strips, clean sidewalks and curblines, remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to
keep within boulevards or to rejuvenate. Add fine pine bark mulch to shrub beds and tree rings. Keep debris from entering private
property.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 4 4 4 2 2 4 2 2
Trim/edge 1 1 2 2 2 1 1 2 1 1
Fertilize 1 1
Herbicide 1 1
Aerate/Overseed
Shrub Beds/Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 2 1 2 1 2 1 2 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 4 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 1 2 4 4 4 2 2 4 2 2 2
Litter 1 1 2 4 4 4 2 2 4 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 5: Houser Way Bypass Boulevard
(Shrub bed north of 430 Sunset Boulevard Northeast (on Sunset), at end of I-405 exit ramp. Clean curblines. Remove litter,
leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch.
Keep debris from entering surrounding street areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1
Fertilize
Mulch - wood chips 1
Leaf Removal 4
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 2 4 4 4 4 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 6: Sunset Boulevard North Frontage
(East side of Sunset Boulevard North from Bronson Way North (SR 169) to Northeast 3rd Street, including beneath south
side of I-405 overpass. Clean sidewalks and curblines. Remove litter, leaves, and weeds. Lightly prune groundcovers to
keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street
areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 2 2
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 1 1 1 1 1 1 1 1 1 1 1
Litter 2 2 2 2 2 4 4 4 4 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 7: Factory Place North Triangle
(Vacant lot east of 1526 N. 3rd Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves
and weeds. Keep debris from entering private property.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 2 2 2 2
Trim/edge 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 2 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 8: South Cedar Avenue
(Between South 4th Street and Houser Way South, including beneath the south side of I-405 overpass. Includes seating area, all
shrub beds, and stairway. Clean staircase, curblines and parking lots. Remove litter, leaves, and weeds. Lightly prune shrubs and
groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering surrounding street
areas and private properties.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 2 2
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 1 1 1 1 1 1 1 1 1
Litter 2 2 2 2 2 4 4 4 4 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 9: I-405 Wall at Cedar River Park
(From Houser Way underpass to Maple Valley Highway (SR 169 off ramp). Clean sidewalks and curblines. Remove litter, leaves,
and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep
debris from entering surrounding park areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 2 4 4 4 4 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 10: Cedar River Park Frontage
(South side of SR 169 from I-405 to park’s east property line, including the center boulevard and 180’ south along park
entrance both sides of road. Operate and maintain irrigation system. Mow and edge turf. Clean sidewalks and
curblines. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to
rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street and park areas.
Operate and Maintain Irrigation System at this Site Only
Section 10
Frequency Schedule
Irrigation System Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Start-up 1
Winterize 1
Monitor/Adjust 1 1 1 1 1 1
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 2 2 4 2 2 4 2 1
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 2 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 2 2
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 1 1 1 1 1 1 1 1 1 1 1
Litter 2 2 2 2 2 2 2 2 2 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 11: Maple Valley Highway Berm/Frontage
(North side of SR 169 from 140th Place Southeast to 149th Avenue Southeast. Mow turf. Clean pathway. Remove litter,
leaves, and weeds. Add wood chip mulch to tree rings. Keep debris from entering street, pathway and park areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1 1 1 1 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 12: Northeast Sunset Boulevard Triangle
(Sunset Boulevard Northeast and Northeast Park Drive, north of 1170 Sunset Boulevard Northeast. Mow and edge turf.
Clean sidewalks and curblines. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from
entering surrounding streets and private property.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 2 2 1 1 2 2 1
Trim/edge 1 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - wood chips 1
Leaf Removal 2 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 4 4 4 4 4 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 13: Northeast Sunset Boulevard Frontage
Edmonds Avenue Northeast to 2502 Northeast Sunset Boulevard, first driveway on north side of Sunset; sidewalks only,
both sides of street. From 2502 NE Sunset Boulevard to Harrington Ave. NE; sidewalks both sides of street and turf
areas (north side of street, north of sidewalk to fence). From Harrington AvenueNortheast to Northeast 12th Street,
south side only up to but not including Walgreens, sidewalk and planting strips. Mow and edge turf. Clean sidewalks
and curblines. Remove litter, leaves, and weeds. Keep debris from entering streets and pivate property areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 2 4 4 4 2 2 2 2 2
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize 1
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 4 4 4 4 4 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 14: Fire Station #12
(1209 Kirkland Avenue Northeast. Mow and edge turf. Clean parking lots, north woods area, enclosures,
sidewalks, and curblines. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within
planting bed, clear building walls or to rejuvenate. Add fine pine bark mulch. Keep debris from entering
surrounding streets and private property areas.)
Requires access into parking area
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 2 4 4 2 2 4 4 1
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize 1
Mulch - fine pine bark 1
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 2 2 4 4 2 2 4 4 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 15: Harrington Avenue Northeast Boulevard
[Harrington Avenue Northeast and Northeast 5th Street (north of 2721 Harrington Avenue NE). Mow turf. Remove litter, leaves,
and weeds. Keep debris from entering surrounding streets and private property areas.]
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1 1 1 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 16: Northeast 2nd Street Frontage
(North side of Northeast 2nd Street from Monroe Avenue Northeast to Public Works gate at 3555 Northeast 2nd Street. Clean
curblines. Remove litter, leaves, and weeds. Lightly prune shrubs to keep within planting bed or to rejuvenate. Add wood chip
mulch. Keep debris from entering street.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1
Herbicide - pre-emerge 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 17: Public Works Shops (Saturday Only Site)
(3555 Northeast 2nd Street. Mow turf and edge. Clean employee parking lots, sidewalks and curblines. Remove litter, leaves and
weeds. Lightly prune shrubs and groundcovers to keep within planting beds, clear building walls or to rejuvenate. Add fine pine
bark mulch to tree wells and shrub beds.)
Maintenance work can only occur on Saturday at this location
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 3 4 4 4 4 3 4 4 2
Trim/edge 1 2 2 2 2 2 2 2 2 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 18: Northeast 4th Street Frontage
(North side of street from Union Avenue Northeast to 4350 Northeast 4th Street and; south side of street from
4301 to 4405 Northeast 4th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and
weeds. Add fine pine bark mulch to tree wells. Keep debris from entering surrounding street and private property
areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 2 2 2 2 2 2 2 2 2 2
Fertilize 1 1 1
Herbicide 1 1
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch Tree Rings - fine pine bark 1
Leaf Removal 4 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 4 4 4 4 4 4 4 4 4 4 4 4
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 19: Harrington Avenue Northeast Frontage
(West side of street from Northeast 16th Street, south to Northeast 12th Street. East side of street, from Northeast 16th
Street to Northeast 10th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds.
Lightly prune shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add wood chip mulch to tree rings
and to swale shrub beds. Keep debris from entering surrounding streets and private property areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 2 2 2 2 2 2 2 2 2 2
Fertilize 1 1 1
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 2 2 2 2 2 2 2 2 2
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - wood chips 1
Leaf Removal 2 2 1
Prune Groundcover 1
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 4 4 4 4 4 4 4 4 2 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 20: Duvall Avenue Northeast Frontage
(West side of street from 1827 Duvall Avenue Northeast to 4626 Northeast 24th Street, then from 2501 Duvall Avenue Northeast
at wall to Renton city limits. East side of street from 1702 Duvall Avenue Northeast to 2322 Duvall Avenue Northeast, then from
driveway at 4702 Northeast 25th Street to Southeast 95th Way intersection. Clean sidewalks and curbline. Remove litter, leaves
and weeds. Lightly prune shrubs and groundcovers to keep within beds, at or below 3 feet in height for visual clearance at
intersections or to rejuvenate. Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding streets and
private property areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 2 2 2 2 2 2 2 2 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 2 2
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 21: Coal Creek Parkway Frontage
(East side of street from NE 95th Way to Southeast May Valley Road. Clean sidewalks and curblines. Remove litter, leaves and
weeds. Lightly prune trees and shrubs to keep within beds. Add wood chip mulch to tree and shrub beds.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1 1
Bed Weeding 1 1 1 1 2 2 2 2 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 1 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 22: Fire Station # 16
(12923 156th Avenue Southeast. Mow turf. Clean parking lot, remove litter, leaves, and weeds. Lightly prune shrubs and
groundcovers to keep within beds or to rejuvenate. Add wood chip mulch to shrub beds.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 2 2 2 2 2
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - fine pine bark 1
Leaf Removal 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 2 4 4 4 2 2 2 2 2 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 23: Talbot Road Frontage
(South of I-405 overpass to South Puget Drive, including beneath overpass. Mow and edge turf. Remove litter, leaves and weeds.
Add fine pine bark mulch to tree rings. Keep debris from entering surrounding private property.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 2 2 2 2 2 2 2 2 2 2
Fertilize 1 1 1
Herbicide 1 1
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 24: Lake Avenue Open Space
(Vacant lot at 1511 Lake Avenue South. Mow turf. Remove litter, leaves and weeds. Add wood chip mulch to tree
rings. Keep debris from entering surrounding private property.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 2 2 2 2 2 2 2 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 25: Talbot Hill Reservoir Park
(1900 Talbot Road South. Mow and edge turf, including along streets. Clean parking lot. Remove litter, leaves and weeds. Empty
trash cans and replace with new liners. Lightly prune groundcover and shrubs to keep within beds, clearance along walls, or to
rejuvenate. Add wood chip mulch to tree rings and shrub beds.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 4 4 4 2 2 2 2 1
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge
Fertilize
Mulch - wood chips 1
Leaf Removal 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 26: Shattuck Avenue South Frontage
(Between Houser Way South and South 4th Place, both sides of street and beneath railroad overpass. Remove litter, leaves and
weeds. Lightly prune shrubs and groundcovers to keep within beds or to rejuvenate. Add wood chip mulch to beds. Keep debris
from entering surrounding streets and private property areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 2 2 2 2 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1
Fertilize
Mulch - wood chips 1
Leaf Removal 2 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 2 2 2 2 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 27: Rainier Avenue South
(Between South Grady Way and 250 Rainier Avenue South, both sides of street and boulevards. Clean sidewalks and
curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds, to rejuvenate,
or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds; add fine pine bark mulch to planting
strips. Keep debris from entering surrounding private property. See detailed plan for specific maintenance
boundaries.)
See detailed site plan of areas for specific maintenance boundaries
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1 1 1 1
Bed Weeding 1 1 4 4 4 4 4 4 4 4 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal
Prune Groundcover 1 1 1 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 4 4 4 4 4 4 4 4 4 4 4 4
Litter 8 8 8 8 8 8 8 8 8 8 8 8
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 28: Southwest Grady Way Frontage
(North side of Southwest Grady Way from Oakesdale Avenue Southwest to Longacres Avenue Southwest at King County
Metro driveway, 1520 Southwest Grady Way. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves
and weeds between street and fence, including gateway sign area. Lightly prune shrubs and groundcovers to keep
within beds, to rejuvenate, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds. Keep debris
from entering surrounding streets.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 4 4 4 2 2 2 2 1
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 4 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 2 2 4 4 2 2 2 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 29: Oakesdale Ave. S.W./Black River Frontage
(Between 602 Oakesdale Avenue Southwest and 1,060 feet north to end of sidewalk on Monster Road Southwest,
north side of street, including the center boulevard. Mow turf and edge. Clean parking lot, sidewalks (including
bridge) and curblines. Remove litter, leaves and weeds. Empty trash containers and replace liners. Keep debris
from entering street.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 4 4 4 2 2 4 2 1
Trim/edge 1 1 2 2 2 1 1 2 1 1
Fertilize
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 30: Southwest 27th Street Frontage
(From Oakesdale Avenue Southwest to Naches Avenue Southwest, both sides of street, including center boulevard. Mow and
edge turf. Clean bike path, sidewalks and curblines. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep
debris from entering surrounding streets and private property areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 4 4 4 2 2 2 2 1
Trim/edge 1 1 2 2 2 1 1 1 1 1
Fertilize
Herbicide 1 1
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 2 4 4 4 2 2 2 2 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 31: Fire Station #14
(1900 Lind Avenue Southwest. Mow turf and edge. Clean parking lots, driveways, practice yards, entryways, sidewalks
and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds, to
rejuvenate, or to clear building walls; keep entry sign clear and visible from the street. Remove weeds from practice
yard and fenceline; maintain a 3-foot clear zone on outside of fence. Add wood chip mulch to tree rings and shrub
beds.)
Section 10
Frequency Schedule
Turf - Fields Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 1 2 2 2 2 2 2 2 2 1
Fertilize
Herbicide - Fencelines
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs - sign 1 1
Bed Weeding 1 1 1 1 1 1 1 1 1
Blackberry along fence 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 4 4 4 4 4 4 4 4 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 32: Springbrook Trail
(Segment 1: From Black River Riparian Forest trailhead along Oakesdale Avenue Southwest to Southwest 16th Street.
Mow turf. Clean trail, sidewalks and curblines. Remove litter, leaves, moss and weeds. Lightly prune trees/shrubs to
keep out of trail shoulders. Empty trash containers and replace liners. Segment 2: At 800 Southwest 27th Street
beginning 1,055 feet north of Southwest 27th Street to Southwest 43rd Street. Mow turf. Clean trail, sidewalks and
curblines. Remove litter, moss, leaves and weeds. Lightly prune shrubs to keep out of trail shoulders Empty trash
containers and replace liners.)
Pressure wash trail boardwalk segment south of Southwest 27th Street
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 2 2 2 2 2 2 2 1
Trim/edge 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Tree/Shrub Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Blackberry 1 1
Prune Tree Branches 1 1
Herbicide - pre-emerge
Herbicide - post-emerge 1
Moss Removal 1
Mulch
Leaf Removal 2 4 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Pressure wash boardwalk 1
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 32: Springbrook Trail – Boeing-Longacres Segment
(From SW 16th Street to the north property line and parking lot at 1905 Raymond Avenue SW, a total distance of
approximately 1,460 feet. Clean trail, remove litter, control moss, and clean 2 interpretative signs.)
Section 10
Frequency Schedule
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Clean pathway & signs 2 2 2 2 2 2 2 2 2 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 33: Edlund Farm Open Space
(17611 Southeast 103rd Avenue. Mow field, planting strip and edge along street. Clean sidewalks and curblines. Remove litter.
Exclude immediate areas around houses maintained by residents.
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1 1
Trim/edge 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 34: Cleveland Farm Open Space
(19415 Talbot Road South. Mow fields. Remove litter. Control blackberry shrubs at Southwest entrance. Exclude area around
house maintained by residents. Schedule field mowing during periods of dry soil conditions.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 35: Fire Station #13
(18002 108th Avenue Southeast. Clean parking lots, sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs
and groundcovers to keep within beds, to rejuvenate, or for building wall clearances. Add fine pine bark to shrub beds. Keep debris
from entering streets and private property.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 2 2 2 2 2 2 2 2 2
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 1 1
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding 1 1 1 1 1 1 1 1 1 1
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1
Trim/edge 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Blackberry Shrubs Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 36: 11017 Southeast 186th Place Open Space
(Vacant lot. Mow field. Clean sidewalk and curbline. Remove litter.)
Site 37: Fire Station #17
(14810 Southeast Petrovitsky Road. Mow and edge turf. Clean parking lots, driveways, sidewalks and curblines.
Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to provide clearance or to rejuvenate.
Add fine pine bark mulch to shrub beds and tree rings. Keep debris from entering street and private property
areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 2 2 2 2 2
Trim/edge 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 4 4 4 2 2 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 38: Tiffany-Cascade Connector Trail and Frontage
(East of 12130 Southeast 160th Street. Mow grass north of sidewalk/street and two passes on trail from Southeast 160th Street to
pipeline. Clean sidewalks and curblines. Remove litter. Keep debris from entering surrounding streets.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1 1 1 1 1 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 2 2 2 2 2 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 39: Fire Station #15
(New Station - 1404 North 30th Street. Mow and edge turf. Clean parking lots, enclosures, walkways, sidewalks and curblines.
Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within planting beds, clear building walls and
fixtures, or to rejuvenate. Add fine pine bark mulch.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 2 4 4 4 4 4 4 4 4 2 2
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 4 4 4 4 4 4 4 4 2 2
Only when necessary Only when necessary
Due at same time as bed weeding above
Due at same time as other activities above
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 40: Lake Washington Boulevard North Frontage
(4350 Lake Washington Boulevard North. Mow and edge turf. Clean sidewalks and curblines, including east side of
bridge. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Empty trash container and replace liner.
Keep debris from entering street.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 41: May Creek Trail
(4350 Lake Washington Boulevard North. Control invasive knotweed in natural area. Prune vegetation encroaching to edge of
pathway. Clean area of litter.)
Section 10
Frequency Schedule
Knotweed Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Herbicide - post emerg.1
Pathway Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1 1 1 1
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 42: Seahawks Sign Frontage
(Southwest corner of Seahawks Way and Lake Washington Boulevard North. Clean sidewalk and curblines. Lightly prune shrubs
and groundcover to keep within beds, maintain sign visibility or to rejuvenate. Remove litter, leaves and weeds. Add fine pine
bark mulch.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - fine pine bark 1
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 2 2 2 2 2 2 2 2 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 43: Ripley Lane Trail and Frontage
(East of 5031 Ripley Lane North at trailhead, then 875 feet north to Renton city limits. Mow and edge turf,
including street frontage. Clean pathway and street of litter, stones/debris, leaves and weeds. Prune vegetation
away from fence or to keep trail open to both sides. Empty trash can and replace with new liner.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 2 2 2 2 2 2 2 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Blackberry/invasives Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1 1 1 1
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter, stones, debris 1 1 2 2 2 2 2 2 2 2 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 44: New Sunset Park
(2715 Block NE 10 Street: Two open fields between Sunset Lane NE and NE 10 Street; weed two detention ponds.
Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to
detention pond.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow Fields
Mow Planting Strips
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
2 Detention Ponds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 2 2 4 4 4 4 4 4 4 4 2 2
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - wood chips 1
Leaf Removal 1 4 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow Section 9, Trim/Edge Applies Here
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 45: Old Highlands Library
(2902 NE 12 Street: Lawn, shrub beds in front/around building. Clean parking lot, sidewalks and curblines. Mow turf
and edge. Mow natural area grasses. Remove litter, leaves and weeds. Add wood chip mulch to shrub beds.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow Natural Area 1 1 1 1 1 1 1 1 1 1
Mow Lawn 2 4 4 4 4 4 4 4 4 2
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 2 2 2 2 2 2 2 2 2 2
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - wood chips
Leaf Removal 1 4 2
Prune Shrubs 1 1 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow Section 9, Trim/Edge Applies Here
Litter 4 4 4 4 4 4 4 4 4 4 4 4
De
l
e
t
e
d
-
A
d
d
e
n
d
u
m
#
5
-
1
7
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 46: Logan Avenue North Frontage
(The east side of Logan Avenue North, including boulevards and east side of sidewalks, from the Cedar River, north to
North 6th Street. Boulevards, sidewalks, curblines, and shrub beds.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow Turf
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub and G.C. Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 2 2 4 4 4 4 4 4 4 4 4 2
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1 1
Fertilize
Mulch - fine bark 1
Leaf Removal 1 4 2
Prune Groundcover 1 1 1 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding See Shrub and G.C. Beds Above
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 4 4 4 4 4 4 4 4 4 4 4 4
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 47: Duvall Avenue Northeast Boulevard
(Two boulevards north and south of NE 8th Street. Clean curbline. Remove litter, leaves and weeds. Lightly prune shrubs and
groundcovers to keep within beds, at or below 3 feet in height for visual clearance at intersections or to rejuvenate. Add wood
chip mulch to tree and shrub beds. Keep debris from entering surrounding streets.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 2 2 2 2 2 2 2 2 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 2 2
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 48: Heritage Park Shrub Bed
Section 10
Frequency Schedule
Shrub Bed Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 2 2 2 2 2 2 2 2 2 2 2 2
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1 1 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding Included as part of above Bed Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 2 2 2 2 2 2 2 2 2 2 1
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
(233 Union Avenue NE: Large shrub bed between turf and asphalt pathway. Remove litter, leaves and weeds.
Add wood chip mulch. Added shrub bed area.)
Site 49: Harrington Avenue Northeast- South
Unit Frontage
(East side of street from Northeast 8th Place, south to Northeast 7th Street. Mow and edge turf. Clean sidewalks and
curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers in swales to keep within beds or to
rejuvenate. Add wood chip mulch to tree rings and to swale shrub beds. Keep debris from entering surrounding streets
and private property areas.)
Section 10
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 2 2 2 2 2 2 2 2 2 2
Fertilize 1 1 1
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 2 2 2 2 2 2 2 2 2
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 2 2 1
Prune Groundcover 1
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 4 4 4 4 4 4 4 4 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 50: Sunset Lane and NE 10 Street Frontages
(2680 Sunset Lane NE: Beginning at the intersection of NE Sunset Boulevard and NE 10 Avenue moving
counterclockwise: Newly created planting strips between sidewalks and curbs along the north side of NE 10 Street
from NE Sunset Boulevard to Glenwood Avenue NE; also both sides of street adjacent to the Renton Highlands Library
on NE 10 Avenue; along the southerly and westerly side of Sunset Lane NE from Glenwood Avenue NE to NE 10th
Avenue at the library; along Harrington Avenue NE between NE Sunset Boulevard and Sunset Lane NE on both sides
of the street; along both sides of the street on Glenwood Avenue NE and along both sides of Harrington Avenue NE
north of NE 10 Street and; along both sides of Sunset Lane NE northeasterly of NE 10 Street. Sidewalks, curblines, and
shrub beds containing shrubs, groundcovers, perennials and mulch. Remove litter, leaves and weeds. Add wood chip
mulch.)
Section 10
Frequency Schedule
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 1 2 2 2 2 2 2 2 2 1 0
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - wood chips 1
Leaf Removal 1 2 2
Prune Groundcover 1 1 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding Included as part of above Bed Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 2 4 4 4 4 4 4 4 4 4 4 4
Litter 2 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
ATTACHMENT B
2019-2021 Landscape Maintenance Agreement
SCOPE OF WORK – COST PER TASK
Tree Wells Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Trunk or root sprouts 176.00
Herbicide pre-emerge 72.00 72.00 72.00
Herbicide post-emerg 60.00 60.00 60.00
Fertilize
Mulch 200.00
Leaf removal 88.00 176.00 352.00
Prune Groundcover 66.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 154.00 168.00 96.00 96.00 356.00 344.00 156.00 96.00 156.00 168.00 272.00 448.00
GRAND TOTAL $2,761.00
SITE # 1: PARK AVE N FRONTAGE
From N 1st ST to N 6th ST both sides of street. Clean sidewalks, curblines and tree grates. Remove litter, leaves, & weeds. private property
Keep debris from entering private property.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $2,510.00
SST $251.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00
Trim/edge 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Fertilize 120.00 120.00 120.00 120.00
Herbicide 48.00 48.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 48.00 48.00 48.00
Herbicide post-emerg 48.00 48.00
Fertilize
Mulch 200.00
Leaf removal 44.00 176.00 88.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 250.00 506.00 386.00 706.00 338.00 386.00 506.00 386.00 502.00 474.00 118.00
GRAND TOTAL $5,046.80
SITE # 2: NORTH 3RD STREET FRONTAGE
From Burnett Ave North to Factory Ave North, both sides of street. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves & weeds.
Add wood chip mulch to tree rings. Keep debris frn entering private property. Protect homeowner flower plantings.
SECTION 8-B
2019 ~ COST PER TASK
TOTAL $4,588.00
SST $458.80
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 176.00 176.00
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 45.00 45.00
Fertilize
Mulch 352.00
Leaf removal 264.00 132.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
Litter 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
Monthly Costs 0.00 70.00 248.00 158.00 555.00 158.00 424.00 158.00 158.00 203.00 688.00 158.00
GRAND TOTAL $3,275.80
SITE # 3: NORTHEAST PARK DRIVE FRONTAGE
From Logan Ave North to 400 feet east of I-405, north side of street only. Clean sidewalks & curblines. Remove litter, leaves & weeds. Mow turf north of
of sidewalk. Lightly prune shrubs and groundcovers to keep within planting strips. Add wood chip mulch. Keep debris from entering streets.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $2,978.00
SST $297.80
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 66.00 132.00 396.00 396.00 396.00 132.00 132.00 396.00 132.00 132.00
Trim/edge 66.00 66.00 132.00 132.00 132.00 66.00 66.00 132.00 66.00 66.00
Fertilize 150.00 150.00
Herbicide 150.00 150.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 132.00
Bed Weeding 44.00 88.00 44.00 88.00 44.00 88.00 44.00 88.00 44.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch 454.00
Leaf removal 88.00 352.00 176.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 22.00 22.00 44.00 88.00 88.00 88.00 44.00 44.00 88.00 44.00 44.00 44.00
Litter 22.00 22.00 44.00 88.00 88.00 88.00 44.00 44.00 88.00 44.00 44.00 44.00
Monthly Costs 132.00 176.00 420.00 1092.00 1262.00 924.00 420.00 434.00 748.00 674.00 772.00 264.00
GRAND TOTAL $8,049.80
SITE 4: BOEING FRONTAGE
Park Ave N from N 6th St to N 7th,only boulevards on north & south side of Boeing pedestrian bridge. From North 7th St to North 8th St, both sides of street
and boulevards. North 8th St, sough side only,from Garden Ave North to Logan Ave North. Logain Ave North, east side only, fron North 6th St to North 8th St.
boulevards or to rejuvenate. Add fine bark mulch to shrub beds and tree rings. Keep debris from entering private property area.
SECTION 8 - B
Mow and edge planting strips, clean sidewalks and curblines, remove litter, leaves & weeds. Lightly prune shrubs and groundcovers to keep within
2019 ~ COST PER TASK
TOTAL $7,318.00
SST $731.80
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 176.00
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 60.00 60.00
Herbicide post-emerg 60.00
Fertilize
Mulch 200.00
Leaf removal 220.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 20.00 20.00 124.00 64.00 264.00 320.00 84.00 84.00 84.00 64.00 300.00 20.00
GRAND TOTAL $1,592.80
SITE # 5: HOUSER WAY BYPASS BOULEVARD
Shrub bed north of 430 Sunset Boulevard Northeast (on Sunset), at end of I-405 exit ramp. Clean curblines. Remove litter, leaves & weeds. Lightly prune shrubs
& groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris fron entering surrounding street areas
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $1,448.00
SST $144.80
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00
Herbicide pre-emerge 60.00 60.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch 392.00
Leaf removal 88.00 88.00
Prune Groundcover 88.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
Litter 20.00 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 31.00 53.00 113.00 53.00 505.00 73.00 73.00 133.00 73.00 53.00 289.00 119.00
GRAND TOTAL $1,724.80
SITE # 6: SUNSET BOULEVARD NORTH FRONTAGE
East side of Sunset Blvd North from Bronson Way North (SR169) to Northeast 3rd St, including beneath south side of I-405 overpass. Clean sidewalks &
curblines. Remove Litter, leaves & weeds. Lightly prune groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris
SECTION 8 - B
from entering surrounding street areas
2019 ~ COST PER TASK
TOTAL $1,568.00
SST $156.80
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 22.00 44.00 44.00 44.00 44.00 44.00
Trim/Edge 22.00 22.00 22.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 0.00 0.00 64.00 64.00 64.00 86.00 20.00 64.00 86.00 20.00 0.00 0.00
GRAND TOTAL $514.80
SITE # 7: FACTORY PLACE NORTH TRIANGLE
Vacant lot east of 1526 N 3rd St. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves & weeds. Keep debris from entering private property
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $468.00
SST $46.80
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 88.00 88.00 88.00 88.00 88.00
Herbicide pre-emerge 150.00 150.00
Herbicide post-emerg 72.00 72.00
Fertilize
Mulch 1000.00
Leaf removal 88.00 88.00
Prune Groundcover 176.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00
Litter 20.00 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 20.00 20.00 280.00 114.00 1130.00 150.00 62.00 134.00 150.00 42.00 544.00 130.00
GRAND TOTAL $3,053.60
SITE 8: SOUTH CEDAR AVENUE
Between South 4th St and Houser Way South, including beneath the south side of I-405 overpass. Including seating area, all shrub beds, and stairway. Clean
staircase, curblines, and parking lots. Remove litter, leaves & weeds. Lightly prun shrubs and groundcovers to keep within planting bed or to rejuvenate.
SECTION 8 - B
Add wood chip mulch. Keep debris from entering surrounding street
2019 ~ COST PER TASK
TOTAL $2,776.00
SST $277.60
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 120.00 120.00 120.00
Herbicide post-emerg 72.00 72.00
Fertilize
Mulch 1118.00
Leaf removal 88.00 88.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 20.00 64.00 184.00 64.00 1254.00 84.00 204.00 84.00 156.00 64.00 272.00 108.00
GRAND TOTAL $2,813.80
SITE # 9: I-405 WALL TO CEDAR RIVER PARK
From Houser Way underpass to Maple Valley Highway (SR169 off ramp). Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs
& groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding park areas.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $2,558.00
SST $255.80
Irrigation System Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Start-up 150.00
Winterize 150.00
Monitor/Adjust 60.00 60.00 60.00 60.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 22.00 44.00 44.00 44.00 88.00 44.00 44.00 88.00 44.00 22.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide 90.00 90.00
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 90.00 90.00
Fertilize
Mulch 166.00
Leaf removal 176.00 176.00
Prune Groundcover 176.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 52.00 162.00 274.00 274.00 590.00 288.00 334.00 244.00 468.00 334.00 428.00 448.00
SITE # 10: CEDAR RIVER PARK FRONTAGE
South side of SR 169 fron I-405 to park's east property line, including the center boulevard and 180' south along park entrance both sides of road.
Mow & edge turf. Clean sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to
rejuvenate. Add fine pine bark mulch. Keep debris fron entering surrounding street and park areas.
GRAND TOTAL $4,285.60
Operate and maintain irrigation system.
2019 ~ COST PER TASK
TOTAL $3,896.00
SST $389.60
SECTION 8 - B
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 396.00 396.00 396.00 396.00 396.00 396.00 396.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 90.00 90.00
Fertilize
Mulch 148.00
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 110.00 416.00 416.00 654.00 506.00 20.00 20.00 506.00 416.00 506.00 20.00
GRAND TOTAL $3,971.00
SITE # 11: MAPLE VALLEY HIGHWAY BERM/FRONTAGE
North side of SR 169 from 140th Place Southeast to 149th Ave Southeast. Mow turf. Clean pathway. Remove litter, leaves & weeds. Add wood chip mulch to tree
rings. Keep debris fron entering street, pathway and parking areas.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $3,610.00
SST $361.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 44.00 88.00 88.00 88.00 44.00 44.00 88.00 88.00 44.00
Trim/edge 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 84.00
Leaf removal 88.00 44.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 15.00 15.00 15.00 15.00 30.00 30.00 30.00 30.00 30.00 15.00 15.00 15.00
Monthly Costs 15.00 15.00 103.00 103.00 246.00 118.00 118.00 74.00 162.00 103.00 191.00 59.00
GRAND TOTAL $1,437.70
SITE # 12: NORTHEAST SUNSET BOULEVARD TRIANGLE
Sunset Blvd Northeast & Northeast Park Drive, north of 1170 Sunset Blvd Northeast. Mow & edge turf. Clean sidewalks and curblines. Remove litter, leaves &
weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding streets and private property
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $1,307.00
SST $130.70
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 176.00 176.00 352.00 352.00 352.00 176.00 176.00 176.00 176.00 176.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize 90.00
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 54.00 54.00
Herbicide post-emerg 42.00 42.00
Fertilize
Mulch
Leaf removal 220.00 440.00 440.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 20.00 284.00 428.00 460.00 522.00 480.00 304.00 304.00 346.00 504.00 778.00 460.00
weeds. Keep debris from entering streets and private property areas.
SITE # 13: NORTHEAST SUNSET BOULEVARD FRONTAGE
Edmonds Ave Northeast to 2502 Northeast Sunset Blvd, first driveway on north side of Sunset; sidewalks only, both sides of street. From 2502 NE Sunset Blvd to
Harrington Ave NE; sidewalks both sides of street ande turf areas (north side of street, north of sidewalk to fence). From Harrington Ave Northeast to Northeast
12th St, south side only up to but including Wallgrees, sidewalk & planting strips. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves &
GRAND TOTAL $5,379.00
SECTION 8-B
2019 ~ COST PER TASK
TOTAL $4,890.00
SST $489.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 22.00 44.00 44.00 88.00 88.00 44.00 44.00 88.00 88.00 22.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide 120.00 120.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 88.00
Bed Weeding 88.00 88.00 88.00 88.00 88.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 90.00 90.00
Fertilize
Mulch 524.00
Leaf removal 88.00 176.00 176.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 10.00 10.00 20.00 20.00 40.00 40.00 20.00 20.00 40.00 40.00 10.00 10.00
Monthly Costs 10.00 76.00 286.00 228.00 874.00 260.00 286.00 108.00 470.00 260.00 430.00 186.00
GRAND TOTAL $3,821.40
SITE # 14: FIRE STATION # 12
1209 Kirkland Ave Northeast. Mow & edge turf. Clean parking lots, north woods area, enclosures, sidewalks & curblines. Remove litter, leaves & weeds. Lightly
surrounding streets and private property areas
SECTION 8 - B
prune shrubs and groundcovers to keep within planting bed, clear building walls or to rejuvenate. Add fine pine bark mulch. Keep debris from entering
2019 ~ COST PER TASK
TOTAL $3,474.00
SST $347.40
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 44.00 44.00 44.00 44.00 44.00 44.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 10.00 10.00 10.00 10.00 10.00 10.00
Monthly Costs 0.00 0.00 54.00 54.00 54.00 54.00 0.00 0.00 54.00 54.00 0.00 0.00
GRAND TOTAL $356.40
SITE # 15: HARRINGTON AVENUE NORTHEAST BOULEVARD
Harrington Ave Northeast and Northeast 5th St (north of 2721 Harrington Ave NE). Mow turf. Remove litter, leaves and weeds. Keep debris
from entering surrounding streets and private property areas.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $324.00
SST $32.40
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 150.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch 800.00
Leaf removal 154.00 154.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 20.00 214.00 20.00 924.00 20.00 64.00 80.00 64.00 20.00 218.00 174.00
GRAND TOTAL $2,021.80
SITE # 16: NORTHEAST 2ND STREET FRONTAGE
North side of Northeast 2nd St from Monroe Ave Northeast to Public Works gate at 3555 Northeast 2nd St. Clean curblines. Remove litter, leaves & weeds.
Lightly prune shrubs to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering street.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $1,838.00
SST $183.80
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 352.00 528.00 704.00 704.00 704.00 704.00 528.00 704.00 704.00 352.00
Trim/edge 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 120.00 120.00 120.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch 1650.00
Leaf removal 132.00 264.00 264.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 492.00 854.00 910.00 2620.00 910.00 1030.00 734.00 970.00 1042.00 876.00 294.00
GRAND TOTAL $11,838.20
SITE # 17: PUBLIC WORKS SHOPS (SATURDAY ONLY SITE)
3555 Northeast 2nd St. Mow turf and edge. Clean employee parking lots, sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs &
groundcovers to keep within planting beds, clear building walls or to rejuvenate. Add fine pine bark mulch to tree wells and shrub beds.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $10,762.00
SST $1,076.20
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 55.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 55.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize 120.00 120.00 120.00
Herbicide 90.00 90.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 114.00
Leaf removal 352.00 88.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 74.00 173.00 348.00 318.00 342.00 228.00 348.00 228.00 318.00 348.00 525.00 162.00
GRAND TOTAL $3,753.20
SITE # 18: NORTHEAST 4TH STREET FRONTAGE
North side of street from Union Ave Northeast to 4350 Northeast 4th St and; south side of street from 4301 to 4405 Northeast 4th St. Mow & edge turf.
Remove sidewalks U curblines. Remove litter, leaves & weeds. Add fine pine bark mulch to tree wells. Keep debris fron entering surrounding street
SECTION 8 - B
and private property areas.
2019 ~ COST PER TASK
TOTAL $3,412.00
SST $341.20
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 110.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00 110.00
Trim/edge 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00
Fertilize 90.00 90.00 90.00
Herbicide 66.00 66.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 396.00
Bed Weeding 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00
Herbicide pre-emerge 120.00 120.00 120.00
Herbicide post-emerg 90.00 90.00
Fertilize
Mulch 296.00
Leaf removal 396.00 396.00 198.00
Prune Groundcover 220.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 20.00 10.00
Monthly Costs 0.00 910.00 792.00 678.00 908.00 952.00 792.00 612.00 678.00 1218.00 878.00 208.00
SITE # 19: HARRINGTON AVENUE NORTHEAST
West side of street fron Northeast 16th St, south to Northeast 12th St. East side of street, from Northeast 16th St to Northeast 10th St. Mow and edge turf. Clean
sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add wood chip
mulch to tree rings & to swale shrub beds. Keep debris from entering surrounding streets and private property areas.
GRAND TOTAL $9,488.60
SECTION 8-B
2019 ~ COST PER TASK
TOTAL $8,626.00
SST $862.60
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 528.00
Bed Weeding 264.00 264.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 264.00 264.00
Herbicide pre-emerge 110.00 110.00
Herbicide post-emerg 120.00 120.00
Fertilize
Mulch 1952.00
Leaf removal 264.00 528.00 528.00
Prune Groundcover 88.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 294.00 294.00 668.00 558.00 3158.00 558.00 668.00 558.00 678.00 822.00 822.00 910.00
GRAND TOTAL $10,986.80
SITE # 20: DUVALL AVENUE NORTHEAST FRONTAGE
West side of street from 1827 Duvall Ave Northeast to 4626 Northeast 24th St, then from 2501 Duvall Ave Northeast at wall to Renton city limits. East side of
street from 1702 Duvall Ave Northeast to 2322 Duvall Ave Northeast, then from driveway at 4702 Northeast 25th St to Southeast 95th Way intersection. Clean
SECTION 8 - B
sidewalks & curbline. Remove litter, leaves & weeds. Lightly prune shrubs & groundcovers to keep within beds, at or below 3 feet in height for visual clearance
at intersections or to rejuvenate. Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding streets or private property areas.
2019 ~ COST PER TASK
TOTAL $9,988.00
SST $998.80
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 132.00 132.00
Bed Weeding 44.00 44.00 44.00 44.00 88.00 88.00 88.00 88.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 60.00 60.00 60.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch 380.00
Leaf removal 88.00 88.00 88.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Monthly Costs 54.00 54.00 246.00 54.00 538.00 230.00 158.00 98.00 114.00 142.00 202.00 142.00
GRAND TOTAL $2,235.20
SITE # 21: COAL CREEK PARKWAY FRONTAGE
East side of street from NE 95th Way to Southeast May Valley Road. Clean sidewalks and curblines. Remove litter, leaves & weeds.
Light prune trees and shrubs to keep within beds. Add wood chip mulch to tree and shrub beds
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $2,032.00
SST $203.20
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 220.00 440.00 440.00 440.00 220.00 220.00 220.00 220.00 220.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 154.00
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 128.00
Leaf removal 264.00 264.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 10.00 10.00 20.00 40.00 40.00 40.00 20.00 20.00 20.00 20.00 20.00 10.00
Monthly Costs 10.00 10.00 284.00 524.00 652.00 524.00 438.00 284.00 284.00 284.00 548.00 274.00
GRAND TOTAL $4,527.60
SITE # 22: FIRE STATION # 16
12923 156th Ave Southeast. Mow turf. Clean parking lot, remove litter, leaves & weeds. Lightly prune shrubs and groundcovers to keep within beds
or to rejuvenate. Add wood chip mulch to shrub beds
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $4,116.00
SST $411.60
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00
Trim/edge 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Fertilize 90.00 90.00 90.00
Herbicide 120.00 120.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 75.00 75.00 75.00
Herbicide post-emerg
Fertilize
Mulch 177.00
Leaf removal 176.00 352.00 352.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 206.00 503.00 458.00 590.00 338.00 428.00 338.00 533.00 604.00 558.00 382.00
GRAND TOTAL $5,464.80
SITE # 23: TALBOT ROAD FRONTAGE
South of I-405 overpass to South Puget Drive, including beneath overpass. Mow and edge turf. Remove litter, leaves & weeds. Add fine pine bark mulch to tree
rings. Keep debris from entering surrounding private property.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $4,968.00
SST $496.80
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 66.00 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 86.00 86.00 152.00 152.00 152.00 152.00 152.00 152.00 152.00 86.00 20.00
GRAND TOTAL $1,498.20
SITE # 24: LAKE AVENUE OPEN SPACE
Vacant lot at 1511 Lake Ave South. Mow turf. Remove litter, leaves & weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding
private property
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $1,362.00
SST $136.20
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 176.00 352.00 704.00 704.00 704.00 352.00 352.00 352.00 352.00 176.00
Trim/edge 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 132.00
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 66.00 66.00
Herbicide post-emerg
Fertilize
Mulch 592.00
Leaf removal 352.00 352.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 338.00 580.00 866.00 1458.00 866.00 646.00 514.00 580.00 514.00 690.00 382.00
GRAND TOTAL $8,210.40
SITE # 25: TALBOT HILL RESERVOIR PARK
1900 Talbot Road South. Mow & edge turf, including along streets. Clean parking lot. Remove litter, leaves & weeds. Emptry trash cans and replace with new
liners. Lightly prune groundcover and shrubs to keep within beds, clearance along walls, or to rejuvenate. Add wood ship mulch to tree rings & shrub beds.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $7,464.00
SST $746.40
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 88.00
Bed Weeding 55.00 55.00 110.00 110.00 110.00 110.00 55.00 55.00 55.00 55.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 120.00
Fertilize
Mulch 296.00
Leaf removal 88.00 44.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 75.00 165.00 130.00 426.00 220.00 250.00 75.00 75.00 75.00 341.00 64.00
GRAND TOTAL $2,107.60
SITE # 26: SHATTUCK AVENUE SOUTH FRONTAGE
Between Hoser Way South and South 4th Place, both sides of street and beneath railroad overpass. Remove litter, leaves & weeds. Lightly prune shrubs &
groundcovers to keep within beds or to rejuvenate. Add wood chip mulch to beds. Keep debris from entering surrounding streets & private property areas.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $1,916.00
SST $191.60
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 286.00 286.00 286.00 286.00
Bed Weeding 132.00 132.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 132.00 132.00
Herbicide pre-emerge 255.00 255.00 255.00
Herbicide post-emerg 168.00 168.00 168.00
Fertilize
Mulch 1564.00
Leaf removal
Prune Groundcover 132.00 132.00 132.00 132.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00
Litter 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00
Monthly Costs 696.00 951.00 1510.00 1092.00 3242.00 1347.00 1510.00 1260.00 1092.00 1678.00 951.00 696.00
GRAND TOTAL $17,627.50
SITE # 27: RAINIER AVENUE SOUTH
Between South Grady Way and 250 Rainier Ave South, both side of street and boulevards. Clean sidewalks & curblines. Remove litter, leaves & weeds. Lightly
pine bark mulch to planting strips. Keep debris from entering surrounding private property.
SECTION 8 - B
SEE DETAILED PLAN FOR SPECIFIC MAINTENANCE BOUNDRIES
prune shrubs and groundcovers to keep within beds, to rejuvenate, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds; add fine
2019 ~ COST PER TASK
TOTAL $16,025.00
SST $1,602.50
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 352.00 352.00 352.00 176.00 176.00 176.00 176.00 88.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide 72.00 72.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 150.00 150.00 150.00
Herbicide post-emerg 66.00 66.00 66.00
Fertilize
Mulch 1160.00
Leaf removal 88.00 352.00 176.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 40.00 40.00 80.00 80.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 20.00 196.00 454.00 552.00 1746.00 520.00 454.00 370.00 376.00 438.00 698.00 196.00
GRAND TOTAL $6,622.00
SITE # 28: SOUTHWEST GRADY WAY FRONTAGE
North side of Southwest Grady Way from Oaksdale Ave Southwest to Longacres Ave Southwest at King County Metro driveway, 1520 Southwest Grady Way. Mow
SECTION 8 - B
groundcovers to keep within beds to rejuvenate, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds. Keep debris from
& edge turf. Clean sidewalks & curblines. Remove litter, leaves & weeds between street and fence, including gateway sign area. Lightly prune shrubs &
2019 ~ COST PER TASK
TOTAL $6,020.00
SST $602.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 352.00 352.00 352.00 176.00 176.00 352.00 176.00 88.00
Trim/edge 44.00 44.00 88.00 88.00 88.00 44.00 44.00 88.00 44.00 44.00
Fertilize
Herbicide 105.00 105.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 308.00
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal 264.00 528.00 528.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 162.00 250.00 575.00 470.00 778.00 250.00 250.00 575.00 514.00 690.00 558.00
GRAND TOTAL $5,612.20
SITE # 29: OAKESDALE AVE S.W./BLACK RIVER FRONTAGE
Between 602 Oakesdale Ave Southwest and 1,060 feet north to end of sidewalk on Monster Road Southwest, north side of street, including the center boulevard
Mow turf & edge. Clean parking lot, sidewalks, (including bridge) & curblines. Remove litter, leaves & weeds. Empty trash containers and replace liners.
SECTION 8 - B
Keep debris from entering street.
2019 ~ COST PER TASK
TOTAL $5,102.00
SST $510.20
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 110.00 220.00 440.00 440.00 440.00 220.00 220.00 220.00 220.00 110.00
Trim/edge 88.00 88.00 176.00 176.00 176.00 88.00 88.00 88.00 88.00 88.00
Fertilize
Herbicide 105.00 105.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 90.00 90.00
Herbicide post-emerg 72.00 72.00
Fertilize
Mulch 192.00
Leaf removal 176.00 176.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 10.00 10.00 20.00 40.00 40.00 40.00 20.00 20.00 20.00 20.00 10.00 10.00
Monthly Costs 10.00 252.00 462.00 805.00 964.00 700.00 372.00 372.00 549.00 372.00 518.00 186.00
GRAND TOTAL $6,118.20
SITE # 30: SOUTHWEST 27TH STREET FRONTAGE
From Oakesdale Ave Southwest to Naches Ave Southwest, both sides of street, including center boulevard. Mow & edge turf. Clean bike path, sidewalks &
curblines. Remove litter, leaves & weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding streets & private property areas.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $5,562.00
SST $556.20
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 176.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 176.00
Trim/edge 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 198.00
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 72.00 72.00
Blackberry along fence 44.00 44.00 44.00
Mulch 336.00
Leaf removal
Prune Groundcover 220.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 20.00 20.00
Monthly Costs 0.00 328.00 612.00 656.00 1110.00 1074.00 702.00 656.00 684.00 612.00 374.00 20.00
GRAND TOTAL $7,510.80
SITE # 31: FIRE STATION # 14
1900 Lind Ave Southwest. Mow turf & edge. Clean parking lots, driveways, practice yards, entryways, sidewalks & curblines. Remve litter, leaves & weeds.
weeds from practice yard and fenceline; maintain a 3-foot clear zone on outside of fence. Add wood chip mulch to tree rings & shrub beds.
SECTION 8 - B
Lightly prune shrubs & groundcovers to keep within beds, to rejuvenate, or to clear building walls; keep entry sign clear and visible from the street. Remove
2019 ~ COST PER TASK
TOTAL $6,828.00
SST $682.80
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 352.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 176.00
Trim/edge 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Blackberry 55.00 55.00
Prune Tree Branches 44.00 44.00
Herbicide pre-emerge
Herbicide post-emerg 120.00
Moss removal 220.00
Mulch
Leaf removal 572.00 1144.00 286.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Pressure wash boardwalk 3000.00
Litter 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Monthly Costs 50.00 50.00 732.00 512.00 731.00 3512.00 512.00 512.00 512.00 1183.00 1480.00 336.00
GRAND TOTAL $11,134.20
SITE # 32: SPRINGBROOK TRAIL
Segment 1: From Black River Riparian Forest trailhead along Oakesdale Ave Southwest to Southwest 16th St. Mow turf. Clean trail, sidewalks, & curblines.
Remove litter, leaves, moss & weeds. Lightly prune trees/shrubs to keep out of trail shoulders. Empty trash containers & replace liners. Segment 2: At 800
SECTION 8 - B
PRESSURE WASH TRAIL BOARDWALK SEGMENT SOUTH OF SOUTHWEST 27TH ST
Southwest 27th St beginning 1,055 feet north of Southwest 27th St to Southwest 43rd St. Mow turf. Clean trail, sidewalks, & curblines. Remove litter, moss
and weeds. Lightly prune shrubs to keep out of trail shoulders. Empty trash containers and replace liners.
2019 ~ COST PER TASK
TOTAL $10,122.00
SST $1,012.20
Hard Services Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Clean pathway & signs 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Monthly Costs 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
SITE # 32: SPRINGBROOK TRAIL - Boeing-Longacres Segment
(from SW 16th Street to the north property line and parking lot @ 1905 Raymond Ave SW, a total distance of approx 1,460 feet. Clean trail, remove litter, control
moss and clean 2 interpretative signs.)
GRAND TOTAL $1,320.00
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $1,200.00
SST $120.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1200.00 1200.00 1200.00 1200.00
Trim/edge 75.00 75.00 75.00 75.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 50.00 50.00 50.00 50.00
Monthly Costs 0.00 0.00 1325.00 0.00 1325.00 0.00 1325.00 0.00 0.00 1325.00 0.00 0.00
GRAND TOTAL $5,830.00
SITE # 33: EDLUND FARM OPEN SPACE
17611 Southeast 103rd Ave. Mow field, planting strip and edge along street. Clean sidewalks and curblines. Remove litter.
Exclude immediate areas around houses maintained by residents
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $5,300.00
SST $530.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1200.00 1200.00 1200.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter
Monthly Costs 0.00 0.00 0.00 0.00 1200.00 0.00 1200.00 0.00 0.00 1200.00 0.00 0.00
GRAND TOTAL $3,960.00
SITE # 34: CLEVELAND FARM OPEN SPACE
19415 Talbot Road South. Mow fields. Remove litter. Control blackberry shrubs at Southwest entrance. Exclude areas around house maintained by residents.
Schedule field mowing during periods of dry soil conditons
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $3,600.00
SST $360.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 176.00
Bed Weeding 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00
Herbicide pre-emerge 120.00 120.00 120.00
Herbicide post-emerg
Fertilize
Mulch 742.00
Leaf removal 176.00 176.00 176.00
Prune Groundcover 44.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 20.00 250.00 130.00 872.00 130.00 250.00 130.00 130.00 306.00 646.00 196.00
GRAND TOTAL $3,388.00
SITE # 35: FIRE STATION # 13
18002 108th Ave Southeast. Clean parking lots, sidewalks, & curblnes. Remove litter, leaves & weeds. Lightly prune shrubs & groundcovers to keep within
beds, to rejuvenate, or for building wall clearances. Add fine pine bark to shrub beds. Keep debris from entering streets and private property.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $3,080.00
SST $308.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 539.00 539.00 539.00
Trim/edge 88.00 88.00 88.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 15.00 15.00 15.00
Monthly Costs 0.00 0.00 0.00 0.00 642.00 0.00 642.00 0.00 642.00 0.00 0.00 0.00
GRAND TOTAL $2,118.60
SITE # 36: 11017 SOUTHEAST 186TH PLACE OPEN SPACE
Vacant lot. Mow field. Clean sidewalk and curbline. Control Blackberry
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $1,926.00
SST $192.60
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 176.00 176.00 88.00 88.00 88.00 88.00 88.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 88.00
Bed Weeding 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Herbicide pre-emerge 72.00 72.00
Herbicide post-emerg 72.00
Fertilize
Mulch 358.00
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 0.00 0.00 322.00 338.00 768.00 338.00 250.00 250.00 322.00 250.00 338.00 0.00
GRAND TOTAL $3,493.60
SITE # 37: FIRE STATION # 17
14810 Southeast Petrovitsky Road. Mow & edge turf. Clean parking lots, driveways, sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs
& groundcovers to provide clearance or to rejuvenate. Add fine pine bark mulch to shrub beds & tree rings. Keep debris from entering street & private property
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $3,176.00
SST $317.60
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 220.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 20.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 20.00 20.00
GRAND TOTAL $2,200.00
SITE # 38 TIFFANY-CASCADE CONNECTOR FRONTAGE
East of 12130 Southeast 160th St. Mow grass north of sidewalk/street & two passes on trail from Southest 160th St to pipeline. Clean sidwalks & curblines.
Remove litter. Keep debris from entering surrounding streets.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $2,000.00
SST $200.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 110.00 110.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00 110.00 110.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide 60.00 60.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 200.00
Bed Weeding 88.00 88.00 88.00 88.00 88.00
Herbicide pre-emerge 60.00 60.00 60.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch
Leaf removal 88.00 176.00 176.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 30.00 30.00
Monthly Costs 140.00 184.00 472.00 384.00 472.00 524.00 472.00 324.00 532.00 412.00 508.00 316.00
Only when necessary Only when necessary
GRAND TOTAL $5,214.00
SITE # 39 FIRE STATION # 15
Vacant lot at 1404 North 30th Street. Mow field. Clean sidewalks & curblines. Remove litter. Prune shrubs along sidewalk to provide visibility to
surrounding businesses. Keep debris from entering surrounding street.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $4,740.00
SST $474.00
Due at same time as bed weeding above
Due at same time as other activities above
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00
Herbicide pre-emerge 72.00
Herbicide post-emerg 72.00 72.00
Fertilize
Mulch 64.00
Leaf removal 88.00 88.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 162.00 344.00 272.00 408.00 272.00 272.00 272.00 344.00 360.00 272.00 30.00
SITE # 40 LAKE WASHINGTON BOULEVARD NORTH FRONTAGE
4350 Lake Washington Boulevard North. Mow & edge turf. Clean sidewalks, & curblines, including east side of bridge. Remove litter, leaves & weeds. Add wood
chip mulch to tree rings. Empty trash container and replace liner. Keep debris from entering street
GRAND TOTAL $3,341.80
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $3,038.00
SST $303.80
Knotweed Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Herbicide-post emerge 300.00
Shrub beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 88.00 88.00 88.00 88.00
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00
Monthly Costs 0.00 0.00 118.00 0.00 118.00 0.00 118.00 300.00 118.00 0.00 0.00 0.00
2019 ~ COST PER TASK
SITE 41: MAY CREEK TRAIL
4350 Lake Washington boulevard North. Control invasive plants including blackberry, knotweed, & horsetail in natural area. Clean area of litter.
Addendum #5, work modification
SECTION 8 - B
TOTAL $772.00
SST $77.20
GRAND TOTAL $849.20
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 125.00
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 10.00 10.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 10.00 10.00
Monthly Costs 10.00 54.00 20.00 64.00 145.00 64.00 20.00 64.00 20.00 64.00 10.00 10.00
2019 ~ COST PER TASK
SITE # 42: SEAHAWKS SIGN FRONTAGE
Southwest corner of Seahawk Way and Lake Washington Boulevard North. Clean sidewalks & curblines. Lightly prune shrubs & groundcover to keep
within beds, maintain sign visibility or to rejuvenate. Remove litter, leaves & weeds. Add fine pine bark mulch.
SECTION 8 - B
TOTAL $545.00
SST $54.50
GRAND TOTAL $599.50
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 44.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prun Shrubs 88.00 88.00 88.00 88.00
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 74.00 118.00 206.00 118.00 206.00 118.00 206.00 118.00 206.00 74.00 30.00
GRAND TOTAL $1,654.40
SITE 43: RIPLEY LANE TRAIL AND FRONTAGE
East of 5031 Ripley Lane North at trailhead, then 875 feet north to Renton city limits. Mow & edge turf, including street frontage. Clean pathway & street of litter
stones/debris, leaves & weeds. Prune vegetation away from fence or to keep trail open to both sides. Empty trash can and replace with new liner.
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $1,504.00
SST $150.40
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 88.00 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00 88.00
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 592.00
Leaf removal 132.00 528.00 264.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00
Monthly Costs 128.00 128.00 216.00 216.00 808.00 216.00 216.00 216.00 216.00 348.00 656.00 392.00
GRAND TOTAL $4,131.60
SITE 44: NEW SUNSET PARK
(2715 Block NE 10th Street: Two open fields between Sunset Lane NE and NE 10th Street; weed two detention ponds
Clean sidewalks, and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to detention pond.)
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $3,756.00
SST $375.60
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter
Monthly Costs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GRAND TOTAL $0.00
SITE 45: OLD HIGHLANDS LIBRARY
(2902 NE 12th ST: lawn, shrub beds in front/around building. Clean parking lot, sidewalks & curblines.
Mow turf and edge. Mow natural area grasses. Remove litter, leaves and weeds. Add wood chip to shrub beds
SECTION 8 - B
NO LONGER DOING AS OF 2018
2019 ~ COST PER TASK
TOTAL $0.00
SST $0.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 176.00 176.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 176.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 90.00 90.00 90.00
Fertilize
Mulch fine bark 1844.00
Leaf removal
Prune Groundcover 88.00 88.00 88.00 88.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 250.00 340.00 514.00 516.00 2358.00 516.00 604.00 426.00 514.00 516.00 516.00 250.00
GRAND TOTAL $8,052.00
SITE 46: LOGAN AVENUE NORTH FRONTAGE
ide of Logan Avenue North, including boulevards, and east side of sidewalks, from the Cedar River, north to North 6th Street. Boulevards, sidewalks, curblines shrub bed
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $7,320.00
SST $732.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 132
Bed Weeding 66 66 132 132 132 132 132 132 132 132 66 66
Herbicide - pre-emerge 96 96
Herbicide - post-emerge 96 96
Fertilize
Mulch - fine pine bark 596
Leaf Removal 44 88 88
Prune Groundcover 132
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Litter 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Monthly Costs 76.00 76.00 238.00 142.00 966.00 142.00 238.00 142.00 238.00 186.00 164.00 296.00
GRAND TOTAL $3,194.40
SITE 47: DUVALL BOULEVARDS
between NE 4th St and NE 8th St
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $2,904.00
SST $290.40
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00
Herbicide pre-emerge 360.00 360.00
Herbicide post-emerg 120.00 120.00 120.00 120.00
Fertilize
Mulch wood chip 4000.00
Leaf removal 132.00 264.00 264.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 22.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 22.00
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 218.00 360.00 600.00 360.00 4240.00 360.00 240.00 600.00 240.00 492.00 504.00 482.00
GRAND TOTAL $9,565.60
SITE 48: HERITAGE PARK
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $8,696.00
SST $869.60
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 44.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 198
Bed Weeding 44 88 88 88 88 88 88 88 88 88
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch fine bark 475
Leaf removal 220 220 220
Prune Groundcover 66
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 30.00 30.00
Monthly Costs 30.00 360.00 280.00 280.00 755.00 346.00 280.00 280.00 280.00 500.00 426.00 250.00
GRAND TOTAL $4,473.70
SITE 49: HARRINGTON AVE NE - SOUTH UNIT FRONTAGE
(East side of street from NE 8th place, south to NE 7th street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune
shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add wood chip mulch to tree rings and to swale shrub beds. Keep debris from entering
surrounding streets and private property areas.)
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $4,067.00
SST $406.70
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch - wood chips 1600.00
Leaf removal 44.00 88.00 88.00
Prune Groundcover 44.00 44.00 44.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Litter 20.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00
Monthly Costs 64.00 194.00 260.00 304.00 1860.00 260.00 304.00 260.00 260.00 348.00 282.00 216.00
GRAND TOTAL $5,073.20
SITE 50: SUNSET LANE and NE 10 STREET FRONTAGES
SECTION 8 - B
2019 ~ COST PER TASK
TOTAL $4,612.00
SST $461.20