Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_190712_v1.pdf Construc�on Mi�ga�on Descrip�on Proposed Construc�on Dates: 1/1/20 – 9/1/20 Hours and Days of Opera�on: M-F, 7AM – 4PM Proposed Hauling and Transporta�on Routes: transporta�on routes will go from the site on 116th and then north to 168th Street or south to Petrovitsky Road. All routes are on arterials and not through residen�al neighborhoods. Measures to be implement to minimize dust, traffic and transporta�on impact, erosion, mud, noise, and other noxious characteris�cs: Dust: Given that construc�on will largely occur during fall and winter, dust issues are not an�cipated. However, if dust is an issue, Contractor to provide water tank. Traffic: Site provides significant laydown area for equipment and materials, therefore no traffic impact is foreseen on site or on public streets. Erosion/Mud: Contractors to establish and inspect BMPs related to erosion and sediment such as filter fence, waddles, wheel washes, protec�on of catch basins and storm drains, etc. Contractor to follow pollutant control measures. No stockpiling of soil an�cipated. Dewatering not expected. Noise: No adverse noise expected. Construc�on to occur during day�me hours. Noxious characteris�cs: None an�cipated. Special hours: none proposed. Preliminary traffic control plan: no traffic control plan an�cipated.