HomeMy WebLinkAboutContract AIIIIIIIIIIIIII11k
� Washington State
vI/ Department of Transportation Local Agency A Bement Supplement
Agency Supplement Number
City of Renton
Federal Aid Project Number Agreement Number CFDA Number
STPUL-1173 (001) LA 3357 20.205
The Local Agency desires to supplement the agreement entered into and executed on August 8, 1996
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Project Description
Name Burnett Transitway Length 0.85 km/0.53 mi
Termini South 4th Street to South 2nd Street(SR-900)
Description of Work ® No Change
Reason for Supplement
To obtain construction funding and to adjust PE costs for increases in project design complexity.
Estimate of Funding
TypeT f Work (1) (2) (3) (4) (5)
o Previous Supplement Estimated Total Estimated Agency Estimated
Agreement/Suppl. Project Funds Funds Federal Funds
PE a.Agency 28,000.00 2,000.00 30,000.00 6,000.00 24,000.00
80 0/0 b.Other 79,000.00 73,300.00 152,300.00 30,460.00 121,840.00
Federal Aid c.State 1,000.00 0.00 1,000.00 200.00 800.00
Participation
Ratio for PE d.Total PE Cost Estimate(a+b+c) 108,000.00 75,300.00 183,300.00 36,660.00 146,640.00
Right of Way e.Agency
f.Other
Federal Aid State
Participation
Ratio for RW h.Total R/W Cost Estimate a+f+
Construction i.Contract 1,223,230.00 1,223,230.00 469,230.00 754,000.00
j.Other Metro/Consultant 58,000.00 58,000.00 58,000.00
k.Other
61.6 % I.Agency 135,216.00 135,216.00 135,216.00
Federal Aid m.State 1,500.00 1,500.00 1,500.00
Participation
Ratio for CN n.Total CN Cost Estimate(i+i+k+i+m) 1,417,946.00 1,417,946.00 663,946.00 754,000.00
o.Total Project Cost Estimate(d+h+n) 108,000.00 1,493,246.00 1,601,246.00 700,606.00 900,640.00
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency O ial Washington State Department of Transportation
By BY
Title Mayor ^ Assistant Secretary for Highways and Local Programs
ATTEST ' V ' Date Executed
Brenda Fritsvold, Deputy City Clerk
DOT Form 140-041 EF
Revised 11/99
Adft� Washington State (d�I/ Department of Transportation Local Agency A eement Supplement
Agency Supplement Number
City of Renton
Federal Aid Project Number Agreement Number CFDA Number
STPUL-1173 (00 1) LA 3357 20.205
The Local Agency desires to supplement the agreement entered into and executed on August 8, 1996
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Project Description
Name Burnett Transitway Length 0.85 km/0.53 mi
Termini South 4th Street to South 2nd Street(SR-900)
Description of Work ®No Change
Reason for Supplement
To obtain construction funding and to add$200,000 approved by the PSRC in 1999 and$1.1 million approved in 2000,for a
total increase of$1.3 million in Federal funding.
Estimate of Funding
Type of Work (1) (2) (3) (4) (5)
yp Previous Supplement Estimated Total Estimated Agency Estimated
Agreement/Suppl. Project Funds Funds Federal Funds
PE a.Agency 28,000.00 2,000.00 30,000.00 6,000.00 24,000.00
80 0/0 b.Other 79,000.00 73,300.00 152,300.00 30,460.00 121,840.00
Federal Aid
Participation c.State 1,000.00 0.00 1,000.00 200.00 800.00
Ratio for PE d.Total PE Cost Estimate a+b+c 108,000.00 75,300.00 183,300.00 36,660.00 146,640.00
Right of Way e.Agency
% f.Other
Federal Aid g.State
Participation
Ratio for RW h.Total R/W Cost Estimate a+f+ )
Construction i.Contract 2,059,600.00 2,059,600.00 356,772.00 1,702,828.00
j.Other Metro/Consultant 58,000.00 58,000.00 10,047.00 47,953.00
k.Other
823 0/0 I.Agency 50,000.00 50,000.00 8,661.00 41,339.00
Federal Aid m.State 1,500.00 1,500.00 1,240.00
Participation
Ratio for CN n.Total CN Cost Estimate(i+j+k+i+m) 2,169,100.00 2,169,100.00 375,740.00 1,793,360.00
o.Total Project Cost Estimate(d+h+n) 108,000.00 2,244,400.00 2,352,400.00 , 0 1,940,000.00
The Local Agency further stipulates that pursuant to said Title 23,regulations and policies and procedures, and as a con i�n�(
to payment of the Federal funds obligated,it accepts and will comply with the applicable provisions.
Agency Off ' Washington State Department of Transportation
By
415 4A it A
By
Title J sse Tanner, Mayor Assistant Secretary for Highways and Local Programs
Date Executed
DOT Form 140-041 EF
Revised 11/99
VrWashington State al Agency Federal Aid
Department of Transpo tion Project Prospectus
Prefix Route
Federal Aid STPUI-1173 1142 2/18/2000
Project Number Date
Local Agency LA 3357 WSDOT Fa ederal Employer
Project Number Use Only) x ID Number 91-6001271
Agency Federal Program Title
City of Renton ❑ 20.204 ® 20.205 ❑ 20.206 ❑ 20.209 ❑ Other
Project Title
Burnett Transitway
Project Termini From To
South 4th Street South 2nd Street (SR-900)
From: To: Length of Project Award Type
0.85 km (0.53 mt) ® Local ❑ Local Forces ❑ State ❑ Railroad
Federal Agency City Number County Number County Name WSDOT Region
® FHWA ❑ Others 1070 17 King I 1
Congressional District Legislative Districts Urban Area Number TMA/MPO/RTPO
9th 11th 1 PSRC
Total Local Agency Phase Start
Phase Estimated Cost Funding Federal Funds Date
(Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar) Month • Year
P.E. $183,300 $32,134 $151,166 03/00
R/W $0 $0 $0
Const. $2,169,100 $380,266 $1,788,834
Total $2,352,400 $412,400 $1,940,000
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
Varies, 40 feet to 114 feet 1 2 lanes
The existing facility consists of a two-lane collector with curb, gutter and sidewalk, with a designated
parking area located on abandoned railroad right-of-way between travel lanes for approximately half of its
length. Temporary improvements have been undertaken in this corridor to provide bus access to an
interim transit hub, located on this corridor.
Description of Proposed Work
Roadway Width Number of Lanes
®New Construction ❑3-R ❑2-R 52 to 52 feet 2 to 3 lanes
This project will construct north-south corridor improvements on Burnett Avenue and/or other nearby
streets to enhance and facilititate bus, pedestrian and bicycle access to the final Intermodal Center.
Improvements include improved geometrics for bus movements, traffic signal enhancements, street
lighting and improved pedestrian and bicycle access.
Local Agency Contact Person Title Phone
Lee Haro Planning and Programming Manager (425)430-7217
Mailing Address City State Zip Code
1055 South Grady Way Renton WA 98055
B y (A
Design Approval Approving Authority
(CA Agencies Only) Title Transportation Design Supervisor Date 2/23/00
DOT Form 140-101 EF Page 1 of 3
Revised 6/99
9G��
.�
Amok Washington State
Department of Transport on 'co -ocal Agency 'Agreement Supplement
Agency Supplement Number
City of Renton
Federal Aid Project Number Agreement Number CFDA Number
,¢ -STPUL-1173 (00 1) LA 3357 20.205
The Local Agency desires to supplement the agreement entered into and executed on August 8, 1996
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Project Description
Name Burnett Transitway Length 0.85 km/0.53 mi
Termini South 4th Street to South 2nd Street(SR-900)
Description of Work ®No Change
Reason for Supplement
To obtain construction funding
Estimate of Funding
Type of Work (t) (2) (3) (4) (5)
Previous Supplement Estimated Total Estimated Agency Estimated
Agreement/Suppl. Project Funds Funds Federal Funds
PE a.Agency 28,000.00 6 2400 24
80 % b.other Consultant 79,000.00 73.399-06' 9 oao 15 "6 l5 goc 3 63r�o°I2
Federal Aid
Participation c.State 1,000.00 0.00 1,000.00 200.00 800.00 ,{
J
Ratio for PE d.Total PE Cost Estimate a+b+c 108,000.00 7ir-1 0:00 l� 13,300 i�0 2f lyoe 3 0 $b, 146
Right of Way e.Agency
% f.Other
Federal Aid g State
Participation
Ratio for RW h.Total R/W Cost Estimate(e+f+ )
Construction i.Contract 1,223,230.00 1,223,230.00 469,230.00 754,000.00
j.Other Metro/Consultant 58,000.00 58,000.00 58,000.00
k.Other
61.6 % 1.Agency 135,216.00 135,216.00 135,216.00
Federal Aid
Participation m.State 1,500.00 1,500.00 1,500.00
Ratio for CN n.Total CN Cost Estimate(i+i+k+i+m) 1,417,946.00 1,417,946.00 663,946.00 754,000.00
o.Total Project Cost Estimate(d+h+n) 108,000.00 1,49 1,,601r24M ,
1� i'T61 11S2s,g4(e 0551540 1340)g00
The Local Agency further stipulates that pursuant to said Title 23, regulatidns dnd policies and procedures, and as a condition (J
to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency O ial Washington State Department of Transportation
By By— c—L
Title Mayor Assistant Secretary for Highways and Local Programs
ATTEST: � "`� Date Executed !-�-
Brenda Fritsvold, Deputy City Clerk
DOT Form 140-041 EF
Revised 11/99