HomeMy WebLinkAboutContract AIIIIIIIIIIIIII11k � Washington State vI/ Department of Transportation Local Agency A Bement Supplement Agency Supplement Number City of Renton Federal Aid Project Number Agreement Number CFDA Number STPUL-1173 (001) LA 3357 20.205 The Local Agency desires to supplement the agreement entered into and executed on August 8, 1996 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name Burnett Transitway Length 0.85 km/0.53 mi Termini South 4th Street to South 2nd Street(SR-900) Description of Work ® No Change Reason for Supplement To obtain construction funding and to adjust PE costs for increases in project design complexity. Estimate of Funding TypeT f Work (1) (2) (3) (4) (5) o Previous Supplement Estimated Total Estimated Agency Estimated Agreement/Suppl. Project Funds Funds Federal Funds PE a.Agency 28,000.00 2,000.00 30,000.00 6,000.00 24,000.00 80 0/0 b.Other 79,000.00 73,300.00 152,300.00 30,460.00 121,840.00 Federal Aid c.State 1,000.00 0.00 1,000.00 200.00 800.00 Participation Ratio for PE d.Total PE Cost Estimate(a+b+c) 108,000.00 75,300.00 183,300.00 36,660.00 146,640.00 Right of Way e.Agency f.Other Federal Aid State Participation Ratio for RW h.Total R/W Cost Estimate a+f+ Construction i.Contract 1,223,230.00 1,223,230.00 469,230.00 754,000.00 j.Other Metro/Consultant 58,000.00 58,000.00 58,000.00 k.Other 61.6 % I.Agency 135,216.00 135,216.00 135,216.00 Federal Aid m.State 1,500.00 1,500.00 1,500.00 Participation Ratio for CN n.Total CN Cost Estimate(i+i+k+i+m) 1,417,946.00 1,417,946.00 663,946.00 754,000.00 o.Total Project Cost Estimate(d+h+n) 108,000.00 1,493,246.00 1,601,246.00 700,606.00 900,640.00 The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency O ial Washington State Department of Transportation By BY Title Mayor ^ Assistant Secretary for Highways and Local Programs ATTEST ' V ' Date Executed Brenda Fritsvold, Deputy City Clerk DOT Form 140-041 EF Revised 11/99 Adft� Washington State (d�I/ Department of Transportation Local Agency A eement Supplement Agency Supplement Number City of Renton Federal Aid Project Number Agreement Number CFDA Number STPUL-1173 (00 1) LA 3357 20.205 The Local Agency desires to supplement the agreement entered into and executed on August 8, 1996 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name Burnett Transitway Length 0.85 km/0.53 mi Termini South 4th Street to South 2nd Street(SR-900) Description of Work ®No Change Reason for Supplement To obtain construction funding and to add$200,000 approved by the PSRC in 1999 and$1.1 million approved in 2000,for a total increase of$1.3 million in Federal funding. Estimate of Funding Type of Work (1) (2) (3) (4) (5) yp Previous Supplement Estimated Total Estimated Agency Estimated Agreement/Suppl. Project Funds Funds Federal Funds PE a.Agency 28,000.00 2,000.00 30,000.00 6,000.00 24,000.00 80 0/0 b.Other 79,000.00 73,300.00 152,300.00 30,460.00 121,840.00 Federal Aid Participation c.State 1,000.00 0.00 1,000.00 200.00 800.00 Ratio for PE d.Total PE Cost Estimate a+b+c 108,000.00 75,300.00 183,300.00 36,660.00 146,640.00 Right of Way e.Agency % f.Other Federal Aid g.State Participation Ratio for RW h.Total R/W Cost Estimate a+f+ ) Construction i.Contract 2,059,600.00 2,059,600.00 356,772.00 1,702,828.00 j.Other Metro/Consultant 58,000.00 58,000.00 10,047.00 47,953.00 k.Other 823 0/0 I.Agency 50,000.00 50,000.00 8,661.00 41,339.00 Federal Aid m.State 1,500.00 1,500.00 1,240.00 Participation Ratio for CN n.Total CN Cost Estimate(i+j+k+i+m) 2,169,100.00 2,169,100.00 375,740.00 1,793,360.00 o.Total Project Cost Estimate(d+h+n) 108,000.00 2,244,400.00 2,352,400.00 , 0 1,940,000.00 The Local Agency further stipulates that pursuant to said Title 23,regulations and policies and procedures, and as a con i�n�( to payment of the Federal funds obligated,it accepts and will comply with the applicable provisions. Agency Off ' Washington State Department of Transportation By 415 4A it A By Title J sse Tanner, Mayor Assistant Secretary for Highways and Local Programs Date Executed DOT Form 140-041 EF Revised 11/99 VrWashington State al Agency Federal Aid Department of Transpo tion Project Prospectus Prefix Route Federal Aid STPUI-1173 1142 2/18/2000 Project Number Date Local Agency LA 3357 WSDOT Fa ederal Employer Project Number Use Only) x ID Number 91-6001271 Agency Federal Program Title City of Renton ❑ 20.204 ® 20.205 ❑ 20.206 ❑ 20.209 ❑ Other Project Title Burnett Transitway Project Termini From To South 4th Street South 2nd Street (SR-900) From: To: Length of Project Award Type 0.85 km (0.53 mt) ® Local ❑ Local Forces ❑ State ❑ Railroad Federal Agency City Number County Number County Name WSDOT Region ® FHWA ❑ Others 1070 17 King I 1 Congressional District Legislative Districts Urban Area Number TMA/MPO/RTPO 9th 11th 1 PSRC Total Local Agency Phase Start Phase Estimated Cost Funding Federal Funds Date (Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar) Month • Year P.E. $183,300 $32,134 $151,166 03/00 R/W $0 $0 $0 Const. $2,169,100 $380,266 $1,788,834 Total $2,352,400 $412,400 $1,940,000 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes Varies, 40 feet to 114 feet 1 2 lanes The existing facility consists of a two-lane collector with curb, gutter and sidewalk, with a designated parking area located on abandoned railroad right-of-way between travel lanes for approximately half of its length. Temporary improvements have been undertaken in this corridor to provide bus access to an interim transit hub, located on this corridor. Description of Proposed Work Roadway Width Number of Lanes ®New Construction ❑3-R ❑2-R 52 to 52 feet 2 to 3 lanes This project will construct north-south corridor improvements on Burnett Avenue and/or other nearby streets to enhance and facilititate bus, pedestrian and bicycle access to the final Intermodal Center. Improvements include improved geometrics for bus movements, traffic signal enhancements, street lighting and improved pedestrian and bicycle access. Local Agency Contact Person Title Phone Lee Haro Planning and Programming Manager (425)430-7217 Mailing Address City State Zip Code 1055 South Grady Way Renton WA 98055 B y (A Design Approval Approving Authority (CA Agencies Only) Title Transportation Design Supervisor Date 2/23/00 DOT Form 140-101 EF Page 1 of 3 Revised 6/99 9G�� .� Amok Washington State Department of Transport on 'co -ocal Agency 'Agreement Supplement Agency Supplement Number City of Renton Federal Aid Project Number Agreement Number CFDA Number ,¢ -STPUL-1173 (00 1) LA 3357 20.205 The Local Agency desires to supplement the agreement entered into and executed on August 8, 1996 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name Burnett Transitway Length 0.85 km/0.53 mi Termini South 4th Street to South 2nd Street(SR-900) Description of Work ®No Change Reason for Supplement To obtain construction funding Estimate of Funding Type of Work (t) (2) (3) (4) (5) Previous Supplement Estimated Total Estimated Agency Estimated Agreement/Suppl. Project Funds Funds Federal Funds PE a.Agency 28,000.00 6 2400 24 80 % b.other Consultant 79,000.00 73.399-06' 9 oao 15 "6 l5 goc 3 63r�o°I2 Federal Aid Participation c.State 1,000.00 0.00 1,000.00 200.00 800.00 ,{ J Ratio for PE d.Total PE Cost Estimate a+b+c 108,000.00 7ir-1 0:00 l� 13,300 i�0 2f lyoe 3 0 $b, 146 Right of Way e.Agency % f.Other Federal Aid g State Participation Ratio for RW h.Total R/W Cost Estimate(e+f+ ) Construction i.Contract 1,223,230.00 1,223,230.00 469,230.00 754,000.00 j.Other Metro/Consultant 58,000.00 58,000.00 58,000.00 k.Other 61.6 % 1.Agency 135,216.00 135,216.00 135,216.00 Federal Aid Participation m.State 1,500.00 1,500.00 1,500.00 Ratio for CN n.Total CN Cost Estimate(i+i+k+i+m) 1,417,946.00 1,417,946.00 663,946.00 754,000.00 o.Total Project Cost Estimate(d+h+n) 108,000.00 1,49 1,,601r24M , 1� i'T61 11S2s,g4(e 0551540 1340)g00 The Local Agency further stipulates that pursuant to said Title 23, regulatidns dnd policies and procedures, and as a condition (J to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency O ial Washington State Department of Transportation By By— c—L Title Mayor Assistant Secretary for Highways and Local Programs ATTEST: � "`� Date Executed !-�- Brenda Fritsvold, Deputy City Clerk DOT Form 140-041 EF Revised 11/99