Loading...
HomeMy WebLinkAboutVideo Inspection Report mil • Gary's Tele-Scan rY PO Box 68757 Ga s Seattle, WA 98188 Tele-Scan VIDEO INSPECTION REPORT Phone: (206) 242-5452 Cellular: (206) 949-9185 alALL REPORTS ARE SUBJECT TO OWNERS ENGINEERING APPROVAL r• . Fax: (206) 244-8398 GARYST*024C7 Customer Project Location UTILITY SYSTEMS EDENWOOD Starting MH Ending MH Flow Joint Type Pipe Size Pipe Type MH 2 MH 3 Against 'r R,GASKET 8" PVC Tape Number Start Tape Counte End Tape Counter Date Camera Direction Invoice# 1 0 11.00 10/8/2002 UpStream 21007 Remarks SHEET 1 1 Ftp. Observation Category Position Comments •0.0 Do..:._;i:_,,;;. Manhole Structure MH 2 upV it •153.5 Service Connection Left Structure - - •175.8 Service Connection eight Structure 3 •179.6 Sag Begins Pipe •182.1 Pending 1/2 inch St/uctu-s •185.4 Sag Ends Pipe - •228.4 Sag Begins Pipe •232.7 Ponding 3/6 inch Structure -236.3 Sag Ends Pipe ----• Service Cnnnectio- Structure - •249.5 Upstream Manhole Structure hr/',3 (enaratxl nn Tuasdav Ort(1R 7007 at 3.04 PM by tha PineTPnhA TV insnxtinn system ----71114157— Gary's Tele-Scan Gass PO Box 68757 Seattle,WA 98188 Tele-Sean VIDEO INSPECTION REPORT Phone: (206)242-5452 ALL REPORTS ARE SUBJECT TO OWNERS ENGINEERING APPROVAL Cellular: (206) 949-9185 Fax: (206) 244-8398 GARYST*024C7 Customer Project Location UTILITY SYSTEMS EDENWOOD PLAT Starting MH Ending MH Flow Joint Type Pipe Size Pipe Type MH 3 CO 1 Against R,GASKET 8" PVC Tape Number Start Tape Counte End Tape Counter Date Camera Direction Invoice# 1 11.00 13.45 10/8/2002 UpStream _ 21007 Remarks SHEET 2 Ftg. Observation Category Position Comments — •0.0 Downstream Manhole A • • 77.4 End TV Observation Reference LOWER BEND TO CO 1 CiP.nP.ratPd on T1JAPAav C)rt 011 2002 at 3.0R PM by the PinPTPrhOZ TV insnertinn system Gary's Tele-Scan Gary,s PO Box 68757 Seattle,WA 98188 Tele-Scan VIDEO INSPECTION REPORT Phone: (206) 242-5452 Cellular: (206) 949-9185 Ilk ALL REPORTS ARE SUBJECT TO OWNERS ENGINEERING APPROVAL Fax: (206) 244-8398 • GARYST*024C7 Customer Project Location UTILITY SYSTEMS IL EDENWOOD PLAT Starting MH Ending MH Flow _ Joint Type Pipe Size Pipe Type MH 2 MH 4 Against [I R,GASKET 8" PVC Tape Number Start Tape Counte End Tape Counter Date Camera Direction Invoice# 1 I 13.45 20.00 10/8/2002 UpStream 21007 Remarks SHEET 3 Ftg. Observation Category Position Comments u.J i.:ov,rzt: aur ManholeVW -. V -- •20.4 Service Connection Right 0.,,. •71.9 Service Connection Right Structure 3 R A - - •126.1 Service Connection Right Structure 3 - •128.1 Service Connection Left Structure 9 •135.5 Service Connection Right Structure 3 •146.7 Service Connection Left Structure 9 - •150.3 Upstream Manhole Structure MH 4 Generated nn Tuesday Ort OR 7on7 at 3.91 PM by the PineTarh®TV insnection system ( Gary's Tele-Scan 1 PO Box 68757 " 'V s Seattle,WA 98188 Tele-S�an VIDEO INSPECTION REPORT Phone: (206) 242-5452 Cellular: (206) 949-9185 I ALL REPORTS ARE SUBJECT TO OWNERS ENGINEERING APPROVAL Fax: (206)244-8398 GARYST*024C7 Customer Project Location UTILITY SYSTEMS EDENWOOD PLAT Starting MH Ending MH Flow Joint Type Pipe SizePipe Type MH 2 MH 1 With R,GASKET 8" PVC Tape Number Start Tape Counte End Tape Counter Date Camera Direction_ Invoice# j 1 20.00 23.00 10/8/2002 DownStream 21007 Remarks SHEET 4 Ftg. Observation Category Position Comments •0.0 Ups11ean1 Nlennule ruc ure alV R V •81.3 Service Connection Right Structure 3 --•102.2 Downstream Manhole Structure Mt Generated nn TI1Psrlav Ort OR 2(1)7 at 3'76 PM by the PinaTerhfft TV insncctinn systPm Gary's Tele-Scan PO Box 68757 Ga rY t Seattle,WA 98188 Tele-Svin VIDEO INSPECTION REPORT Phone: (206) 242-5452 ALL REPORTS ARE SUBJECT TO OWNERS ENGINEERING APPROVAL Cellular: (206) 949-9185 Fax: (206) 244-8398 GARYST*024C7 Customer Project Location UTILITY SYSTEMS C EDENWOOD PLAT Starting MH Ending MH Flow Joint Type Pipe Size Pi T e MH 1 EX MH With 11 R,GASKET 8" PVC Tape Number Start Tape Counte End Tape Counter Date Camera Direction Invoice# 1 23.00 26.30 10/8/2002 DownStream 21007 Remarks SHEET 5 Ftg. Observation Category Position Comments •0.0 Up „prole Structure MH V V --52.2 Downstream Manhole Stnuct; rX MI' henPrated nn Tuacdav Oct OR?no?at 3 40 PM hu the PineTarh®TV insnectinn cvatem