HomeMy WebLinkAboutCO 03 CAG-19-001 , CO #3-19 C . 0 't 0 " ± 4' + 4*N 1 0 Change Order No. 3 Contract Title: Renton Avenue South Resurfacing Contractor: R.W.Scott Construction Contract No. : CAG-19-001 Federal Aid No. : STP(UL)-1201(023) 'ii Ordered by Engineer i - Proposed by the Contractor(VECP) 1 0 Unilateral Amount I Working Days [Origin !Contract: $1,585,247.60 60 Current Contract: $1,723,061.10 I 67 ...... Estimated Net Change This Order: <$3,595.00> [New Contract: I $1,719,466.10 16°7 Prepared By: 10144 By ) /' 125/(1 4 . x-54-1.• _L ,---A.,. 5 Resident EngiOer Date Engineer(City of Renton Transportation Date Design Manager) Reviewed By: Consent By: /1- -' • / n ineer ,, *eco . V iiit--511`i Date Surety (Greater ase) than 25%cost and/or 20% Date time incre Reviewed By: Endo ... / Tr ' . _, -9 /25/( City of Rento1 4 oject I4anager Date Contractor Date Reviewed By: Execu ed By: --)'2 -ICI /leg/ City Attorney #"" Date City of Remo P lic Works ate Administrator/Mayor Change Order No.3 Contract Title:Renton Avenue South Resurfacing Contract No.CAG-19-001 Pagel of 4 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: HMA modifications. Engineer has requested to change the number of EAALs in the mix design for Bid Item 20 HMA CI. h" PG 64-22 from (0.3 to <3 million)to (3 to <30 million). Replace the first paragraph of Section 5-04.2(2) Mix Design—Obtaining Project Approval with the following: The number of ESALs for the design and acceptance of the HMA shall be 3 to<30 million. CSTC modifications. Contractor has requested to use Crushed Surfacing Base Course (CSBC) in lieu of Crushed Surfacing Top Course (CSTC) in some areas.These areas are below cement concrete traffic and pedestrian islands,cement concrete sidewalks, cement concrete curb ramps, cement concrete driveway entrances, and cement concrete driveway repair areas.These areas also include below and behind cement concrete curb and gutter, below the HMA within pavement repair areas, and below and behind modular block wall units. Tapping Sleeve and Valve Assembly modifications. Engineer has requested the Tapping Sleeve and Valve Assembly shall be modified so that a portion of the work is completed as a City Water Utility contractor installed connection. The following is supplemented to Section 7-12.3: The Tapping Sleeve and Valve Assembly work by the Contractor shall include excavation, removal of excess or unsuitable trench excavation material,dewatering,valve box,valve stem extension, blocking, poly-wrapping the pipe,testing,flushing, disinfection and final adjustment of the valve box to finished grade. Work by the City Water Utility contractor shall include furnishing and installing the tapping sleeve and valve, per Section 7- 09.3(19)A Connections to Existing Mains. Reason for Change: HMA modifications. Based on the recommendation from King County Materials Laboratory,the HMA mix design is increased to a higher gyration mix due to the steep grade and bus traffic along Renton Avenue South. Change Order No. 3 Contract Title: Renton Avenue South Resurfacing Contract No.CAG-19-001 Page 2 of 4 CSTC modifications. The Contractor has requested the use of CSBC to facilitate achieving optimum moisture content and required compacted density. Tapping Sleeve and Valve Assembly modifications. Installation by the City Water Utility contractor facilitates compliance with the Contract. Materials: This change order will result in the reduction of 274.41 tons of bid item 17 (Crushed Surfacing Top Course) and the addition 274.41 tons of Crushed Surfacing Base Course as new bid item 54. Crushed Surfacing Base Course shall meet the requirement of WSDOT 9-03.9(3). Acceptance shall be based on satisfactory test results of material incorporated into the project. Plans: No changes. Adjustment: The following payment items are deleted/added to the Contract: Unit Unit No. Description Quantity Price Total Deleted 17 Crushed Surfacing Top <320> TN $60.00 <$19,200.00> Course Added 3-17 Crushed Surfacing Top 45.59 TN $60.00 $2,735.40 Course Added 3-54 Crushed Surfacing Base 274.41 TN $60.00 $16,464.60 Course Deleted 107 Tapping Sleeve and Valve <1> EA $7,500.00 <$7,500.00> Assembly Added 3-107 Tapping Sleeve and Valve 1 EA $3,405.00 $3,405.00 Assembly—See Description of Change Change Order No. 3 Contract Title: Renton Avenue South Resurfacing Contract No.CAG-19-001 Page 3 of 4 Extension of Time: The Time for Completion is extended 0 Working Days. Equitable Adjustment: The City and Contractor agree that this Change Order does not include an equitable adjustment per Section 1-09.4 of the 2018 WSDOT/APWA Standard Specifications. Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern this Change Order.The Work of the referenced Contract is modified to include the changes detailed herein.The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials,overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order El Plans Field Directive ® Change Order Quotation El Estimated Change Order Cost Project Labor List ❑ Force Account Equipment Rate Request (DOT Form 422-010 EF) ❑ Equitable Adjustment Determination Change Order No.3 �a Contract Title: Renton Avenue South Resurfacing Contract No.CAG-19-001 Page 4 of 4