HomeMy WebLinkAboutVideo Inspection Report CUES, Inc.
3600 Rio Vista Avenue ;: R K,1
Orlando, FL 32805 f'Pipeline In miecporion son..
Phone: 407-849-0190
Fax: 407-425-1569
Observations by Inspections
SITE DATA
Mainline ID: City: Address:
DWE SSMH3 SSMH2 Renton 2008 NE 12th St
Upstream node: Downstream node: Pipe type: Pipe shape: Pipe height: Pipe width:
SSMH3 SSMH2 PVC Circular 8 8
INSPECTION DATA
Scheduled date: Start date/time: End date/time:
2/5/2013 7:47:54 AM 2/5/2013 7:49:45 AM 2/5/2013 7:58:07 AM
Surveyed footage: Status: Operator: Work order no.:
173.6 Stopped Valentin R. 253-405-1592
Reason: Weather: Condition:
Pre-Acceptance Light Rain
Comments
OBSERVATIONS
Footage Rev. Length Clock From Clock To Code Modifiers/Severity Rating
0.0 Yes Manhole
0.0 Yes Water Level
8.0 Yes START AGAINST FLOW
50.4 Yes 3 Lateral Capped
106.1 Yes 3 Lateral Capped
155.8 Yes 3 Lateral Capped
173.6 Yes Manhole
173.6 Yes STOP
Observations By Inspections Tuesday, February 05, 2013 8:07 AM Page 1 of 1
CUES, Inc.
3600 Rio Vista Avenue R1 Fr F.
Orlando, FL 32805 P'Means inspection ,I.t., .
Phone: 407-849-0190
Fax: 407-425-1569
Observations by Inspections
SITE DATA
Mainline ID: City: Address:
DWE SSMH2 SSMH1 Renton 2008 NE 12th St
Upstream node: Downstream node: Pipe type: Pipe shape: Pipe height: Pipe width:
SSMH2 SSMH1 PVC Circular 8 8
INSPECTION DATA
Scheduled date: Start date/time: End date/time:
2/5/2013 7:59:38 AM 2/5/2013 8:03:54 AM 2/5/2013 8:07:13 AM
Surveyed footage: Status: Operator: Work order no.:
71.9 Stopped Valentin R. 253-405-1592
Reason: Weather: Condition:
Pre-Acceptance Light Rain
Comments
OBSERVATIONS
Footage Rev. Length Clock From Clock To Code Modifiers/Severity Rating
0.0 No Manhole
0.0 No Water Level
8.0 No START WITH FLOW
22.1 No 9 Lateral Capped
71.9 No Manhole
71.9 No STOP
Observations By Inspections Tuesday, February 05, 2013 8:07 AM Page 1 of 1
a
CUES, Inc.
3600 Rio Vista Avenue lit//k p 1-r C '4*
Orlando, FL 32805
Phone: 407-849-0190
Fax: 407-425-1569
Project Summary
Diamond W Excavating
Main ID Date Address Start MH Finish MH Pipe Asset length Surveyed Length
DWE SSMH3 SSMH2 2/5/2013 2008 NE 12th St SSMH2 SSMH3 PVC 173.6
DWE SSMH2 SSMH1 2/5/2013 2008 NE 12th St SSMH2 SSMH1 PVC 71.9
Number of inspections: 2 Subtotal o.o ft 245.5 ft
Total 0.0 ft 245.5 ft
Project Summary Tuesday, February 05, 2013 8:08 AM Page 1 of 1