AMENDMENT NO. 1 TO AGREEMENT FOR THE HEATHER
DOWNS DETENTION POND WATER QUALITY RETROFIT PROJECT
THIS AMENDMENT, dated July 8, 2019, is by and between the City of Renton (the "City"), a
Washington municipal corporation, and The Louis Berger U.S., Inc. ("Consultant"), a New York
corporation. The City and the Consultant are referred to collectively in this Amendment as the
"Parties." Once fully executed by the Parties, this Amendment is effective as of the last date
signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-19-023, dated
February 5, 2019, to provide necessary services for the Heather Downs Detention Pond Water
Quality Retrofit Project (referred to herein as the "Agreement");
Whereas,the Parties wish to amend the Agreement to include additional design services in order
to complete the work items listed in Exhibit A-1 Scope of Services.
NOW THEREFORE, It is mutually agreed upon that CAG-19-023 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to include additional design
services as specified in Exhibit A-1, which is attached and incorporated herein.
2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit A-1. All Work shall be performed by no later than July 31,
2020.
3. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $8,018 from $111,600 to $119,618,
plus any applicable state and local sales taxes.The additional compensation shall be paid
based upon Work actual performed according to the rate(s) or amounts specified in
Exhibit B-1, which is attached and incorporated herein.
4. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONSULTANT
•AI
Gregg Zirii er Syn i Dudley
PW Adminis ator Vice President
)1116 / ct '1 /i`1
Date Date
Approved as to Legal Form
Shane Moloney
Renton City Attorney
Contract Template Updated 03/12/2019
PAGE 2 Of 2
CAG-1 9-023
EXHIBIT A-1
City of Renton
Heather Downs Detention Pond Water Quality Retrofit Project
Addendum No. 1
SCOPE OF WORK
6-27-19
Louis Berger is currently under contract with the City of Renton to perform preliminary and final design of
the Heather Downs Detention Pond Water Quality Retrofit project. The project is located at the
intersection of Union Ave SE and SE 4th Street and is intended to improve surface water quality for its
tributary basin. The project is partially funded through an Ecology grant to improve stormwater quality.
During preliminary design, the City CCTV'd a tributary storm drain along Union Ave SE and found some
pipe systems in need of repair/replacement.
The purpose of Addendum No. 1 is to add design of a replacement pipe system for the pipe segments
that were found to be in need of repair. Exhibit A-1.1 presents the storm drains to be replaced. The
design effort will be incorporated in the current pond retrofit design, although it is noted that the pipe
system is unlikely to be eligible for grant funding. The following paragraphs provide a scope of work and
supplement budget.
Scope of Services
The Addendum Scope of Services required is divided into the work tasks listed below and are described
in detail in the subsequent section.
Task 1 Supplemental Project Management (additional budget to current task)
Task 2 Not Used
Task 3 Supplemental Survey and Base Mapping (additional budget to current task)
Task 4-6 Not Used
Task 7 Supplemental Design, Construction Documents, and Cost Estimate (additional budget to
current task.
General Project Assumptions:
l. The main contract assumptions apply to this addendum.
2. City will coordinate with SPU regarding locating and potholing City of Seattle Water Line in area.
3. City will provide all potholing required for the project.
Task 1 - Supplemental Project Management
Scope of Services—City of Renton Heather Downs Stormwater Quality Retrofit Project I 1
Supplemental project management will include developing a subconsultant agreement and updated
work plan to add survey and design effort to incorporate it into the current design effort.
Task 3-Supplemental Survey and Base Mapping
The Consultant shall supplement the current survey base map to add the area shown on Exhibit A-1.1.
The survey will be performed with same information collected as set forth in the main contract area. This
will include retaining a private utility locator to paint and locate underground utilities.
Task 3 -Assumptions:
• Confined space entry will not be required.
• City will coordinate with SPU.
• City will coordinate all potholes.
Task 3 - Consultant Deliverables:
• Supplement survey area to be incorporated in main contract area CADD file.
Task 7- Supplemental Design, Construction Documents, and Cost Estimate
Adding the pipe system replacement will include adding a design sheet to the main contract drawing
set. It will include the pipe replacements plan and profile for the pipes shown on Exhibit A-1.1. City
standard details will be assumed for trenching and pavement repair. This work will include assisting in the
selection of where to pothole utilities and recommendations for the best pipe replacement alignment
considering the crossing of SPU's 36-inch diameter pipeline. Submittals will include a draft preferred
alignment plus 90%and final design to be incorporated into the main contract drawing set. Associated
specifications and cost estimates will also be incorporated into the main contract submittals.
Task 7 Assumptions
• Main contract assumptions apply.
• No new sidewalks or ADA compliance is required in the supplement area.
• The work will not need a continuous base map between the two work areas.
Task 7 Deliverables
• Preferred alignment sketch for City review.
• Supplement work will be in the main contract 90%and final design submittals
Project Fee:
For performing the supplemental work as described above in the Scope of Work,Consultant has
estimated a total contract fee of$8,018. The estimate is included as Exhibit B-1. The fee is based upon
Consultant billing rates times an estimate of the number of hours. The overall project fee shall not be
Scope of Services—City of Renton Heather Downs Stormwater Quality Retrofit Project I 2
exceeded without prior written authorization from the City. Should the City request additional services
beyond the Scope of Work,this effort and cost shall be agreed upon and approved by the City.
Estimates within specific tasks are estimates of level of effort and may vary between tasks.
Project Schedule:
Consultant will perform the work in order to complete the supplemental scope of work incorporated
into the main contract schedule
Scope of Services—City of Renton Heather Downs Stormwater Quality Retrofit Project I 3
EXHIBIT A-1.1
�. a ,
,00 . _ E ' - Replace CBs, consider best
., ‘ 3, o " alignment to replace pipes
# ,, „AL.. ,
j to connect to main storm
system in Union. Consider
i ` ' _ depth of SPU 36" line and
° `' �1 1 1 , meeting vertical separation
* requirements.
•
t
Supplemental 1
Survey area; ,
- include utility ,
locate , ,> Ta
,tr ,
............_
1 E r
�
-,.y C ,
_
321`
♦ tom' :.
' � . , - w*`
Scope
- Survey
- Coordinate with City on City conducted
potholes.
- review design options for pipe and CB
replacements including optional alignments.
- add plan and profiles to drawing set for 90%
and final drawings and specifications
Assumptions
- no existing sidewalks, so ADA is not
applicable.
- City coordinate with SPU
-City conduct potholes
City of Renton EXHIBIT B-1
Project:Heather Downs Detention Pond Retrofit Project PAGE 1 OF 3
Supplement No.1 Budget Summary
june 27,2019
Charges
Task Subtask LB Labor LB General Travel Subcontractor Total
No. No. PhaselTask Hrs Labor Revenue Expenses Expenses Charges' Charges
1 0 Project Management 2.50 $490 $0 $0 $490
3 0 Survey and Base Mapping 0.50 $49 $0 $0 $2,447 $2,496
7 0 Design,Construction Documents&Estims 40.00 $4,982 $0 $50 $0 $5,032
GRAND TOTALS 43.00 $5,521 $0 $50 $2,447 $8,018
City of Renton EXHIBIT&1
Project:Heather Downs Detention Pond Retrofit Project PAGE 2 OF 3
Labor Revenue Summary
lune 2/,2019
Enter names and rates from left to right Task Totals
Select Name,Class,OR Giseburt, Cammermeyer,
Nelson,Ralph D Michael S Weber,Mary B Jon W JUNIOR CAD Olson,Arlene T LA
Phase Task Classification°- Principal Sr PM PE CAD Admin
No. No. PhaselTask Labor Rate $275.34 $222.16 $184.52 $144.59 $98.30 $91.83 $136.00 Hours Revenues
1 0 Project Management 0.00 $0
1 1 Project Administration 2 0.5 2.50 $490
3 0 Survey and Base Mapping 0.5 0.50 $49
7 0 Design,Construction Documents&Estimate 5 10 20 5 40.00 $4,982
0.00 $0
Total Hours 0.00 7.00 0.00 10.00 20.50 5.50 0.00 43.00
Total Revenues $0 $1,555 $0 $1,446 $2,015 $505 $0 $5,521
Check $5,521
City of Renton EXHIBIT B•1
Project:Heather Downs Detention Pond Retrofit Project PAGE 3 OF 3
Subcontractor Costs
june 27,2019
Enter Names and Rates
Name HWA Geo 1Alliance Expenses
SEE&l Cost $0.00 $2,447.00
Client Rate* $1.00 $1.00 LB
%Mark-up or Fixed Include Admin
Phase Task Rate** %Mark-up %Mark-up %Mark-up Fixed Rate Mark-up? Cost to Client Cost to LB Mark-up
No. No. Phase/Task Final Bill Rate $0.00 $2,447.00 $0.00 No
1 0 Project Management $0 $0 $0
3 1 Topographic Survey 1.00 $2,447 $2,447 $0
7 0 Design,Construction Documents&Estimate $0 $0 $0
$0 $0 $0
Total Charges to Client $0 $2,447 $0 $2,447
61 ALLIANCE
GEOMATICS
SURVEYING & MAPPING
MBE/DBE
Level of Effort
t- NUMBER os$ Date 19Ja 1 A L L I A N C E
o 49
W NAME Heather()owns POndAdd'I ay pg
CLIENT Louis Berger Old BB GEOMATICS
G SURVEYING MAPPING!
OWNER City of Renton ,,.l
Principe! PM PLS Asti PM CADS 5 GADD4 TECH 4 TEC:,2 Admin FEE
TASK
S 224 , 1-1 S 127 - 90 $ 118 $ 105 S 1055 , 77 , 90
NUMBER DESCRIPTION HOIiR'o TASK
1 Survey PM,Ado,,QA/QC 1 I S 71A
2 Red Mapo-og n 1 4 S 846
3 Me P•oceswag 4 4 S 472
4 0 S
3 0 $
6 0 ,
-�
7 0 $
TDIn.,.0.2 2 ''T i -
2 224 00 310 90 , an.or' S ;'n rio . . 02 1,In ss If",f;f1 - Oil MI S 2,032.00
A:T,._Cn0CL 7900211 LD SILARY SC:'OP, S 2,032
OTHER DIRECT COSTS
MIOGSGE 1 ;ONE WAY) 14 MILEAGE ETOTAL MILES) 28 0.014 S 1>
•w1,1•of fcd days 1 PER DIEM‘DAYS) $
NOTES LODGING(DAYS) S
MATERIALS&SUPPLIES RECORD OF SURVEY $
OTHER(DESCRIBE) $
SUE LOCATES UTILITY LOCATES ESTIMATED S 400
TOTAL OTHER DIRECT COSTS $ 41.5
GRAND TOTAL FEE ESTIMATE $ 2,447