Loading...
HomeMy WebLinkAboutR-405401U) z Q C� 2 LU Q U7 rr Q W U g Q N 0 ro rn 0 0 63 IQLQ� PROJEC T CON TA C IS.- OWNER/APPLICANT ............................ HARBOUR HOMES, LLC ..........................................................400 N 34TH STREET, SUITE 300 .......................................................... SEATTLE, WASHINGTON 9810J .......................................................... (206) 315-8130 ......................................................... CONTACT JAM/E WALTIER .......................................................... JWAL TIER@HARBOURHOMES. COM CIVIL ENGINEER/SURVEYOR............... D.R. STRONG CONSULTING ENGINEERS, INC. .......................................................... 620 - 7th AVENUE .... ....... ....... ....... ....... I ...... I ...... I........... KIRKLAND, WASHINGTON 98033 .......................................................... (425) 827-3063 .......................................................... CONTACT YOSHIO L. PIEDISCALZI, P.E. ............. YOSHIO.P/EDISCALZ/ODRSTRONGCOM .......................................................... CONTACT JAMES G. REICHHOFF, P.L.S. .......................................................... JAMES. REICHHOFF@DRSTRONG. COM GEOTECHNICAL ENGINEER .................. EARTH SOLUTIONS NW, LLC ..........................................................1805 - 136 TH PL NE, SUITE 201 ..........................................................BELLEVUE, WA 98005 ..................................................... (425) 449-4704 ...... ....... ....... ....... ....... ....... I........... CONTACT KYLE CAMPBELL, P.E. TRAFFIC ENGINEER ............................. TRAFFEX ..........................................................11410 NE 124TH ST., #590 .... ....... ....... ....... ....... I ...... I.................. KIRKLAND, WA 980J4 .......................................................... (425) 522-4118 .......................................................... CONTACT LARRY D. HOBBS, PE .......................................................... LARRY@NWTRAFFEX.COM LANDSCAPE ARCHITECT ..................... VARLEY VARLEY VARLEY ..........................................................1274J NE 170TH LANE .......................................................... WOODINVILLE, WA 98072 .......................................................... (425) 466-0515 .......................................................... CONTACT JEFF VARLEY .......................................................... VARLEY-JEFFCsHOTMAIL.COM SHEET INDEX C1 1 OF 28 COVER SHEET C2 2 OF 28 TOPOGRAPHY MAP C3 3 OF 28 HORIZONTAL AND VERTICAL CONTROL PLAN C4 4 OF 28 TREE RETENTION PLAN C5 5 OF 28 ON SITE TREE RETENTION TABLE C6 6 OF 28 CLEARING AND TESC PLAN C7 7 OF 28 TESC NOTES AND DETAILS C8 8 OF 28 TESC NOTES AND DETAILS C9 9 OF 28 ROAD AND GRADING PLAN C10 10 OF 28 ADA RAMP DETAILS C11 11 OF 28 STANDARD WSDOT RAMP AND STREET SIGN DETAILS C12 12 OF 28 ROAD AND MAILBOX DETAILS C13 13 OF 28 ROAD CROSS SECTIONS C14 14 OF 28 STORM DRAINAGE PLAN C15 15 OF 28 SE 141ST PLACE STORM DRAINAGE PLAN AND PROFILE C16 16 OF 28 160TH AVE SE STORM DRAINAGE PLAN AND PROFILE C17 17 OF 28 BYPASS EASEMENT STORM DRAINAGE PLAN AND PROFILE C18 18 OF 28 162ND AVE SE STORM DRAINAGE PLAN AND PROFILE C19 19 OF 28 VAULT DETAILS C20 20 OF 28 STORM DRAINAGE DETAILS C21 21 OF 28 STORM DRAINAGE DETAILS C22 22 OF 28 STORMFIL TER DETAIL C23 23 OF 28 SEWER EXTENSION PLAN C24 24 OF 28 SEWER PLAN AND PROFILE C25 25 OF 28 SEWER PLAN AND PROFILE C26 26 OF 28 SANITARY SEWER DETAILS C27 27 OF 28 CHANNELIZATION AND SINGAGE PLAN C28 28 OF 28 COMPOSITE UTILITY PLAN L-I 1 OF 3 LANDSCAPE PLAN L-2 2 OF 3 LANDSCAPE PLAN L-3 3 OF 3 LANDSCAPE PLAN IL 1 OF 3 ILLUMINATION PLAN IL2 2 OF 3 ILLUMINATION DETAILS IL3 3 OF 3 ILLUMINATION DETAILS 1 1 OF 4 EXISTING CONDITIONS 2 2 OF 4 PROPOSED PROJECT 3 3 OF 4 BUFFER ENHANCEMENT PLANTING PLAN 4 4 OF 4 PRELIMINARY BUFFER ENHANCEMENT PLANTING PLAN SI 1 OF 3 STRUCTURAL NOTES AND TYP. DETAILS S2 2 OF 3 VAULT LID AND FOUNDATION PLANS AND DETAILS S3 3 OF 3 WALL SECTIONS AND DETAILS S81 1 OF 1 BRIDGE PLAN, STRUCTURAL NOTES AND TYP. DETAILS r � Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) PIE of WAS1, C 53232 _ �SSI0NA1, b�p•lg 4 TA NORTH GRAPHIC SCALE 0 50 100 200 1 INCH = 100 FT. PROJECT DESCRIPTION: ADDRESS OF THE PROPERTY..... 14120 160TH AVE. SE, RENTON, WA PARCEL NUMBER.........................145750-0110 EXISTING ZONING: ....................... R-4 PROPOSED DWELLING UNITS:......13 ACREAGE:....................................4.49 ACRES (195,531 S.F.) GROSS PERMITTED DENSITY .................... 4.00 DU/ACRE PROPOSED DENSITY .................... 3.66 DU/ACRE R. 0. W. AREA: .............................. 0.73 ACRES (31,907 S.F) WORK WITHIN EXISTING R.O. W.:... 0.23 ACRES (9,892 S.F.) CRITICAL AREA: ............................ 0.04 ACRES (1,730 S.F.) PROPOSED USE .......................... SINGLE FAMILY DETACHED HOUSING SEWER DISTRICT .......................... CITY OF RENTON WATER DISTRICT. .......................... KING COUNTY WATER DISTRICT 90 SCHOOL D/STRICT........................ ISSAQUAH #411 FIRE DISTRICT ............................. CITY OF RENTON TELEPHONE SERVICE .................... CENTURY LINK POWER SOURCE .......................... PUGET SOUND ENERGY LIST OF TRACTS: TRACT 'A" STORM DRAINAGE................................0.122 ACRES (5,J08 SF) TRACT 'B" SENSITIVE AREA..................................0.465 ACRES (20,246 SF) TRACT "C" TREE RXTEN TION..................................0.080 ACRES (3,500 SF) GENERAL NO TES: 1. ALL EXISTING STRUCTURES TO REMAIN. 2. A 5-YEAR TIER // TEMPORARY USE PERMIT WILL BE APPLIED FOR THE EXISTING STRUCTURES OCCUPYING LOTS 8 AND 9. AREA TABLE.• TOTAL SITE AREA: ...................................... 4.489 ACRES (195,531 S.F.) GROSS DISTURBED SITE AREA: .............................. 4.12J ACRES (179,630 S.F.) NEW IMPERVIOUS SURFACE AREA..............1.93 ACRES (83,941 S.F.) REPLACED IMPERVIOUS SURFACE AREA:..0.08 ACRES (3,427 S.F.) BUILDING COVERAGE ALLOWED BY ZONING ................................. 35Z IMPERVIOUS AREA ALLOWED BY ZONING..................................509 ERC M1 TIGA TION MEASURES: CEDARS AT THE HIGHLANDS MITIGATION MEASURES PROJECT CONSTRUCTION SHALL COMPLY WITH THE RECOMMENDATIONS FOUND IN THE SUBMITTED GEOTECHNICAL REPORT PREPARED BY EARTHWORKS NW, DATE FEBRUARY 23, 2017 DOE CONSTRUCTION STORMWA TER PERMIT: GENERAL PERMIT NUMBER: XXXXXXXXX CER TIFIED EROSION & SEDIMENT CONTROL LEAD: EARTH SOLUTIONS NW, LLC (425) 449-4704 D.R. STRONG CONSUL TING ENGINEERS ENGINEERS PLANNERS SURVEYORS 620 - 7th AVENUE KIRKLAND, WA 98033 O 425 827 3063 F 425 827 2423 SE 1/4 SECTION 14, TOWNSHIP 23 N, RANGE 5 E, W.M. CFED�L,6�� A �' F�,I,� H,[GHLANDS LEGAL DESCRIPTION: LOT 6, BLOCK 3, CEDAR PARK FIVE ACRE TRACTS, ACCORDING TO PLAT THEREOF RECORDED IN VOLUME 15 OF PLATS, PAGE 91, RECORDS OF KING COUNTY, WASHINGTON. SURVEYOR'S NO TES 1. ALL TITLE INFORMATION SHOWN ON THIS MAP HAS BEEN EXTRACTED FROM FIRST AMERICAN TITLE INSURANCE COMPANY COMMITMENT FOR TITLE INSURANCE ORDER NUMBER NCS- 781158- WA 1 DATED JANUARY 4, 2014. IN PREPARING THIS MAP, D.R. STRONG CONSULTING ENGINEERS INC. HAS CONDUCTED NO INDEPENDENT TITLE SEARCH NOR IS D.R. STRONG CONSULTING ENGINEERS INC. AWARE OF ANY TITLE ISSUES AFFECTING THE SURVEYED PROPERTY OTHER THAN THOSE SHOWN ON THE MAP AND DISCLOSED BY REFERENCED FIRST AMERICAN TITLE INSURANCE COMPANY COMMITMENT. D.R. STRONG CONSULTING ENGINEERS INC. HAS RELIED WHOLLY ON FIRST AMERICAN TITLE COMPANY REPRESENTATIONS OF THE TITLES CONDITION TO PREPARE THIS SURVEY AND THEREFORE D.R. STRONG CONSULTING ENGINEERS INC. QUALIFIES THE MAPS ACCURACY AND COMPLETENESS TO THAT EXTENT. 2. THIS SURVEY REPRESENTS VISIBLE PHYSICAL IMPROVEMENT CONDITIONS EXISTING ON JANUARY 27, 2017. ALL SURVEY CONTROL INDICATED AS "FOUND" WAS RECOVERED FOR THIS PROJECT IN JANUARY, 2017. J. PROPERTY AREA = 195,531i SQUARE FEET (4.4888i ACRES). 4. ALL DISTANCES ARE IN FEET. 5. THIS IS A COMBINED FIELD TRAVERSE AND GLOBAL POSITIONING SYSTEM SURVEY. A LEICA FIVE SECOND COMBINED ELECTRONIC TOTAL STATION AND A LEICA SERIES 1200 GLOBAL POSITIONING SYSTEM WERE USED TO MEASURE THE ANGULAR AND DISTANCE RELATIONSHIPS BETWEEN THE CONTROLLING MOCUMENTATION AS SHOWN. CLOSURE RATIOS OF THE TRAVERSE MET OR EXCEEDED THOSE SPECIFIED IN WAC 332-130-090. ALL MEASURING INSTRUMENTS AND EQUIPMENT ARE MAINTAINED IN ADJUSTMENT ACCORDING TO MANUFACTURER'S SPECIFICATIONS. 6. UTILITIES OTHER THAN THOSE SHOWN MAY EXIST ON THIS SITE. ONLY THOSE UTILITIES WITH EVIDENCE OF THEIR INSTALLATION VISIBLE AT GROUND SURFACE ARE SHOWN HEREON. UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE ONLY. UNDERGROUND CONNECTIONS ARE SHOWN AS STRAIGHT LINES BETWEEN SURFACE UTILITY LOCATIONS BUT MAY CONTAIN BENDS OR CURVES NOT SHOWN. SOME UNDERGROUND LOCATIONS SHOWN HEREON MAY HAVE BEEN TAKEN FROM PUBLIC RECORDS. D.R. STRONG CONSULTING ENGINEERS INC. ASSUMES NO LIABILITY FOR THE ACCURACY OF PUBLIC RECORDS. TITLE RESTRICTIONS. 1. THIS SITE IS SUBJECT TO POTENTIAL CHARGES, FOR THE KING COUNTY SEWAGE TREATMENT CAPACITY CHARGE, AS AUTHOR/ZED UNDER RCW 35.58 AND KING COUNTY CODE 28.84.050. SAID CHARGES COULD APPLY FOR ANY PROPERTY THAT CONNECTED TO THE KING COUNTY SEWER SERVICE AREA ON OR AFTER FEBRUARY 1, 1990. 2. THIS SITE IS SUBJECT TO THE RESTRICTIONS, CONDITIONS, DEDICATIONS, NOTES, EASEMENTS AND PROVISIONS, IF ANY, AS CONTAINED AND/OR DELINEATED ON THE FACE OF THE PLAT OF CEDAR PARK FIVE ACRE TRACTS RECORDED IN VOLUME 15 OF PLATS, PAGE 91, IN KING COUNTY, WASHINGTON. J. THIS SITE IS SUBJECT TO THE TERMS AND PROVISIONS CONTAINED IN THE DOCUMENT ENTITLED "ORDINANCE NO. 5465" AS DISCLOSED BY INSTRUMENT RECORDED UNDER RECORDING NUMBER 20091105000541. 4. THIS SITE IS SUBJECT TO UNRECORDED LEASEHOLDS, IF ANY, RIGHTS OF VENDORS AND SECURITY AGREEMENT ON PERSONAL PROPERTY AND RIGHTS OF TENANTS, AND SECURED PARTIES TO REMOVE TRADE FIXTURES AT THE EXPIRATION OF THE TERM. REFERENCES.- 1. THE PLAT OF LIBERTY GARDENS REC. NO. 20150326000915. 2. THE PLAT OF LIBERTY GROVE CONTIGUOUS REC. NO. 20070206000523. VERTICAL DA TUM: NAVD 88 PER CITY OF RENTON VERTICAL CONTROL BENCHMARK.. 1. CITY OF RENTON CONTROL POINT NO. 2127 FOUND PUNCHED 1-112" BRASS DISK IN CONCRETE MONUMENT DOWN 0.8 /N MONUMENT CASE AT THE INTERSECTION OF THE CENTERLINE OF 148TH PLACE SE AND SE. 142ND STREET, ELEVATION = 363.697 FEET. 2. CITY OF RENTON CONTROL POINT NO. 1852: FOUND PUNCHED 3" BRASS SURFACE DISK AT THE INTERSECTION OF THE CENTERLINE OF NE. 4TH STREET AND 148TH AVENUE SE., ELEVATION = 454.769 FEET. BASIS OF BEARINGS: N0125'00"W BETWEEN CITY OF RENTON HORIZONTAL CONTROL POINTS 2127 AND 1852. 1 CITY COMMENTS 02.19.19 1 CITY COMMENTS 05.03.19 NO. I REVISION DRD 104.11.19 CYW 106.20.19 BY I DATE CONDITIONS OF APPROVAL CEDARS AT THE HIGHLANDS HEARING EXAMINERS DECISION THE PROPOSED PRELIMINARY PLAT, STREET MODIFICATION TIER 2 TEMPORARY USE PERMIT COMPLY WITH ALL THE DEVELOPMENT STANDARDS QUOTED ABOVE AND ARE THEREFORE APPROVED SUBJECT TO THE FOLLOWING CONDITIONS OF APPROVAL: I. THE APPLICANT SHALL COMPLY WITH THE MITIGATION MEASURE ISSUED AS PART OF THE DETERMINATION OF NON -SIGNIFICANCE MITIGATED, DATED AUGUST 24TH, 2018. 2.A FINAL DETAILED A FINAL DETAILED LANDSCAPE PLAN SHALL BE SUBMITTED COMPLIANT WITH RMC 4-8- 120 AND RMC 4-4-070 AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO ISSUANCE OF THE CONSTRUCTION PERMITS. 3.THE APPLICANT SHALL SUBMIT AN UPDATED TREE RETENTION AND REPLANTING PLAN THAT DEMONSTRATES COMPLIANCE WITH RMC 4-4-130 FOR REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO ISSUANCE OF THE CONSTRUCTION PERMITS. 4.THE APPLICANT SHALL CREATE A HOME OWNERS ASSOCIATION ('HOA) THAT MAINTAINS ALL IMPROVEMENTS AND LANDSCAPING IN THE STORM TRACT AND ANY AND ALL OTHER COMMON IMPROVEMENTS. A DRAFT OF THE HOA DOCUMENTS SHALL BE SUBMITTED TO, AND APPROVED BY, THE CURRENT PLANNING PROJECT MANAGER AND THE CITY ATTORNEY PRIOR TO FINAL PLAT RECORDING. SUCH DOCUMENTS SHALL BE RECORDED CONCURRENTLY WITH THE FINAL PLA T. 5.PROPOSED LOTS 12 AND 13 SHALL UTILIZE A JOINT -USE DRIVEWAY FOR VEHICULAR ACCESS. AN UPDATED PLAN SHALL BE PROVIDED AT THE TIME OF CONSTRUCTION PERMIT APPLICATION FOR REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER, A NOTE TO THIS EFFECT SHALL BE RECORDED ON THE FACE OF THE PLAT. 6. A PHOTOMETRIC STUDY AND STREET LIGHTING PLAN SHALL BE SUBMITTED AT THE TIME OF CONSTRUCTION PERMIT FOR REVIEW AND APPROVAL BY THE CITYS PLAN REVIEWER PRIOR TO ISSUANCE OF A CONSTRUCTION PERMIT. 7. A COVENANT SHALL BE REQUIRED AS A PART OF THE FINAL PLAT PURSUANT TO RMC 4-2-110D, NOTE 14. &THE APPLICANT SHALL PROVIDE A COMBINATION OF THE FOLLOWING IN ORDER TO ENSURE A SAFE ROUTE TO ALL THREE SCHOOLS: A PHYSICAL STRUCTURE TO ALLOW PASSAGE TO AND FROM LIBERTY HIGH SCHOOL, A PLAN SHOWING EXISTING AND PROPOSED IMPROVEMENTS TO CREATE A SAFE ROUTE FROM THE PROJECT SITE TO THE BUS STOP, OR DOCUMENTATION FROM THE ISSAQUAH SCHOOL DISTRICT THAT AN ADDITIONAL STOP WILL BE ADDED CLOSE TO THE PROJECT SITE. THE PROPOSAL FOR A SAFE ROUTE TO SCHOOL WOULD BE SUBJECT TO REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER DURING CONSTRUCTION PERMIT APPLICATION REVIEW. 9.THE BUILDER/APPLICANT (HARBOUR HOMES) SHALL RESTORE THE IMPACTED CRITICAL AREAS BUFFER IN TRACT B PER THE WETLANDS BUFFER MITIGATION PLAN REVIEWED AND APPROVED BY OTAK AFTER EXPIRATION OF THE TUP. THE DOCUMENT SHALL BE RECORDED CONCURRENTLY WITH THE FINAL PLAT AND THE CONDITION SHOULD BE RECORDED ON THE FACE OF THE FINAL PLAT AND AS A COVENANT ON LOT 8. THE APPLICANT SHALL SUBMIT A SEPARATE SURETY DEVICE FOR THE FINAL MITIGATION PHASE TO ENSURE FULL RESTORATION OF THE BUFFER AFTER THE BARN/CARPORT ON LOT 8 AND TRACT B IS DEMOLISHED. 10. NO COMMERCIAL OR INDUSTRIAL -STYLE LIGHTING SHALL BE UTILIZED ON THE LOTS 8 OR 9. IF ANY COMMERCIAL OR INDUSTRIAL -STYLE LIGHTING IS CURRENTLY INSTALLED ON EITHER OF THE TWO BUILDINGS, THE LIGHTING SHALL BE REMOVED PRIOR THE ISSUANCE OF THE FIRST RESIDENTIAL BUILDING PERMIT. 11. ANY PROPOSAL TO CONVERT THE STORMWATER VAULT WITHIN TRACT A TO A STORMWATER DETENTION POND SHALL BE CONSIDERED A MAJOR PLAT AMENDMENT SUBJECT TO THE REQUIREMENTS OUTLINED UNDER RMC 4-7- 080M.2. 12. THE PROPOSED STORMWATER VAULT WITHIN TRACT A SHALL BE LOCATED ENTIRELY BELOW GROUND. ENGINEERED CONSTRUCTION PLANS SHOWING THE VAULT ENTIRELY BELOW GROUND SHALL BE SUBMITTED AT THE TIME OF CONSTRUCTION PERMIT REVIEW FOR REVIEW AND APPROVAL. 13. THE VAULT SHALL BE DESIGNED IN A MANNER THAT FULLY RETAINS THE SIDEWALK, PLANTER STRIP, AND VERTICAL CURBING PROPOSED IN THE ROW AND DOES NOT IMPACT ANY REQUIRED ROW IMPROVEMENTS. 14. THE APPLICANT SHALL INCORPORATE A PEDESTRIAN CONNECTION WITHIN TRACT A (VAULT) FOR REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER AT THE TIME OF CONSTRUCTION PERMIT APPLICATION REVIEW 15. THE APPLICANT SHALL SUBMIT AN UPDATED PLAN THAT UTILIZES A PEDESTRIAN -FOCUSED DESIGN FOR THE VAULT ROADWAY ACCESS AT THE TIME OF CONSTRUCTION PERMIT APPLICATION SUBMITTAL. THE NEW DESIGN WOULD BE SUBJECT TO REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER AND PUBLICS WORK STAFF. 16. THE APPLICANT SHALL RECORD AN EASEMENT ENCOMPASSING THE PORTION OF THE BARN/CARPORT STRUCTURE IN THE CRITICAL AREAS BUFFER (TRACT B) THAT WOULD AUTOMATICALLY BE EXTINGUISHED AFTER EXPIRATION OF THE TEMPORARY USE PERMIT. THE DOCUMENT SHALL BE RECORDED CONCURRENTLY WITH THE FINAL PLAT. 17. THE INITIAL AND FINAL MITIGATION PLAN FOR THE REDUCED WETLANDS BUFFER SHALL BE SUBJECT TO REVIEW AND APPROVAL BY THE CITY'S SECONDARY WETLANDS REVIEWER, OTAK. THE REVIEW SHALL OCCUR AT THE APPLICANT'S EXPENSE. 18. ALL ROAD NAMES SHALL BE APPROVED BY THE CITY. 19. SANITARY SEWERS SHALL BE PROVIDED BY THE DEVELOPER AT NO COST TO THE CITY AND DESIGNED IN ACCORDANCE WITH CITY STANDARDS. SIDE SEWER LINES SHALL BE INSTALLED EIGHT FEET (8) INTO EACH LOT IF SANITARY SEWER MAINS ARE AVAILABLE, OR PROVIDED WITH THE SUBDIVISION DEVELOPMENT. 20. CONCRETE PERMANENT CONTROL MONUMENTS SHALL BE ESTABLISHED AT EACH AND EVERY CONTROLLING CORNER OF THE SUBDIVISION. INTERIOR MONUMENTS SHALL BE LOCATED AS DETERMINED BY THE DEPARTMENT. ALL SURVEYS SHALL BE PER THE CITY OF RENTON SURVEYING STANDARDS. ALL OTHER LOT CORNERS SHALL BE MARKED PER THE CITY SURVEYING STANDARDS. THE SUBDIVIDER SHALL INSTALL ALL STREET NAME SIGNS NECESSARY IN THE SUBDIVISION. 21. ALL UTILITIES DESIGNED TO SERVE THE SUBDIVISION SHALL BE PLACED UNDERGROUND. ANY UTILITIES INSTALLED IN THE PARKING STRIP SHALL BE PLACED IN SUCH A MANNER AND DEPTH TO PERMIT THE PLANTING OF TREES. THOSE UTILITIES TO BE LOCATED BENEATH PAVED SURFACES SHALL BE INSTALLED, INCLUDING ALL SERVICE CONNECTIONS, AS APPROVED BY THE PUBLIC WORKS DEPARTMENT. SUCH INSTALLATION SHALL BE COMPLETED AND APPROVED PRIOR TO THE APPLICATION OF ANY SURFACE MATERIAL. EASEMENTS MAY BE REQUIRED FOR THE MAINTENANCE AND OPERATION OF UTILITIES AS SPECIFIED BY THE PUBLIC WORKS DEPARTMENT. 22. ANY CABLE TV CONDUITS SHALL BE UNDERGROUNDED AT THE SAME TIME AS OTHER BASIC UTILITIES ARE INSTALLED TO SERVE EACH LOT. CONDUIT FOR SERVICE CONNECTIONS SHALL BE LAID TO EACH LOT LINE BY SUBDIVIDER AS TO OBVIATE THE NECESSITY FOR DISTURBING THE STREET AREA, INCLUDING SIDEWALKS, OR ALLEY IMPROVEMENTS WHEN SUCH SERVICE CONNECTIONS ARE EXTENDED TO SERVE ANY BUILDING. THE COST OF TRENCHING, CONDUIT, PEDESTALS AND/OR VAULTS AND LATERALS AS WELL AS EASEMENTS THEREFORE REQUIRED TO BRING SERVICE TO THE DEVELOPMENT SHALL BE BORNE BY THE DEVELOPER AND/OR LAND OWNER. THE SUBDIVIDER SHALL BE RESPONSIBLE ONLY FOR CONDUIT TO SERVE HIS DEVELOPMENT. CONDUIT ENDS SHALL BE ELBOWED TO FINAL GROUND ELEVATION AND CAPPED. THE CABLE TV COMPANY SHALL PROVIDE MAPS AND SPECIFICATIONS TO THE SUBDIVIDER AND SHALL INSPECT THE CONDUIT AND CERTIFY TO THE CITY THAT IT IS PROPERLY INSTALLED. 23. ALL LOT CORNERS AT INTERSECTIONS OF DEDICATED PUBLIC RIGHTS -OF -WAY, EXCEPT ALLEYS, SHALL HAVE MINIMUM RADIUS OF FIFTEEN FEET (15). YLP SURVEYED: JGR YLP DESIGNED: DRAWN: YLP GLB CHECKED: AP P R APPROVED,.L•P' 1�11'1�J SCALE: AS NOTED ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATUM �AOV%kC TY OF RENTON Planning/Building/Public Works Dept. SE 134TH ST SE 2N SE 136TH ST PROJECT SITE L � Q Q SE 144TH ST 7_11 Q� vi `'' SE 149TH ST h� VICINITY MAP: 1 "=1, 500' GEO TECH RECOMMENDA TIONS.• THE FOLLOWING PERTAINS TO THE GENERAL SITE ONLY. EARTH SOLUTIONS NW LLC STATES THAT BASED ON THE RESULTS OF THE STUDY PERFORMED, THE PROPOSED RESIDENTIAL BUILDINGS CAN BE SUPPORTED ON CONVENTIONAL CONTINUOUS AND SPREAD FOOTING FOUNDATIONS BEARING ON COMPETENT NATIVE SOILS, RE -COMPACTED NATIVE SOILS, OR NEW STRUCTURAL FILL. SLAB -ON -GRADE FLOORS SHOULD BE SUPPORTED ON DENSE NATIVE SOILS OR STRUCTURAL FILL. COMPETENT SOILS SUITABLE FOR SUPPORT OF FOUNDATIONS SHOULD BE ENCOUNTERED AT DEPTHS OF ONE TO THREE FEET BELOW EXISTING GRADES EXCEPT WHERE DEEPER EXISTING FILL IS LOCATED. WHERE LOOSE OR UNSUITABLE SOIL CONDITIONS ARE EXPOSED AT FOUNDATION SUBGRADE ELEVATIONS, LIKE MAY EXIST THROUGHOUT THE WESTERN PORTION OF THE SITE, COMPACTION OF THE SOILS TO THE SPECIFICATIONS OF STRUCTURAL FILL, OR OVEREXCAVATION AND REPLACEMENT WITH A SUITABLE STRUCTURAL FILL WILL BE NECESSARY IN -SITU SOILS THE SOILS ENCOUNTERED THROUGHOUT THE MAJORITY OF THE TEST SITES HAVE A MODERATE TO HIGH SENSITIVITY TO MOISTURE AND WERE GENERALLY IN A MOIST CONDITION AT THE TIME OF EXPLORATION (JUNE 2016). IN THIS RESPECT, THE IN -SITU SOILS MAY NOT BE SUITABLE FOR USE AS STRUCTURAL FILL IF THE SOIL MOISTURE CONTENT IS MORE THAN 3 PERCENT ABOVE THE OPTIMUM LEVEL AT THE TIME OF CONSTRUCTION. IN GENERAL, SOILS ENCOUNTERED DURING THE SITE EXCAVATIONS THAT ARE EXCESSIVELY OVER THE OPTIMUM MOISTURE CONTENT WILL REQUIRE MOISTURE CONDITIONING PRIOR TO PLACEMENT AND COMPACTION. CONVERSELY, SOILS THAT ARE BELOW THE OPT/MUM MOISTURE CONTENT WILL REQUIRE MOISTURE CONDITIONING THROUGH THE ADDITION OF WATER PRIOR TO USE AS STRUCTURAL FILL. IF THE IN -SITU SOILS ARE DETERMINED TO NOT BE SUITABLE FOR USE AS STRUCTURAL FILL, THEN USE OF A SUITABLE IMPORTED SOIL MAY BE NECESSARY. STRUCTURAL FILL STRUCTURAL FILL IS DEFINED AS COMPACTED SOIL PLACED IN FOUNDATION, SLAB -ON -GRADE, AND ROADWAY AREAS. FILLS PLACED TO CONSTRUCT PERMANENT SLOPES AND THROUGHOUT RETAINING WALL AND UTILITY TRENCH BACKFILL AREAS ARE ALSO CONSIDERED STRUCTURAL FILL. SOILS PLACED IN STRUCTURAL AREAS SHOULD BE PLACED IN LOOSE LIFTS OF 12 INCHES OR LESS AND COMPACTED TO A RELATIVE COMPACTION OF 95 PERCENT, BASED ON THE LABORATORY MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR METHOD (ASTM D-1557). SOIL PLACED IN UTILITY TRENCHES, PAVEMENT AREAS, AND IN SLAB -ON -GRADE AREAS SHOULD BE COMPACTED TO A RELATIVE COMPACTION OF AT LEAST 95 PERCENT. ADDITIONALLY, MORE STRINGENT COMPACTION SPECIFICATIONS MAY BE REQUIRED FOR UTILITY TRENCH BACKFILL ZONES, DEPENDING ON THE RESPONSIBLE UTILITY DISTRICT OR JURISDICTION. DRAINAGE PERCHED SEEPAGE SHOULD BE ANTICIPATED IN SITE EXCAVATIONS ON THE SITE, PARTICULARLY DURING WINTER, SPRING, AND EARLY SUMMER MONTHS. HEAVY SEEPAGE SHOULD BE EXPECTED WHERE EXISTING FILL IS LOCATED. TEMPORARY MEASURES TO CONTROL SURFACE WATER RUNOFF AND GROUNDWATER DURING CONSTRUCTION WOULD LIKELY INVOLVE INTERCEPTOR TRENCHES AND SUMPS. EARTH SOLUTIONS NORTHWEST SHOULD BE CONSULTED DURING PRELIMINARY GRADING TO IDENTIFY AREAS OF SEEPAGE AND TO PROVIDE RECOMMENDATIONS TO REDUCE THE POTENTIAL FOR INSTABILITY RELATED TO SEEPAGE EFFECTS. IN OUR OPINION, FOUNDATION DRAINS SHOULD BE INSTALLED ALONG BUILDING PER/METER FOOTINGS. A TYPICAL FOUNDATION DRAIN DETAIL IS PROVIDED AS PLATE 4. NOTE FOR CER TIFI CA TION r•»���:�� ��.�i�•�:l,�rfrrl.AA THE TOPOGRAPHY AND BOUNDARY SHOWN HEREON IS BASED UPON A FIELD SURVEY BY D.R. STRONG CONSULTING ENGINEERS. REGIONAL FIRE AUTHORITY` APPROVED m OF te1 cthomas 07/08/2019 •``1"`le- R-405401 IN COMPLIANCE WITH CITY OF RENTON STANDARDS Fbbannwalrth ENT ENGINEERING % � EAnn EWATER UTILITY 07/01 /2019 owler 07/05/2019 ' CURRENT PLANNING SURFACE WATER UTILITY amorganroth 06/28/2019 jfarah 07/05/2019 DATE: CEDARS AT THE HIGHLANDS FIELD01.29.19 COVER SHEET PAGE: 14120160TH AVENUE SE RENTON, WASHINGTON 98059 C1 SHEET: OF: 28 DRS PROJECT NO. 16041 T T 0 C) 0) �1 U 00 T C) C) C) T i Q D J C) C) C) i T U) 0 z Q 2 W Q U7 W U