DECLARATION OF PUBLIC RIGHT-OF-WAY Property Tax Parcel Number: 172305-9013
Project File#:PRM04-0043 Project Title:
Maple Valley Highway(SR 169)HOV Lanes and
Queue Jump Improvements Project,Phase I
The CITY OF RENTON, a Municipal Corporation in King County, Washington, covenants that it is
the lawful owner of the following described property and that it has a good and lawful right to
execute this document and does hereby declare the following described property to be public right-
of-way.
LEGAL DESCRIPTION:
A portion of the East Half of Section 17, Township 23 North, Range 5 East, W.M., in the City of
Renton, King County, Washington.
(Please see attached Exhibit A for complete legal description.)
IN WITNESS WHEREOF, said City has caused this instrument to be executed by the Mayor and
Deputy City Clerk this / . L _ day of nimAl , 20 0 5 .
/I�„I� / ✓v lE
t
olker-Wheeler,t., -KathyY MAYOR
-=Michele Neumann,DEPUTY CITY CLERK
STATE OF WASHINGTON )SS
COUNTY-OF KING )
I certify that.I know or have satisfactory evidence that Kathy Keolker-
/,,/Nilfri,, Wheeler and Michele Neumann are the persons who appeared before me,
and said persons acknowledged that theysigned this instrument, on oath
. ., g g
it = stated that theywere
� �,�SSt(±�,, ,••f•• � authorized to execute the instrument and acknowledged
.000
4001�0l F.f4; it as the MAYOR,and the DEPUTY CITY CLERK,CITY OF RENTON,to
•
'moi/. 51;W be the free and voluntary act of such parties for the uses and purposes
y; A •�o ti 1 mentioned in the instrument.
PA, �BLIC
ek"` '•• 0 55. ,444kte.A
"""'• • � II' Notary Public in and for the State of Washington
I
," oo/f,Y -1 Notary(Print) -1)e%Dyr'oL A Z E1/a.vis
My appointment expires: 1/-/9— a O O$
Dated: -/.2-.2 00 S
EXHIBIT A
ACQUISITION "B"
LEGAL DESCRIPTION
A portion of a parcel of land located in Government Lot 4 and Government Lot 7 and the
southwest quarter of the northeast quarter of Section 17, Township 23 North, Range 5
East, W.M. Said parcel more particularly described as follows:
Beginning at the intersection of the easterly line of the Pacific Coast Railroad
Company's right-of- way with the centerline produced North 81°56' East of First
Avenue North, shown as County Road along the Southerly line of Car Works
Addition to Renton, according to the Plat thereof recorded in Volume 15 of Plats,
page 47, in King County, Washington;
Thence South 23°38'45" West along the easterly line of said railroad right of way
38.76 feet more or less to the southerly line of a County Road and the TRUE
POINT OF BEGINNING, which point is marked by a concrete monument;
Thence along said County Road line North 86°12' East 99.82 feet to a point on a
curve to the right with a radius of 286.48 feet, which point is in the southwesterly
line of Maple Valley Road;
Thence continuing on said southwesterly line of said curve to the right and parallel
with the centerline of said Maple Valley Road 180.45 feet;
Thence continuing along said Maple Valley Road line South 41°25' East 1228.45
feet to the north side of fence marking the northerly line of a tract of land leased to
Stoneway Dock Company, a corporation, by instrument dated March 1, 1937 and
recorded under Recording Number 2994387; said point being designated as
Monument No. 1;
Thence along the northerly side of said fence line South 4T32'30" West 273.25
feet to Monument No. 2;
Thence South 88°26'00"West 251.95 feet to Monument No. 3;
Thence South 39°24'35"West 73.20 feet to Monument No. 4;
Thence North 79°04'40" West 176.04 feet to Monument No. 5;
Thence South 2T58'20" West 400 feet more or less to the southerly boundary of
said Government Lot 4;
Thence northwesterly along said Government Lot line 980 feet more or less to the
easterly line of the Pacific Coast Railroad Company's right of way;
Thence northeasterly along said right of way line 1,350 feet more or less to the
TRUE POINT OF BEGINNING;
Except that portion thereof conveyed to the City of Seattle by deed recorded under
Recording Number 6013616;
Except that portion conveyed to the State of Washington by deed recorded under
Recording Numbers 5137511 and 9008280491.
Said portion more particularly described as follows:
BEGINNING at the most easterly corner of said parcel, said point
being opposite and 39.32 feet southwesterly of, when measured
at right angles thereto, centerline HES 1539+78.27 as per sheet 4
of 4, SR169 MP 23.69 to MP 25.07 State Highway Right of Way
Plan Approved Feb. 18, 1971;
Thence South 4T50'32" West along the southeast line of said
parcel 241.95 feet to the beginning of a non-tangent curve
concave to the north having a radius of 390 feet;
Thence along the arc of said curve, the radius point of which
bears North 19°26'50" West, through a central angle of 05°01'37"
a distance of 34.22 feet;
Thence North 14°25'12" West 60.70 feet to the beginning of a
non-tangent curve concave to the north having a radius of 324.00
feet;
Thence along the arc of said curve, the radius point of which
bears North 13°55'34" West, through a central angle of 09°15'40"
a distance of 52.37 feet;
Thence North 23°11'13" West 4.68 feet to the beginning of a
curve concave to the north having a radius of 325.00 feet;
Thence along the arc of said curve, the radius point of which
bears North 23°31'52" West, through a central angle of 18°38'08"
a distance of 105.71 feet;
Thence North 47°50'00" East 4.29 feet;
Thence North 42°10'00" West 15.00 feet;
Thence North 47°50'00" East 44.69 feet;
Thence North 04°31'24" East 7.46 feet to a point opposite and 77.58 feet
southwesterly of, when measured at right angles thereto, centerline HES
1540+31.92;
Thence North 39°59'03" West 5.11 feet to a point on the boundary line of
said parcel which is opposite and 77.53 feet southwesterly of, when
measured at right angles thereto, centerline HES 1540+36.99;
Thence North 47°50'32" East 37.83 feet to an angle point of said parcel
which is opposite and 39.72 feet southwesterly of, when measured at
right angles thereto, centerline HES 1540+38.04;
Thence South 41°06'11" East 60.00 feet along the southwest margin of
said State Route 169 to the POINT OF BEGINNING.
Situate in the City of Renton, King County,Washington.
• 4
EXHIBIT B
NE 1/4. SEC. 17. TIIP. 23 N. RAGE $ Jr. W u
o - - - - -
+ S R. 169 (MAPLE VALLEY KAY.)
0
V- co
10 S 39'59'09' E
243.50' 1541+36.50 PT
Z • 3 15^+00 1541+00 N 1540+00 N
•_ M t\ M
N C4 d- U) O a> p
u7
Ip EXIST. RIGHT OFWAY M
o
o►
ACQUISITION 'A v • l
N 39'59'O3"W 191.93 x•:^:. op•` N 39'5903" W 100.0 x3 �`d. 0,.co
PROPOSED ... �. 1540+36.99 •pk
CS `'21 o+,
i.r
.... .„
RIGHT OF WA �y ' 177.53 o •n
ti^ h
•x • y0
. PROPOSED
q �( 1723059173 ) u . RIGHT
,"6^oti OF WAY
x
PARCEL LINEm]
.70w
1723059013 � \N\2!
s. RAN ACQUISITION L J 4)A Q\
SITE DATA .°
ACQUISITION k 19,696 SQ. FT. 0 8
ACQUISITION -
8: 12.862 SQ. FT. _ - I
ITI
.PP
TOTAL ACQUISIIUON: 32.558 SQ. FT. S�f �p-
.1.?. . )
ACQUISITION DIMENSIONS PARCEL UNE -17
UNE BEARING'13" W 511 DISTANCE 60 30 0
59 60
16 S 04'31.24' W 7.46 11
C7 S 4270'00" F 15.00 SCALE IN FEET
18 S 47 50'0O' W 4 29
19 S ?3'11.13" F I 4.68 THIS IS NOT A BOUNDARY SURVEY MAP
jJPerteet, Inc. RIGHT-OF-WAY
EXHIBITPIMAP
9013
27 boom 2511-7T00 • e 900 • ESI, TA 96 FOR: CITY OF RENTON FUELIC WORKS
(mss)$as!-ema rimalk priest-earn
DATE: DEC 9, 2004 SHEET 1 OF 3
1
• ,
MEMORANDUM OF UNDERSTANDING
This Memorandum of Understanding is between the Planning/Building/Public Works
Department operating in its transportation function (Transportation) and the Community Services
Department operating in its parks function(Parks).
1. Parks owns Tax Parcel Number 172305-9013 off of Maple Valley Highway(SR 169) of
20.15 acres.
2. Transportation has planned and designed the Maple Valley Highway (SR 169)HOV
(High Occupancy Vehicle) Lanes and Queue Jump Improvements Project. Phase I of this
project will construct roadway and pedestrian improvements for the new Cedar River
Park access off of SR 169. In order to construct Phase I of this project, Transportation
needs a portion of the parcel indicated in the prior paragraph and more fully described in
Exhibit A and shown in Exhibit B as Acquisition"B".
3. Parks is aware of the improvements needed for the project described in the prior
paragraph, which will reduce highway congestion and improve traffic safety.
4. Both departments have previously agreed to mitigation of the impacts to the Cedar River
Park as described in the April 9, 2002 and September 3,2002 memos from
Transportation summarizing the agreed-to mitigation and requesting a letter from Parks
agreeing to the mitigation as part of the environmental documentation and the September
25, 2002 memo from Parks stating and agreeing to the mitigation. As shown in the
January 10,2005 memo from Transportation and the December 13,2004 memo from
Parks, both departments have agreed to transfer the property referred to as Acquisition
«B„
Based upon the foregoing facts, Parks and Transportation enter into the following
agreement:
1. Parks will transfer to Transportation the property referred to as Acquisition"B"which is
described in Exhibit A and shown in Exhibit B.
2. Transportation will use this property in the Maple Valley Highway(SR 169)HOV (High
Occupancy Vehicle)Lanes and Queue Jump Improvements Project for road purposes.
Dated this 313#- day of , 2005.
I
Dennis ulp / Gregg *! e.
Community Services Administrator Plannin: :uilding/Public Works Administrator
Attachments: Memos dated April 9,2002,September 3,2002,and January 10,2005 from Transportation
Memo dated September 25,2002 and December 13,2004 from Parks
Exhibits A and B
,AY
O
C. ; CITY OF RENTON
• . ® I') MEMORANDUM
DATE: April 12, 2005
TO: Gregg Zimmerman, Planning/Building/Public Works Administrator
Dennis Culp, Community Services Administrator
FROM: Jay Covington, Chief Administrative Officer
CC: Kathy Keolker-Wheeler, Mayor
SUBJECT: Execution of Declaration of Right-Of-Way Document
The Mayor asked me to review a folder of materials she recently received from the City Clerk's
that included a declaration of right of way for property needed for the SR 169 expansion.
Included with the right of way document was a memorandum of understanding signed by both of
you. The MOU indicates that the Community Services Department agrees to transfer a portion of
Cedar Park property to the Planning/Building/Public Works department for road purposes.
We want to make it clear that—unless property is owned by an enterprise fund—there should be
no document such as an MOU that infers property rights vested in one department or the other.
The park property is owned by neither of your departments. It is owned by the City of Renton. I
thought we had cleared up this confusion when we reviewed the surplus property policy and
procedure several months ago. I am concerned that you seem not to have understood that
discussion.
I understand that we need the Declaration of Right of Way document to record the conveyance of
property for road purposes. And I understand and expect that the two of you need to develop
recommendations for the Mayor(and Council if necessary)to consider regarding mitigation
impacts from road projects on city property designated for park purposes. But those agreements
should not imply department property ownership,unless the property is owned by one of the
City's utility funds.
Please make sure others in your departments understand this as well, and include this memo with
the Memorandum of Agreement signed 31st of March, 2005
rte' '
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM RiEC
JA" 1
DATE: January 10, 20050 ;,..;05
UT
il'op
TO: Dave C stensen ` �TYSYSNTCM3
oN
Utility Systems Division
FROM: Robert Lochmiller, x7303
Transportation System Division
SUBJECT: SR 169: Right-of-Way(ROW)Documents
Attached is the exhibit map and legal description for the ROW dedication needed from
Cedar River Park for Phase l of the Maple Valley Highway(SR 169)Improvement
project. Please review the documents and proceed to City Council for dedication. For
the fist phase, only Acquisition B, as labeled on the exhibit map and legal descriptions, is
needed for the dedication. The remaining acquired property needed for the entire
project's ROW will be obtained in Phase 2 of the project.
I have also included a letter from the Parks Department stating their acceptance of the
dedication of Park property.
Please process this as quickly as possible; we want to go to construction early this year.
If you have any questions, please let me know.
Thanks.
Attachments: Parcel 1723059013 Exhibit Map
Right-of-Way Acquisition Legal Description
December 13,2004 Parks Department Memo
cc: Leslie Lahndt
File
H:Division.s‘Transpor.tai\DESIGN.ENG\Rob\SR 169-Maple Valley Improvemenls\Memo s\Memo to Tech Service 050110.doc
•
•
RECEIVED
COMMUNITY SERVICES JAN -5
MEMORANDUM Transportation Systems Div.
DATE: December 13,2004
TO: Leslie Lahndt,Transportation Systems Division
FROM: Leslie Betlach,Parks Departmen��C!#�
SUBJECT: SR 169:Cedar River Park Land Dedication
The Parks Department is aware of the improvements needed for the Maple Valley Highway(SR
169)HOV Project. Both departments have previously agreed to the mitigation to Cedar River
Park. As part of the agreement,a portion of land from the Cedar River Park will be dedicated to
City right-of-way.
The Parks Department agrees that the Cedar River Park portion of land,shown as Acquisition B
on the attached exhibit map,will be dedicated as City right-of-way which is needed for Phase 1 of
the Maple Valley Highway(SR 169)HOV Project.
The remaining Park frontage needed for the Maple Valley Highway(SR 169)HOV Project will
be dedicated once Phase 2 of the project commences.
Thank you for involving us on this project. I look forward to working with you in the future.
cc: Dennis Culp
Sandra Meyer
HADivisans\T .w
DESIGN EN
r� GAobISR 169 Mspk Valley 4nprova„eMsVo{pnoW4attp to Pads W 12ll.doe
f A
%0 CITY OF RENTON
Community Services
MEMORANDUM '
k. �
- `3&
Date: September 25, 2002 0 .p0 °
To: Leslie Lahndt, Transportation Design Supervisor °'So: //
From: Leslie Betlach, Parks Directo
Re: Maple Valley Highway (SR-169) HOV
Thank you for your recent memorandum regarding the Maple Valley Highway (SR-169)
HOV project. The Parks Department is aware that the Transportation Systems Division
is proposing to make improvements to Maple Valley Highway in the vicinity of 1-405, in
order to reduce highway congestion and improve traffic safety.
We realize this project will take a strip of park land in Cedar River Park adjacent to the
Maple Valley Highway (approximately 14,050 sq. ft.), relocate approximately 98 parking
spaces, and relocate the Park entrance. It is our understanding these impacts will be
mitigated. Upon total project completion, the new Park entrance will be located further
east from 1-405 and will direct traffic through the east side of the park rather than
through the middle of the park, a potentially positive outcome.
We reached agreement on Parks mitigation as summarized in your April 9, 2002
memorandum to me. Mitigation includes the following:
1. Landscaping
2. Textured (architecturaVgraphic) concrete wall barrier 42" high beside sidewalk
along SR-169 (total wall height would be approximately 8' from parking lot).
Parks will have the opportunity to review and approve design drawings.
3. An ADA ramp/walk from the sidewalk along SR-169 down to the parking lot
by the current Park access.
4. Demolition of the Parks Maintenance Building unless Parks has previously
demolished the building. If demolition of the existing maintenance facility is
not possible because a replacement facility is not available, Transportation
will modify SR-169 to accommodate the Cedar River Park Shop at its current
location. Details of this arrangement will be specified in a separate inter-
departmental agreement.
CITY OF RENTON
PLANNING/BUILDING/ PUBLIC WORKS
• MEMORANDUM
DATE: September 3,2002
TO: Leslie Betlach,Parks Director n_
FROM: Leslie Lahndt,Transportation Design Supervisor (j
STAFF CONTACT: Joe Armstrong,x7303 Q,,�
SUBJECT: Maple Valley Highway(SR-169)HOV
As we have previously discussed, the proposed improvements to the Maple Valley Highway at
Cedar River will take a narrow strip of land from the front of the Park, relocate the entrance to
the Park, and relocate approximately 98 parking spaces. These improvements will relieve
congestion in the vicinity of the I-405 interchange and improve safety. See the attached memo
dated April 9, 2002 summarizing our agreed mitigation for Parks impacts.
In the long run, I believe that shifting the Park entrance approximately 700 feet to the east will
benefit Cedar River Park. The existing Park entrance can become congested when there are long
traffic queues near I-405, a situation which is occurring more and more often and which will be
significantly reduced by moving the entrance out of the high congestion area. The new Park
entrance also allows direct access to parking,the theater,the community center,and the proposed
pool. Additionally, the new entrance will be shared between the Stoneway site and the
Maintenance Facility(15,600 sq. ft. from the Stoneway site). Subtracting the 14,050 sq. ft. taken
from along the Maple Valley Highway, the net change to Parks property due to our impacts is a
gain.
As part of the documentation we are preparing for submittal to WSDOT, we require a memo
from Parks to us, indicating that you are aware of this project, and in fact have discussed and
agreed with us on the mitigation required so as to not have a negative impact on the operation of
the Park. I have attached a suggested memo which should be signed and return to me. I look
forward to receiving the memo back in the near future. I will be gone September 5, 2002 through
September 15, 2002,but please feel free to remit to Joe Armstrong.
Thank you for all your help and cooperation with us on this project.
Attachments: 2
Cc: Gregg Zimmerman
Jim Shepherd
_Sandra Meyer
Leslie Lahndt
Joe Armstrong
File
•
CITY OF RENTON
PLANNING/ BUILDING/ PUBLIC WORKS
MEMORANDUM
DATE: April 9, 2002
TO: Leslie Betlach, Parks Director
FROM: Leslie Lahndt, Transportation Design Supervisor
STAFF CONTACT: Joe Armstrong, x7303
SUBJECT: Maple Valley Highway (SR-169) HOV
This memo and the two attachments are in response to your requests stated at our
March 29, 2002 meeting discussing mitigation for Parks as part of our Maple Valley
Highway (SR-169) HOV project.
I was pleased with our meeting and felt we had agreed on a mutually beneficial
solution for our project. The primary points of our agreement are summarized in this
memo. There are two attachments; the first is the latest rendition of Option C
showing how we will mitigate for access and parking spaces which was modified from
the original to meet your requests. The second is a copy of the City-Stoneway
agreement you had requested.
Agreed to Parks mitigation as follows:
1) Landscaping and textured concrete wall barrier 42" high beside sidewalk along
SR-169 (total wall height would be approximately 8' from parking lot). You will
have the opportunity to review this once it is designed.
2) An ADA ramp/walk from the sidewalk along SR-169 down to the parking lot by
the current Park access.
3) Demo of the maintenance building. We will perform this work unless Parks has
an opportunity first to do the work themselves.
4) Replace parking in kind. This has been done as shown in the attached
rendition of Option C. In addition we will pursue parallel parking as allowable
along the original parking on SR-169.
In addition to the above, we agreed there is the possibility our project timing may not
work well with Parks projects therefore, a transfer of money in lieu of actual parking
mitigation construction may be a possibility. I supplied some very preliminary cost
estimates at our meeting but we can firm those up if this becomes an option we want
to pursue.
Thank you for working with us on this project. I feel we were able to reach a solution
that serves us both. I will be forwarding a copy of this memo to our consultant, Rich
•
Return Address:
City Clerk's Office
City of Renton
1055 South Grady Way
Renton, WA 98055
DECLARATION OF PUBLIC RIGHT-OF-WAY Property Tax Parcel Number: 172305-9013
Project File#:PRM04-0043 Project Title:
Maple Valley Highway(SR 169)HOV Lanes and
Queue Jump Improvements Project,Phase I
The CITY OF RENTON, a Municipal Corporation in King County, Washington, covenants that it is
the lawful owner of the following described property and that it has a good and lawful right to
execute this document and does hereby declare the following described property to be public right-
of-way.
LEGAL DESCRIPTION:
A portion of the East Half of Section 17, Township 23 North, Range 5 East, W.M., in the City of
Renton, King County, Washington.
(Please see attached Exhibit A for complete legal description.)
IN WITNESS WHEREOF, said City has caused this instrument to be executed by the Mayor and
City Clerk this day of , 20
Kathy Keolker-Wheeler,MAYOR
Bonnie I. Walton,CITY CLERK
STATE OF WASHINGTON )SS
COUNTY OF KING )
I certify that I know or have satisfactory evidence that Kathy Keolker-
Wheeler and Bonnie I. Walton are the persons who appeared before me, and
said persons acknowledged that they signed this instrument,on oath stated
that they were authorized to execute the instrument and acknowledged it as
the MAYOR,and the CITY CLERK,CITY OF RENTON,to be the free
and voluntary act of such parties for the uses and purposes mentioned in the
instrument.
Notary Public in and for the State of Washington
Notary(Print)
My appointment expires:
Dated:
•
EXHIBIT A
ACQUISITION "B"
LEGAL DESCRIPTION
A portion of a parcel of land located in Government Lot 4 and Government Lot 7 and the
southwest quarter of the northeast quarter of Section 17, Township 23 North, Range 5
East, W.M. Said parcel more particularly described as follows:
Beginning at the intersection of the easterly line of the Pacific Coast Railroad
Company's right-of- way with the centerline produced North 81°56' East of First
Avenue North, shown as County Road along the Southerly line of Car Works
Addition to Renton, according to the Plat thereof recorded in Volume 15 of Plats,
page 47, in King County, Washington;
Thence South 23°38'45" West along the easterly line of said railroad right of way
38.76 feet more or less to the southerly line of a County Road and the TRUE
POINT OF BEGINNING, which point is marked by a concrete monument;
Thence along said County Road line North 86°12' East 99.82 feet to a point on a
curve to the right with a radius of 286.48 feet, which point is in the southwesterly
line of Maple Valley Road;
Thence continuing on said southwesterly line of said curve to the right and parallel
with the centerline of said Maple Valley Road 180.45 feet;
Thence continuing along said Maple Valley Road line South 41°25' East 1228.45
feet to the north side of fence marking the northerly line of a tract of land leased to
Stoneway Dock Company, a corporation, by instrument dated March 1, 1937 and
recorded under Recording Number 2994387; said point being designated as
Monument No. 1;
Thence along the northerly side of said fence line South 4T32'30" West 273.25
feet to Monument No. 2;
Thence South 88°26'00" West 251.95 feet to Monument No. 3;
Thence South 39°24'35"West 73.20 feet to Monument No. 4;
Thence North 79°04'40" West 176.04 feet to Monument No. 5;
Thence South 2T58'20" West 400 feet more or less to the southerly boundary of
said Government Lot 4;
Thence northwesterly along said Government Lot line 980 feet more or less to the
easterly line of the Pacific Coast Railroad Company's right of way;
Thence northeasterly along said right of way line 1,350 feet more or less to the
TRUE POINT OF BEGINNING;
Except that portion thereof conveyed to the City of Seattle by deed recorded under
Recording Number 6013616;
Except that portion conveyed to the State of Washington by deed recorded under
Recording Numbers 5137511 and 9008280491.
c a .t
•
Said portion more particularly described as follows:
BEGINNING at the most easterly corner of said parcel, said point
being opposite and 39.32 feet southwesterly of, when measured
at right angles thereto, centerline HES 1539+78.27 as per sheet 4
of 4, SR169 MP 23.69 to MP 25.07 State Highway Right of Way
Plan Approved Feb. 18, 1971;
Thence South 4T50'32" West along the southeast line of said
parcel 241.95 feet to the beginning of a non-tangent curve
concave to the north having a radius of 390 feet;
Thence along the arc of said curve, the radius point of which
bears North 19°26'50" West, through a central angle of 05°01'37"
a distance of 34.22 feet;
Thence North 14°25'12" West 60.70 feet to the beginning of a
non-tangent curve concave to the north having a radius of 324.00
feet;
Thence along the arc of said curve, the radius point of which
bears North 13°55'34" West, through a central angle of 09°15'40"
a distance of 52.37 feet;
Thence North 23°11'13" West 4.68 feet to the beginning of a
curve concave to the north having a radius of 325.00 feet;
Thence along the arc of said curve, the radius point of which
bears North 23°31'52" West, through a central angle of 18°38'08"
a distance of 105.71 feet;
Thence North 47°50'00° East 4.29 feet;
Thence North 42°10'00" West 15.00 feet;
Thence North 47°50'00" East 44.69 feet;
Thence North 04°31'24" East 7.46 feet to a point opposite and 77.58 feet
southwesterly of, when measured at right angles thereto, centerline HES
1540+31.92;
Thence North 39°59'03"West 5.11 feet to a point on the boundary line of
said parcel which is opposite and 77.53 feet southwesterly of, when
measured at right angles thereto, centerline HES 1540+36.99;
Thence North 47°50'32" East 37.83 feet to an angle point of said parcel
which is opposite and 39.72 feet southwesterly of, when measured at
right angles thereto, centerline HES 1540+38.04;
Thence South 41°06'11" East 60.00 feet along the southwest margin of
said State Route 169 to the POINT OF BEGINNING.
Situate in the Cityof Renton, KingCount Washin ton.
Y, 9
EXHIBIT B
NE 1/4, SEC 17. TWP. 23 N, RCM 5 E. W..11:
0 — _
1- S.R. 169 (MAPLE VALLEY Him) o
V. (0
1() S 39'5909" E
243.50' 1541+36.50 PT
ZW — ---- r- — — 1 — —:--
00 • 3 1542+00 1541+00 I 1540+00 — —
Z (� N N
M 1� M
0 P( N �. t) O tT to O
Q to EXIST. RIGHT OF WAY in M M
fil'4 Air
A e UISITION A 71 v'Y :� `'� „
N 39'5903' W 191.93 .S'.lc OpA. \` N 39'5903" W 100.0 r3 ��� o^+i'
PROPOSED yR� & I 1540+36.99 p \"��
RIGHT OF WA % I 1J7.53 b •n
l^. a
• 0 r`
'I
4i 4 •, h PROPOSED
A K 1723059173 ) ie ; RIGHT
ye`v., OF WAY
k.• `•
`F
PARCEL UNE ( m�
I -44,-\\\.(0a �
.h` \h
SCS_, WI
1723059013 I cn
�F\2!
M R/W ACQUISITION
SITE DATA ' p\k
ACQUISITION k 19,696 SQ. FT. \
ACQUIS111ON 8: 12,862 SQ. FT. �.i� I
TOTAL ACQUISITUON: 32.558 SQ. FT. s 60 *PP`
` . )
F
ACQUISITION DIMENSIONS PARCEL UNE-----7
LINE BEARING
L1 N 395903" W 5 DI11STANCE _ 60 30 0
60
L6 S 0431'24" W 7.46 F� 1
L7 S 4270'o0" F 15170 SCALE IN FEET
1
18 S 47.50'009
L9 S 2371'13" F 4.68 THIS IS NOT A BOUNDARY SURVEY MAP
P erte e t, Inc. RIGHT-OF-WAY
>7 505EXH93 MAPA
27+07 comy beau, • suite goo • EYerett, U 08201 FOR CITY OF RENTON PUBLIC WORKS
Plmootc((aa) s62-r11X1 hoc(cam 120-e01e toot Iwamoto=
DATE: DEC 9, 2004 SHEET 1 OF 3
•,:i •,4765, CITY OF RE TOIL
..& Office of the City Attorney
Lawrence J.Warren
Kathy Keolker-Wheeler, Mayor
Assistant City Attorneys
Mark Barber
Zanetta L. Fontes
Ann S. Nielsen
MEMORANDUM Sasha P. Alessi
Whitney A. Faulkner
To: Dave Christensen, Wastewater and Technical Services supervisor
From: Lawrence J. Warren, City Attorney
Date: March 10, 2005
Subject: Review of Declaration of Public Right of Way document and MOU
between Parks and Transportation for SR 169 HOV Project,Phase I
While I still believe that the City could keep these records internally, I can see no harm in filing a
declaration of right-of-way. It is no more than a notice document. The Declaration is approved as
to legal form. Additionally, the MOU regarding Heather Downs is approved as to legal form.
Please feel free to call, should you have any questions.
Lawrence J. W; en
LJW:ma. RECEWE
D
Enc. t4AR I 'i 2005
cc: Jay Covington
Karen McFarland CITY rORENTON
UTILITY SYSTEMS
Post Office$ox 626-Renton,Washington 98057-(425)255-8678/FAX(425)255-5474 R E N T O N
0
AHEAD OF THE CURVE
This paper contains 50%recyded material,30%post consumer
' `,• lT`ir OF RENTom
APR 0 5 2005
CITY OF RENTONRECEIVED
CITY CLERK'S OFFICE
PLANNING/BUILDING/PUBLIC WORKS of
MEMORANDUM ItitiN
DATE: April 5, 2005
TO: Bonnie Walton, City Clerk
fI f\
FROM: Karen McFarland, Engineering Specialist(x7209)'
SUBJECT: Execution of Declaration of Public Right-Of-Way Document
Attached please find a Declaration of Public Right-Of-Way document for the Mayor's signature.
As shown by the attached MOU, the Community Services Department has agreed to transfer a
portion of the Cedar River Park property to the Planning/Building/Public Works Department for
road purposes.
Currently, the Transportation Systems Division has a project on the City's most recently updated
Six-Year Transportation Improvement Program, 2005-2010, as the SR 169 HOV Project (140th
Way SE to SR 900). In order to proceed with Phase 1 of this project, the Transportation Systems
Division needs a portion of the Cedar River Park property, referred to as Acquisition "B" in the
attached documents. Since the Cedar River Park property is under the responsibility and
management of the Parks Division, a Memorandum of Understanding was needed to formalize
the agreement between the Community Services Department and the Planning/Building/Public
Works Department.
The MOU merely transfers the responsibility of this portion of the Cedar River Park property to
the Transportation Systems Division. The attached Declaration of Public Right-of-Way
document is intended to declare the property as public right-of-way. Notice of this declaration
will occur upon recording.
After the Declaration of Public Right-of-Way document has been signed, please return it to me
so that I may fill out the appropriate documentation and submit a package for recording.
Thank you.
Attachment: Declaration of Public Right-Of-Way
MOU between Parks and Transportation for Maple Valley Highway(SR 169)HOV(High
Occupancy Vehicle)Lanes and Queue Jump Improvements Project,Phase I
Memo dated March 10,2005 from Larry Warren
P:\Current Projects\ROWProjects\WSDOT\SRI69\Phasel\Parks_Property\DoROWexec 0405.doc