HomeMy WebLinkAboutRS_TopGolf_Renton_Signal_Timing_Improvements_Renton_TopGolf_190801_v1 12131 113th Avenue NE, Suite 203, Kirkland, WA 98034 | 425.821.3665 | MEMORANDUM Date: August 1, 2019 TG:1.18185.00 To: Justin Johnson – City of Renton From: Mike Swenson, P.E., PTOE – Transpo Group Francesca Liburdy – Transpo Group cc: Eric Uebelhor – ARCO Murray Subject: Renton TopGolf: Logan Avenue N/N 8th Street Intersection Improvements The following memorandum summarizes traffic operations and a proposed intersection improvement for the TopGolf site located south of N 8th Street between Logan Avenue N and Park Avenue N in Renton. The following analysis references the information presented in the July 2019 Renton TopGolf Traffic Impact Analysis (TIA)1. This memorandum presents a potential intersection improvement at the Logan Avenue N/N 8th Street intersection to improve future (2020) with- project anticipated traffic operations. Project Description The proposed Renton TopGolf development will be located at the southeast corner of the Logan Avenue N/N 8th Street intersection. The project includes a TopGolf facility with 102 golf driving range bays at the currently undeveloped site and is anticipated to be constructed in 2020. Two site accesses are proposed on Logan Avenue N. Traffic Operations The following section summarizes the traffic operations for existing, future without-project, and future with-project conditions at the Logan Avenue/N 8th Street intersection, as presented in the July 2019 Renton TopGolf traffic impact analysis. Weekday peak hour traffic operations for existing and future without-project conditions were evaluated at the study intersection based on the procedures identified in the Highway Capacity Manual (2010), and were evaluated using Synchro 9.1. The signal timing and phasing information was obtained from the City of Renton and input into Synchro for the signalized intersections. Analysis parameters such as lane channelization were maintained for future 2020 conditions relative to existing conditions. Table 1. Existing and Future (2020) Weekday Peak Hour Intersection Operations LOS Standard Existing 2020 Without-Project 2020 With-Project Intersection LOS1 Delay2 WM3 LOS Delay WM LOS Delay WM AM Peak Hour 1. Logan Avenue N/N 8th Street E B 19 - B 19 - B 19 - PM Peak Hour 1. Logan Avenue N/N 8th Street E C 31 - C 33 - D 37 1. LOS as defined by the HCM (TRB, 2010) 2. Average delay per vehicle in seconds. 3. Worst movement (WM) reported for side-street stop-controlled intersections. 1 Renton TopGolf Traffic Impact Analysis, Transpo Group (July 2019) 2 Logan Avenue N/N 8th Street Intersection Improvements As requested by City staff, an option for improving the intersection level of service was evaluated. The following identifies a possible signal operational improvement that could be implemented by the City, resulting in the improved operations. · Increased cycle length and splits: By increasing the intersection cycle length from 110 seconds to 120 seconds and optimizing intersection splits, the overall intersection level of service is LOS C with 34 seconds of delay under future (2020) with-project PM peak hour conditions. Detailed LOS and timing worksheets are included in Attachment A. The overall Logan Avenue N/N 8th Street intersection operations under future with-project PM peak hour conditions can be improved from LOS D to LOS C with changes to the intersection signal timing. The intersection with signal timing improvements is anticipated to operate at LOS C with approximately 34 seconds of delay. 3 Attachment A: LOS Worksheets Timings Renton Top Golf 1: Logan Ave N & N 8th Ave Future (2020) With-Project Weekday PM Peak Hour Transpo Group Synchro 9 Report Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Lane Configurations Traffic Volume (vph) 40 25 20 100 5 5 820 10 705 Future Volume (vph) 40 25 20 100 5 5 820 10 705 Turn Type Prot NA Perm Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 Detector Phase 5 2 2 1 6 3 8 7 4 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 10.9 26.9 26.9 10.9 27.9 10.9 33.9 10.9 31.9 Total Split (s) 16.0 27.0 27.0 16.0 28.0 18.0 57.0 19.0 58.0 Total Split (%) 13.3% 22.5% 22.5% 13.3% 23.3% 15.0% 47.5% 15.8% 48.3% Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 All-Red Time (s) 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9 Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None None C-Min None C-Min Act Effct Green (s) 8.2 6.5 6.5 11.4 6.8 6.0 86.4 6.4 86.5 Actuated g/C Ratio 0.07 0.05 0.05 0.10 0.06 0.05 0.72 0.05 0.72 v/c Ratio 0.38 0.15 0.11 0.62 0.23 0.06 0.74 0.12 0.57 Control Delay 62.5 55.6 1.1 69.2 21.5 55.4 16.8 56.4 11.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 62.5 55.6 1.1 69.2 21.5 55.4 16.8 56.4 11.9 LOS E E A E C E B E B Approach Delay 46.0 54.4 17.0 12.5 Approach LOS D D B B Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 4:SBT and 8:NBT, Start of Green Natural Cycle: 115 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 19.5 Intersection LOS: B Intersection Capacity Utilization 76.2% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 1: Logan Ave N & N 8th Ave Phasings Renton Top Golf 1: Logan Ave N & N 8th Ave Future (2020) With-Project Weekday PM Peak Hour Transpo Group Synchro 9 Report Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 10.9 26.9 26.9 10.9 27.9 10.9 33.9 10.9 31.9 Total Split (s) 16.0 27.0 27.0 16.0 28.0 18.0 57.0 19.0 58.0 Total Split (%) 13.3% 22.5% 22.5% 13.3% 23.3% 15.0% 47.5% 15.8% 48.3% Maximum Green (s) 10.1 21.1 21.1 10.1 22.1 12.1 51.1 13.1 52.1 Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 All-Red Time (s) 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Minimum Gap (s) 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Recall Mode None None None None None None C-Min None C-Min Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 14.0 14.0 15.0 21.0 19.0 Pedestrian Calls (#/hr) 0 0 0 0 0 90th %ile Green (s) 10.1 7.7 7.7 10.1 7.7 6.8 70.9 7.7 71.8 90th %ile Term Code Max Gap Gap Max Gap Gap Coord Gap Coord 70th %ile Green (s) 9.8 6.9 6.9 10.1 7.2 0.0 85.3 0.0 85.3 70th %ile Term Code Gap Gap Gap Max Hold Skip Coord Skip Coord 50th %ile Green (s) 8.4 6.4 6.4 10.1 8.1 0.0 85.8 0.0 85.8 50th %ile Term Code Gap Gap Gap Max Hold Skip Coord Skip Coord 30th %ile Green (s) 7.1 0.0 0.0 18.5 5.5 0.0 89.7 0.0 89.7 30th %ile Term Code Gap Skip Skip Hold Gap Skip Coord Skip Coord 10th %ile Green (s) 0.0 0.0 0.0 8.1 0.0 0.0 100.1 0.0 100.1 10th %ile Term Code Skip Skip Skip Gap Skip Skip Coord Skip Coord Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 4:SBT and 8:NBT, Start of Green Control Type: Actuated-Coordinated HCM 2010 Signalized Intersection Summary Renton Top Golf 1: Logan Ave N & N 8th Ave Future (2020) With-Project Weekday PM Peak Hour Transpo Group Synchro 9 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 40 25 20 100 5 40 5 820 96 10 705 10 Future Volume (veh/h) 40 25 20 100 5 40 5 820 96 10 705 10 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.86 1.00 0.94 1.00 0.95 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1727 1727 1727 1881 1881 1900 1863 1863 1900 1845 1845 1900 Adj Flow Rate, veh/h 42 26 0 105 5 42 5 863 101 11 742 11 Adj No. of Lanes 1 2 1 1 2 0 1 1 0 1 1 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 10 10 10 1 1 1 2 2 2 3 3 3 Cap, veh/h 52 458 205 130 322 248 11 941 110 22 1060 16 Arrive On Green 0.03 0.14 0.00 0.07 0.18 0.18 0.01 0.58 0.58 0.01 0.59 0.59 Sat Flow, veh/h 1645 3282 1468 1792 1787 1377 1774 1626 190 1757 1811 27 Grp Volume(v), veh/h 42 26 0 105 5 42 5 0 964 11 0 753 Grp Sat Flow(s),veh/h/ln 1645 1641 1468 1792 1787 1377 1774 0 1816 1757 0 1838 Q Serve(g_s), s 3.0 0.8 0.0 6.9 0.3 3.1 0.3 0.0 57.2 0.7 0.0 34.5 Cycle Q Clear(g_c), s 3.0 0.8 0.0 6.9 0.3 3.1 0.3 0.0 57.2 0.7 0.0 34.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.10 1.00 0.01 Lane Grp Cap(c), veh/h 52 458 205 130 322 248 11 0 1051 22 0 1076 V/C Ratio(X) 0.80 0.06 0.00 0.81 0.02 0.17 0.44 0.00 0.92 0.49 0.00 0.70 Avail Cap(c_a), veh/h 138 577 258 151 329 254 179 0 1051 192 0 1076 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.92 0.92 0.92 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 57.7 44.8 0.0 54.8 40.5 41.6 59.4 0.0 22.7 58.8 0.0 17.5 Incr Delay (d2), s/veh 23.8 0.1 0.0 22.5 0.0 0.3 24.6 0.0 13.8 15.5 0.0 3.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.7 0.4 0.0 4.3 0.1 1.2 0.2 0.0 32.4 0.5 0.0 18.5 LnGrp Delay(d),s/veh 81.6 44.8 0.0 77.3 40.5 41.9 84.0 0.0 36.5 74.4 0.0 21.3 LnGrp LOS F D E D D F D E C Approach Vol, veh/h 68 152 969 764 Approach Delay, s/veh 67.5 66.3 36.8 22.1 Approach LOS E E D C Timer 1 2 3 4 5 6 7 8 Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 14.6 22.6 6.7 76.1 9.7 27.5 7.4 75.3 Change Period (Y+Rc), s * 5.9 * 5.9 * 5.9 * 5.9 * 5.9 * 5.9 * 5.9 * 5.9 Max Green Setting (Gmax), s * 10 * 21 * 12 * 52 * 10 * 22 * 13 * 51 Max Q Clear Time (g_c+I1), s 8.9 2.8 2.3 36.5 5.0 5.1 2.7 59.2 Green Ext Time (p_c), s 0.0 0.1 0.0 4.9 0.0 0.2 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 34.4 HCM 2010 LOS C Notes