HomeMy WebLinkAboutContract CAG-13-003 t= 1 Document A101 TM - 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year o20/1 (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) City of Renton This document has important legal consequences.Consultation with 1055 South Grady Way an attorney is encouraged with Renton,WA 98057 respect to its completion or modification. AIA Document A201 TM-2007, General Conditions of the Contract for Construction,is adopted in this document by and the Contractor: reference.Do not use with other (Name, legal status, address and other information) general conditions unless this document is modified. Northern Pacific Construction Design&Development 15310 SE 21st Bellevue,WA 98007 for the following Project: (Name, location and detailed description) Public Works Shops Building D Remodel 3555 NE 2nd St,Renton,WA The Architect:' . (Name, legal.status, address and other information) Wagner Architects and Planners 1916 Pike Place Seattle,WA 98101 The Owner and Contractor agree as follows. AIA Document A101 TM—2007.Copyright m 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Init. Architects_All rights reserved.WARNING:This AIA"Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA`'Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible t under the law.This document was created on 12/11/2012 16:44:51 under the terms of AIA Documents-0n-Demand TM order no. 2008559082 ,and is not for resale.This document is licensed by the American Institute of Architects for one-time use only,and may not be reproduced prior to its completion. TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract;Documents consist of this Agreement,Conditions of the Contract(General,Supplementary and other Conditions),,Drawings,Specifications,Addenda issued prior to execution of this Agreement,other documents listed.in this Agreement and Modifications issued after execution of this Agreement,all of which form the Contract,and are,as fully�4 part of the Contract as if attached to this Agreement or repeated herein.The Contract represents the entire and integrated agreement between,the parties hereto and supersedes prior negotiations,representations or agreements,either written or oral.An enumeration of the Contract Documents,other than a Modification,appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents,except as specifically indicated in the Contract Documents to be the responsibility of others. �f ; ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION §3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert:the date of commencement if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.) If,prior to the commencement of the Work,the Owner requires time to file mortgages and other security interests,the Owner's time requirement shall be as follows: §3.2 The Contract Time shall be measured from the date of commencement. AIA Document All 0f TM—2007.Copyright®1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Init. Architects.All rights reserved.WARNING:This AleDocument is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or 2 distribution of this AleDocument,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible t under the law.This document was created on 12/11/2012 16:44:51 under the terms of AIA Documents-on-DemandTm order no. 2008559082 ,and is not for resale.This document is licensed by the American Institute of Architects for one-fime use only,and may not be reproduced prior to its completion. §3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than Ninety ( 90 )days from the date of commencement,or as follows: (Insert number of calendar days.Alternatively, a calendar date may be used when coordinated with the date of commencement. If appropriate, insert requirements for earlier Substantial Completion of certain portions of the Work) Portion of the Work Substantial Completion Date Subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any,for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work.) ARTICLE 4,CONTRACT SUM §4A The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract.The Contract Sum shall be Ninety four thousand five hundred twenty one dollars and 50 cents Dollars ($94,521.50 ),subject to additions and deductions as provided in the Contract Documents. §4.23he Contract Sum is based upon the following alternates,if any,which are described in the Contract Documents and,are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates.If the bidding orproposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.) §4.3 Unit prices,if any: (Identify and state the unit price;state quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price per Unit($0.00) ALA Document A101 TM—2007.Copyright®1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Init. Architects.All rights reserved.WARNING:This AleDocument is protected by U.S.Copyright law and International Treaties.Unauthorized reproduction or 3 distribution of this AleDocument,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible t under the law.This document was created on 12/11/2012 16:44:51 under the terms of AIA Documentson-DemandTm order no. 2008559082 ,and is not for resale.This document is licensed by the American Institute of Architects for one-time use only,and may not be reproduced prior to its completion. §4.4 Allowances included in the Contract Sum,if any: (Identify allowance and state exclusions, if any,from the allowance price) Item Price($0.00) ARTICLE 5 PAYMENTS §5.1:PROGRESS PAYMENTS §5.1,1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the.Architect,the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. §5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the `month,or as follows: The City of Renton operates on a two week cycle according to the 2012 and 2013 Accounts Payable Calendar,a copy of which will be provided to the Contractor. Applications for payment must be received by the Owner a minimum of one week prior to any Purchase Order cutoff date to be processed in that run. §5:1:3 Provided that an Application for Payment is received by the Architect not later than the day Of a:mnonth,the Owner shall make payment of the certified amount to the Contractor not later than the day;.of the(same)(folio month.If an Application for Payment is received by the Architect after the application date fixed.above,payment shall be,made by the Owner not later than ( )days after the Architect receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) e §.5AA Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents.The schedule of values shall allocate the entire Contract Sum among the various portions of the Work.The schedule of values shall be prepared in such form and supported by such data to:, substantiate its accuracy as the Architect may require.This schedule,unless objected to by the Architect,shall be used as a basis for reviewing the Contractor's Applications for Payment. 5.1.5'A Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of § PP Y: P g P P the period covered by the Application for Payment. §15:1:6 Subject to other provisions of the Contract Documents,the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values,less retainage of five percent( 5%).Pending final determination of cost to the Owner of changes in the Work,amounts not in dispute shall be included as provided in Section 7.3.9 of AIA Document A201Tm-2007,General Conditions of the Contract for Construction; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction(or,if approved in advance by the Owner,suitably stored off the site at a location agreed upon in writing),less retainage of five percent( 5%); .3 Subtract the aggregate of previous payments made by the Owner;and .4 Subtract amounts,if any,for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AIA Document A201-2007. AIA Document A101 TM—2007.Copyright m 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Init. Architects.All rights reserved.WARNING:This AleDocument is protected by U.S.Copyright law and International Treaties.Unauthorized reproduction or 4 distribution of this AleDocument,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible t under the law.This document was created on 12/11/2012 16:44:51 under the terms of AIA Documents-on-DemandTm order no. 2008559082 ,and is not for resale.This document is licensed by the American Institute of Architects for one-time use only,and may not be reproduced prior to its completion. §5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances: .1 Add,upon Substantial Completion of the Work,a sum sufficient to increase the total payments to the full amount of the Contract Sum,less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims;and (Section 9.8.5 of AIA Document A201-2007 requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any) .2 Add,if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of AIA Document A201-2007. §5.1.8 Reduction or limitation of retainage,if any,shall be as follows: (If it is intended,prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Sections 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation) §'5.1:9 Except with the Owner's prior approval,the Contractor shall not make advance payments to suppliers for materials or`equipment which have not been delivered and stored at the site. §51FINAL_PAYMENT §5il Final payment;constituting the entire unpaid balance of the Contract Sum,shall be made by the Owner to the Contractor when t the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201-2007,and to satisfy other requirements,if any,which.extend beyond final payment;and .2 a final Certificate for Payment has been issued by the Architect. §5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment,or as follows: ARTICLE 6 DISPUTE RESOLUTION §6.1 INITIAL DECISION MAKER The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007,unless the parties appoint below another individual,not a party to this Agreement,to serve as Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) AIA Document A101 T"—2007.Copyright®1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Init. Architects.All rights reserved.WARNING:This AIODocument is protected by U.S.Copyright law and International Treaties.Unauthorized reproduction or 5 distribution of this AleDocument,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible t under the law.This document was created on 12/11/2012 16:44:51 under the terms of AIA Documents-on-DemandTm order no. 2008559082 ,and is not for resale.This document is licensed by the American Institute of Architects for one-time use only,and may not be reproduced prior to its completion. §6.2 BINDING DISPUTE RESOLUTION For any Claim subject to,but not resolved by,mediation pursuant to Section 15.3 of AIA Document A201-2007,the method of binding dispute resolution shall be as follows: (Check the appropriate box.If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.) ® Arbitration pursuant to Section 15.4 of AIA Document A201-2007 ❑ Litigation in a court of competent jurisdiction ❑ Other: (Specify) ARTICLE 7 TERMINATION OR SUSPENSION §7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-2007. §7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2007. ARTICLE 8 MISCELLANEOUS PROVISIONS §8AMhere reference is made in this Agreement to a provision of AIA Document A201-2007 or another Contract', Document,the reference refers to that provision as amended or supplemented by other provisions of the Contract . .Documents. §8.2;Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below;or in the absence thereof,at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) §8.3 The Owner's representative: (Name, address and other information) Michael_Nolan,Facilities Coordinator Renton City Hall 1055 South Grady Way Renton,WA 98057 425-430-6608 office,425-766-6164 cell mnolan @rentonwa.gov §'8.4 The Contractor's representative: (Name, address and other information) Michael Coulon Northern Pacific Construction Design&Development 15310 SE.21 st Bellevue,WA 98007 425-652-0553 mike @northpcinc.com §8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. AIA Document A701 T —2007.Copyright®1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Init. Architects.All rights reserved.WARNING:This AIArpocument is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or 6 distribution of this AleDocument,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible t under the law.This document was created on 12/11/2012 16:44:51 under the terms of AIA Documents-on-DemandTm order no. 2008559082 ,and is not for resale.This document is licensed by the American Institute of Architects for one-time use only,and may not be reproduced prior to its completion. I §8.6 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS §9.1 The Contract Documents,except for Modifications issued after execution of this Agreement,are enumerated in the sections below. • 9.1:1 The Agreement is this,executed AIA Document A101-2007 Standard Form of Agreement Between Owner and § g g Contractor. §9.1.2 The General Conditions are AIA Document A201-2007,General Conditions of the Contract for Construction. §9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages 00800 Special Conditions 11-30-12 2 �. 00810 Insurance Provisions 11-30-12 1 Y � r §9.1.47he Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement) Attached exhibit:Division Zero and Construction Drawings,Public Works Shops Building D Remodel Section Title Date Pages AIA Document A1I01 T"—2007.Copyright®1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Init. Archly_All rights reserved.WARNING:This AlieDocument is protected by U.S.Copyright law and International Treaties.Unauthorized reproduction or 7 distribution of this Ale Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible t under the law.This document was created on 12/11/2012 16:44:51 under the terms of AIA Documents-on-DemandTM order no. 2008559082 ,and is not for resale.This document is licensed by the American Institute of Architects for one-time use only,and may not be reproduced prior to its completion. I §9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Attached exhibit:Construction Drawings,Public Works Shops Building D Remodel Number Title Date §9.1.6 The Addenda,if any: Number Date Pages Addendum l 11-30-12 16 Addendum 2 12-4-12 3 Tr: 4' Port'ibns of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. §9.1.7.Additional documents,if any,forming part of the Contract Documents: .1 AIA Document E201Tm-2007,Digital Data Protocol Exhibit,if completed by the parties,or the following: .2 Other documents,if any,listed below: (List here any additional documents that are intended to form part of the Contract Documents.AIA Document A201-2007 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders,sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents) AIA Document A101 T"—2007.Copyright®1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Init. Architects.All rights reserved.WARNING:This AleDocument is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or 8 distribution of this AleDocument,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible / under the law.This document was created on 12/11/2012 16:44:51 under the terms of AIA Documents-on-Demand TM order no. 2008559082 ,and is not for resale.This document is licensed by the American Institute of Architects for one-time use only,and may not be reproduced prior to its completion. ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A201-2007. (State bonding requirements, if any, and limits of liability for insurance required in Article 11 of AIA Document A201-2007.) Type of Insurance or Bond Limit of Liability or Bond Amount($0.00) Performance and Payment Bond $94,521.50 This eement entered in as of the day and year first written above. OWN R(STg NreT CONTRACTOR(Signature) Denis Law,Mayor of Renton Michael Coulon,President (Printed name and title) (Printed name and title) Ata.es�t Bonnie I . Walton, City Clerk AIA Document A101 T"—2007.Copyright 01915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Init. Architects.All rights reserved.WARNING:This Ale Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or 9 distribution of this Me Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible t under the law.This document was created on 12/11/2012 16:44:51 under the terms of AIA Documents-on-Demand TM order no. 2008559082 ,and is not for resale.This document is licensed by the American Institute of Architects for one-time use only,and may not be reproduced prior to its completion. I WAGNER '�. ARCHITECTS DESCRIPTION OF PROPOSED WORK PiKE N PLACE R CONTRACTOR TO: GENERAL NOTES NE SUNSET BLVD �`""'�. SEATTLE WA 98101 O 206 • 448 . 2528 OBTAIN A MECHANICAL PERMIT AND COMPLETE ALL WORK SHOWN ON PLANS. 1. ALL WORK SHALL BE IN CONFORMANCE WITH APPLICABLE CODES AND LOCAL F A X • 4 4 1 • 6 1 8 4 OBTAIN AN ELECTRICAL PERMIT AND COMPLETE ALL ELECTRICAL WORK SHOWN ON PUNS. BUILDING REQUIREMENTS,WHICH INCLUDE CURRENT EDITIONS OF THE IBC x o g n era r c h I t e c t n.c o m INSTALL AN ADA COMPLIANT TOILET ROOM INCLUDING All NECESSARY PIPING&FIXTURES. AND WA STATE ENERGY CODE. SEE STRUCTURAL SHEETS FOR STRUCTURAL .. SHEATH ONE SIDE OF THE EXISTING FRAMED WALL BETWEEN WORK BAYS WITH A PASS THROUGH. INFORMATION. INSTALL A NEW INSULATED PLYWOOD WALL BETWEEN WORK BAYS. 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS SHOWN ON THE DRAWINGS z 0004003 INSTALL A NEW MANDOOR BETWEEN WORK BAYS. BEFORE COMMENCING WITH WORK. ANY DISCREPANCIES SHALL BE BROUGHT L REGISTERED TO THE ATTENTION OF THE ARCHITECT PRIOR TO STARTING ANY CONSTRUCTION a ARCHITECT INSTALL AN OWNER SUPPUEO JIB CRANE. IN THE AREA CONCERNED.DO NOT SCALE DRAWINGS. = - REMOVE TWO EXISTING ELECTRIC UNIT HEATERS AND ASSOCIATED WIRING. 9 INSTALL NEW EXHAUST FANS AND 2 PROPANE UNIT HEATERS. 3. PRIOR TO AND DURING THE WORK,CONTRACTOR SHALL VERIFY THE ROBERT E WAGNER CONDITIONS AND ANY CONDITION INCONSISTENT OR PROBLEMATIC WITH REGARD SGIE OF WASItlNC1W VENDERS i0: TO THE INTENT OF THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO STARTING OR CONTINUING WORK IN THAT AREA. INSTALL A NEW PROPANE LINE FROM AN EXISTING TANK ON SITE TO THE BUILDING. INSTALL PROPANE LINES TO THE NEW UNIT HEATERS. 4. ALL DIMENSION LINES ARE TO THE FACE OF FINISHED WORK,OR AS NOTED. "y PROVIDE AND INSTALL A NEW VEHICLE HOIST. DIMENSIONS NOTED AS"CLR"INDICATE CLEAR DISTANCES BETWEEN FINISHES. NE 4TH Si OWNER T0: 5. WHERE ON ANY OF THE DRAWINGS OR DETAILS A PORTION OF THE WORK IS SHOWN AND/OR DETAILED,AND THE REMAINDER IS INDICATED IN OUTLINE, PROVIDE BUILDING AND MECHANICAL PERMITS. THE PARTS SHOWN ANO/OR DETAILED SHALL APPLY TO All OTHER LIKE PROVIDE TRENCHING FROM THE EXISTING PROPANE TANK TO THE BUILDING. PORTIONS OF THE WORK. NE 2ND ST - PURCHASE A NEW JIB CRANE,TO BE INSTALLED BY THE CONTRACTOR. INSTALL 5 NEW TRENCH DRAINS AT THE OVERHEAD DOORS. 6. PROVIDE SUFFICIENT BLOCKING IN WALLS FOR SUPPORTING COUNTERS, INSTALL A NEW OIL WATER SEPARATOR. CABINETS,ACCESSORIES,FUTURE ACCESSORIES,ETC. AS REQUIRED. PROJECT SITE PROJECT DATA DRAWING INDEX N LOCATION:NAME: BUILDING D IMPROVEMENTS VICINITY PLAN CS COYER SHEET LOCATION: 3555 NE 2nd ST SCALE: NTS RENTON,WASHINGTON 98056 A0.1 GENERAL NOTES OWNER: CITY OF RENTON AO.2 GENERAL NOTES 1055 SOUTH UTH GRADY WAY_ _ _ RENTON,WASHINGTON 98055 AO.3 GENERAL NOTES (425)430-6600 Al PLANS - ARCHITECT: WAGNER ARCHITECTS p2 TOILET ROOM DETAILS RENTON PUBLIC - PROPERTY LINE 960' 1916 PIKE PUCE X221 SEATTLE,WA 98101 A3 SCHEDULE k DETAILS LEGAL DESCRIPTION I WORKS M1.0 MECHANICAL COVERSHEEf I BUILDING D IMPROVEMENTS BEG SW CDR OF NE 1/4 TH S 89-01-16 E 683.33 FT - TH N 01-04-13 E 363.53 Fi TO TPOB TH CONTG N MIA SYMBOLS LEGEND 01-04-13 E 960 FT TO N LN OF SW 1/4 OF NE 1/4 TH M1.2 SPECIFICATION S 89-03-38 E 642.05 FT i0 NE CDR OF SW 1/4 OF NE 1/4 TH S 01-00-49 W 960 FT TH N 89-03-38 W 643 M1.3 SPECIFICATION FT TO TPOB LESS W 30 FT LESS C/M RGTS MIA SPECIFICATION I ASSESSOR'S TAX NUMBER-1623059123 M2.1 FLOOR PLAN 3555 NE 2nd St LAND USE INFORMATION M3.0 DETAILS Renton,WA 20NING: C P1.0 PLUMBING SCHEDULE I 98056 LOT SIZE: 588,024.0 SF P2.0 FOUNDATION PUN EXISTING BUILDING D FOOTPRINT: 9600.0 SF pp,1 FLOOR PLAN EXISTING GROSS INTERIOR SPACE: FIRST FLOOR AREA: 9600.0 SF P3.0 DETAILS ME22ANINE AREA: 770.0 SF P3.1 DETAILS I I Ralgn Ph- TOTAL AREA: 10370.0 SF 583'-0" 162'-0" 162'-0" 162'-O" =I PERMIT SET PROPOSED CROSS INTERIOR SPACE: 10370.0 SF ED.1 ELECTRICAL SYMBOL SCHEDULE E1.0 POWER PUN E2.0 LIGHTING FLOOR PUN BUILDING CODE INFORMATION E4.0 SPECIFICATION SHEET I I Joe No. as zla� BUILDING CODE: 2009 IBC I 7.SEPTEMBER 201.2. . BUILDING CODE AUTHORITY: CITY OF RENTON BUILDING CODE ANALYSIS NEW PROPANE LINE I OCCUPANCY CLASSIFICATION: S-1 I TO BUILDING D w CONSTRUCTION TYPE: V-B ENERGY CODE PROPANE PROPANE UNIT HEATERS I UILDING C TANK BUILDING D BUILDING E : : : : : INSULATION AT INTERIOR TOILET ROOM WALLS TO BE R-15 BUILDING B ' . . . . . . . . . . . . INSULATION AT EXTERIOR TOILET ROOM WALL TO BE R-21 I sn..t ca^,C^la INSULATION AT TOILET ROOM CEILING TO BE R-21 . . . . . . . I COVER : : : : CONSULTANTS . SHEET ARCHITECT MECHANICAL ENGINEER ELECTRICAL ENGINEER BUILDING A WAGNER ARCHITECTS SIDER+BYERS ADVANCED ELECTRICAL SERVICES ,rala.w a u. i w aF�,e. x 1916 PIKE PLACE X221 192 NIE, WA N 09 192 NIE, WA N ST. X306 _ PROPERTY LINE s6o' SEATTLE, WA 98101 SEATTLE, WA 98109 SEATTLE, WA 98109 - - - - - - - - - - - - � .ha 4 RAY TALBOT NATHAN BYERS BUDD REICHARD £� TEL (206) 448-2528 TEL (206) 285-2966 TEL (206) 282-6364 SITE PLAN cs FAX 206 441-6184 FAX 206 285-1045 FAX 206 282-6368 : ( ) ( ) ( ) N 2 SCALE: 1:60 o WAGNER SECTION 03300 CAST IN PLACE CONCRETE PART 1 GENERAL 2.03 TRIM ARCHITECTS 2.06 CONCRETE REINFORCEMENT 3.05 FINISHES FOR UNFORMED SURFACES P L A N N E R S 1.01 DESCRIPTION OF WORK A Reinforcement A VGF: Vertical Grain Douglas Fir. Kerf bock in members over 6"in width. 1. Fabricate steel bar reinforcement to shapes and dimensions as shown and placed as indicated. A General 1 9 1 6 PIKE PLACE A The work includes exterior trench drains at the overhead doors and patching interior 2. Welding: Where welding of reinforcement is indicated and required,provide welds in Screed all stabs,for whatever finish,to true levels or slopes,work surfaces only to the 2.04 BUILDING FELT SEATTLE WA 98101 slabs where new work or demolition occurs. accordance with AWS CIA;include bar splices,connection devices,inserts,anchors,and anchorage degree required to produce the desired finish;do no finishing in areas where water has _ details where noted or required by drawings, accumulated,drain and re-screed;in no case use cement and sand sprinkling to A Asphalt-saturated fell,weight approximately 30 pounds per 100 s.f. 2 0 6 4 4 8 2 5 2 8 1.02 RELATED SECTIONS 3. Clean reinforcing bars free from loose rust,mud,oil and other foreign matter affecting or absorb moisture. Carefully finish all joints and edges with proper tools,unless otherwise F A X 4 4 1 6 1 8 4 reducing bond using approved portable sandblasting equipment. Accurately position bars in specified. Strike smooth lops of walls or buttresses,horizontal offsets,and similar 2.05 ROUGH HARDWARE w a 1.03 REGULATIONS accordance with approved placement drawings and secure against displacement. Lap at intersections unformed surfaces occurring adjacent to formed surfaces after concrete is placed or as as indicated or as directed;extend reinforcement through,and lap beyond,construction joints indicated on drawings;float.to a texture consistent with that of the farmed surface and A Provide all necessary spikes,nails,screws and bolts for proper installation of rough carpentry; A. Conform with requirements of Renton Building Code as pertains to structural continue finishing of farmed surface uniformly across these related unformed surfaces. sizes and quantities as indicated;where not indicated,provide sizes and quantities as required by cast-in-place concrete,except as supplemented and modified herein. 2.07 CONCRETE FORM WORK Cade or as directed;galvanized. mo4003 REGISTERED A Protection of Forms: Withdraw projecting nails or other objects from contact surfaces before B. Float Finishes: t1�\ 1.04 STANDARD SPECIFICATIONS reusing;clean and completely recondition oil forms prior to reuse;repair any damage to forming 1. Consolidate,level,and screed surfaces to obtain evenness and uniformity;remove all surplus 1. Nails and Spikes: Common,as indicated or in accordance with Table 23-III-C-2 of UBC. 1 7 ARCHITECT surfaces caused during previous usage. Formwork with patches or repairs affecting appearance of concrete after consolidation by striking off with sawing motion against guide strips. Float surface 1 A. Conform with requirements of the following Standard Specifications as referenced or as the concrete surfaces will not he permitted. smooth with power-driven equipment to true plane within a tolerance of 1/4"in 10'as determined 2. Al fasteners shall be stored in the manufacturers original packaging till installed. Any it modified and supplemented hereinafter. w 1. ACI Specifications for Structural Concrete for Buildings,ACI 301. 8. FORMS by a 10'straightedge placed anywhere he slab in any direction. Begin floating when water sheen fastener not stored in the manufacturer's packaging shall he removed from the site. ROBERT E WAGNER P 9 9 were a wsw+axox 2. ACI Recommended Practice for Selecting Proportions for Concrete,ACI 613. 1. For Unexposed Surfaces: Formboords of Standard grade Douglas fir,TNG or shiplo,not has disappeared from surface and/or when mix has stiffened sufficiency a permit operation of 9 P P power floating equipment;use hand floats of wood or cork in locations inaccessible to power-driven B. Provide all necessary hardware. Unless otherwise noted,all framing hardware called for an 3. ACI Recommended Practice for Cold Weather Concreting,ACI 306. wider than 8",S1S2E. equipment. Recheck trueness of surfaces;cut down any high spots and fill any low spots as drawings shall be by Simpson Strang-Tie. Note that some connectors are not standard shapes or ce":vnonU: 4. ACI Recommended Practice for Hot Weather Concreting,ACI 605. 2. For exposed concrete,interior of shafts,and walls to be covered with veneer;Plywood;HOO required to form,smooth,granular texture,free from screed marks and defects. sizes. See drawings for locations and/or details. Hardware shall be attached per manufacturers 5. State of Washington Standard Specifications for Road and Bridge Construction Plyform EXT-APA,Simpson Formguard,or approved;minimum 3/4"thick;omit mill oiling;at the recommendations using all specified fasteners. Equivalent UBC approved products by other 1980. Hereinafter called WSDT. Contractor's option,standard or high-density overlaid plywood forms may be used in lieu of form 2. Provide for surfaces scheduled or noted on drawings and slabs where no other finish is manufacturers may be substituted,upon approval by Engineer but appearance must be the same,or 1.05 QUALITY CONTROL hoards. specified or noted.(FF) approval by architect is necessary. C. FORM RELEASE AGENT C. Applied Treatments 2.06 MISCELLANEOUS ITEMS A. Special Inspection: Notify Architect at least 48 hours before inspection will be required; 1. Burke Concrete Accessories Burke-Release,Noy-Crete Co.Form Coating,Industrial Synthetics 1. Finish slabs as specified hereinbefore and apply surface treatment where scheduled or inspection will be required immediately prior to any intended pours or placement of concrete. Corp. Synthex,or approved. Release agent with non-staining and no-interference characteristic with specified. A Provide all incidentals and accessories,tools,fastenings,and equipment necessary for the bonding capabilities of paints,plasters,or other surface coatings. 2. Sealer-Hardener: Coat newly finished slabs as soon as surface water has disappeared and complete installation of rough carpentry. B. Concrete Work: Concrete work to be exposed architecturally finished concrete;special care upon completion of finishing operation. Apply 1 additional coal just prior to acceptance of the must be taken to provide specified,finished surfaces without grovel packets,and other defacements. D. FORM TREATMENT project. 207 GALVANIZING 1.06 SUBMITTALS Before erection of forming,plug and seal all cracks,holes,slits,gaps and other"telegraphing" imperfections in contact surfaces. Treat contact surfaces as follows: D. Defective Work: Remove and replace when directed by Architect,surfaces which show A. All metal accessories which are to be exposed to weather,or which are adjacent to wet use A. Records: Maintain record of all concrete placement;indicate exact mix proportions,list time, excessive shrinkage cracks. areas in the facilities,shall be hot-dip galvanized in accordance with ASTM A153. P P P Board Forms date,location in the project,weather conditions at the time of placement and the source of the I. For unexposed surfaces: Keep wet previous to placing concrete;wet thoroughly just prior to 3.06 NON-SHRINK GROUT PART 3 EXECUTION _ concrete supply. Make records available to Architect at any time during the course of construction the placing of concrete. and submit at end of concrete placement phase of project. 2. For exposed surfaces: As specified for plywood contact surfaces. A Apply in accordance with manufacturer's direction;protect adjacent finished surfaces from 3.01 INSTALLATION PART 2 PRODUCTS 3. Plywood or Steel Contact Surfaces: Bleach high-density overlaid forms with lye. Spray defacement. Provide for sleeves,and where indicated. release agent to contact surfaces uniformly. Apply before each use at not less than the following A. Workmanship: Carefully layout,cut,fl,and erect items;use sufficient nails,spikes and bolts 2.01 CONCRETE MATERIALS coverages;for steel or high-density plywood forms,1 gallon per 3,000 square feel;for medium 3.07 CURING AND PROTECTION to insure rigidity and permanence. Drive nails perpendicular to grain in lieu of toe-nailing where density plywood form,1 gallon per 1,500 square feel;for standard plywood forms,1 gallon per practicable. Install all work to true lines,plumb and level unless otherwise indicated. A Aggregates 1,000 square feel. A Protect freshly deposited concrete from premature drying and excessively hot or cold 1. Standard: ASTM C33, temperatures;maintain minimal moisture loss at relatively constant temperature for necessary B. Pre-drill lumber with slightly undersized holes if splitting occurs,or if larger than 20d nails --- - - - - --- ---- -- - - -- - - --- - .- -. -.E. ANCHORS AND INSERTS - hydration time and proper hardening of concrete. Do not use curing agents for concrete that will are used... B. Cements 1. Trench frames and grates: At overhead doors shown on drawings,provide Neenah Foundry receive fluid applied waterproofing or pedestrian traffic topping. i. Provide cements obtained from same course or of some brand for concrete in same element model 4996-A2 self forming trench drains and covers. C. Building Felt: Provide under wood plates and any other wood members bearing directly on a portion of the work. PART 3 EXECUTION B. Duration of Curing: In addition to overnight initial curing,continue final curing operations until concrete in connection with earth. Cut neatly and install so that fell is not visible. the cumulative number of Boys or fractions thereof,not necessarily consecutive,during which RENTON PUBLIC 2. Standard Portland Cement: Columbia,Ideal,Kaiser,Lane Star,standard gray Portland cement temperature of the air in contact with concrete is above 50 degrees F.equals 7 days;if high-early conforming with requirements of ASTM C150;use type 1,II or type III. 3.01 CONSTRUCTION AND CONTROL JOINTS strength concrete has been used continue final curing operation for 3 days total calculated as ...END OF SECTION- WORKS C. Admixtures before. Take care to prevent rapid drying at the end of the curing period. If early removal of BUILDING D 1. Use only one brand of admixtures. D. Form all joints perpendicular to main reinforcement,or as shown on drawings. Unless forms is approved and farms are removed during the curing period apply one of the curing methods otherwise noted on drawings,continue all reinforcing across joints;provide longitudinal keys at least specified in Standard Specifications and continue curing for the remainder of the required caving IMPROVEMENTS 2. Water-Reducing Admixture: Master Builders Pazzolilh 344-N,or approved. Chemical 1-1/2"deep at ell joints in wells and between walls and slobs or footings.Remove keyforming period. admixture conforming to requirements of ASTM C494,Type A. inserts and thoroughly clean surface of concrete at all joints before placing next lift using approved 3. Retarder-Densifying Admixture: Master Builders 07210 INSULATION Type B. ders Retarding Pozzalith,or approved; ASTM C494, portable sandblasting equipment. ,r ENO OF SECTION." 4. Accelerator: Chemical admixture designed to accelerate set on concrete but not corrode PART 1 GENERAL reinforcing steel;ASTM C494,Type C. E. In Slabs: Refer to Drawings for Details.Farm or saw-cut to true,straight lines,maximum 5. Air Entraining Agent: Conform to requirements of ASTM 0260. variance from true line of 1/4"in 10'and no irregularities across joint in excess of 1/8 extend 9 9 q 6. Contractor shall verify in writing that all admixtures used are compatible, reinforcing steel through and lap beyond joints. Provide construction or control joint where indicated 1.01 RELATED WORK or not more than 20'o.c.each way,preferably under partitions. SECTION 06100 ROUGH CARPENTRY 3555 NE 2nd St PART 1 GENERAL A Section 06100 Rough Carpentry Renton,WA (L D. Bonding Agents: Grace Construction Materials ied big C,Master Builders ig nd for Liquid 3.02 EXPANSION JOINTS 1.02 QUALITY CONTROL 98056 (LPL),or approved. Emulsion-type additive of plasticized high polymer resins designed for bonding 1.01 WORK INCLUDED of concrete. A Provide in earth-supported structures wherever exterior slabs abut vertical surfaces;at A. Materials: Furnish only materials of tested and certified thermal resistance and performance E. Adhesives intersections of new concrete pavement and walks with old;elsewhere indicated on drawings. Run no A. Wood construction with sawn lumber characteristics. I. Simpson SET,Hilti HIT HY 150,or approved. Use for grouting embedded dowels and reinforcement or other metal trim continuous through joints,unless otherwise indicated. reinforcin bars. B. See general notes for structural carpentry requirements. 9 1.03 SUBMITTALS 2, Grout for exposed surfaces shall he non-staining. 3.07 REPNR 3. Primers and Sealers: As recommended by the adhesive manufacturer. 1.02 REGULATIONS A. Samples:Submit samples of each type and class of insulation,complete A Immediately after removal of forms,cut back lies;inspect surfaces for defects;repair or With fastenings and Ph... F. Other Ingredients: Provide other ingredients as noted on drawings or as required h Code or patch defects only after defects are inspected by Architect and then only with his permission. Do all A Grading Rules: Provide lumber and plywood graded in accordance with official grading rules of adhesives proposed for use;obtain approvol before proceeding Standard Specifications. 9 9 q y cutting and repair within 48 hours after removal of forms;cure repairs some as new concrete, association having jurisdiction;furnish official certification of inspection,if and when requested. PERMIT SET P B. Product Data:Submit manufacturer's published literature for specified products and accessories G. Steel Reinforcement Bars: ASTM A615;types,sizes and rades as indicated and noted on B. Defective Areas: Where patches are allowed,repair and patch areas;must match surrounding 1. Saftwoods: Standard Grading Rules for Western Lumber of the Western Wood Products as applicable,including manufacturers specifications,physical characteristics and performance data. drawings;all bars free from rust and loose scale at time of delivery. areas in color and texture se,as to be indistinguishable after completion,including curing and Association. Submit as a supplement,manufacturers instructions and directions for application if net included in finishing.Determine mix for color by trial mixes before patching;after initial cure,dress patch or manufacturer's published literature. 2.02 SEALER repair area mechanically or by hand for texture match. 2. Plywood: American Plywood Association. JOB NO. 1.04 HANDLING A. For non-formed surfaces: Burke Spartan-Cote Cure-Seal-Hardener,Sarni Kure-N-Seal, C. Preparation for Repair: Repair all defective and damaged concrete,including honeycombed, B. Standards: Comply with ANSI/AITC A 190.1 "Structural Glued Laminated Timber". Dore hviia,w West Floor Treatment,Slonelop CS9,or approved. Transparent curing agent complying with sandstreaked or fractured concrete,voids and gravel ar air pockets;chip defective material out to a A Deliver insulation materials in original tartans or containers with manufacturers labels!hereon; .7.SEPTEMBER 2012. . requirements of ASTM C309,Type 1. 1-inch minimum depth and square edges with surface;no"feathered"edges will be permitted. see that each label clearly stales thermal resistance and conductance and manufacturers name;do Clean prepared areas,dried patch areas and adjoining areas for at least 6 inches around patch free 1.03 DUALITY CONTROL not remove labels or open cartons until Architect has been asked if inspection is necessary. 2.03 NON-SHRINKING GROUT from dust,and keep wet for at least 3 hours prior to application of patch material;allow surfaces to surface dry before applying patch material. A Materials: Provide lumber with moisture content of no more than 19%,furnish moisture PART 2 PRODUCTS . . . ' ' ' ' ' . . ' ' A Hollemite Por-Rok cement,or approved special non-shrinking grout mix,apply in strict content certificates,if and when requested. . ' ' . . ' ' . 'D. Bonding Grout: mix banding grout for patching using approximately 1-port cement and 2.01 Fiberglass Batt Insulation . . . . . accordance with manufacturers directions;lake care to protect adjacent finished surfaces from 1-part fine sand passing No.30 mesh sieve mixed with only enough water to provide a mixture of 1.04 HANDLING - - - defacement. Provide for sleeves,and where indicated. thick cream consistency. After mixing brush hooding grout onto surfaces to he patched. A. Fiberglass Insulation: 2.04 CONCRETE MIXES A Shipping and Storage: Ship and store lumber,trusses,glulams,and all other materials to Fiberglass Batt a Blanket Insulation:Owens-Corning Building Insulation,or approved. , E. Patching Mixture: Mix patching material of approximately some materials as concrete,except protect from damage and exposure to moisture. Kraft-faced,provide widths to maximize available wall cavity space while maintaining air . . . . . . . . . . A. Quality of Concrete that coarse aggregate is omitted and mortar consists of 1-part cement to 2 1/2 parts sand by gaps as necessary. Maximum flame spread index of 25 and maximum smoke developed . . . . . . . . . . . 1. Assumed Compressive Strengths: Assumed compressive strengths and locations of some are damp loose volume. Add no more water than is necessary for proper handling and placing;mix 1.05 DIMENSIONS index of 50. noted an drawings. mortar in advance and allow to stand with frequent manipulation with a trowel,without addition of 2. Admixtures water,until it has reached the stiffest consistency that will permit placing. A Lumber called out in whole numbers,i.e.46,2x8,etc.,denotes sawn lumber. 2.02 ACCESSORIES sn.,r canbnle , , , , , . . . . a.Add in accordance with manufacturers directions. . . ' ' . . . . . . . b. If approved,water-reducing retarder may be used when the temperature of the concrete,as F. Application: When surfaces of patch area are surface dry,thoroughly and uniformly brush 1.07 SUBMISSIONS A Adhesives and Fasteners:Types as recommended by the insulation material manufacturer. . . . . . . . . . Placed.exceeds 65 degrees F. bond coot into surfaces. When bond coat starts to dry and has lost its sheen,apply premixed GENERAL . c. If approved,accelerator may be used when temperature of concrete is less than 40 degrees F. patching mortar to area and consolidate mortar;strike off patch area slightly higher than surrounding A Rough Hardware/Connections: Provide shop drawings of all connectors,connections,and rough PART 3 EXECUTION NOTES d. Use retarder-densifer when placing concrete in worm weather conditions or when ambient surface;leave patch undisturbed for at least 1 hour to permit shrinkage;finish area to match hardware which must be specially fabricated. Provide catalog or all standard items. temperature exceeds 65 degrees F. adjacent surfaces and keep damp for curing for at least 7 days. 3.01 INSTALLATION e.Air-entrain all concrete subjected to freezing temperature after curing. PART 2 PRODUCTS . . . . . . . . . . . . . . G. Tie Holes: Below grade,clean and dampen as specified for preparation of patched area;fill A. Install hall insulation per manufactures recommendations. . . . . . - B. Mix Design holes solid with patching mortar and cure as specified hereinbefore. Above grade,tie hales to be 2.01 ROUGH LUMBER 1. Determine mixes in accordance with the following;maximum water/cement ratio as noted on Placed 24"a.c.in each direction,in similar pattern,as approved by Architect. Clean hale and cover a drawings. metal insert with dab of silicone sealant. A. Joists and Studs: Douglas fir No.2 S4S to standard dimensions,except where special shapes ...END OF SECTION... are specified or indicated;sizes as indicated. w.,aab,wws,s";,�m.m iK V,wernra,m x 2. Proportions and Tests: Conduct determination of proportions and tests in accordance with "i 4`m..i6samn basic relationships and procedures outlined in ACI 211.1 and 211.2. 3.04 FINISHES FOR FORMED SURFACES B. Beams,Stringers,Posts,and Timbers: Douglas fir No.1. 3. Certificates: Submit certification of previously tested mix designs. A As-Cost Finishes 2.05 MIXING CONCRETE i. Rough Form Finish: Provide for surface of subgrade walls,foundation wails and footings. 2.02 PLYWOOD snort No. . . _ _ . A. Standard Concrete 2. Smooth Form finish: Provide for exposed surfaces,including painted surfaces,unless Grade: A-C plywood of all walls. Use Slurd-i-floor at the lop of the toilet room and 1. On-Site Mixing: Job-mixed concrete may be used in lieu of ready-mixed concrete at the otherwise specified. A 1'1/2'plywood at walls. Do not use OSB. A option of the Contractor providing that the concrete meets the requirements of these specifications. _ O .�,2. Ready-Mixed Concrete: Mix and transport in accordance with ASTM C94. ' . . . . . . . . . . . . . . B. Metal Edge Number 200A to be used al all reveals and as indicated on drawings. WAGNER SECTION 08110 STEEL DOORS AND FRAMES B. Supports and anchors shell he fabricated of not less that 18-gauge sheet steel,galvanized SECTION 0GENE DOOR HARDWARE ARCHITECTS PART I-GENERAL C. Corner Reinforcement: Shape CB-114 x 114. where galvanized frames are used. PART I-GENERAL 1.01 SUMMARY 1 2.05 JOINT CEMENT AND REINFORCING TAPE P L A N N E R S C. Rust inhibitive enamel or paint primer shall he used,baked on,and suitable as a base for 1.0 SUMMARY specified finish paints complying with ANSI A224.1,'Test Procedure and Acceptance Criteria for Prime 191 6 PIKE PLACE A SECTION INCLUDES Painted Steel Surfaces on Steel Duos and Frames.' A. SECTION INCLUDES A As recommended by manufacturer for intended purpose. SEATTLE WA 98101 1. Work under this section comprises of furnishing hollow metal doors&frames. 2.03 FRAMES 1. The work in this section includes furnishing all items of finish hardware as hereinafter specified PART 3 EXECUTION 2 0 6 4 4 6 •2 5 2 8 or obviously necessary for all swinging doors. F A X 4 4 1 • 6 1 8 4 B. RELATED DOCUMENTS A. Provide hollow metal frames for doors.Conceal fastenings unless otherwise indicated. 3.01 APPLICATION OF WALLBOARD nag ne r or nrrec ss.eom I. Related documents,drawings and general provisions of contract,including General and 1. Interior Cer Frames:Level 2,14-gauge B. RELATED DOCUMENTS A Comply with applicable requirements of Standard Specifications,except as herein modified. Assure that 50-degree F.temperature will be maintained. Provide solid blocking behind all joints not Supplementary Conditions and Division 1 specification sections apply to this section. f. co:SF Series 1. Related documents,drawings and general provisions of contract,including General and on framing members. op04oa� C. RELATED SECTIONS g.Curries:N Series Supplementary Conditions and Division 1 specification sections apply to this section. REGISTERED h.Fleming:F Series I. Section 06100,ROUGH CARPENTRY C. RELATED SECTIONS D. Placement m Wallboard: Apply board to Pilings before applying d walls. Use full-size ARCHITECT do 2. Section 08710,DOOR HARDWARE B. Fabricate frames with mitered and laces only welded turners,re-prime al the welded areas. sheets of maximum practical lengths tic insofar as rise joi t Prange,ids in moderate contact; a NI welds to he flush with neatly mitered or hutted material cuts. i. 06200-Finish Carpentry not force into lace. Stagger vertical and transverse ants;arrange Dints ono opposite sides of a 3. Section 09900,PAINTING partition so as to occur on different studs. ROBERT E WAGNER 2. 08110-Metal Dears and Frames mini[cr wawrmax 1.02 REFERENCES C. All frames shall have minimum 7 gauge hinge reinforcements,14-gauge lack strike reinforcing, 3. 08210-Wood Doors C. Attachment: Use specified screws of 12"o.c.in field of board and 8"o.c.staggered along and 12-gouge closer reinforcing.All frames shall have minimum 7 gouge hinge reinforcements with - vertical edges. A. STANDARDS an additional high frequency 12-gauge hinge reinforcement welded to the top hinge,14-gauge lock 1.02 REFERENCES c^n<mmar<: strike reinforcing,and 12-gauge closer reinforcing. 1. NFPA 80-Fire Doors and Windows A. STANDARDS DP Metal Trim: Use metal casings at all joints between wallboard and other materials. Use D. Provide temporary shipping bars to be removed before setting frames. specified metal trim on all exlernol corners. 2. ANSI/SDI-100-Recommended Specifications for Standard Steel Doors an Frames 1. ANSI A156.1 -Butts and Hinges 3.02 FINISH 3. ASTM-F 476-Standard Test Methods for Security of Swinging Doors Assemblies E. Except on weatherst6pped frames,drill stops to receive three(3)silencers on strike jambs of 2. ANSI A156.3-Exit Devices 4. HMMA 862-Guide Specifications for Commercial Security Hollow Metal Doors and Frames single frames and two(2)silencers on heads of double frames. 3. ANSI At 56.4-Door Controls-Door Closers A All exposed walls and ceilings to receive smooth finish,suitable for paint or wall covering. 5. SDI-105-Recommended Erection Instructions for Steel Frames 4. ANSI AT 56.5-Auxiliary Locks and Associated Products 6. SOI-107-Hardware on Steel Doors(reinforcement application) F. Provide minimum 0.0179'thick steel plaster guards at mortar boxes at back of hardware 5. ANSI A156.6-Architectural Door Trim 7. ANSI-A250.4-Steel Doors and Frames Physical Endurance cutouts where mortar or other materials might obstruct hardware operation and to close off interior 6. ANSI A156.7-Template Hinge Dimensions 103 JOINT TREATMENT 8. UL10C-Standard for Positive Pressure Fire Tests of Door Assemblies of openings. 7. ANSI A156.13-Mortise Locks and Latches Closer 8. ANSI A156.15-Closer r Holder Release Devices A All work shall conform to the applicable requirements of Standard Specifications and to the B. CODES 2.G4 FABRICATION 9. ANSI A156.16-Auxiliary Hardware recommendations of the wallboard manufacturer. All exposed work shall be smooth and free from 1. NFPA-101-Life Safety Code 10. N SII A156.18 7 Material and nd Finishes the Contract defects. Tape and cement all joints;reinforce all corners;fill all exposed fastener heads. Fill all cracks of electrical outlets and similar for fireproofing. Repeal process as many times as necessary Y A Fabricate steel frame units to he rigid,neat in appearance,and Tree from defects,warp,or for appearance. All exposed joints and fastener heads shall be smooth and flush with surface of 2. IBC 2003-International Building Code - buckle.Where practical,lit and assemble units in manufacturers plant.Clearly identify work that board. Fire tape at attic spaces and behind ceramic tile. 3. ANSI-A117.1-Accessible and Usable Building and Facilities cannot be permanently factory assembled before shipment,to assure proper assembly at Project site. B. CODES 4. ADA-Americans with Disabilities Act Comply with ANSI/SDI 100 requirements. 3.04 REPAIR 1. NFPA 101 -Life Safety Cade 1.03 SUBMITTALS 2. IBC 2003-International Building Code 1. Clearances shall be no more than 1/8'at jambs and heads except between non fire rated 3. ANSI At 17.1 -Accessible and Usable Building's and Facilities A After installation of drywall assemblies and before application of finish painting or other A. GENERAL REQUIREMENTS pairs of doors which may be no more than 1/4.'Not more than 3/4'at the bottom of the doors. 4. ADA-Americans with Disabilities Act scheduled finish,inspect work for any deficiencies and correct same;leave drywall assemblies complete with trim as indicated,ready for finish plastering or other finish treatment as scheduled. 1. Submit copies of the hollow metal door and frame shop drawings to engineer for approval. B. Tolerances shall comply with SDI-117'Manufacturing Tolerances Standard Steel Doors and 1.03 SUBMITTALS 3.05 CLEAN-UP Frames' _-__.B.__P.RODUCT_DATA.-.---__._ A. PRODUCT DATA A_-_ _ __ _ _ _ __ _ _ _ _ Unless otherwise indicated,provide exposed fasteners with countersunk flat or oval heads for - At-tondusion of work,leave premises neat and clean,remove all tools,equipment an surplus- C. 1. Submit shop drawings showing fabrication and installation of standard steel frames.Include exposed screws and bolts. 1. Submit catalog cuts and/or product data sheets for all scheduled finish hardware. materials and legally dispose of all debris off the site. Repair and/or replace property damage as details at each frame type,elevations of door and frame types,conditions at openings,details of directed by the Contractor. construction,location and installation requirements of door and frame hardware reinforcements,and D. Prepare frames to receive mortised and concealed hardware according to final door hardware 2.01 HARDWARE SCHEDULE RENTON PUBLIC details of joints end connections.Show anchorage and accessory items. schedule and templates provided by hardware supplier.Comply with applicable requirements of SDI-107 and ANSI-A1I5 Series specifications for door and frame preparation for hardware. A. Notify the Owner if the following hardware schedule does not include all hardware necessary "'ENO OF SECTION- WORKS C. SHOP DRAWINGS for a complete and finished project,including installation of all new and relocated doors.Hardware 1� E. Reinforce frames to receive surface-applied hardware.Drilling and tapping for surface-applied supplier is responsible for handing and sizing all products as listed in the hardware heading. BUILDING D 1. Provide a schedule of doors and frames using some reference numbers for details and door hardware may be done at Project site.Provide internal reinforcements for all doom to receive door Ouantities listed are for each pair of doors,or for each single door. SECTION 09900 PAINTING IMPROVEMENTS openings as those an the contract documents.Shop drawings should include the following information: closers and exit devices. PART 1 -GENERAL a.Material thickness and/or gauge. F. Locate hardware as indicated on Shop Drawings or,if not indicated,according to the Door and B. Manufacturers and Abbreviations: b:Mortises and reinforcements. Hardware Institutes(OHI)"Recommended Locations for Architectural Hardware for Standard Steel The following manufactures are approved. Other manufacturers require prior approval. 1.01 DESCRIPTION c.Anchorage types. Doors and Frames." 1. MC-McKinney (similar quality hinges by Stanley are acceptable) A. Paint all new GWB surfaces. d.Locations of exposed fasteners. 2. YA-Yale e.Mounting locations of standard hardware. PART III-EXECUTION 3. BE-Best B. Seal all new Plywood surfaces. 3555 NE 2nd St 1.04 OUALITY ASSURANCE 3.01 INSTALLATION END OF SECTION"' C. Paint new mandoars. Renton,WA A. SUBSTITUTIONS A. Install steel frames,and accessories according to shop drawings,manufacturer's data,and as 1.02 STANDARD SPECIFICATIONS 98056 1. All substitution specified. o requests must be submitted within the procedures and time frame as outlined A Architectural Painting Specification Manual,latest edition,published by the Master Pointers in Division 1,General Requirements.Approval of products is at the discretion of the architect and his B. Comply with provisions of 501-105,'Recommended Erection Instructions for Steel Door Frames; Institute(All available from the Washington Slate Council of Painting and Decorating Contractors of consultant. unless otherwise indicated.Set frames accurately in position,plumbed,aligned,and braced securely SECTION 09250 GYPSUM WALL BOARD America(PDCA),WSC-P(KA,870 SW 136th St,Burien,WA 98166,206-243-7477. until permanent anchors ore set.Alter wall construction is completed,remove temporary braces and PART 1 GENERAL 8. MANUFACTURER QUALIFICATIONS spreaders,leaving surfaces smooth and undamaged. 1.01 RELATED WORK The words"Specifying Authority'as used in the Standard Specifications Section,shall mean the Devgn Phe« 1. Manufacturer shall be a member in good standing of the Steel Door Institute(SDI). 1. Except for frames located in existing concrete,masonry,or gypsum board assembly Architect. construction,place frames before constructing enclosing walls and ceilings. A. Section 06100,ROUGH CARPENTRY PERMIT SET 1,05 DEWERY,STORAGE,AND HANDLING B. Standard specifications of each paint manufacturer shall be incorporated as applicable to R. Section 09900,PAINTING 2. In masonry construction,install at least 3 wall anchors per jamb adjacent to hinge location an specific installations. A. The supplier shall deliver all materials to the project site;direct factory shipments are net hinge jamb and at corresponding heights on strike jamb.Acceptable anchors include masonry wire 1.02 STANDARD SPECIFICATIONS 1.03 COLORS allowed unless agreed upon beforehand.Supplier shall coordinate delivery times and schedules with anchors and masonry T-shaped anchors, the contract.,. A. Conform to Recommended Specifications for the Application and Finishing of Gypsum Board as 3. At existing concrete or masonry construction,install at least 3 completed opening anchors per published by the Gypsum Association(also published as ANSI 97.1). A. Colors: As indicated or as selected by the Architect. Do not order paints until all JOB NO. B. Deliver frames cardboard wrapped or crated to provide protection during transit and jobsits jamb adjacent to hinge location on hinge jamb and at corresponding heights on strike jamb.Set colors are selected or scheduled. A maximum of 3 interior colors will be selected. storage.Provide additional protection to prevent damage to any factory-finished doors.Mark all doors frames and secure to adjacent construction with bolts and masonry anchorage devices. 1.0.3 SUBMITTALS .7.SEPTEMBER 201.2. . and frames with opening numbers as shown on the contract documents and shop drawings. 1.04 SUBMITTALS ' 4. In metal-stud partitions,install at least 3 wall anchors per jamb at hinge and strike levels.In A. Product Data: Submit manufacturers published literature for specified products and ' ' . . . ' . . ' ' ' . C. Inspect frames upon delivery for damage.Minor damages may be repaired provided refinished steel-stud partitions,attach wall anchors to studs with screws. A Number of Samples: Submit of each stain and paint finish in duplicate. Sample for paint . . . . items ore equal in all respects to new work and acceptable to the architect.Otherwise,remove and accessories as applicable,including manufacturers specifications,physical characteristics,and finishes of each color and each gloss texture. Supply one quart of each approved paint to Owner. . . .. ._ . . replace damaged goads as directed. C. Fit hollow-metal doors accurately in frames,within clearances specified in ANSI/SDI 100.Install Performance data. Submit as a supplement,manufacturers instructions and directions for application Each quart is to be labeled for type and color. fire rated doors with clearances specified in NFPA 80. it not included in manufacturers published literature. . . . . . . . . . . . . . D. Store frames at the building site in a dry and secure place. . . B. Preparation of Samples: Approximately 4'z 12"size for trim finishes. Approximately 12 . . . . . PART 2 PRODUCTS x 3.02 ADJUSTING AND CLEANING 12"sizes for all others. Apply and label successive shingle fashion with each coat partially exposed. . . . . . . . . . . . . . 1, Place units on minimum 4'high wood blocking. . . . . ' ' ' . ' 2. Avoid use of non-vented plastic or canvas shelters that could create a humidity chamber. A. Immediately alter erection,sand smooth any rusted or damaged areas of prime coat and 2.01 ACCEPTABLE MANUFACTURERS C. Timing for Submittal of Samples: Submit after material list is approved and colors are : : : : : ; : : : : : 1 If cardboard wrapper on door becomes wet,remove carton immediately. apply touchup of compatible air-drying primer selected;before materials are delivered to job;in ample time to permit consideration without delaying , . . , . _ , . 4. Provide 1/4'spaces between slacked doors to promote air circulation. A. National Gypsum Co.,U.S.Gypsum Co.,Kaiser Gypsum Co.,Beslwall Gypsum Co.,Pahco construction schedule. . . . . . . . . . . . . . B. Immediately before final inspection,remove protective wrappings from doors and frames. Products Co.,or approved. 1.06 WARRANTY 2.02 GYPSUM WALLBOARD D. Material Lists: Submit list of all products proposed for use for Architect's approval. Submit 3 copies before commencing painting complete with name of manufacturer,trade name or number,and sn<.r c^ngear. A. All doors and frames shall be warranted in writing by the manufacturer against defects in "'END OF SECTION'•' purpose for which material is proposed. Obtain Architect's approval before ordering. Use same materials and workmanship for a period of one(1)year commencing on the date of final completion 1.A. EdgesardTapered and acceptance. Contractorsro Pond lot use(or all one tof the namorl manufacturers for for eachotherwise epaater finshbprovideld Architect. ' GENERAL : 2. Thicknesses Butt exact colors selected by Architect are available. p p NOTES PART It-PRODUCTS 3. Thicknesses 5/8"unless otherwise indicated. 2.01 MANUFACTURERS 4. Fire rated Type C a 5/81hroughout. s _ . _ _ . . . . 5. Moisture resistant: Use in toilet roams,shower rooms,bathrooms,and wet areas and any E. Manufacturers'Specification,Directions and Recommendations:Conform to manufacturer wall within 8'of plumbing fixtures or plumbed appliance. specifications,directions and recommendations for best results in use of each of their products for . . _ . . . . . . A. Subject to compliance with requirements,provide standard hollow metal doors and frames by 6. At shafts,provide and install systems as necessary to achieve required lire ratings. each condition. Should they be at a variance with these specifications,report discrepancy to Architect for decision. c one of the following: ' �T 2.03 SCREWS - F. Color Formula List: At time of acceptance of the project furnish to the Owner o typewritten n>< 1. Ceco Corporation list of all colors and types of paint installed therein,complete with either the color formula for 2. Curries Company A. ASTM C646 Type S.except type S-12 for use on 20-gauge or heavier framing, t"for single wss�w••,^'n^•,^,P',,,,,u� ;,,x,i 3. Fleming Company layer or for base layer,1-5/8'for face layer in double-layer construction. For trim and other duplication or identifying paint manufacturers number for replacement paint. ^ 2.02 MATERIALS fastenings,as recommended by the manufacturer. G. Product Data: Submit manufacturers published literature for manufacturer's specifications, sn«x wo. 2.04 METAL TRIM physical characteristics and performance data. Submit as a supplement,manufacturers instructions . A. All frames shall he manufactured of commercial quality cold rolled steel per ASTM-A366 and and directions for application if not included in manufacturer's published literature. A568 general requirements;galvanized to A60 or G60 or golvanealed to A40 minimum coating weight A. Shapes and sizes shown in Standard Specifications,formed from zinc-coaled steel conforming 3 to Federal Specification QOS-775,class d or e,not less than 25 gauge. :A0112' . ' 3� standard per ASTM-A924.Internal reinforcing may he manufactured of hot rolled pickled and ailed �� steel per ASTM-AS69. . . . . . . . . . . . . . . WAGNER 1.05 HANDLING 3.05 CLEANING STEEL C. Floor and roof framing: provide double joists under all ARCHITECTS parallel par lilions that extend over more than half the joist length A. Delivery and Storage of Materials: Deliver in unopened containers;manufacturers original A. Clean paint spatters,spots and stains from finished surfaces. Replace or repair damaged and around all openings in floors or roofs unless otherwise noted. P L A N N E R S labels thereon. Do not open until approved by Architect. Store and mix material where directed by surfaces which are not satisfactorily cleaned as directed by the Architect. 13.All anchors embeded in masonry or concrete shall be A307 headed halts or AJfi provide solid hlocking at all bearing points. to joists to Architect. 3.06 DEFECTIVE WORK threaded rod with an aslm 563 henry her nut tack welded on the em6eded end. supports with two tme nails. At ti.b,,joists to flush headers e. 1 16 P I K E P LAC heoms with simpsan metal joist hangers in accordance with notes above. SEATTLE WA 9 81 01 B. Inflammable Material: Take extraordinary care to prevent lire. Open cans of paint and nail all multi-joist heoms together with I6d @ 12'o.c. staggered. 2 0 6 4 4 8 2 5 2 8 varnish only as needed. Keep rubbing cloths and oil rags in lightly closed metal containers or A. Contractor responsible,from whatever cause;refinish without extra cost. Repair all work F A X 4 4 1 6 1 B 4 remove from building at close of each days work. damaged during construction;leave in first-class condition. Where uniform color and sheen of Unless otherwise noted on the plans, plywood roof and floor surface is not obtained,add additional coots as directed by Architect,at no additional cost to Owner. sheathing shall be laid up with groin perpendicular to supports and w aanxsrorchlteets.eom PART 2-PRODUCTS nailed @ 6'o.c. to framed panel edges, struts and over sled walls as shown on plans and @ 12'o.c.to intermediate supports. Provide approved 2.01 MATERIALS """END OF SECTION""" plywood edge clips centered between joists/trusses at unblocked roof 0004003 WOOD sheathing edges. All floor Shea lhi ng edges shall have approved TAG REGISTERED A. Unless otherwise specified,furnish paint,varnish,stain,enamel,lacquer,fillers and related joints or shall be supported with solid blocking. Allow 1/8'spacing ARCHITECT products for prime,intermediate and finish coats,of a type,brand and manufacturer listed in the Standard Specifications. Materials not specifically noted in the Standard specifications,and required 14. Framing lumber shall he kiln dried or MC-]9, and graded and marked In for the work,such as linseed ail,shellac,thinners,or other materials required for the work,shall he conformance with W.C.L.B. standard grading rules for vest coast lumber no. ROBE T W WAGNER of quality not less than required by applicable published Federal or Slate Specification Standards. 17. Furnish to the following minimum standards: B. Paint to be Sherwin-Williams brand latex paint or approved equal. JOISTS (2X A 3X MEMBERS) DOUG-FIR NO. 2 General Structural Notes AND BEAMS: MINIMUM BASE VALUE, Fib=850 PSI C. Clear sealer for plywood to be Varathane by Rustoleum Crystal Clear Polyurethane or approved THE FOLLOWING APPLY UNLESS SHOWN OTHERWISE ON THE PLANS STUDS, PLATES M MISC. FRAMING: DOUG-FIR OR HEM-FIR NO. 2 equal. 2.02 MIXING AND THINNING 15. Plywood sheathing shall be gr ode C-0, exterior glue or structural 11, exterior glue in conformance with UBC standard 23-2. A. Mix according to manufacturer's directions or as directed by Architect. CRITERIA Roof sheathing shall be 1/2"(nominal)with span rating 32/16. 2.03 SHEEN Wall sheathing shall be 1/2"(nominal)A/C faced Douglas Fir with span rating 24/0. 1. All materials, workmanship, design, and construe Lion shall conform to the Top of toilet room sheathing shall be 1'STURD-I-FLOOR. A. Where gloss or sheen is specified or is listed as a standard for approval for the project,the Drawings, specifications, the Uniform Building Cade (1997 edition) terms refer to tested luster,shine or sheen of the dry film and for purposes of this specification Refer la wood framing notes below for typical nailing requirements. are defined as follows,when tested with a 60-degree reflector meter. 1.Flat: 10-degree glass or less. 2. Contractor shall verify all existing dimensions, member sizes, and 2.Eggshell: 11 to 19-degree gloss. - Conditions pr tar to commencing any work. ell dimensions of existing 16. All wood in direct contact with concrete or masonry shall he separated 3.Satin: 20 to 30-degree gloss. construction shown an the drawings are Intended as guidelines only end must by(2) layers of 301 asphalt impregnated building paper between the untreated 4.Semi-lass: 31 to 74-de ree loss. be verified. 9 9 9 wood and concrete or masonry 5.Glass: 75-degree gloss or more. 3. Contractor shall provide temporary bracing for the structure and structural I7. Timber connectors called out by letters and numbers shall be "Strong-Tie B. Unless otherwise specified rovide eggshell sheen. components until all final connections have been completed in accordance p p 99 with the pions. by Simpson company, as specified in their catalog number C-2003. Equivalent 204 TEXTURE devices by other manufacturers may he substituted, provided they have ICBO 4. Contractor shall he responsible for all safety pr ecau lions and the methods, uppreval for equal or greater lead capacities. Provide number and size of techniques, sequences or procedures required to perform the contractors fasteners as specified by manufacturer. Connectors shall he installed in A. Unless otherwise specified,finish a(paint t he smooth and free from texture. Use the work. the architect has no overall supervisory authority or actual cannectnetwoiththe manufacturer's recommendations.i bolls in onnech connector straps appropriate method of applying paint to avoid texturing the surface. _and/or direct responsibility-for-the-specific working conditions at the site _ -washers of and or for an hazards resulting from the actions of an trade contractor. All bolts hen wood members shall conform lo'ASTM screws.-Provide wood. - --- -- - - -- - -- -- -- - ----- PART 3-EXECUTION / Y 9 Y the architect has no duly to inspect, supervise, note, correct, or report under the heads and nuts of all bolts and lag screws bear inq an woad. Unless noted otherwise, all nails shall be as called out below. All shims 3.01 PREPARATION FOR PAINTING any health or safety deficiencies of the owner, contractors, or other entities shall he seasoned and dried and the same grade (minimum)as members RENTON PUBLIC or persons at the project site. connected. All 2x joists shell he connected to flush heoms with'LUS' A. All surfaces must he smooth,dry,uniform in texture,clean and free of all greases,dust,dirt 5. Contractor-initialed changes shall be submitted in writing to the architect series joist hangers. All TJI joists shall he connected to flush beams with WORKS and other detrimental substances. Remove or protect all hardware,lighting fixtures and similar for approval prior to fabrication or construction. changes shown on shop temperatures have been attained and will he maintained. •ITT" series joist hangers. All double-joist beams shall he connected to finished items;return same to their original state on completion of painting. Determine that proper drawings only will not satisfy this requirement. flush beams with"MIT'series joist hangers. BUILDING D B. Preparation of Surfaces 6. Drawings indicate general and typical details of construction. where 18. Wood fasteners IMPROVEMENTS 1.Galvanized Metal Surfaces: Wash with SSPC SP-1 Solvent Clean. conditions are not specifically indicated but are of similar character to 2.Ferrous Metal Surfaces: Remove all rust and scale;wash with appropriate solvent;wire brush all details shown, similar details of construction shall be used, subject to A. Nail sizes specified on drawings are based on the following unpainted welds;touch up all bare metal and scratched and abraded surfaces;recoat all review and approval by the architect and the structural engineer. specifications: wire brushed surfaces. If necessary to adequately clean surface,blast per 7. Special inspection of the following types of construction shall be provided SIZE LENGTH DIAMETER 3.Finished Wood S recomurf mendations ces: Sand paint manufacturer. in accardance with the international building code and the project 8d 2-1/2" 0.131° ad as necessary la obtain perfectly smooth surfaces. See lha!all specifications by a qualified testing agency designated by the building 10d 3' 0.148" nd St nails are properly set. This does not apply to exposed framing at canopies. owner, the architect and building department shall be furnished with copies 16d BOX 3-1/2" 0.135" Renton,3555 N E 2 nd 3.02 APPLICATION OF FINISHES of all inspection and lest results. If contractor for proposes the use of alternate nails, they shall submit 98056 WA nail specifications to the structural engineer(prior to construction) A. Number of Coats: specilied hereinafter for each type of finish. On shop primed work an for review and approval. additional prime coat is not t intended,except touch-up. If necessary to obtain uniform color or Zen,add additional coals. CONCRETE B. Nails-plywood(APA rated sheathing) fasteners to framing shall he B. thickness of Coats; Use ample undiluted materials;apply in uniform thickness over entire driven flush to face of sheathing with no countersinking permitted. areas;do not exceed manufacturers recommended spreading rate per gallon. Conform to Standard 8. Concrete shall he mixed, proportioned, conveyed and placed in accordance Specifications. with UBC Section 1905, 1906 and ACIi 301, including testing procedures. a,sn Phm, concrete shall attain a 28-day strength of f'c= 2,500 psi and mix shall 19. WOOD FRAMING NOTES--THE FOLLOWING APPLY UNLESS OTHERWISE SHOWN ON THE PERMIT SET C. Colors of Coals: Tint prime coals if necessary to obtain uniform finish coals. Vary color contain at less than 5-1/2 sacks of cement.per cubic yard and shall he PLANS: between coals;final coal to exactly match samples. proper tinned to produce a slump of 5"or less. A. All wood framing details not shown otherwise shall be constructed to D. Approval of Successive Coats: Obtain Architects approval of each coat before succeeding coat All concrete with surfaces exposed to standing water shall be air-entrained the minimum standards of the Uniform Building Code. Minimum nailing, is applied;without this approval,Architect reserves right to require an additional coat. with an air-entraining agent conforming to ASTM C260, C494, and C618. unless otherwise noted, sholl conform to TABLE 23-II-B-1 of the UBC. to to air content for frost-resistant concrete shall he in accordance with Coordinate the size and location of all openings with Mechonical JOB M,0. table 19-x-1 of the uniform building code. and Architectural drawings. Provide washers under the heads and nuts E. Workmanship: Highest quality of skilled workmen to Architects satisfaction. Spread material 9 of all bolts and lag bolts bearing on wood. Installation of lag bolts nag, new:ions evenly without runs,sags,thin spots and skips. Cut sharp lines against unpainted surfaces and shall conform to National Design Specification for wood construction other colors. Allow each coal to harden at least 24 hours between coats. Finish surfaces uniform, 9. Reinforcing steel shall conform to ASTM A615(Including supplement sl), : 7.SEPTEMBER 201.2. free Irom streaks,blotches and other defects. grade 40, fy=40,000 psi. exceptions: any bars specifically so noted on (1997 edition) with o lead bare hole of 60 to 70 percent of the shank the drawings shall be grade 60, fy=60,000 psi. welded wire fabric shall diameter. Lead holes are not required far 3/8'and smaller lag screws. 3.03 PANTING OF INTERIOR WORK conform to ASTM A-185. B. WALL FRAMING: Refer architectural drawings for the site of all wells. , , . . , , . . . , , . All studs shall be spaced at 16"0.c. ono. two studs minimum shall be . . . . . A. Paint all ferrous,and shop-primed metal surfaces,except items specified not to he painted. 10. Concrete protection(cover) for reinforcing steel shall be as(allows: provided at the end of all walls and al each side of all openings, and . . . . . . ' Paint all metal surfaces of mechanical and electrical items. Paint all items as specified hereinafter. at beam or header bearing locations. Two 2x8 headers shall be provided ' . . . . . B. Plywood walls Footings and other unformed surfaces cast against and permanently exposed over all openings not otherwise noted. Solid blocking for woad calurtns 1.2 coals clear finish to earth. . . . . . 3° shall be provided through floors to supports below. Provide continuous Formed surfaces exposed to earth of weather(J6 hors or larger). . 2" solid blocking at mid-height of all stud walls over 10'-0" in height. , . _ ; ; C. Golvonized Metal where metal is visible (05 bars or smaller). . . . . 1-112" 1. Do not paint Slabs and walls(int. face). . .greater of bar diameter plus 1/8"OR 3/4' End nail lop plate to each stud with two l6d nails, and toenail or end nail each stud to bottom plate with two I6d nails. D. Clear finish Woad-Trim and Doors shegg cont��y' 1. 1 coat stain All stud walls shall have their lower wood plates attached to wood 2.2 coats of clear finish froming below with 16d nails @ 12"o.c. staggered or bolted to can- ANCHORAGE cre to with 5/8'diameter anchor bolts(with 7'minimum embedment) GENERAL E. Gypsum Wallboard @ 4•% o., unless indicated otherwise. Individual members of hailt- 1. 1 coat acrylic primer up Posts shall be nailed to each other with I6d @ 12"a.c. staggered. NOTES 2. 2 coats acrylic enamel,eggshell sheen 11. Expansion bolts into concrete and concrete masonry units shall be Mhen not other vise na fed, provide gypsum wallboard on interior K. Bolt 11"as manufactured by the Hilt!corp., installed in strict surfaces nailed to all studs, top and bottom plates, and blacking with F. Metal Doors k Frames accardance with I.C.B.O, report no. 4627, including minimum embedment nails @ 7' o.c. Nail 112"GWB with 5d cooler nails and 5/8"GWO with 1. 1 coat primer requirements. Bit cooler nails. Provide 1y2" (nominal) APA rated sheathing(span 2.2 coals finish,eggshell sheen i 2i�a rating 24/D)on exterior surfaces nailed al all panel edges(block un- 3.04 EXPOSED MECHANICAL AND ELECTRICAL WORK Substitutes proposed by contractor shall he submitted for review with supported edges), and tap and bottom plates with nails @ 6'o.c. and 1.C.B.O. reports Indic.....equivalent or greater load capacities. special to all intermediate studs and blocking with nails @ 12"o.c. allow 9 u�ate" s„a„awm inspection is required far all expansion bolt installation. 1/8"spacing at all panel edges and ends. °ma,wka Nam A Paint the following items 2 coats to match color selected by Architect. ^a^�•^ 1.All items which receive prime coat under Mechanical and Electrical specifications. 2.All piping,pipe covering,ducts,grilles,registers,radiators and similar. 12. Epoxy-grouted items(threaded rods or reinforcing bar) specified on the sn,ee ua. 3.All conduit,boxes,panelboords and similar. drawings shall be installed using "HIT-HY150'as manufactured by Hilt! . . carp. install in strict accordance with I.C.B.O. report no. 5193. AO B. AI grilles,registers and similar shall be spray painted. rods shall he ASTM,A-36 unless otherwise noted. .: gg C. Paint interior surfaces of ductwork that can be seen through grilles,louvers or registers with 1 coat flat black paint. Coordinate with mechanical. _ . . . . . . I I . . Edo . . . . . . . . . . . . . . WAGNER ARCHITECTS PLANNERS 1916 PIKE PLACE SEATTLE WA 98101 2 0 6 4 4 8 2 5 2 8 F A X 4 4 1 6 1 9 4 sago era lthlta cts.com REGISTERED ARCHITECT ° 81 RATING TEST VALUE (4) 1%6'WEDGE ANCHORS NEW JIB CRANE ROBERT E WAGNER FIRE BASE PLATE SOUND FRAME S12E/ GAUGE /SPACING IJ O DN. EXISTING METAL STUDS SIDE 2 EXISTING ME22ANINE 3 SIDE 1 MATERIAL/ THICKNESS BASE PLATE 200 W o 1 LAYER PLYWD 1 2" o o CL� ® ® EXISTING MEZZANINE I- SIDE 2 MATERIAL/ THICKNESS NEW Z SPANCO FR250-8-14 �/ J EXISTING PLYWD 1:1 I Q rn INSULATION TYPE / R-VALUE PLAN SIDE 1 O� 3 6 \ 'GAP\—ALIGN EDGE OF JIB BASE GATE PLATE WITH EDGE OF MEZZANINE BASE PLATE �- B2 RATING TEST VALUE R SOUND BASE PLATE DETAIL MEZZANINE PLAN FRAME S12E/ GAUGE /SPACING WOOD 2x4 16"c.c SIDE 2 SCALE: 1 1/2"=1'-0". SCALE: 1/8" = 1-0" SIDE 1 MATERIAL/ THICKNESS W 1 LAYER PLYWD 1/2" -----------'----a ---- --- _ - - - - . . ._ ... -- --- -- -- — - -------------- ----- a 3 SIDE 2 MATERIAL/ THICKNESS J o 1 LAYER GWB " 5 8 SIDE 1 Q INSULATION TYPE / R-VALUE RENTON PUBLIC 1 LAYER BATT R-15 WORKS BUILDING D IMPROVEMENTS B3 RATING TEST VALUE FIRE SOUND FRAME SIZE/ GAUGE /SPACING SIDE 2 WOOD 2x6 16"o.c SIDE 1 MATERIAL/ THICKNESS ....._............__............................. LLJ EXISTING PLYWD 3555 NE 2nd St }ate L—3 Renton,WA SIDE 2 MATERIAL/ THICKNESS 98056 J o 1 LAYER GWB 5 8" SIDE 1 INSULATION TYPE / R-vuuE PLAN 1 LAYER BATT R-21 Design Pxoaa PERMIT SET B4 RATING TEST VALUE o FIRE I SOUND FRAME SIZE/ GAUGE /SPACING SIDE 2 DOOR FRAM HOLLOW METAL j WOOD 2x6 16"o.c lal DOOR FRAME, NO DOOR I SIDE 1 MATERIAL/ THICKNESS EXISTING JOB N0. LL.I 1 LAYER PLYWD 1 2° RI MEZZANINE ABOVE NEW HOIST, a_ I BY VENDER e� : NEW JIB CRANE,- .7.SEPTEMBER 2012 f-3 SIDE 2 MATERIAL/ THICKNESS SEE 3 Al w J o 1 LAYER PLYWO 1 2" EXISTING / Qw INSULATION TYPE / R-1/2" PAN SIDE 1 MAINTENANCE SHOP ----------- ---------------------------� �-----� OR 1 LAYER BATT R-21 02 . 100 101 1 7 103 104 106 BAY 1 BAY 2 BAY 3 SEE 1/A2 A2 BAY 4 NEW MAINTENANCE SHOP BAY 5 BAY 6 UP TO — NEW WALL, MEZZ. ANCHORS AT 6' O. C. FLOOR WALL NOTES: EXIST. ELEC PANEL i.PROVIDE BLOCKING WHERE NECESSARY TO SUPPORT TOILETROOM FIXTURES&EQUIPMENT. EXIST. OVERHEAD I \\.Dy 105 St 2.ALL WALLS AND CEIUNG IN TOILET ROOM TO BE 5/8'GWB(GREEN BOARD). \\\ DOOR TYP. TOILET I / 1 p3 sneer ce"le"la 3.GWB WALLS TO BE PRIMED AND THEN PAINTED WITH A MINIMUM 2 COATS OF SHERWIN-MLLIAMS PURE WHITE I < I .A �+ (SW7005 LATEX PAINT IN SEMI GLOSS. : FLOOR PLANS: 4.PLYWOOD)TO BE SEALED WITH 2 COATS OF RUSTOLEUM VARATHANE CRYSTAL CLEAR POLYURETHANE IN SEMI GLOSS. \ TJ 1 \ (� T.. NEW 6"TRENCH DRAIN, EXIST. BOLLARD--// OLLARD 18"D CONC. FOOTING TYP., ——— : : : : : . . . . . ' . (5) TOTAL SEE 6/A2 TYP. CUT BACK AS NECESSARY : w : : : : I :- . . ' TO FIT NEW TRENCH DRAIN NEW OIL WATER 1 I NEW PROPANE LINE q . . . . . _ EXISTING 6" S.S. LINE---" SEPARATOR SEE MECH.� I FROM EXISTING TANK ' . . . . . . . p \ \ LIJ BUILDING D PLAN \J EiaA am afm�i,ell W "�aml SCALE: 1/8"=1'-0° \ I I �,,,,N". 5 N t� z� �o I 6'-y2 WAGNER 5-6" ARCHITECTS TOILET ACCESSORIES P L A N N E R S I(D DESCRIPTION MOUNTING HEIGHTS MANUFACTURER&MODEL NO. 1916 P I K E PLACE MIRROR +40"MAX.AFF TO BOTTOM BOBRICK-8-165 2436 SEATTLE WA 98101 ® S.M.TOILET PAPER DISPENSER +19"-27"AFF TO CENTERLINE BOBRICK-B-2890 2 0 6 4 4 8 2 5 2 8 H.C.GRAB BAR +33"-36"AFF TO CENTERUNE 809RICK-B-5806x36, F A X 4 4 1 6 1 8 4 8-5806.42,B-5806x18 S.M.SOAP DISPENSER +40"MAX.TO POINT OF DISPENSING BOBRICK-B-2111 S.M.TOILET SEAT COVER DISPENSER +44"MAX.TO POINT OF DISPENSING 809RICK-B-121 SEE ELEVATIONS 80 -8 211 0°04007®� ® C o COAT HOOK REGISTERED \A © PAPER TOWEL OISP. ASTE RECEPT. +48"MAX.TO POINT OF DISPENSING BOBRICK-B-3942 ARCHITECT \ F.D. H S.M.SANITARY NAPKIN DISPOSAL +19"-27"AFF TO CENTERLINE BOBRICN-8-154 ROBERT E WAGNER ® EXHAUST FAN, -S.M.=SURFACE MOUNTED STATEMWALIINGION SEE MECH. B2 NOTE FOR ADA ACCESSIBLE DESIGN: 9"FROM R.O. A L OPERATING MECHANISMS OR DISPENSING LOCATIONS MUST BE MOUNTED B/T 15"&48"OF FINISHED FLOOR FOR AN UNOBSTRUCTED APPROACH,AND WITHIN 44"IF REACH DEPTH IS BETWEEN 20°&25" B3 C WATER SUPPLY AND GRAIN PIPES UNDER LAVATORIES SHALL BE INSULATED OR OTHERWISE CONFIGURED TO PROTECT ACNNST CONTACT. PIPE INSULATION TO BE"HANDY SHIELD"BY PLUMBEREX SPECIALTY PRODUCTS. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORY SINKS. PROVIDE ADA SIGN AT TOILET THAT MEETS ICC/ANSI A117.1 CHAPTER 7 REQUIREMENTS. ALL COMMON USE CONTROLS INCLUDING LIGHT SWITCHES,HEATING/AIR CONDITIONING CONTROLS,SECURITY CONTROLS,ELECTRICAL CONVENIENCE OUTLETS AND OPERABLE PARTS OF ACCESSIBLE ELEMENTS MUST BE WITHIN REACH RANGES SPECIFIED IN ICC/ANSI A117.1 SECTIONS 308,309. OPERABLE PARTS ARE TO BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT PINCHING OR GRASPING OR TWISTING OF THE WRIST PER ICC/ANSI 309.4. \ EXISTING MAN DOOR EXISTING O.H. DOOR TOILET ROOM PLAN REFLECTED CEILING PLAN SCALE: 1/2"=i'-0" SCALE: 1/2"= N 3'-6" 3,-0„ 3'-4° 2'-0" 1'-0" RENTON PUBLIC WORKS COAT 18"VERT. \\ \ HOOK BUILDING D GRAB BAR IMPROVEMENTS ELECTRIC 1"STURD-I-FLOOR _� ❑v 0 HEATER 2.5"x2.5"06GA GALV. BREAK METAL CORNER GUARD TYP. x 2x6® 16 O.C. _i ° O o m z R-21 BATT INSULATION / 5/8 GWB 3555 NE 2nd St M Renton,WA 98056 A 7" MIN B p 4 C p 9" MAX " RUBBER BASE,TYP. 1'-6" INTERIO'R°ELEVATIONS J LE: P ERMIT SET JOB NO. O.H. DOOR TRACK STEEL FRAME Onle PeWSions STEEL FRAME BEYOND EDGE OF OPENING : :7.SEPTEMBER 201.2: O.H. DOOR TRACK � � � � � � � ' O.H. DOOR o 5/8" GWB ' EDGE OF OPENING ' ' . w . WALL BEYOND -� 2x4 0 16"O.C. O.H. DOOR O.H. DOOR R-15 BATT INSULATION FACE OF FOOTING 1/2" PLYWOOD : . . 6" B„ 6„ GRATE 8"X1" TO : _ FRAME BY TRENCH ME 6" _ DRAIN MFR. \ TOILET ROOM / PATCH ASPHALT gr _ TOILET ROOM: EXISTING ;DETAILS. . MAN DOOR #4 REBAR TYP. <.�I I I—III-I 4" RUBBER BASE : : . ® 24"O.C. -III-I —II l I A 1/2"x5 1/2"WEDGE ANCHOR, EMBED FLANGE 2 PER WALL NP. / 9" FROM R.O. \ AND STRAINER — — III—III—III CONCRETE FLOOR A BASE PER MECH. u mmn ,tg nom"wroa.� ama°N BASIS OF DESIGN: �.s'��vme .AAjfm1d..e,ae. NEAH FOUNDRY MODEL# R-4996-A SM1eet Na. EAST ELEVATION SOUTH ELEVATION TRENCH DRAIN TYPICAL WALL SECTION ^ c 7 ^LJ ag SCALE: 1/2°=1•-0° v SCALE: 1/2°=1•-0" 6 SCALE: 1"= 1'-0" SCALE: 1°=1'-0" :AL w� J I WAGNER ARCHITECTS PLANNERS ALIGN THE TOP OF THE SIDE 1916 PIKE PLACE LOUVER WITH TOP OF LOWERS ON- SEATTLE WA 98101 THE FRONT OF THE BUILDING TOp OF LOUVERS TO ALIGN WITH 2 0 6 4 4 8-2 S 2 8 DOORSCHEDULE TOP OF OVERHEAD DOORS TYP. F A X 4 4 1 • 6 1 8 4 wogn era rchu a ct s.0om MARK LOCATION TYPE DOOR SIZE In FRAME HDWR RATING EXIT DETAILS REMARKS ME I ---I'm m WIDTH HEIGHT THICK MAT. FIN. GLAZ. MAT. FM. GROUP MIN DEVICE HEAD JAMB THRES Ver aARO sizes 0004003 REGISTERED 1 10 - Y _ A 48 4 PT F •No r ARCHITECT 1.02 1 t - 0 �- M A 84 - HM PT HM / 1 106--AY A 6 B4 1-314 HM PT �T 1 ROBERT E WAGNER m>E or wwasrw NOTE: REFERENCE ELEVATIONS SEE MECHANICAL PLANS FOR LOUVER LOCATIONS NOTE: DO NOT CUT ANY EXISTING WALL GIRTS 0 EXISTING METAL SIDING INSULATION PER NEW CLOSURE \ NOTE: WALL TYPES VERIFY WALL TYPE FOR HM DOOR FRAME SHEATHING VARIES, DIMENSION OF FRAME CAULK PERIMETER OF NOTE: SEE WALL TYPES FRAME BOTH SIDES,TYP. VERIFY WALL TYPE FOR (2)2x6 HEADER NEW METAL FLASHING HOLLOW METAL SHEATHING VARIES, DIMENSION OF FRAME W/SPACER,TYP. CAULK ENTIRE PERIMETER DOOR NP. SEE WALL TYPES FRAME BOTH SIDES,TYP. OF FRAME ATTACHMENT ANGLE PER HM DOOR FRAME MANUFACTURE'S REDS.,TYP. DOOR HARDWARE GROUPS NEW WALL GIRT AS NEEDED 7'-0"0'-0"HOLLOW SETT NEW LOUVER,SEE MECH. METAL DOOR,TYP. Door:1.02 INSECT SCREEN TYP. -- ----- ---- 341q. YA2314 NRP 32D UK 1 D.Cim KI 45HJ 5CPS IC nder-Zero BlOed) 320 BE LOUVER HEAD DETAIL JAMB DETAIL HEADER DETAIL 1DOOrCMser(w)Slap) 351 CPS EN SA I KrWate K705010'xt-1R'LOVABECSK 32D RO 7 1 RO er tee RENTON PUBLIC SET2 T SCALE: 1 1/2"= 1'-0° SCALE: 1 1/2"=1'-0" SCALE: 1 1/2°= 1' Dwr -0° �,,,0, WORKS BUILDING D 3 Hinge T03386 320 MK NON IMPROVEMENTS 1 ldldlsel(Passage) 45HN 14J 32D BE 00 NOT CUT ANY EXISTING WALL GIRTS 1 Dar C6mr(.lHcMOpen•SWp) 351 CPSH EN SA .1 Kdom l K1050IVxl-1/2'L)W4BECSK 32D RO 1 Gasketlig(Ped.ter) S88D PE NEW LCUVER,VERIFY SIZE PIPE,SEE MECH. 3 Sum., 608 RO WITH MECHANICAL CAULK ENTIRE PERIMETER OF STORM COLLAR W/ NOTE: FRAME Np EXISTING SILICONE SEALANT METAL ROOF METAL FIASHING VERIFY WALL TYPE FOR HM DOOR FRAME FASTENERS DIMENSION OF FRAME CAULK PERIMETER OF 3555 NE 2nd St NEW METAL FLASHING FONT.BUM TAPE FRAME BOTH SIDES,TYP. Renton,WA HOLLOW METAL SHEATHING VARIES, NEW CLOSURE DOOR TYP. SEE WALL TYPES 98056 ATTACHMENT ANGLE PER MANUFACTURE'S REO'S - EXISTING METAL SIDING EXISTING WALL GIRT D<a�gn Ph°,e PERMIT SET �eLOUVER SILL DETAIL �� PIPE PENETRATION JAMB DETAIL SCALE: 1 1/2°=1'-0° J SCALE: 11/2'= 1'-0" SCALE: 1 1/2"= V-0" JOB NO. Dale ReMUarq . . . . . .7.SEPTEMBER 2012. . . . . . . . . . . . . . . . EXISTING WALL CONDITION UNKNOWN, CONTRACTOR TO VERIFY CONDITIONS BEFORE INSTALLATION NEW WALL GIRT . . . . . . . LOUVER,VERIFY SIZE VENT PER MECHANICAL SHEATHING VARIES, ' WITH MECHANICAL BATT INSULATION NOTE: SEE WALL TYPES : : : : PLYWOOD SHEATHING VERIFY WALL TYPE FOR (2)2x6 HEADER ' ESCUTCHEON PLATE DIMENSION OF FRAME W/SPACER,TYP. CAULK PERIMETER OF FRAME BOTH SIDES,TYP, `CAULK ENTIRE PERIMETER HM DOOR FRAME OF FRAME < :SCHEDULE: : METALXSIDING� xI`��—NEWL EDGE TRIM PER O.W.S.MECHANICAL METAL DOOR,TYP.W .oT D.ET.AILJ. +_q1 1/2' : . . . . . . . R . . . LOUVER JAMB DETAIL ��WALL PENETRATION HEADER DETAIL SCALE: 1 1/2°= V SCALE: 1 1/2°=V-0" J SCALE: 1 1/2"= 1'-0" .� ��r�✓ , Sfie,l No. ZQ A3 WAGNER ARCHITECTS PLANNERS 1916 PIKE PLACE SEATTLE WA 98101 HVAC GENERAL NOTES LOUVER SCHEDULE 2 0 6 4 4 8 . 2 2 8 FAX 4 4 1 6 1 1 8 4 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET, FREE wog.-nichilects.com WHICH MAYBE REQUIRED.THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER MARK MAKE MODEL I WIDTH HEIGHT AREA MATERIAL FINISH NOTES: L-1 GREENHECK ES0403 36" 30" 3.48 ALUMINUM KYNAR 1,2 TRADES AND IS TO VERIFYALL CLEARANCES BEFORE COMMENCING WORK. L-2 GREENHECK ESD-403 36" 30' 3.48 ALUMINUM KYNAR 1,2 �el0 2. MATERIALS,METHODS AND INSTALLATION SHALL COMPLYWITH THE PROVISIONS OF THE L-3 GREENHECK ESD403 38" 24" 2.78 ALUMINUM KYNAR 1,2 E - LATEST EDITION OF THE WASHINGTON STATE MECHANICAL CODE,INTERNATIONAL BUILDING O��IISfi1! L-4 GREENHECK ESDA03 36" 24" 1 2.78 ALUMINUM KYNAR 1,2 CODE,INTERNATIONAL FIRE CODE AND LOCAL CODES AND ORDINANCES. NOTES: et7AL • 1.SEE ARCHITECTURAL SPEC.FOR FINISH COLOR. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLYWTH THE LATEST INTERNATIONAL 2.PROVIDE ALUMINUM BIRDSCREEN. MECHANICAL CODE AND WITH CURRENT SMACNA STANDARDS. I , 4.JOINTS OF DUCT SYSTEM SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE , _ DUCT SEALANT. 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS TO MEETTHE REQUIREMENTS OF ELECTRIC WALL HEATER SCHEDULE 192 Nickerson,Suite#300 THE CURRENT WASHINGTON ENERGYCODE AND SPECIFICATION. Seattle,Washington 98109 HEAT ELEC Phone:206.285.2966 6. FLEXIBLE DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 6 FT IN Fax:206.285.1045 MARK MAKE MODEL SERVES I KW VOLTIPH NOTES: LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH EWH MARKEL E3321 TD-RP TOILET ROOM 750 1 120/1 11,2 NOTES: THE CURRENT INTERNATIONAL BUILDING CODE. 1.HIGH TEMPERATURE MANUAL RESETAND OVERTEMPERATURE SAFEGUARD 8. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOOR SHALL BE SLEEVED AND FIRE 2.BUILT N THERMOSTAT STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 9. PROVIDE RETURN DUCT SMOKE DETECTOR(S)FOR AUTOMATIC SHUTDOWN OF ALL RENTON PUBLIC HEATING OR COOLING EQUIPMENT DELIVERING IN EXCESS OF 2000 CFMNACCORDANCE CEILING PADDLE FAN SCHEDULE WORKS WITH THE CURRENT INTERNATIONAL MECHANICAL CODE.POWER WRING AND INTERLOCK i ELEC WGT. BUILDING D WRING WITH THE BUILDING FIRE ALARM SYSTEM IS BYTHE ELECTRICAL CONTRACTOR. MARK MAKE MODEL DIA. CFM RPM (WATTS) VOLTIPH LEIS NOTES IMPROVEMENTS 10.HVAC EQUIPMENT,VALVES AND DAMPERS SHALL BE LOCATED IN EASILYACCESSIBLE CF DAYTON I 4C854 56" 1 25,500 265 1 110 1 12011 25 1,2,3 LOCATIONS,UNLESS SHOWN ON ARCHITECTURAL DRAWINGS.REQUIRED ACCESS PANELS NOTES: 1.FURNISH SPEED CONTROL MOUNTED AT ELECTRICAL PANEL FOR BALANCING. SHALL BE PROVIDED BYTHE HVAC CONTRACTOR AND INSTALLED BYTHE GENERAL 2.SECONDARY SUPPORT CABLE. CONTRACTOR. 3.SEE PLANS FOR UNIT GUAM" 3555 NE 2nd St Renton,WA 98056 UNIT HEATER SCHEDULE GAS HEATING ELECTRICAL n.y rev. MARK MAKE MODEL CFM INPUTMBH OUTPUTMBH EFF AMP HP VOLTIPH WEIGHT NOTES: CHECKSET UH-1 REZNOR UDAS175 1537 120 99.6 83% 5.1 120 120/1 125 LBS 1,2,3,4 ENERGY CODE NOTES UH-2 REZNOR UDAS125 2242 175 142.25 83% 3.8 1/6 120N 200 LBS 1,2,3,4 1. SEE SCHEDULE FOR EQUIPMENT TYPE,CAPACITYAND EFFICIENCY. JOB NO, 2. PROVIDE THERMOSTAT CONTROLS CAPABLE OF A FINE(5)DEGREE DEADBAND ood • NOTES: BETWEEN HEATING AND COOLING. 1.7-DAY PROGRAMMABLE STAT . . .AUGUST. . . 3. PROVIDE AUTOMATIC SETBACK CONTROLS WITH NIGHT SETBACK AND SEVEN 2.CONCENTRIC TERMINAL KIT • • • • • • • ' ' ' ' ' . . . . . . . . . . . . . . (7)DIFFERENT DAYTYPES. 3.24 V CONTROL TRANSFORMER . . . . . . . . . . 4. PROVIDE DAMPERS FOR OUTSIDE AIR INTAKES AND EXHAUST FANS WHICH 4. PROPANE CONVERSION KIT CLOSE AUTOMATICALLYWHEN THE SYSTEM IS OFF,EXCEPT FOR THOSE . . . . . . . . SYSTEMS WHICH OPERATE CONTINUOUSLY. 5. PROVIDE MICROPROCESSOR-BASED THERMOSTAT FOR HEAT PUMP CONTROLS. 6. PROVIDE GAS-FRED HEATING EQUIPMENTWITH MODULATING ORSTAGED FAN SCHEDULE CONTROL FOR ALL EQUIPMENT OVER 225 MBH. ESP HP ELEC WGT. MAX 7. PROVIDE A MEANS OF BALANCING EVERYAIR SUPPLY OUTLETAND AIR OR ,MARK SERVES MAKE MODEL TYPE CFM INCH WC RPM (WATTS) VOLTIPH LBS BONES NOTES: P"C?.' . ' . • • ' . WATER TERMINAL DEVICE. • • •COYER SHEET. EF-1 TOILET ROOM PANASONIC FV-15VQ5 CEILING 120 0.25" - 30W 120/1 15 0.5 A,4 8. SIMULTANEOUS HEATING AND COOLING IN AZONE IR NOT PERMITTED. EF-2 BAY3-5 AREA GREENHECK BSQ-160-5 NLNE CENT. 1800 0.5" 881 12 HP 120/1 240 8.3 B,1,2,3,b,6 9. SEAL TRANSVERSE AND LONGITUDINAL SEAMS OF ALL DUCTWORK. . . . 10. DUCT INSULATION:SEE SPECIFICATION SECTION 15250. EF-3 BAY 1-2 AREA GREENHECK BSQ-130-3 NLNE CENT. 1200 0.5" 1228 113 HP 120/1 140 10.4 B,1,2,3,5,6 . . . . . . . . . ; 11. PIPE INSULATION:SEE SPECIFICATION SECTION 15250. EF-4 BAY 1-2 AREA GREENHECK SEI-8-440-G SIDEWALL DR. 135 0.25" 1 1350 1150 HP 120/1 50 3.3 A,4,7,8 ; ; ; ; ; , , ; , ; ; ; , , 12. ALL ELECTRIC MOTORS GREATER THAN 1.0 HP SHALL MEET WASHINGTON NOTES: STATE ENERGYCODE TABLE 14.4 EFFICIENCY REQUIREMENTS. 1. EXTENDED LUBE LINES S.MOTORIZED BACKDRAFT DAMPER A. RUNS CONTINUOUSLY 2.AUTOMATIC BELTTENSIONER 6.SPRING FLANGING ISOLATION B.CO SENSOR AND MANUAL WALL SWITCH IN 3.MOTOR COVER 7.SHORT WALL HSG.WITH FLUSH EXTERIOR 4.MANUAL BACKDRAFT DAMPER 8.WEATHERHOOD WITH BIRD SCREEN,45 DEGREE SYMBOL ABBRV DESCRIPTION WAGNER MECHANICAL SYMBOLS LEGEND ® SEQUENCE OF OPERATIONS ARCHITECTS ROUND ELBOW OUT OF PAGE P L A N N E R S 1916 PIKE PLACE Q ROUND ELBOW INTO PAGE SEATTLE WA 98101 SYMBOL ABBRV DESCRIPTION 2 0 a 4 4 4 4 8 1 b 6 5 8 8 0 ROUND DUCT OUT OF PAGE FAX • t 8 a wa Onec icniie cts.com P I PLUMBING EQUIPMENT "S" ROUND DUCT INTO PAGE RENTON BUILDING D SEQUENCE OF OPERATION DETAIL NUMBER ROUND BREAK(CONTINUATION) M-I SHEET DUCT 1. CONTROLSYSTEM. O FLAG NOTE RECTAN BREAK(CONTINUATION) PROVIDE SIN ACCORD WITH T ELECTRIC/ELECTRONIC CONTROLS TO PERFORM PO �ses1a FUNCTIONS INACCOFtDVNTHTHEFOLLOWING. �adr L comet. REVISION TAG PIPE BREAK(CONTINUATION) 2. TOILET EXHAUST FAN:EF-1 AHU-I MECHANICAL EQUIPMENT FAN OPERATES CONTINUOUSLY. O T THERMOSTAT D DIFFUSER/GRILLE TYPE 3. BAY 1-2 CONTINUOUS EXHAUST FAN:EF-4 CFM ® SENSOR FAN OPERATES CONTINUOUSLY. —_--__--_ Ow COLD WATER I SECTION NUMBER —"--"—'-- HW NOT WATER 4. APPARATUS BAY EXHAUST FANS:EF-2 8 EF-3 Seattle,Wa shin WASTE 98109 Suite#300 SHEET NUMBER HWC HOT WATER CIRCULATING Phone:206.285.2966 FAN OPERATES WITH WALL SWITCH(BY E.C.)OR RELAY FROM Fax:206.285.1045 W WASTE(BURIED) CO SENSOR. FAN ACTIVATES ON CARBON MONOXIDE(CO) -------- WASTE(ABOVE GRADE) LI_VEL OF 50 PPM(ADJ).FAN INTERLOCK OPENS ASSOCIATED W MOTORIZED DAMPERS WHEN FAN IS OPERATING.ON A CO INTERNALLY LINED DUCT y VENT LEVEL OF 100 PPM(ADJ)ACTIVATE WARNING BELL(BELL L BY E.C.) IOXI2 DUCT(IST DIMENSION SIDE SHOWN, • DIRECTION OF FLOW 2ND DIMENSION OTHER SIDE) BALANCING VALVE(CIRCUIT SETTER) 5. UNIT HEATERS:UH-1 R UH-2 FLEX DUCT CHECK VALVE UNITS OPERATE ON LOW VOLTAGE ELECTRONIC UNION THERMOSTATS. ® RECTANGULAR SUPPLY MGT OUT OF PAGE --o BALL VALVE RECTANGULAR SUPPLY DUCT INTO PAGE 6. ELECTRIC WALL HEATER: EWH-1 RENTON PUBLIC 0 WORKS PRESSURE GAUGE UNIT OPERATES WITH BUILT IN THERMOSTAT. ® BUILDING D D SUPPLY DIFFUSER THERMOMETER —194 STRAINER 7. CEILING FANS: CF IMPROVEMENTS ® RECTANGULAR RETURN DUCT OUT OF PAGE © --� PIPING FLEXIBLE CONNECTIONS FANS OPERATE WITH MANUAL WALL CONTROL(BY E.C.) RECTANGULAR RETURN DUCT INTO PAGE OR G RETURN OR EXHAUST GRILLE ----I I OR ] CAP —� NOSE BIBB 3555 NE 2nd St Renton,WA VD VOLUME DAMPER O PIPE DOWN 98056 MOTORIZED CONTROL DAMPER PIPE UP REMOTE OPERATED VOLUME DAMPER TEE UP —_ BDD BACKDRAFT DAMPER TEE DOWN o.r nv. FG FLEX CONNECTION ® PUMP CHECKSET -� rO FLOOR DRAIN TURNING VANES STRAIGHT TAP 0 ROOF DRAIN aos No. AFF ABOVE FINISHED FLOOR TAPERED FITTING : : z4:KWL&'dli . � N75 NOT 70SCALE - - - - - - . . . . . . . . . . . . . . BELL MOUTH FITTING GSM GALVANIZED SHEET METAL EG EXHAUST GRILLE CONICAL FITTING CD CEILING DIFFUSER RAG RETURN AIR GRILLE . . . . . . . . . . . . . . 45 DEG.ANGLE TAP AP ACCESS PANEL IE INVERT ELEVATION TYP TYPICAL P" . . . . . . . . DN DOWN : •SYFABO LS' LEGEND • - . . . . . . . . . . . . . a.a k'. . . . . . . . . . . . . . . . . . . . . . . . . WAGNER Renton Public Works Building D Renton Public Works Building D Renton Public Works Building D ARCHITECTS 2.04 FIRESTOP FOR PIPING P L A N N E R S SECTION 15000 S. Record Drawings:Provide two sets of record drawings for each Plumbing and HVAC.Show 1 9 1 6 P I K E PLACE GENERAL PROVISIONS location of piping,ductwork,and equipment and size of piping and ductwork.Locate all A. Contractor shall provide all required firestopping for its work,shall note In Its proposal what SEATTLE W A 98101 valves,cocks,dampers and similar equipment. firestopping manufacturer and products it intends to use,and shall indicate the amount of budget Included in Its proposal for frestopping.Where PVC or ASS piping passes through 2 0 6 4 4 8 2 5 2 8 1.01 SCOPE OF WORK C. Operating and Maintenance Manuals:Fumish two(2)copies of operating and maintenance rated walls,provide Speeseai SSC Firestop Collars.Install with Speeseal sealant per F A X 4 4 1 6 1 8 4 manuals.Manual shall be hard cover loose-leaf with index and tabbed Sections.Manual manufacturers Instructions. w o g n is r a r c h I I e c t s.c o m A. Conform to General and Supplementary Conditions,the modifications thereto and Division 1 shall Include the following,as a minimum: General Requirements for all work In Division 15. 2.05 IDENTIFICATION Manufacturers,suppliers,and subcontractors'names,addresses and phone numbers. S. Plumbing and HVAC are design/bid/build contracts with Sider+Byers as Engineer of Record. Schedule and description of routine maintenance for each component to Include oiling, A Equipment Nameplates:Black bakelite with white layer,1/4"lettering with equipment Provide labor,materials and equipment and provide satisfactory Installation of mechanical lubrication and greasing data;and belt sizes,types and lengths, schedule designations(e.g.:"EF•1,Exhaust Fan'). work complete and ready to operate In strict accordance with the specifications and drawings. • Balancing and lest data. .ZQ46 A, C. Provide mechanical systems to support Control diagrams and sequence of operating. D. Pipe Marking:Semirigid plastic coil markers with written legend,color-coded background, ys pport renovation of an existing vehicle repair facility, Written guarantees. and flow arrow all in accord with ANSI A13.1.Designations same as legend on drawings. Including but not limited to the following. ``O 15615 1. Plumbing: D. Operation Instruction Period:Conducted by Contractor during minimum eight(8)hour period. C. Valve Tags:1-1/2"diameter 18 gauge brass,aluminum,or 3/32"plastic stamped to Indicate 'P4171 TE¢. a. All new domestic cold and hot water piping.Below grade, X are al Type K copper. Deliver and post all operation and maintenance Instructions at this time. service,1/4"lettering,chain hanger.Plain English designations so no Index H required. �'eroNAL Above grade,Type L copper,Flowguard Gold CPVC,or PEX are allowed. - b. All new plumbing fixtures.See fixture schedule. 1.06 ELECTRICAL 2.06 PAINT c. All new waste and vent system.Below grade waste and vent to be ASS or PVC. Above grade waste and vent to be ABS,PVC,or cast-Iron no-hub, A. Power Wiring:See electrical documentation. A. Ductwork:Paint interior of ductwork visible through grilles and diffusers with a flat black PEN d. Floor drains and trench drains where shown. paint.Prepare and paint surfaces in accord with Division 9. • e. Pressure relief piping from water heaters to acceptable drain. B. Control Wiring:By Division 15,both line and low voltage required for control.If Division 15 , I. Drain pans underwater healers,piped to acceptable drain. contractor wants electrical contractor to Install line voltage control wiring.that Is an Internal 3.01 PIPE AND PIPE FITTINGS 2. Heating Ventilation and Air Conditioning: arrangement between contractors and ultimate responsibility rests with Division 15. a. Electric Unit Heaters with related controls as indicated. A Pipes:Remove burrs before reaming:Use pipe cement on male threads only. e b. Exhaust systems as Indicated. C. Owner will not entertain additional cost request due to tack of coordination between Division 3. Insulation,vibration and noise isolation requirements: 15 and electrical contractor. B. Opening in Pipes:Keep closed during process of work. a. All hot and cold domestic water piping shall be Insulated per code with preformed 192 Nickerson,Suite#300 fiberglass insulation with'FSK"facing.For piping 1'and larger,shield insulation with 1.07 WARRANTY C. Concealed Piping:Install so as not to Interfere with light fixtures or other trade components. Seattle,Washington 98109 metal wrap at each support.Supports shall not touch pipe. Phone:206.285.2966 b. Where pipes pass through a wall or floor,the hole shall be oversized by 1",stuffed A Warrant materials and workmanship for one year after Substantial Completion.Provide D. Close Nipples:Not permitted on any part of work.Use standard short nipples for short pipe Fax:206.285.1045 with fiberglass and sealed with caulk.No contact with the wall or floor is allowed. written guarantee and submit with Maintenance and Operating Manual. connections.Use of bushings not permitted. C. Domestic supply lines shall be fed through standard plastic isolation grommets at all stud penetrations. 1.08 COORDINATION OF WORK E. Co pp er Tubin g:Solder joints with co pp er j oints in copper piping. . 1.02 CODES AND STANDARDS A. Coordinate design and shop drawings to preclude Interference between trades.Conflicts F. Connections Between Pipes of Dissimilar Metals:Make with insulating(Dielectric)unions. shall be brought to the attention of the Architect prior to installation. Include cast iron valve connections to adapters for copper Iron. Conform to following code and agency requirements having jurisdictional authority over mechanical installation: C. Insure proper'rough-en"on all equipment to which connections are made. G. Cutting of Copper Pipe:Use a cutter.Smooth sharp edges with emery cloth. International Building Code with local amendments H. Pipe Tees:Saddles not permitted.Use tee's orT-Drill. International Mechanical Code with local amendments. 1.09 CUTTING AND PATCHING Uniform Plumbing Code 3.02 VALVES AND SPECIALTIES National Electric Code A. Perform all cutting and patching necessary to Install work.Patching shall match adjacent Local Sewer and Water District Requirements surfaces. A. Pressure Relief Valves:Install at all points required by codes and where required for Local Department of Health protection of equipment and piping.Set pressure shall be as Indicated or directed.Pipe Local Fire Code discharge to nearest floor drain(pressure cannot exceed 30 psig)or to safe acceptable RENTON PUBLIC National Fire Protection Association(NFPA) terminus. Washington Industrial Safety and Health Act(WISHA) Washington State Energy Code B. Ball Valves:Must be used in lieu of gate valves on all services. WORKS Comply with current ADA Standards. C. Unions/Flanges:Install at final connections to equipment and on control side(downstream)of BUILDING D 1.03 FINAL CONSTRUCTION APPROVAL all valves in mains,branches and risers. IMPROVEMENTS Renton Public Works Building D Page 1 Renton Public Works Building D Page 13 Renton Public Works Building D Page 15 SECTION 15050 D. Access Panels:Provide to service valves,dampers,motors,air vents or other concealed Recommended upon completion of the following: BASIC MATERIALS AND METHODS equipment 3555 NE 2nd St Permit submittal 2.01 DOMESTIC WATER VALVES E. Escutcheons:Install at all places where exposed piping passes through walls,floors or Testing and cleaning ceilings of finished areas. Renton,WA Owner operation Instruction period A. Nibco,Crane,Slockham,Hammond or Milwaukee equal to Nihon model numbers listed: Execution of Architect/Engineer's final observation report F. Galvanized Steel Sleeves:Not less than 16 gauge,cast in concrete wherever piping passes 98056 Operation and maintenance manuals though concrete floors or walls.Sleeves for insulated pipe shall be of sufficient size to allow Record drawings Domestic Service the covering to pass through sleeve.Extend sleeve 1"above finished floor for sleeves In Doors of rooms exposed to water.For penetration of floors and wall from buried pipe,caulk 1.04 TERMS OF CONTRACT Gate: Not Permitted Use Ball Valve annular space between pipe and sleeve.Provide UL listed fire sealant at fire rated surfaces. A. Submittals: Globe: 2"&under T-211 3.03 IDENTIFICATION 1. Submit for review six(6)copies of brochures(catalog data),with each item labeled and 2-1/2"6 over F-718 O.ipr Rxe• marked with the exact equipment being provided.Although Plumbing and HVAC may be A. Equipment Nameplates:Affix prominently on equipment.Pipe Marking:Every 20 feet,ngwall submitted as separate units,each discipline must be complete.Do not provide'partial', Check: 2"1 under F-913 or partitions,and at a unctions.Minimum one marker above each room with plumbing CHECK SET p p e P P (Hertz) 2-12'E over F-918 Pa pep j p B or"early"submittals;these will he returned unreviewed. fixtures.Lettering oriented to be read from below horizontal centeriine.Valve Tags:Provide 2. All information shall be bound and clearly labeled.Turn in all Plumbing and HVAC on all valves.Plain English designations so no Index is required. discipline submittals as a single unit Do not provide'partial"or"early'submittals. Check: 2"&under T-480 2. Submittals may be furnished as hard copy or electronic files.Either method must be (Vert) 2-112"8 over F-910 organized as set forth above.Hard copies must be bound in a single book with all parts SECTION 15140 included.Electronic files must be one file in PDF formal. Bali: 2"8 antler T-585-70 SUPPORTS AND ANCHORS JOB ND, 3. Unless otherwise Indicated,material and equipment to be submitted include all items 21/2"d over Odle Rrdrkre specified In Part 2(Products)in each section of Division 15 and as listed on equipment 2.01 GENERAL 24./t116'l15•f 241Y schedules on drawings. . , , , . . . . . . . 4. Do no fabrication or manufacture of products until return of approved submittals. B. Pressure Relief Valves:Bronze ANSI 221.22 with bottom inlet,side outlet,spring loaded,top A. Furnish standard and fabricated hangers and supports complete with necessary inserts. . . . . . . . . . . . 5. Provide shop drawings for all products,systems,system components,and special lever.Setting at lesser of 10%or 25 psig over operating pressure.Threaded Inlet.Watts bolts,nuts,rods,washers and other accessories. supports which are not a standard catalog product and which may be fabricated for the 174A,Faris,Consolidated,Lonergan. Contractor or by the Contractor.Layout drawings to scale and show dimensions where B. Prevent contact between dissimilar metals,such as copper tubing and steel,by use of accuracy of location Is necessary for coordination or communication purposes. 2.02 PIPE AND FITTINGS copper-plated,plastic coated,or flexible materials.All supports which contact copper tubing 6. The Contractor shall in addition,submit drawings and/or diagrams as follows.Drawings shall be copper plated. and details under the section shall Include(but not be limited to)the fallowing: See Relevant Section. a. Electrical Interlock wiring diagrams 2.03 PIPING SPECIALTIES 2.02 PIPE HANGERS AND SUPPORTS ; ; ; b. Temperature control diagrams 7. The Architect's review of such drawings shall not relieve the Contractor of responsibility A. Hangers:Hot and cold pipe sizes under 2 inches:split ring. for deviations from the Contract drawings or specifications,unless he has,in writing, A. Strainers:0.045"perforated 304 stainless steel screen;threaded for 2"and smaller,flanged called the attention of the Architect to such deviations at the time of the submission,nor for 2-112"and larger with blow-off discharge piped to nearest drain Armstrong At SC,Yarway, B. Plumbers Tape:Not acceptable. • • • • • ' • . . . . shall it he him from responsibility for errors or omission in such drawings. Same. B. Substitutions: B. Gauges:4 1/2"case within 7 feet of floor;6"case if mounted above seven feet.Cast C. Protection "Thermal Shlelr tProtectionSaddles:Galvanized iz d sheta metal jacket,Pipe Shields,Inc. 5hed Caereb 1. Manufacturers and models of equipment and material indicated herein and on drawings aluminum black finish.Accuracy 112 of 1%.Operating range shall register mid-point on dial. ; 9 • . . . .HGATION are those upon which mechanical design should be based.Other manufacturers with Dial ranges to be submitted for approval.U.S.Gage,Marsh,Trerice,Weiss. D. For CPVC domestic water piping:Hanger and support system may include plastic elements products considered equal In general qualily may be listed without specific model specifically Intended for support of CPVC domestic water piping,Holdrite or approved equal. - designation. C. Access Panels:Same type and construction Stainless as those specified in Division B or Milcor,Type 2. In selecting substitute equipment,Contractor Is responsible for and must guarantee equal 'K"with screwdriver operated lock.Stainless steel access panels in file walls. 2.03 DUCT HANGERS AND SUPPORTS performance and fit:Cost of redesign and all additional costs incurred to accommodate ' the substituted equipment shall be borne by the Contractor. A. Hanger straps and rods shall be in accord with SMACNA Duct Construction Standards. - 3. Any and all substitutions must be requested by the contractor,and approved by the . . . . . . . . Owner or Architect prior to incorporation into the project. . . . . . . . . . . 4. Request for substitution must be submitted with sufficient time for review to avoid ' ' ' . • ' ' . • ' ' . Impacting work schedules.If not,they will be turned down. 1.05 DOCUMENTATION M r�.r � +,r 'r4' `(..e A Permits:Submitted for,paid for and obtained by contractor.Submit copies of signed, ta�.t approved permits to the Architect.See Supplementary Conditions. . . . . . . Page 12 Page 14 Page l6 ' Renton Public Works Building D Renton Public Works Building D Renton Public Works Building D WAGNER ARCHITECT S 2.04 SLEEVES B. General:Brass and bronze body with brass and stainless steel now control components P L A N N E R S with check stops,vandal resistant lockable handle,rough bronze finish.Certified to ASSE 1 9 1 6 PIKE PLACE A. Through frame or similar construction:Form with 18 gauge galvanized steel. 3.02 INSTALLATION 1070 standard. SEATTLE W A 9 81 01 B. Through Ocor slabs: 2.04 WATER HAMMER ARRESTORS 2 0 6 4 4 8 2 5 2 8 9 A Provide insulation as listed in 3.01. 1. Steel pipe sleeves for steel and plastic carder pipe. FAX 4 4 1 6 1 8 4 2. Copper(type K)pipe sleeves for copper carder pipe. S. Apply covering when building is thoroughly dry to prevent shrinkage. A Factory fabricated.PDI certified unit with stainless steel construction and nitrogen charge. w a It n e r a r c h I I e c 1 s.c o m 2.05 SEISMIC SUPPORTS MIFAB,Wade Shokslop,PPP or approved. C. Insulate all risers,branches end connections to equipment. 2.05 EXPANSION TANK SJ A. Provide seismic support per IBC 1613 requirements(previously"Seismic Zone 3"conditions). D. Insulate pipe at hangers and provide protection saddles or shields. A. Armstrong,Amtrol,TACO or approved. 3.01 PIPE AND EQUIPMENT SUPPORT E. Do not insulate over equipment data labels. 2.06 DOMESTIC WATER HEATER '$E° A. Locate hangers,supports and accessories to support pipelines,valves and additional F. Insulation is not required on sound lined ductwork with sufficient insulating value. concentrated loads. A Manufacturers:A.O.Smith,or approved equal. Insulate outside air Intake ductwork. 4 SSrte B. Install no support,anchors or sway braces In any manner which may damage building G. B Type:Automatic electric vertical storage • construction. b'IONAL - H. Insulate all return air and exhaust air ductwork external of building Insulation.Return air and . , , . C. Minimum hanger support points. exhaust air ductwork inside Insulated envelope of building need not be insulated. C. Tank:Glass fined welded steel,minimum 2.112"thermal Insulation,encased in corrosion- 1. Adjacent to fittings at each offset or change of direction. resistant steel jacket with baked-on enamel finish.Minimum energy factor 0.90,minimum 2. End of branch over 5 feet long and at each riser. I. Closed-cell foam(IMCOA or equal)may not be Installed on this project. 6 year warranty. 3. As required on straight runs to maintain grade and slope to drain. D. Controls:UL 174,automatic water thermostat with temperature range from 120 to 770 , degrees F,flanged or scree in copper or IncolOy steel elements,enclosed controls and D. Where several pipes can be Installed parallel and at same elevation,provide multiple or SECTION 15400 electrical junction box.Wire double element units so elements do not operate trapeze hangers. PLUMBING FIXTURES AND TRIM simultaneously. s 3.02 DUCT SUPPORT •l 2.01 PLUMBING FIXTURES E. Accessories:Brass water connections and dip tube,drain valve,aluminum/stainless A Make field measurements to establish locations of hangers and supports where installation steel or magnesium anode and temperature and pressure relief valve. will not damage building construction. A. As scheduled,or approved equals.Unless Indicated otherwise all fixtures shall be white or 192 Nickerson,Suite#300 manufacturers standard. 3.01 EXTERIOR WALLS Seattle,Washington 98109 Phone:206.285.2966 B. Locate hangers,supports and accessories ci handle loads imposed by ductwork,and air A. Install water piping on Interior side of building Insulation. Fax:206.285.1045 distribution devices and with maximum spacing noted. 2.02 FIXTURE TRIM P P 9 9 C. Support all ductwork to prevent sag,undue play and swing. A Solid brass,chrome finish,single handle,vandal resistant aerator,washerless.Chicago, 3.01 WATER HAMMER ARRESTORS 0. Maximum spacing per SMACNA standards. Delta,Fiat,HDF or approved equal. A Install on hot and cold water of each fixture group(e.g.:one arrestor may serve each service 2.03 FUTURE SUPPLIES to a toilet).Select unit sizes and install in accord with PDI Standard WH-201. E. Adjust hangers and supports as required to bring system to proper line and grade. 3.03 PIPE HANGER SPACING MAXIMUM A. Install for all required fixtures equal to Speedway Flexible Supplies TR39A or similar fixed key (MAXIMUM) stop type as applicable to specific fixtures. SECTION 15420 A. Copper and CPVC Water Piping: 2.04 FIXTURE SUPPORTS SOIL AND DRAINAGE SYSTEMS Hanger Rod Hanger Rod Pipe Sae Max Diameter Pipe Size Max Diameter A. Provide concealed am carriers for all wall mount lavatories.Wade or approved equal by J.R. 2.01 SANITARY SEWER Ik VENT PIPING,BURIED WITHIN 5 FEET OF BUILDING Inches Eett inches Inches Feet (inches) Smith,Zum,Watts,Josam,or MIFAB. 112 5 3/8 1 12 8 1/2 A. Cast Iron Pipe&Fittings:ASTM A888,CISPI 301,hub-less.Made in USA by AB81, 3/4 6 3/8 2 g 1/2 3.01 EXPOSED PIPING,VALVES,HANGERS,ETC.,AT FIXTURES Charlotte or Tyler marked with collective trademark of the Cast Iron Soil Pipe Institute(CISPI) 1 6 3/8 21/2 10 1/2 and listed by NSF International, RENTON PUBLIC 1 114 7 318 3 10 112 A. Chromium plated. 1. Fittings:Long pattern cast Iron. 2. Joints:Neoprene gasket ASTM C-564,all type 304 stainless steel camp and shield WORKS B. PEX Piping:Per manufacturers recommendations. 3.02 COUNTER-TOP SINKS assemblies,80 in4bs worm drive.FW1680.Class 1,CISPI 310 and certified by NSF BUILDING International.Minimum 4 clamps up to 4',6 clamps for 5"and larger.Husky SD 4000, BUILDING C. Cast Iron Soil Pipe:Minimum one hanger per pipe length within 18"of joint. A. Verify with cabinet supplier priorto ordering. Mission Heavy Weight,Clamp-All or approved equal. IMPROVEMENTS Renton Public Works Building D Page j 7 Renton Public Works Building D Page)9 Renton Public Works Building D Page 111 D. Place hanger within one foot of each horizontal elbow. 3.03 FIXTURES AND EQUIPMENT B. ASS Pipe:Schedule 40,ABS material,DWV,Cellular Core.bell and spigot style solvent sealed ends.NSF Standard 14,ASTM F628,ASTM D3965. 3.04 SEISMIC PROVISIONS A. Furnish all traps,valves,tallpleces and other trim not furnished with equipment to Include 1. Fittings:ABS,DWV,ASTM D2661. contract,kitchen and owner furnished equipment. 2. Joints:Solvent weld.ASTM D2235. 3555 NE 2nd St A Install in accord with IBC 1613,SMACNA Standard and for Seismic Zone 3 conditions. 3.04 SHUT-OFF VALVES C. PVC Pipe:Schedule 40 solid wall PVC,bell and spigot solvent sealed ends.NSF Standard Renton,WA 14,ASTM D1785.ASTM 01784. 98056 SECTION(5250 A. Provide on all water lines to fixture groups. 1. Fittings:Schedule 40,PVC,ASTM D2665. INSULATION 2. Joints:Solvent weld with ASTM 02564 solvent cement. 3.05 FIXTURES 2.01 INSULATION 2.02 SANITARY SEWER&VENT PIPING,ABOVE GRADE A. Locate In accordance with details on architectural drawings.structural drawings andlor A. Preformed Glass Fiber(PGF)Piping insulation:4#density,0.24K at 75"F mean temp., Architects direction in field. A. Cast Iron Pipe 8.Fittings:ASTM A888,CISPI 301,hub-less.Made in USA by AB81,Charlotte laminated jacket.Manville Micro-Lok AP-T or approved. or Tyler marked with collective trademark of the Cast Iron Soil Pipe Institute(CISPI)and 0 Phrw 3.06 FIXTURE AND EQUIPMENT MOUNTING listed by NSF International. B. Foamed Plastic(FP)Piping Insula8on:0.27K at 75'F mean temp.,Armstrong Armanex or 1. Fittings:Long pattern cast Iron. CHECK SET approved. A. Provide concealed am hangers for all wall mounted fixtures.Align fixtures and equipment 2. Joints:Neoprene gasket ASTM C-564,all type 304 stainless steel clamp and shield Installed In batteries In accord with architectural drawings.Flt fixtures on finished walls assemblies,801Mbs worm drive.FM-1680,Class 1.Husky,Mission,Clamp-All or C. Flexible Glass Fiber Blanket(FGF)for ducts in conditioned space:3/4#density,minimum R- without noticeable warpage on either the wall or fixture and grout with G.E.silicone or similar approved equal. 3.3 installed,Toil jacket.Manville Miaalite or approved. approved material. 2.03 CLEANOUTS D. Flexible Glass Fiber Blanket(FGF)for ducts outside conditioned space:2"thickness,1-12# 3.07 WATER CONNECTIONS JOB NO• density,minimum R-7 installed,foil jacket.Manville Microli[e or approved. hrMa. A. Install Individual stops on all fixtures.R water connections are concealed,Instal valves in lieu Wade,Zum,Sioux Chief,J.R.Smith or Josam equal to Wade models listed. Oob E. Not accepted:IMCOA closed-cell foam orsimllar polyolefin foam Insulation. of stops. Floor Cleanout 6000-2-7-5 bronze tapered thread plug 24.Al1Gl1Sf 2012 : Flcor Cleanout 6000-TS-1 use in file floors. 3.01 APPLICATION 3.08 FIXTURE CONNECTIONS(INCLUDING WATER,SOIL,WASTE AND VENT) . Floor Cleanout 6000-2-72 with carpet marker. Wan Cleanout 8590-FJR bronze plug,chrome cover. A. Pipe Insulation:Provide on all piping as listed In table below. A. In accordance with rough-In details of manufacturer. Grade Cleanout 6004-39-118 cast Iron body w/bronze plug. PIPE SIZE SECTION 15410 2.04 TRAP PRIMERS LjLJ_fii nsul unouts t t/4.-2" 2 1/2'1" 5"'6' DOMESTIC WATER SYSTEMS A MIFAB,J.R.Smith,Josam,Wade,or Zum equal to Wade model 2400. >vpe 2.01 PIPE AND FITTINGS ' 3.01 HORIZONTAL SOIL AND WASTE PIPING Domestic PGF/ 12' 112" 112" 112" 112" A. Below Grade:Type"W copper with wrought copper fittings and 95-5 solder or HOPE with A. Grade at 114"per foot where possible,but In no case less than 118"per foot Install all main CW FP fused joints. vertical sot and waste stacks with provisions for expansion. Domestic HW PGF 1" 1" 1" 1 1/2" 1 1/2" B. Above Grade:Type"L",hard drawn copper with wrought copper fittings;95-5 solder. a"C." and tempered Chrome-plated brass for exposed piping to fixtures. 9 pp 3.03 FLOOR DRAINS AND TRENCH DRAINS - - water A. Trapped and vented.Install automatic primers throughout. SPECIFi GAT 10N - 2.02 WATER PRESSURE REDUCING VALVES . • • , , _ • , • , , . , S. Duct Insulation:Provide on ell ductwork as listed In table below. A. Manufacturers:Watts or equal by Apollo/Conbraco,Wilkens or approved equal. 3.04 CLEANOUTS Duct Location Air Conditioned Healed Only B. 2 Inches and Smaller.Bronze body with stainless steel Inlet strainer,reinforced EPDM A. Provide Query 50 feet and install at all locations required by code to permit cleaning of all Building Exterior 2',R-7 2",R-7 diaphragm,replaceable stainless steel seat,adjustable outlet pressure between 25-75 waste piping.Provide cleanouts full size of pipe,but no larger than 4".Coordinate with - - - - - - psi,300 psi working pressure,33F-16GF operating temperature range.Watts U5-Z3. Architect when cleanouts are located In finished rooms.Install cleanout threads with Unconditioned Space 2",R-7 2",R-7 • • • • • • Inside Building 2.03 TEMPERING VALVE(PUBLIC LAV) graphite.Locate cleanouts to clear cabinet work and to be easily accessible. , • • . , , , , . . • , , . Supply Air Ductwork 1",R-3.3 1",R-3.3 A. Manufacturers:Symmons,Leonard,Powers or approved equal. M ry�iYr In Concealed Spaces •+ �+ Outside Air Intake 2",R-11 2",R-11 Page j 8 Page 110 Page 112 �Epj�,{ •gp�j�ik. . .1. k3 R6'• . . . . . . . . . . . . . . . . . . . . . . . . WAGNER ARCHITECTS PLANNERS Renton Public Works Building D Renton Public Works Building 0 Renton Public Works Building D 1916 PIKE PLACE SEATTLE WA 98101 SECTION 15459 G. Accessories: LIQUID-PETROLEUM GAS SYSTEMS 1. Concentric vent termination kit E. Protect of the Work.and entry of foreign materials by temporary covers,completing 2 O b • 4 4 1 2 5 2 B 2. Propane conversion kit sections of the Work,and isolating parts of completed system. F A % 4 4'1 6 1 6 4 2.01 LPG PIPING,BURIED WITHIN 5 FEET OF BUILDING 2.02 FORCED AIR WALL HEATER F. Provide factory vent and combustion air terminations.Flash and seal piping penetrating w a g n e r a r c n I 1 e c s.c o m A. Steel Pipe:ASTM A53,Schedule 40 black,seamless.Manufactured in the USA. building exterior to maintain Integrity of assembly. i. Fittings:ASTM A234,forged steel welding type. A. Manufacturers:Markel,Cadet,Brasch a approved equal. G. Level and plumb flue piping,chimney and stacks. 2. Joints:ASME 831.9,welded. R•ZsAoF 6p `O\` 3. Jacket AWWA C105 polyethylene jacket or double layer,half-lapped 10 mil B. Heavy gauge housing and frame with sealed tubular heating element,thermal overload polyethylene tape. - cut-off,fan delay switch,bulit4n tamperproof thermostat,vane axial blower.UL listed, SECTION 15990 2.02 LPG PIPING,ABOVE GRADE 2.03 CENTRIFUGAL INLINE FANS 2.01 SUBMITTAL TESTING AND BALANCING z' �xsals A Steel Pipe:ASTM A53,Schedule 40 black,seamless.Manufactured in the USA A. Manufacturers:Greenheck,Cook or approved equal. 'fOOt sp4o 1. Fittings:ASME 816.3,malleable iron,or ASTM A234,forged steel welding type. A. Provide three(3)copies of typed and bound report.Include a copy of report in Operation and �O47oNA 2. Joints:Threaded for pipe 2 Inch and smaller;welded for pipe 2.112 Inches and B. Construction:Square galvanized steel with duct wllars,two removable access panels. Maintenance Manual. N�dexmR anger. Backward inclined aluminum wheel and Inlet,statically and dynamically balanced. 2.02 FORMAT 2.03 BALL VALVES C. Belt Drive: A. Report shall consist of test sheets similar to AABC Forms as follows: I�1I�` 1. Motor.Heavy duty ball bearing type with steel frame mounted on vibration P Form 12666 Diffusers and Grilles , • A Manufacturers:Nibw,Stockham,Milwaukee,or approved equal. Isolators out of the air stream.Selected operating horsepower to be a maximum Form 12766 Air Handling Equipment of 80%of rated motor horsepower without using safety factor. • Form 12866 Exhaust Fans _ S. 1/4 inch to t Inch:MSS SP 110,Class 125,two piece,threaded ends,bronze body, 2. Bearings:Pillow block type,self-aligning,permanently sealed,lubricated bail • s _ chrome plated bronze ball,reinforced tenon seats,blow-out proof stem,lever handle,UL bearings,with L-10 life at 100,000 hours. 842 listed for flammable liquids and LPG,full port.(Nibco T585-70-UL) 3. Shafts:Hot rolled steel,ground and polished,with key way. D. Report shall include the following: - 3.01 PREPARATION 4. V-Ben Drive:Cast iron or steel sheaves,dynamically balanced,keyed.Variable 1. Preface suggesting abnormalities and problems encountered. and adjustable pitch sheaves selected so required rpm Is obtained with sheaves 2. Instrumentation List Including type,model,manufacturer,serial number,and calibration set at mid-position.Matched belts,and drive rated minimum 1.5 times nameplate dates. 192 Nickerson,Suite 4300 A. Ream pipe and tube ends.Remove burrs.Bevel plain end ferrous pipe. rating of motor. 3. System Identification reporting location of zones,supply,return,and exhaust openings. Seattle,Washington 98109 5. Accessories: Phone:206.285.2966 B. Remove scale and dirt,on Inside and outside of pipe,before assembly. a. Motorized Control damper. 4. Record following fa each place of air handling equipment. Fax:206.285.1045 a. Manufacturer,model number,and serial number. b. NEMA rated disconnect switch. - b. Design and manufacturer rated date. C. Prepare piping connections to equipment with flanges or unions. C. Motor cover. c. Actual CFM 3.02 INSTALLATION-BURIED PIPING SYSTEMS d' Extended lubrication lines. d. Suction and discharge static pressure of each fan. e. Spring Isolators. e. Outside-air and retum-air total CFM. , A Install LPG piping In accordance with NFPA 58. 2.04 CEILING PADDLE FAN f. Actual operating current,voltage,and brake horsepower of each fan motor. g. Belt size and quantity. B. Verify connection to existing piping system size,location,and invert. A. Manufacturers:Dayton,Leading Edge or approved equal. h. Static-pressure controls final operating set points. C. Establish elevations of buried piping with not less than 2 it of cover. B. Commercial-duty fans with balanced fan blades and contoured metal for wobble-free 2.01 QUALIFICATIONS operation.White epoxy enamel finish.Direct-drive,18-pole permanent split capacitor D. Establish minimum separation from other services piping in accordance with calla. motors with permanently lubricated ball bearings and built-in self-resetting thermal A. Work of this section shall be performed by a contractor or Independent Air Testing And overload protector.Downrods of 7/8"OD steel pipe with 1/4"holes al both ends provided Balance Agency capable it testing and balancing heating,ventilating,o ad a and cooling systems to E. Install plastic ribbon tape continuous overlap of pipe and buried 6 inches below finish with mounting hardware.UL Listed.Provide with secondary support cable and balance,adjust,and lest air moving equipment,air distribution,end exhaust systems. grade,above pipe line. Acceptable Agencies: RENTON PUBLIC adjustable speed controls. F. Install trace wire continuous over top of pipe and plastic ribbon tape continuous buried 6 205 CEILING FAN B. AIRTEST Co.,Inc. 425.313-0172 WORKS INSTALLATION-ABOVE GROUND PIPING SYSTEMS Ut- inches below finish grade,above pipe line. . A. Centrifugal fan mounted in insulated cabinet suitable for ceiling Installation,AMCR rated and C. Neudorfer Engineers,Inc. 206-621-1810 BUILDING D 3.03 approved.Panasonic,Greenheck,Cook or approved equal. D. American Air Measurement 425-7884036 A. Install LPG piping in accordance with NFPA 58. Accessories: IMPROVEMENTS 8. Provide rwn-conducing dielectric connections whereverjointing dissimilar metals. Integral wining grille. B. Report shall Include the following: Backdraft damper. 1. Preface suggesting abnormalities and problems encountered. C. Grade horizontal pipe not less than Y.."in 15 feet. Disconnect Switch or plug. Renton Public Works Building D Building 13 Page Renton Public Works 9 j 9 D Page 115 Renton Public Works Building D pogo 117 3555 NE 2nd St D. Route piping In orderly manner and to conserve building space and not Interfere with use 2. Instrumentation List including type,model,manufacturer,serial number,and calibration Renton,WA ofspace. dates. 2.06 THERMOSTATS AND SENSORS 3. System Identification reporting location of zones,supply,return,and exhaust openings. 98056 E. Provide 6"long drip leg at bottom of vertical pipe. 4. Record following for each piece or air handling equipment. A. Mount thermostats and other human Interface devises at 48"centerline above finished floor a. Manufacturer,model number,and serial number. F. Take from tap or side of horizontal pipe, to comply with ADA accessibility per ANSI At 17.1.Align thermostats and devises with light b. Design and manufacturer rated data. switches and other controls. d. Suction and discharge static pressure of each fan. G. Sleeve pipe passing through partitions,walls and floors. B. Coordinate wall location of thermostats and other wall mount devises with light switches and e. Outside-air and retum-alr total CFM. H. Install firestopping at fire rated wnstruclion perimeters and openings containing controls provided by others.All devises in the same vicinity should be grouped at a common I. Actual operating current,voltage,and brake horsepower of each fan motor. penetrating alcoves and piping. elevation with regular horizontal spacing intervals. g. Belt size and quantity. 0 Plea. I. Install Identification on piping systems including underground piping. 2.07 CO SENSOR h. Static-pressure controls final operating set points. CHECK SET J. Install valves with stems upright or horizontal,not inverted. A. Manufacturer:AlrTest or approved equal. 3.01 GENERAL A. Do not begin testing and balancing until systems are completed and in good working order. K. Protect piping systems from entry of foreign materials by temporary covers,completing B. CO Sensor:Electrochemical,0-200 ppm linear range,•1.5%accuracy,T90 response Then,put all systems and equipment into operation and continue operation until an adjusting, sections of the Work,and Isolating parts of completed system. time of less than one minute,span and zero adjustments,temperature corrected,4-20 balancing,testing,demonstrations,instructions and cleaning of systems have been JOB p0. d mA output signal.(TR2000) complete. 3.04 FIELD QUALITY CONTROL Gab I1rArJa+ A Pressure test LPG i C. Controller(CT2100):Integrated sensing capability for CO gas with two sets of relays for S. Provide ladders,scaffolding,additional dampers and clean fillers as required elsewhere in 24.A!JdL&2012 . . piping in accordance with NFPA 58, fardalarm activation.LED Indication of power,fault and 2 threshold indicators for each these specifications. ' ' ' ' ' ' ' ' B. Subject pipe to air pressure of 60 psig for 30 minutes with no perceptible drop In gas channel.NEMA 4X enclosure . . pressure. C. Air and water now roles shall be measured and adjusted to deliver final flow rates within 10% SECTION 15851 of design rates(except variable flow distribution systems need not be balanced upstream of C. When pressure tests do not meet specified requirements,remove defective work,replace CHIMNEYS AND STACKS the controlling device). and retest. 2.01 TYPE B DOUBLE WALL GAS VENTS D. Check motors for proper rotation,coupling and drive alignment,belt tension and freedom from vibration,etc. . . . . . . . . . . . . . . SECTION 15800 A. Manufacturers:Melalbestos,Ampco or approved equal. HVAC SYSTEMS E. Provide drive changes and dampers as necessary to accomplish design balances. , B. Fabrication:Inner pipe of sheet aluminum,and outer pipe of galvanized sheet steel, F. After completion of testing and balancing,operate systems under normal conditions for at . . . . . . . . . . . . . . 2.01 GAS FIRED UNIT HEATERS tested in compliance with UL 441. least two days of 8 hours each to demonstrate specified performance. C. Accessories:Complete stack system with fittings,thimble,storm collar,roof flashing and G. Contractor shall Include an extended warranty f 90 days,after completion of lest and awl lkntMx� Y Y. P A. Manufacturers:Reznor or approved equal. cap. balance of work,during which the Owner's representative,at his discretion,may request a � �SPEGI FIGATIGH - B. Self-contained,packaged,(,d recheck or resetting of any outlet,supply air or exhaust fan,as listed in lest report. factory assembled,pre-wired unit consisting of cabinet,supply 2.02 SINGLE WALL METAL(COMBUSTION AIR INTAKE) - - fan,heat exchanger,burner,controls,and accessories: 1. Heating fuel:Natural gas fired,83%efficiency, A. Single wall spiral ductwork. - 2. Gas Control:Single stage ' ' ' ' ' • 3. Ignition System:Electric direct Ignition. B. Accessories:Complete stack system with fittings,storm collar,roof flashing and cap. . . . . . . . . . . . . . 4. Location:Suspended overhead. 3.01 INSTALLATION ' C. Cabinet:Powdercoated galvanized steel,fully gasketed access panel with safety - - Interlock;Insulated or double panel constmction;roll-formed adjustable,horizontal A. Install flue and vent piping per manufacturer's Installation instructions.Note maximum . . . . . . . . . . . . . louvers;fan guard. allowable venting length. D. Supply Fan:Propeller. B. Install piping to maintain headroom without interfering with use of space or taking more k t"I'�'•. 't spew than necessary. E. Heat Exchanger:Multicell,4 Pass serpentine style with tubes of Titanium stabilized aluminized steel. C. Sleeve pipe passing through partitions,walls and floors. Slyd h°' F. Gas Sumer:One piece burner with single orifice,continuous wound stainless steel D. Install piping to allow for expansion and contraction without stressing pipe,Joints.or ribbon,separaled-combustion,power-vented. connected equipment. J A M: : III: Page j 14 Page 116 PagoJ18 WAGNER ARCHITECTS PLANNERS ON, 1916 PIKE PLACE SEATTLE WA 98101 2 0 6 .4 4 8 2 5 2 8 200 / FAX •441 6184 NIEZZANNE NEW JIB CRANE / I @ we g nerorc nflect s.com Av-- 8 GATE A�7 A-2 E .q,�19673 EXISTING ISTING 101 BAY i ,M�SI_AINIEN.A&E SHOP PAY 2 w.w.tc MEZZANINE PLAN UP ktZIP. \� SCALE:118'-1'-0' EXIST. ELEC PANEL 40, 192 Nickerson,Suite#300 Seattle,Washington 98109 v 0 0 0 o Phone:206.285.2966 Fax:206.285.1045 EX EXISTING ELECTRICAL HEATERS PARTIAL DEMO PLAN SCALE:1/8'=1'-0' RENTON PUBLIC WORKS BUILDING D IMPROVEMENTS 3555 NE 2nd St Renton,WA 98056 45' CHAMFER GUT OPENING 4"0 FLUE COMBUSTION W/EXPANDED METAL,HEMMED. � AIR UP TO CONCENTRIC ROOF VENT D.1p Fhm CHECK SET e a o 450 CHAMFER CUT OPENING ____ 64'FLUE A COMBUSTION L3 M W/EXPANDED METAL,HEMMED UN- MG R1 VERIFY THAT 0� OVERHEAD DOORS CF AIR UP TO CONCENTRIC IiYP 3J � , ROOF PENT ,roe No. EF-4 CLEAR FAN yS GZ E ABOVE 1 oor. • 24 Al1Gl)Sf 2012 -4 1EW HOIST FTC BAY 5 EF3 Took gxisn e 101 m �.- BAY 1 MAINTENANCE SHOP BAY 2 - --- - -- �— —� g ; CO SENSOR i LI ..� 103 . GO SENSOR BAY s BAY 4 -':V IdAdNTE AN,E I P UP TO 5 --------- EXIST. ELEC PANEI. 0 t0$ J T EF-2 31"Cb* ------ ------- g - £ - -`---- g - --- - - FLOOR PLAN WALL GAP WALL SWITCH EF- (BY DIV 26) MOTORIZED INSULATED WALL SWITCH(BY DIY 26) CONTROL DAMPER L_2 BUILDING D PLAN `'" N SCALE:1/8'01'-0' M2. 1 . . . . . . . . . . a, all�-Twl 3NON :0180S ore Nl� '9',L'N Ko�Ew 01 VY43HOS 10dIN00 d08N3S IlViM IN3A OldiN30NOO 9 (Z-=13) 00 -3dJcj NIV 1Grivtlx3 Rn-ij 96-AlCl 19 so? NOIJ.GnGWOD- lwm (NONZAN) NAIcIV(JV 0jNlN9DNO:) C-6-A IC) AS�103HO 1,1 [NO9NR'3j ._m A" li 11 EL'A Cl n 1 00 NVJ mz- lgnVHXA 'AlCl: Et'AlCl ]]VMNOE9 N�lW80AX =lOON AVC10tj DNIHGVIA St-Aj(3 lG 99096 NolvrLL'DV Nac4wva 9C-AlCl vm,uolu98 (NOWRN) �VDVIJOA at4il 96-AlCl IS PAZ 3N 999E G-Hi Niv NoiiGnewoo CC-AICI kg A 061 '11>milm(]Al-lc4d"9 INVIV:IG N399M 3NO01-lis gNnlvNac4wa HDiH tilim iviG SiN]1lN3A0WAl (NONEIN) Cl E)Nio-iine iniwNa iGnvH>G SAWM onend NOINI2l 7 STN 'STN ro S—wl� : --� co Dew -11VJL3a NV=l isnVHX3 3NON 01809 rosw -11V13a H31V3H IlNn 11VI30 NV-A isnVHX3 3NIINI QJ GNOIVIOroj 94oVs8Z'90z:xe3 9Nldc4G NO 3N3NcA03N 996Z 98Z'90Z:OuOqd 608 U0l6U14sBAA'9MBaS '9NID"9 Z)jWGI3G AalAONcA :210N 01WGJ3g 3CJJAONcl ooc#el!ns'uOsJOION Mt ?JO— 1W a_ VH CION COCIVINHI L 'IyRolo, 17.1— iona (d).1)Iona CIRNtIl I aNniDMUG IVD IIVM—/ NVA lGnVHXA IJ NV=I.LGnVHXA 'NNOD XA (clkl)'NNOD>Gl� 11 9 0 z 10186 YM 3111Y9S 3:)Vld 3)lld 9161 S 'd 3 N NV I d 51D311 H D2V A 3 N !)VM WAGNER ARCHITECTS PLANNERS GENERAL PLUMBING NOTES' PLUMBING FIXTURE SCHEDULE 1916 PIKE PLACE SEATTLE WA 98101 MARK ITEM MFR:MODEL DESCRIPTION 2 0 6 4 4 8 .2 5 2 8 1. PLUMBING FIXTURES SHALL BE DESIGNED OR EQUIPPED TO MEET T A X 4 4 1 6 1 8 4 FOLLOWING MAXIMUM WATER USE EFFICIENCY STANDARDS: WC-1 WATER TOTO: FLOOR MOUNT,TANK TYPE,161/2"HIGH ELONG. waQneiarcnnecfs.mm A. WATER CLOSETS(TANK STYLE OR FLUSH VALVE). 1.6 GPF CLOSET CST744SL BOWL,VIT.CHINA,PRESS.FLUSH SYSTEM W 11.6 (ADA) GAL/FLUSH,VNiITE B. URINALS. 1.0 GPF C. SHOWER HEADS 2.5 GPM SEAT BEMIS: WHITE PLASTIC,CLOSED FRONT,W/COVER. �Q•�0 ,�' D. LAVATORY&KITCHEN FAUCETS. 2.2 GPM 1900 SINKAND LAVATORYDRAINS SHALL BE CHROME PLATED 17 GA.BRASS mats TUBING BYENGINEERED BRASS,DEARBORN BRASS OR BRASSCRAFT. •�+oKaL•� PROVIDE INSULATED P-TRAP AND SUPPLYCOVERS(TRUEBRO OR EQUAL) LAV-1 LAVATORY KOHLER: 20"X 18",WALL MOUNT,VIT.CHINA,4"CTRS. AT ALL EXPOSED P-TRAPS AND SUPPLIES PER A.D.A.STANDARDS. 2032 W/CONCEALED ARM CARRIERS. 2. PLUMBING FIXTURE MOUNTING SHALL COMPLYWTIH CONTRACT FAUCET CHICAGO: 412"SPOUT,AERATOR,SGL.LEVER HANDLE,4' DOCUMENTS,ADA,AND WASHINGTON STATE ACCESSIBILIIYCODE. 22004CP CTRS,CHROME PLATE. VANDALRES. 3. INSTALL WATER HAMMER ARRESTORS ON HOT&COLD WATER PIPING OF EACH FIXTURE GROUP AND ATALL FIXTURES W/QUK:K ACTING VALVES. DRAIN DEARBORN BRASS: PERFORATED STRAINER W/OFFSET TAILPIECE PER ADA M UNITS SHALL BE ZURN"SHOKTROLL"OREQUAL.SELECTUNITS¢E 760W REQUIREMENTS. wmmmmm AND LOCATION PER MANUFACTURERS RECOMMENDATIONS AND IN ACCORD 192 Nickerson,Suite#300 Seattle,Washington 98109 WITH PDI STANDARD WH-201. PROVIDE ACCESS PANELS AT ARRESTORS Phone:206.285.2966 ABOVE GWB CEILINGS.ALL ACCESS PANELS AND DOORS SHALL BE FD-1 FLOOR ZURN: 2"C.I.BODY,5"SO.ADJ.NICKEL BRONZE STRAINER Fax:206.285.1045 DRAIN Z-415-S TRAP PRIMER TAPPING.PROVIDE TRAP.PRIMER ELMDOR FAB.STEEL ELK SERIES OR EQUAL WITH 14 GAUGE DOOR AND FOR ALL INSTALLATIONS EXCEPT SHOWERS.REFER FRAME.PROVIDE WITH CYLINDER LOCK,CONTINUOUS PIANO HINGE TO FLOOR DETAIL FOR DRAIN CONST.WOR AND PRIME COATED READY FOR PAINTING. COVERING. 4. COLD WATERAND HOT WATER PIPING SHALL BE INSULATED AND ROUTED FULL SIZE WITH APPROPRIATE SEE REDUCTIONAT POINT OF CONNECTION TO FIXTURE. 12"WATER LINE LIMITED TO 10'-0" TD-1 TRENCH NEENAH FOUNDRY: 6"WDE X 9"DEEP SECTIONAL DRAINS(FIELD DISTANCE FROM FIXTURE.'DEAD-LEGS"OR"FUTURE"STUBS ON ACTIVE DRAIN RA996-A FABRICATE TO LENGTH SHOWN ON PLANS.) CAST IRON TRENCH ASSEMBLY WITH TYPE O NARROW POTABLE WATER LINES SHALL BE LIMITED TO 4"TO PREVENT STAGNANT SLOTTED GRATE.H-20 RATED. WATERCONDFIONS. RENTON PUBLIC 5. INSTALL WATER PIPING ON WARM SIDE OF BUILDING INSULATION. SEE WORKS SPEC.FOR INSULATION SYSTEMS.SEE DWGS.FOR ELEC.HEAT TRACE BUILDING D REQUIREMENTS.SEE PLUMBING DETAILS FOR PIPE HANGER STYLE. WH ELECTRIC A.O.SMITH: 10 GAL.STORAGE,1500 WATT ELEMENT VOLT, WATER HEATER EJC-10 18"DIA.XIS"HIGH.PROVIDE DRAIN PAN.. IMPROVEMENTS SEE SPEC.FOR HANGER SPACING. 6. WHEN CONNECTING TO EXISTING BURIED WASTE PIPING VERIFY PROPER FLOW CONDITIONS BEFORE COVERING. BURED WASTE&VENT PIPING OWS OILM/ATER UTILIIYVAULT CO: .450 GAL.PRECAST CONCRETE COMPLETE Wl SHALL BE MIN..2"DIA.&SLOPED 1/4"1FT.,UNLESS OTHERWISE NOTED. SEPARATOR 660-SA BAFFLES,TOP W/ACCESS&INSPECTION COVERS PVC OR ABS PIPING SHALL BE USED ONLY IF APPROVED BY &SAMPLING TEE. 3555 NE 2nd St ADMINISTRATIVE AUTHORITY,SEE SPECIFICATIONS FOR FURTHER INFO. Renton,WA 7. PROVIDE TRAP PRIMERS ON ALL FLOOR DRAINS EXCEPT IN SHOWER 98056 STALLS OR OTHERWISE NOTED ON DWGS.CONTRACTOR SHALL INSTALL LMV TEMPERING SYMMONS: IN-LINE TEMPERING VALVE FOR SGL.TEMP.FAUCETS, ACCESS PANELS WHERE PRIMERS ARE CONCEALED IN WALLS. VALVE 5-210-CK-D-B 3/8 CONNECTIONS. B. COORDINATE VENTTHROUGH ROOF(VTR)LOCATIONS WITH HVAC UNITS. (POINT OF USE) MAINTAIN MIN.10'-0"CLEARANCE.OFFSET VTR AS NECESSARY. bwp Ph— COORDINATE PIPE ROUTING WITH HVAC AND SPRINKLER CONTRACTORS. CHECK SET 9. SITE WATER PRESSURE IS—PSIG PER SEATTLE WATER DEPT. ET-1 EXPANSION AMTROL: STEEL CONST.W/INTERNAL DIAPHRAGM 10"DIA.X 10. RISER DIAGRAMS&PLANS DO NOT SHOW SOME PIPING OFFSETS REQUIRED TANK #STS 10-3/9"HIGH. FOR STRUCTURAL CLEARANCES. EXACT ROUTING MAYVARY FROM THAT INDICATED.IN STACKED RESIDENTIAL APPLICATIONS RISER WASTE PIPING JOB NO. om. 1►rw. SHALL BE CAST IRON.PVC AND ABS ARE NOT ACCEPTED FOR RISERS. : 24 Aija 5T 1412 PROVIDE SUDS RELIEF WHERE REQUIRED. . . . . . . . . . . . . . . PLUMBING FIXTURE CONNECTION SCHEDULE COVER SHEET/SCHEDULE• WATER WASTE PIPE SIZE FD(TURE FIXTURE MARK FIXTURE C.W H.W WASTE VENT-. UNITS UNITS REMARKS WC-1 WATER CLOSET 112" 4" 2" 2.5 3 FLUSH TANK LAV-1 LAVATORY 1/2" 12" 1-12" 1-12" 1.0 1.0 FD-1 FLOORDRAIN 2" 2" 2.0 : . : : : : : : . . . . . . TD-1 TRENCH DRAIN 4" 2" 3.0 • • . • • • • . . . . . . ' 1 .E D . WAGNER ARCHITECTS PLANNERS ON. 1916 PIKE PLACE SEATTLE WA 98101 206 . 448 . 2528 2001 T A X 4 4 1 6 1 8 4 ME22AWNE NE44 JIB CRANE wo gn erarch nett s.com GATE 25 5 KL MEZZANINE PLAN SCALE:1/8'-l'-O' 192 Nickerson,Suite#300 Seattle,Washington 98109 Phone:206.285.2966 Fax:206.285.1045 RENTON PUBLIC ---------- ---- -- — — — — --- WORKS BUILDING D IMPROVEMENTS i 3555 NE 2nd St Renton,WA 98056 MW CHECKSET JOB No. MEZZANINE ABOVE j Dd. RWM. 24 AUGUST 2012 NEW HOIST BAY 5 ; 100 EXl� SnNO 101 Bi;Y i 'AINTE.I�APIC SHOP BAY 2 Li o2] tYal 4 BAY MAINTENANCE SHOP HAY 3 UP TO MEZZ. EXIST, ELEC PANEL—'\l _ "V UP 105 TO,. 22 W sh d C." b.b -•r_ ��� L FOUNDATION PLAN ; — -- — —o 4"W — — 2 V �4"W / 1 OW5 EX 6"WJ 1 • L _ GO(7YP 2) FOUNDATION PLAN 4"W �« N SCALE:1/8'-1'-0* P2.0 WAGNER ARCHITECTS PLANNERS 1916 PIKE PLACE SEATTLE WA 98101 2 0 6 •4 4 8 2 S 2 8 ON. F A X - 4 4 1 61 8 4 wa gn Bafc nliecib.cam 200 M LAV-I MEZZANINE NEW JIB CRANE r— LMV (MOUNT BE �F —0 1112"V—\i �y�r_ reli�Sl' I iy 3/4"CW �Q iiiJJJ �! GATE I I I, 3/4"NW �°NAL FD-i I I`f I MEZZANINE PLAN WH 4"VTR SCALE:1/8'-V (ABOVE RESTROOM \ � / W/DRAIN PAN) J �- I—LI / I 192 Nickerson,Suite#300 l-- --- � -----J '••� Seattle,Washington 98109 Phone:206.285.2966 Fax:206.285.1045 3/4"CW ENLARGED RESTROOM RENTON PUBLIC SCALE:1/2"-l'-O" WORKS BUILDING D IMPROVEMENTS 3555 NE 2nd St Renton,WA 98056 o.a,ph- CHECKSET O JOB Na. Dob IY,tion • . : s4:Al1flUSF 2012 : LPG / MEZZANINE ABOVE. LPG z . . • . ' ' NEW HOIST BAY 5 . 100 EXISTING BAY 1 MAINTENANCF SHOP BAY 2 102 103 CX 34"CW SERVICE &1Y 3 BAY d d NE* MAINTENANCE SHOP PROVIDE SHUT-OFF UP TO P"C?.'4. . . . . . . . . BALL VALVE MEZZ. - EXIST. ELEC PANEL 05 SEE ENLARGED PLAN • • . FLOOR PLAN T ON THIS SHEET . . , . • • . . • • . 3j„CW -—-—-—-—-— -- ------------------ ---------------- PROVIDE 2"JACKETED INSULATION FOR 7D I (TYP) EXPOSED CW SERVICE w ra.ar• r BUILDING D PLAN . . . . . 1V SCALE:1/8'-1'-0' : :d 1 . . . . . . . . . . . . . . . . . . . . . . . . . WAGNER ARCHITECTS NOTES: CLEANOUT AND ACCESS COVER. P L A N N E R S I.PROVIDE TRAP PRIMERS ON ALL FLOOR TOP OF COVER TO BE FLUSH WITH THD.ROD t0 STRUCTURE DRAINS H FLOOR SINKS EXCEPT SHOWER TOP OF FLOOR SEE SPEC. 1916 PIKE PLACE DRAINS OR WHERE OTHERWISE NOTED. FLOOR LINE SEATTLE WA 98101 /"BALL VALVE 206 -448 - 2S28 2.PRIMER VALVE EXPOSED IN F A% • 4 4 1 • 6 1 8 4 PIPE HANGER MEGN.ROOM OR JAN,CLOSET P--- I SUSPENDED RR CONGEALED BEHIND ACCESS PANEL r o n i t e c i WALL STYLE IN OTHER AREAS, I I INSULATION T14RI HANGER- I TRAP PRIMER 7HRU HANGER I I VALVE ie G.I.BEND. SUPPLY LINE TO I I G.I.WASTE LINE. ��MI5 FIXTURE I SUPPLY TUBE LENGTH TO SUIT. �0 Tflt b/OVA L___ J L C ftft ACCESS PANEL FOR DISTRIBUTION I , GRATE PER SCHEDULE MEMBRANE IF INSULATION SHIELD$ CONCEALED UNITS UNIT N INCOMPRESSIBLE INSERT !'2" TRAP PRIMER �—WA5TE LINE (TP)LINES.(TYP.) y , INSULATION OVER PIPE FIN.FLOOR APPLICABLE e BEND A END O UT SLAB OCCURS A7 END OF LINE. 11141191 NOTE: TR50CATE LABEL PIPING PER.SPEC. `."• '*+'+=.+'s:'• +t F �,•'r rr' NOTE •r.;;:.�...• y" FOR GRADE CLEANOUT5(GCO) 192 Nickerson,Suite#300 IN VEHICULAR TRAFFIC AREAS, Seattle,Washington 96109 •?•'-''.i:•, "'t• '•�a` Phone:206.285.2966 .: •: +;°I PROVIDE ACCE65 HOUSING EQUAL . ,:•.::' , d• .. Fax:206.285.1045 :. .•'. '; ::.. •�:+:"t•.":•:::";t:�•, "`":,.;•• •.::• TO WADE$8300 MF39. PIPE HANGER DETAIL 1= --._____ :.:. P PRIMER LINE'•: " - "'-:"` P3.0 N.T.S. HOLES(TYP ) TO OTHER FLOOR DRAINS AS REQUIRED. 3 FLOOR CLEANOUT DETAIL P3°0 N.T.S. 2 TRAP PRIMER DETAIL P3.0 N.T.S. RENTON PUBLIC WORKS GRATE PER SCHEDULE BUILDING D FIN FLOOR MEMBRANE GRATE PER SCHEDULE GRATE PER SCHEDULE IMPROVEMENTS SLAB FIN.FLOOR GROUT GROUT SLAB FIN.FLOOR�� SLAB P E .TP--fit••: A , A , 140T$GOLD WATER 3555 NE 2nd St PIPING IN WALL Renton,WA <. .r`', :• r--� :. i 98056 ANCHOR/CLAMPING, 1 1 1 CLAMP L ANCHOR/CLAMPING I TRAP PRIMER LINE, FLANGE UNDERDECK I SCREWS FLANGE (TYPICAL) CLAMP �1CONCRETE INSTALLATION WO/ MEMBRANE C CONCRETE INSTALLATION W/ CLAMPING RING M CONCRETE INSTALLATION W/ MEMBRANE NOTES CHECK SET �J I.VERIFY FLOORING CONSTRUCTION BEFORE AV ORDERING DRAINS. Ir 2.FLOOR DRAINS SHALL BE FLUSH TO ia' EPC BELOW FIN.FLOOR FLOOR SINKS SHALL r7 :E LEXIBLEBE 1,2"ABOVE TO'114'BELOW FIN.FLOOR � IONS JOB N0. VERIFY W/LOCAL PLUMBING INSPECTOR 120 DEG.F.H61 1 o� ! I . : i4:Ai>cusT:2rifi . . . SET FLUSH GRATE PER r ; : : ; ; ; ; ; : ; : SET FLUSH WITH FLOOR SCHEDULE SEAL WATERTIGHT i I _ . ; . ; (BY OTHERS) MV IN WHITE WITH FLOOR GRATE PER �I I : µy--/ ENAMEL WALL SCHEDULE SEAL WATERTIGHT TEMPERED CABINET BOLT 70 (BY OTHERS) mrn? ., ----�I . . . . . . . . . . . . . . FLOOR W/ STAINLESS '".i.�cGV_..<r.,i .,,���,.�n,-.;;��.-.�.�.e - LIl�_ lj STEEL WL75 NOTES FOR WOOD FLOOR INSTALLATION B I.VERIFY ASSEMBLY PROCEDURE W/ BOLT TO FLOOR W/ PUBLIC LAVATORY WATER SEEPAGE FLOORING MANUFACTURER STAINLESS FLOOR STRUCTURE P"q b 2.ONLY INSTALL FLOOR DRAINS COMPATIBLE STEEL BOLTS SEEPAGE OPENINGS s CONNECTION DETAIL OPENINGS WITH WOOD CONSTRUCTION. DETAILS TRAP I PS.O N.T.S. ' ' PRIMER FLOOR STRUCTURE 3.FLOOR DRAIN TO BE JAY R SMITH 2009 A TRAP PRIMER REVERSIBLE COLLAR CONNECTION OR B,OR APPROVED EQUAL. CONNECTION - - - - - - (WNEN SPECIFIED) 4.VERIFY FLOOR ASSEMBLY WITH ARCHITECT (WHEN SPECIFIED) REVERSIBLE COLLAR TO DETERMINE APPROPRIATE INSTALLATION SEE FIXTURE CONNECTION SEE FIXTURE METHOD. SCHEDULE FOR PIPE 51ZE5 . . ' ' . . .. . . . . CONNECTION . • SCHEDULE FOR E FOR USE W/ SINGLE WOOD FLOORS PIPE 51ZES r�OR USE W/ DOUBLE WOOD FLOORS FLOOR DRAIN / SINK INSTALLATION 4 INSTALLATION STYLES " P3.0 N.T.S. . . .o. . WAGNER ARCHITECTS FINISHED WALL 6"X51i4'DP.X 80"(STDJ P LbAPN N PE R E SECTIONAL TRENCH //�3/4"CW DRAIN.ZURN SERIES SEATTLE WA 98101 ' ✓ 2 0 6 4 4 8 2 5 2 8 ZS86 W/ND FRAME GRATE PER SCHEDULE 6"X20"X20"DF CUT 70 AQUIRE F A X A 4 1 6 1 8 4 TANK Q BOWL PER SEE PLAN CATCH BASIN FINISHED LENGTH w a g n e J a r c h n B C t s.t o m INVERT FOR VARIOUS LENGHTS TD SCHEDULE 311/2, O W/d"OUTLET SHOWN ON PLANS. 7 80"STD.LENGTH 20' INVERT 31j2n =m ------------------------------------------- 4"OUTLET 20' SLOPE DN t� SUPPLY 0 0 it �d SLOPE DN FITTIN DUCTILE IRON GRATE W/ eur T� SECURE SECTIONS STEEL SUPPORT FRAME rONAl AND STOP TOGETHER USING ON TRENCH.SECURE GRATE SEAT END GAPS STAINLESS STEEL W/STAINLESS STEEL SCREWS r , 3-11'22"STUD (TYP) SCREWS. WALL(MIN-) MANUAL MAIN _ I 4"W 70 OTHER DRAINS 5FNT-OFF VALVE ESGUTGHEON i TO SAND/UtATER SEPERATOR NOTE: •. (I �115"5TANDARD HEIGHT 2"VENT I1"BARRIER FREE PROVIDE MIN.4"CONCRETE GROUND 192 Nickerson,Suite#300 FINISHED AROUND UNDER BOTH JOINT Seattle,Washington 98109 ROUGH-I FLOOR TRENCH BASIN.LEVEL UNION = Fax:206285..104566 FOR BACK TO _ J:7, j SEE SCHE LE PER MFGR'S.INSTRUCTIONS. - BACK CLOSET I I a TRENCH DRAIN DETAIL _ AS NECESSARY �LOSET FLANGE P3.1 N.T.S. II -- - 4"LONG TURN �\ 114 BEND FLEXIBLE 6A5 HORIZONTAL OR x4 CONNECTOR VERTICAL FLOW Is*MAX. AS NECESSARY. RENTON PUBLIC GA5-FIRED EOUIPMENt WORKS DRIP LEG = BUILDING D P3� WATER CLOSET DETAIL IMPROVEMENTS N.T.S. s GAS LINE CONNECTION DETAIL 3555 NE 2nd St P3.1 N.T.S. Renton,WA CHROME WALLGOVER MAY EXTEND AS A 98056 AND SCREW. I WASTE OR A VENT LINE. WALL BELL d SPIGOT 3jJ, CONTRACTOR SHAD OR NO-HUB THERMOMETER f 3j4"CW 4 CW Rte. ADJ�57 THIS DIIMENSON I I I PIPING �'-' - - ---------- CHECKSET BY INSTALLING SPACER PLUGGED TEE WITH TEMP/PRESS. BETWEEN VAULT 4 TOP DIAMOND PLATE IAMOND PLATE - - 4"CLEANOUi ACCESS DOOR INSPECTION COVERS CLEANOUT IF PIPE RELIEF VALVE. I---- ----------- - EXTENDS UP.PLUGGED PIPE DRAIN TO �' ET-I -34"HW ELBOW W/CLEANOUT NEAREST FLOOR OTHERWISE DRAIN. JOB N0. MAX I - DIELECTRIC �- UNION ITYPJ o'er 3"Y — ! _6j FLEX COUPLING i FLOOR LINE NOTE OIL/WATER -li; I (TYP-) z I i SET WTR,UTR TO INLETI DEG.F.OUTPUT. SEPARATION II I CHAMBER�I� m —Y - - `y i ANCHOR WATER HEATER --- ��MIN 6 --- /- -- -- -= i TO WALL W/TWO 1"X18 GA. GALV.STEEL STRAPS.SECURE . . . III SEAL B" PERTPLAN CAST-IRON I BUH TO WALL W/FOUR 318"x21'2" PIPE. LAG SCREWS 6 FOUR FENDER 2"XI/4"STAINLESS —__-- WASHERS STE L CLAMP W/ STAIN R WE 3/4"DRAIN : : : : . . ; . ; : : ; RETAINER WEIR 5/8' SS.BOLTS I` - I COCK (TYP.OF 2) IN SAMPLING T E -------- �--- '----- PROVIDE CLEANOUTS @ SINKS 5i, URINALS PER U.P.G.. CLEANOUTS DETAILS �- --- —1'2 SHALL BE LOCATED BELOW FIXTURE. g WATER HEATER DETAIL OIL/WATER INTERCEPTOR DETAIL/WATER INTERCEPTOR DETAIL P3.1 N.T.S. : : : : : P3.1 N.T.S. 6 WALL CLEANOUT DETAIL P3.1 N.T.S. . . . . . . . . . . . . . WAGNER ARCHITECTURE •• PLANNING 1916 PIKE PLACE ELECTR ICAL SYMBOL SCHEDULE LIGHTING FIXTURE SCHEDULE AII.S ASSOCIATES,12VC. SEATTLE, wa 96101 206.448.2528 ADVANCED ELECTRICAL SERVICES FAX •4 4 1 •6 18 4 S7A7FACE/PENa9Vr R(/a/ESCENTL/a/nNG RXIO7E 12PE OESOWPnaV MANUfAMIRERA/a42/ (,� ffs 1)Sa+nie,WueLiuwo 981096 nagnerarchitects.com A P8l9ANT/aG1N MWO R11a7EMr/801-8AY, NUUIE 4_F7814M 114 WALL RMO%Mr LLCNRNG 17MIRE !LAMP,277V 7N-418 7 5-177-PSN-JC (206)282.6364/282.6368 FAX e-mail:aes @netzero.net EA7SIWC PEN'DANTl80 L/GNnNG RXIURE B WALL Ma/N7fD LINEAR RUa7ESCEN7,8'1867H, NLN/F.' 4428175/ipy !T4 we,mme e $ Z E POE&20 AMP War SVIOC IMr 4 LAMP,277V 8W-1-1875-177-P9V-LfN WALL MCUN70 OCCUPWrMNSW W//N/EG9AL SWIM C SURFACE MOWL/N£AR TWaTSOM 277V. N0177E.- 2-r78/75/4a! 60 September 25,2012 CCWNWAON 7D C•400PY MCNOXX ZVS07 rN-228 15-17 7-PSN-WC-SF 0' RUFI A/NCAM BOX 0 WALL Ma1NT LINEAR RUa7ESC r 1 LAMP,120V NUL/lE.- 2428/75/40x 80 EtECiPoCAI ENCIND]NND k IJCNWNG OE9IN O uA7FACf AnYnaveox uo-22875-120-PSN-`N RENTON VEHICLE MAINTENANCE SHED 19"111 u0'a'�'�'�" E•" 98'09 z D D z dz«a 282.6368 ra. DUPLEX RfaP7AaE,10 AMP,CAOUNOED,/Va7Y COLOR ELECTRICAL ELECTRICAL LOAD CALCULATIONS ®SyaAC PURPOERM7TAaEASN070 EXISTING LOADS FWR-PCEX REaP7AaE•10 AML;CRousow IgOVY Caa7 NOTES• ¢n C �oua crO 7CUN0FALar/N7£RRUrnNGRELrnrAa£ L ALL avawsaNTnx&wy ro BE SUPP(fm ww eirNaw BALLASI(s).. Existing Panel'S 1' = 57.2 kva `4 SURFACE A MIfD FWR-FLEX RMWAaE;20 AMP 2 Au RX7URE5'r0 BE RA7m Fa7!20 O7 277&a r LVDU ICW ACaWDIVG 70 Sa/ME - 33291 AC Remove Elec unit heaters - -20.0 kva �.LoWw�, �Q9 DoPLEX REaEPrACLE Mnwu W calwamp (Replace with gas heaters) TM oaYEX a7OUN0 FAULr/N7£RUPRNGREcD iAaEMCUNu IN COl/vanm° Remove(6)250 W HIPS Itg = -1.9 kva I EXPIRES 10/25/13 0 aSCCVYN£CT SVMV CiM MAa7E71c Moral srAR7ER Net existing load = 35.3 kva MANUAL M0107 SWIG/ NEW LOADS CM CROY 10 M0W r9fi;i E lISAN'G BRANCY a"TPAIVaSOAW New Lighting = 2.2 kva Paddle fans 3 @ 110 watts = 0.4 kva IDI I=I IID 7fAXIM 80A70(E) EW H-1 = 0.8 kva V IEZEltum Owwr EF-1 = 0.1 kva ')�'WAIL NEA7EA EF-2 = 1.2 kva EF-3 = 0.9 kva CM-Mall m MO7ORZ£D DAMUF EF-4 = 0.1 kva LCWNFCACW TO aMWG FAY LIH-1 0.6 kva RENTON PUBLIC LIH-2 0.5 kva WORKS Jib Crane 0.7 kva Tire Balancer = 0.6 kva BUILDING D 11A11 MOW RY CCWXW hV WALLS a7 ak1NG Lift = 3.3 kva _ Misc = 2.5 kva IMPROVEMENTS / \ BRMW aRax7RY COYCEALM MURa2R O4 UNL7fRLi4a/N0 /H+L� DARU&9/CA7E(CVIXWOUMPS(LFMO7£MAN2J nw Total new load = 13.9 kva MfcNAmc4L EzeuPM£NrcOECnav SaLEDCttE LOYGO.ISN1NaCA1ESNfU7RA4 t-109VARESOMMCO UC70R r MT OESCRIPRaY Kit F Wa COYNECMY Total Load=49.2 kva 3555 NE 2nd St 7EZfPNae caya#r EM-1 EIECnnC WALL NEAIEA 110V//m 750 AN r15 DIRECT LCWN£CnaY ` EXlsnnc ccwcc4rm aRCamr Cr CUJX PAW FAN I2OV/l4 M0 WARS ORECT COMFCnaL @ 4801277v,3ph,4w,amps=59.2 Renton,WA NN-1 UNLrASA IER GAS 120V 51 ANPS aR£CrcwNfcnav 98056 Eusnnc aRanmrugDERG7afrm (OAS) �m Existing 60 amp service. q UN-2 UNIT N£A I&(GAS) 110V/14 J8 AMPS DIRECT CWNECMOV �- � n7 BE REMOKD/ABANDOYED IN PLACE EF-1 EWAUST FAN-raLET 120V/10. JO WA r73 FACRwYOISCONIVECr EF-1 EXNAUSrFAN-SAY J-5 120V/10 4KW 01O7 RAW SUMV Deign PNOee EF-J EXNAUSMN-BAY 1-1 I10V/l0 MOM?E D SW77a/ PERMIT SET ABBREWATIONS EF-4 EWAUSrFAN-BAY/-1 170V//m ACfWCCWNECr EWN E ERIC WA/ER N£A1& /20V/1m /nECT CONNEC", AFF A801ERN IMED ROCK aG MING JOB NO. YRnIXE EOCtlPMLNr CaYVfcnC4Y SalEa/LE Date wvcsrom CO cw9ar aRr 25.SEPTENBfti 2012 . OF` a/AC EZEMDVT . . . . . . . . . . . �T DfspP/PnaY kYTACE (Q9Q O7YNEL'nGw 6?7 O7owo FAUL r1NIERmpaw - 9DLlaE N6VST 240V/IO JJ Kw JO4/1P/NEMA!A=SW 1/250 AMP O.E fUM-5,Z-110 MW,CU IN 112-C . . . . . . . I LOW Va7AGE - JB CRANE 12O00 700 WAr/5 A10MR RA70 SNl7W - ARE BALANCER 12000 800mns 0/RECr CCWNECi7av . . ' WC WASNINGTOY ENERGY CL'&c . . . . . . . . . . . . . . NEC WOW EIECIRC CWf . . . . . . . . . . . . . (£J EXSnNG 70 RfMA/N . . . . . . . . . . . . . . . (R) r0 SE Risvon SM1eel DantanW fllP FAACnOYAC NCwSEPOWfR SYMBOL . SCHEDULE : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . �e» � m�K,we0sb�1�"M.1 7___m�'�a'1 tl��atlbi . . . . . . . . . . . . . . . E-� . 1 WAGNER ARCHITECTURE ANn S> NESr @ nr LXG !so sa rs U!wE PLANNING 1012 LOADS S U R f A C E 60AIF AUW 0 R W l T B R E A K E R A L C- 1 9 1 6 PIKE PLACE AAP I off PRASEI ar aw#r SEATTLE, WA 98101 U611RNG-WM 1 E 1.5 20 1 A T 2011 25 11Qy7MG-9/ED 1 E 2 0 6.4 4 8.2 5 2 8 UGHRNG-.WED 7 E 29 70 3 B ! 70 21 UCYIRNG-SHED I E FAX •4 4 1 •6 1 8 4 UCNRNG-wfu 1 E 7.3 ZO 5 C 6 ZO 2J L/LTIRNG-9/LD I E PANEL 9/ 255 60 7 A @ 20 LI EX1ERWIfG-SNLDI nagnerarchitecis.com ON 9 B 10 2'T O7 EXIER/CN L(G-9/E0 7 E 11 C 11 - SPACE PANEL SS E J1 15 3 /3 A i 1! - SPACE 15 B 116 SPACE 200 !7 C 118 - SPACE comwneme: I,IMAMNE CYlY1WC7ED Loa "AAI2 AAD LOAF. 455KYA 5MAURS 125x LTC 49.7KYA 59.8AWPS M NOS. .XS'S:O'Cl A 7,E S'`.I N C • Q-10 — ElECTRICN.ENGINEERING A:LIOITING KS0N 193 RMERSON•SUITE.1/16.SEATTLE.Wk 98109 GATE 206.3826064 pph.308.2836366 f. m.adwncedelee4lcoleeMcee.com PA49 504WC LING PANEL' 06A7IQX•NEST BAY At"IM 12012M NX IS 3/!NWE SS SERtLYG NODS WDS SURFACE 10AW MAWL7RCU/7BREAKERAIC G.RK7Cy' ORVflf n KYA ALP Off PHA LKf AMR A T REC-9/EO 1 E 06 ?0 I A 1 20 04 REC-91ED 7 REC-969 1 E 06 10 1 3 B ! 10 1 06 REC-91"01 E REC-9LE0 I E 04 Ill 1 5 C 6 10 06 REC-9/ED 2 E �$,yy9l MEZZANINE PLAN _- ' B o VAX lL 2 SCALE: llr=1'-0° aWC7M LOAD, p UYAA9• 12 AND LOA& WALE Em9 E5 10 13 31KYA 89A/PS /OOx 31KYA 89AIPS NOTES PAYR SO'ED(KE IMMol Ate' crAna•EAST BAY NCC4YI/NC: !80 77 tars J0 4W& SH NCY/SE IOAOS SURFACE 60A.YPYAWT/Rp//T BRfAKERAIC- 7 7NX/ KYA I gw=,=Orr AVASFI CWT I ALF I KYA T &MIG-WALL f 2J 20 1 A 1 12013 - SPARE R L/GNnNC BAY E 29 10 J jC6 - - SPARE - 10 59 10 3 - R RENTON PUBLIC �A IJ 10 .2 0004 CWENLR E WORKS 5PALT BUILDING D COAIYEC7ED La*2551NA 3Q7ALLPS vai�zSXCTC AAtl La* 16:8KYA 32JANPS IMPROVEMENTS N07fs -(R)=RENOt£EXlsn @c toga PAAU Sam SM 3555 NE 2nd St $i 1 1ZLYS SWFALT 12100AWMAWORCLLITeAFuLERRAAdc- Renton,WA 7 ray KYA ALP PRA / P A 98056 {£N/QE UfT E J3 75 1 A 2 70 0.9 RfC E J @ * SPACE 4£N/CLE UFf E 33 25 5 A 6 2512 3.J WEMLZE Ran'" 7 B 8 RISC-N/SC f 1.1 20 9 A 10 10 07 A8 LNANE" R11-H/SC E 1.1 70 11 B 12 70 Q8 REC-N/SC" S°AC£ - - IJ A 1! 20 06 PRE BALANCER" 1• 11 10 15 B 16 20 1.2 EF-2• °"'9"p'°'° PADDLE TANS J ' 0 270 17 A 18 70 I 1.0 EF-J EF-!• PERMIT SET NOTE/! N0j[(I ICY(ET-L(C 8 REC Q3 70 1 19 B 10 - - - M e CYl rc7ED LOA&• L&AA6 10A& �-1 R !T" � !2' �-2 nt ) 191LNA 796AAPS 107 19.1AYA 796AYP5 ` EF! 7 SL-17l! � NO7FS-PANLZ@OARD IS SWARf D,7YPE N00 9-15 SL-I =PROWDf NEW ORWIT BREAKER&COYN£CT TO NEW 1040 JOB N0. MEZZANINE ABC -" Gale Revlaoee IXNOU/T TO T7B @Y OHNER.PULL(7J 1f C< C47Y LAW TO 77B A COYWr fF-J .2-18 104 ......... .......... SAY ....... 100 ,Kj,,STIq 101 .4-17 �• .......::..:::.:...:.: BAY I MPINTENANOE S410P 8AY 2 ------.—rte tU2 SL-18 •° IAW.YC14YO7(EJ. _ BAY 3 (E RAY 4 4 MAINZ SH P g_6.8 SN-24•6(R) I j10 Ass -. \.. TO M J R 9-87Q72 (R) T M Ez. E�N7,.,JJ 7 t SL-16 ............................ I PAEZ S'(1) 111 CYVNECl70 �2 ...................... NOIF S-2 9 M II YAN/7YULY7( snee conlmle m(E) ���I SL-/9 .! ....—. .. _... .. ............ .... P . ... _M ._. .. M _ __ _.. ___. .. . _ . .... . r OWE:R...... '91'(EJ CriYN MI 70 fWL LOC49D PANIZ S/'(f) ... . A60W 7"T ROW .... P.LAN:.:..: . N07f-J5 — NEW OILPrATEF(E) NEW 6"S.S. LINE SEPARATOR ..................... . N07ES ..................... . 1.COYCEAL 89ANLN ORWRY M WALLS N IEW PO YRf.SURFACE MWIRY ................. RLM M=NG @ W00R NEMW/NE M RUN PARALIa 70 RNLLYNG Ma 2 CON(fC7 NEW LOADS 70 EA7S7M0 PAWS AS MOM.SEE PANEL SWED"PROWOE REWSED.nF0 PANEL S09MES M V I NG AEZY C BUILDING D PLAN EWY.4tLDADS 3 4nw o AEW LOADS COYTACI ENQNEER/FEW/PNfNI L0A0S 0/TFEA FRCN/lle'9CN LOADS 4..RE2106E M50.ELECT/NC(MlT HfAIRS CQYNECT(O NEW PRQ°ANE sno t No. I NfAIERS RfW.4'BRAYW ORCU/R7YAS REaMM N 5 RMW S#aE DING 110N7 CEITLET 80X. INSTALL 2-64NO RU97 IXN7ET ..................... . 6OA'FO4 LAWT SWAM NO EF--2 SWICN 1NSIALL 2-GANG nW PLATE. ::E- 11.0 [ ................ WAGNER ARCHITECTURE •• PLANNING 1916 PIKE PLACE SEATTLE, WA 98101 206 448 2528 FAX •441 61 84 eognerorchitects.com ON. c 6 zeo 6 6- co�n�u: ° MEZZAHiNE e ro T carNECrTOtnsrzvc __ A:,SSV.C'1 A;T�) 5,51NC` HID ITp777N6 ORMIT. _ E ECMIM ENMEEMO k Uo RNG WSM 19]A01' 0N,491E 306.9"AT9E,WA 99109 GATE zos:zebo�e4e�x'r pm zmi�mm'• a���G.RBACy90 _MEZZANINE PLAN Tact 2 SCALE: 1/8" 1'-O" E u o1ES 10 eb 19 RENTON PUBLIC WORKS BUILDING D IMPROVEMENTS 3555 NE 2nd St Renton,WA 98056 gap PMw uaNTaNUauEZZANw E(Tm}� - — -- — -- ------ --- PERMITSET rEA7sTwc:ND�rnr?A FAISANG BAY d TURM/'y DJA NT IN Mum,1p B B n B B -F.XN/RfS N NW uAV7ENAN6f 9AT T O R EMIN(7P). ANTAN RAW MUBYAS MINO"O? ( , S /O? JOB NO. tEZZaNI,E ABO E ��— '(RJ (R)' (R) (R)',� �tc...25. MBER.2412 Ro;ram c C C C C C SEP[E A A sffN6 NIB aw BAY ...................... OA X17/�S Rl AO✓AQ71'T ...................... n I t;XISTi�(, 707 I d d I^ d d d I d d c l BAYS c sl(ff I AQr TO BI'AG/N(T1P� ...................... .................. ..................... .. _.._._._— ._...__—_...st.._..__.—_—..__.....__. �...____—_._—_� ..................... BAY 7 MAINTENANCE SFIOP BAY 2 — 702 103 ...................... I BAY 3 I BAY A t:1'MAINTENANCE >HJP I I ............. ....... A A A A A A PENDANT BO/NT TO ... .......... aEZT o o - c 72-0 ATF(T>PJ ....:................. TOILE b c ..... — 6. ....... ... ...: ::: ::.:.....-- ... -:..�. ..:. _ LIGHTING : FLOOR::: NEW OIL WATER :: NEW f"5.5. UN� SEPARATOR :::pLAN /— ... Nola ::.::::::::::::::::::: 7.RENOI£baiSBN6 tOWBAYN/B AXNREs TN awmR BArs IO2/IOJAaf.. ...................... tYWNfCT NfW ftUOffsQh'T[/OTRNG TO fA7SBNG 177 KYT ORO/IlS AS AYA'GItD. / P.PW"P2 A 1 COYIX MS°V EX/S77N6 CCWW/T TO ACCON"n' / BUILDING D PLAN NEWUtHnNm(J)fSANB Ca+77axs BAtANtr tltrmvc taRanrs `\ EYEMYB£INfEN(JJ EXISnNG C7RGYd7S J RW 7 R/TYT/XI W tOCAffM AND AIWN77146 NE/O/T W/ARWISU Sn.et xo. SCALE: I fig=1�-0` A907 TO ROM-hY. ..... - B WAGNER ARCHITECTURE •• PLANNING DIVISION 16-ELECTRICAL SPECIFICATIONS DIVISION I6•ELECTRICAL SPECIFICATIONS-CONTINUED 1916 PIKE PLACE SEATTLE, INA 98101 PART I-GENERAL RACEWAYS AND FITTINGS: 2 0 6'4 4 8-2 5 2 s 1.RIGO CONDUIT(GRSY ZINC-COATED STEEL WITH FULL THREADED CONNECTIONS AS MANUFACTURED BY TRIANGLE ALLIED.WESTERN OR APPROVED EQUAL FAX •441 •6184 2 ELECTRICAL METALLIC TUBING(EDIT):ZINC-COATED STEEL AS MANUFACTURED BY ALLIED,WESTERN OR APPROVED EQUAL.COUPLINGS AND CONNECTORS SHALL BE STEEL COMPRESSION•TYPE, SCOPE OF WORK RAIN AND CONCRETE TIGHT.TRIANGLE,ALLIED,WESTERN OR APPROVED EQUAL w a g n e ra rc h ite c ts.co m 1.THIS WORK SHALL CONSIST OF FURNISHING INSTALLING,TESTING,AND PLACING IN SATISFACTORY AND SUCCESSFUL OPERATION ALL EQUIPMENT,MATERIALS,DEVICES AND NECESSARY 3.FLEXIBLE METALLIC RACEWAY:FLFNBLE METAWC CONDUIT WITH APPROVED FITTINGS AS MANUFACTURED BY ALLIED,WESTERN OR APPROVED EQUAL CONNECTIONS TO EXTERIOR AND DAMP APPURTENANCES TO PROVIDE ELECTRICAL SERVICE AND NECESSARY POWER TO ALL EQUIPMENT HEREINAFTER SPECIFIED ANOOR SHOWN ON THE BANS. LOCATIONS SHALL BE IN WATERTIGHT FLEXIBLE CONDUIT WITH APPROVED CONNECTORS. L THE WORK SHALL INCLUDE ALL MATERIALS,EQUIPMENT AND APPARATUS NOT SPECIFICALLY MENTIONED HEREIN OR NOTED ON THE PLANS,BUT WHICH ME NECESSARY TO MAKE A COMPLETE WORKING INSTALLATION OF ALL ELECTRICAL SYSTEMS SHOWN ON THE PLANS OR DESCRIBED HEREIN.PROVIDE ALL REQUIRED RACEWAYS,SLEEVES AND OUTLET BOXES FOR MR14G INSTALLED FOR ITS: Conw6Pnh: SPECIAL SYSTEMS PROVIDED BY OTHERS. BRANCH CIRCU 3.EXISTING UNDERGROUND 480877 VOLT,3 PHASE,4 WIRE SERVICE AND POWER DISTRIBUTION SYSTEM.TO REMAIN AS INDICATED ON DRAWINGS. 1.TYPE THW,THHNTHMN OR XHHW 6*VOLT INSULATION,COPPER CON VICTOR MINIMUM WIRE SIZE TO BE AWG 612,SOLID.CONDUCTORS YA AND LARGER i0 BE STRANDED.MANUFACTURERS: 4.PROVIDE SUPPORTING DEVICES,WIRING DEVICES,TRIM PLATES,POWER POLES,OVERCURRENT DEVICES,DISCONNECT SWITCHES,NSES,STARTERS LABELING AND GROUNDING AS INDICATED ON AMERICAN INSULATED WIRE CORP.GENERAL CABLE,ROME OR APPROVED EQUAL. DRAWINGS AND AS REWIRED BY CODES.PROVIDE FUSES AS REQUIRED. 2.CABLE TIES SHALL BE THOMAS b BETTS'TY4RAP'.PROVIDE IN SWITCHBOARD.PANELBOPROS,AND OTHER ENCLOSURES TO NEATLY GROUP AND LACE ELECTRICAL CONDUCTORS. 5.PROVIDE RACEWAYS AS SHOWN ON THE DRAWINGSANOIOR AS REQUIRED FOR PROPER INSTALLATION OF THE WORJL ALL WIRING TO BE IN CONDUIT EXCE AT AS ALLOWED BY CODES.BRANCH A'S'S.O.0-I A T,E-S�1;1'N C.' CIRCUIT WIRING MAY BE METAL CLAD CABLE,TYPE MC,WHERE PERMITTED BY CODES. 6.FIXTURES FURNISHED UNDER THIS DIVISION SHALL BE COMPLETE WITH LAMPS AND ALL NECESSARY TRIM AND MOUNTING HARDWARE.INSTALL LIGHTING FIXTURES AS INDICATED.COORDINATE OUTLET BOXES: INSTALLATION WITH OTHER TRADES AND CEILING INSTALLATION.PROVIDE PROPER TRIM TO SUIT CEILING OR WALL TYPE 1.INTERIOR SURFACEd1OUNTED IN UNFINISHED AREAS:ONE-PIECE PRESSED STEEL.ELECTROGALVANQED,SIZE AND DEPTH AS REQUIRED BY CODE,EXCEPT 44NCH SQUARE OR 41NCH Ir OCTAGONAL MINIMUM.APPLETON.STEEL CITY,PACO. EIEOiwCAL FNCMEEWNG k MlFNC DESIGN ?.CONNECTION'BRANCH EQUIPMENT FURNISHED JUNCTION DIVISION IS AND CONN CONNECTIONS FOR AL CONNECTIONS MECHANICAL B OTHER EQUIPMENT AS REQUITED BY SYSTEM INSTALLER. 112 NICI(EIR SLIME 3116.SI,TRE,WA 11108 S.PROVIDE ALL BRMICHCIRWITRY,OUTLETS,JUNCTION BOXES,PMICONNECTIONS FORALL MECHANICAL PROVIDED BY OTHERS 2.INTERIOR FLUSH MOUNTED:SAME PS ABOVE EXCEPT PROVIDE PLASTER RING EXTENSIONTO FINISHED SURFACE. 2�fi. 6�]BB�av 9.PROVIDE ALL OURET,JUNCTION AND PULL BOXES REQUIRED FOR PROPER INSTALLATION OF ELECTRICAL EQUIPMENT BEING INSTALLED UNDER THIS WORK THE CONTRACTOR SHALL REVIEW ALL al DRAWINGS.DETAILS AND ELEVATIONS AND COORDINATE WITH THE ARCHITECT AND EQUIPMENT SUPPLIER PRIOR TO ROUGH-IN,ALL INSTALLATIONS OF WRNG DEVICES AND EQUIPMENT.WHERE LIGHTING FIXTURES: EQUIPMENT IS FURNISHED BY OTHERS,THE CONTACTOR SNAIL ASCERTAIN THE PROPER VOLTAGE,LOAD AND CONNECTION REQUIREMENTS PRAM TO ROUGHNN 1.ALL FLUORESCENT BALLASTS SHALL BE ELECTRONIC RAPID START TYFE WITH TOTAL HARMONIC DISTORTION OF ID%MAXIMUM AND 93%MINIMUM BALLAST FACTOR FIXTURES CONTROLLED BY MOTION SENSORS TO BE PROVIDED WITH PROGRAMMED RAPID START TYPE BALLASTS. G.R('�C�9 2.FIXTURE LENSES SHALL BE.125'THICKNESS MINIMUM. WORK NOT INCLUDED: 3.FLUORESCENT LAMPS SHALL BEAS SPECIFIED IN'UGHTING FIXTURE SCHEDULE'. : O I.MOTORS,CONTROLLERS AND EQUIPMENT AS DESCRIBED IN OTHER DIVISIONS OF THIS SPECIFICATION SHALL BE FURNISHED UNDER THOSE DIVISIONS,BUT SHALL BE SET AND WINED UNDER THIS SECTION. 2.SECURITY SYSTEM DESIGN,WIRINGAND EQUIPMENT PART 3.EXECUTION �929I 3.FIREAfARM SYSTEM(NOT REQUIRED), GENERAL: 4.TELFPHONEJDATA SYSTEM CONOUIT&BOXES 1.IN MATERIALS AND EQUIPMENT IN AGWD WORKMANLIKE MANNER UTILIZING CRAFTSMEN WHO ARE SKILLED IN THAT PARTICULAR TRADE PROVIDE WORK WHICH HASA NEAT AND FINISHED JQUL APPEARANCE EXPIRES 10 25 19 EENECK CONFLICTS,COTELOCATIONSOFELECTRICALSYSTEM COMPONENTS SHOWN ON DRAWINGS NE ESSARY HANGWITH OTHER SYSTEMS TOO SANOEWIPMENi HAVING FIXED LOCATIONS.IN TAE EVENT OF CONFLICTS,CONSULT THE ENGINEER THE ENGINEERS DECISION SHALL GOVERN.MAKE NECESSARY CHANGES AT NO COST TO OWNER 3.FOLLOW MANUFACTURERS'INSTALLATION INSTRUCTIONS EXPLICITLY,UNLESS OTHERWISE INDICATED.WHEREVER ANY CONFLICT ARISE BETWEEN MANUFACTURERS'INSTRUCTIONS,OWES AND QUALITY ASSURANCE: REGULATIONS,AND THESE CONTRACT DOCUMENTS,FOLLOW ENGINEERS DIRECTION AT NO ADDITIONAL COST TO OWNER.KEEP COPY OF MANUFACTURERS INSTALLATION INSTRUCTIONS ON THE REGULATORY REQUIREMENTS: JOB SITE AVAILABLE FOR REVIEW AT ALL TIMES. 1. FEDERAL,STATE AND LOCAL BUILDING CODES AND ORDINANCES 2. STATE AND FEDERAL LAW SECURING SITE WORN(: 3. WASHINGTON ADMINISTRATIVE CODE(WAC) 1,THE CONTRACTOR ALONE ISSOLELY RESPONSIBLE FOR SECURING ALL ELECTRICAL SITE WORK WITH ADEQUATE BARRIERS AND WARNING INDICATORS 4. NATO NAL ELECTRICAL CODE(NEC) 5. LIFE GAFETY CODE(NFPa101) CLEANUP. 6. WASHINGTON S'LABO ATORY EC) 1,UPON COMPLETION OF THIS WORT(AND BEFORE FINAL ACCEPTANCE AND PAYMENT,THE ELECTRICAL CONTRACTOR SHALL,AT HIS EXPENSE,REMOVE FROM THE SITE AND ADJOINING PROPERTY. 7. UNDENAL ELE ELECTRIC SAFETY NATIONAL ELECTRIC SAFETY CODE(NESC) PAID DISPOSE OF PII SURPLUS AND DISCARDED MATERIALS,RUBBISH,TEMPORARY BUILDINGS.EQUIPMENT AND DEISM WHICH MAY HAVE ACCUMULATED DURING THE PROSECUTION OF THE 9. AMERICAN NATIONAL STANDARDS WSTIME(ANSI) ELECTRICAL WORK ALL FUTURES,DEVICES.EQUIPMENT.PANELS,ETC.SHALL BE LEFT THOROUGHLY CLEAN AND IN PROPER CONDITION. 10. NATIONAL ELECTRICAL MANUFACTURERS!ASSOCIATION(NE" GUARANTEE- 1. THE OCCUPATIONAL SAFETY AND HEALTH ACT(OSHA) 1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK PUT IN UNDER THIS SPECIFICATION AND DRAWINGS.HE SHALL MAKE GOOD,REPAIR OR REPLACE,AT HIS OWN EXPENSE,AS MAYBE NECESSARY,AND DEFECTIVE WORK,MATERIALS OR PARTS WHICH MAY SHOW ITSELF WITHIN ONE YEAR AFTER FINAL ACCEPTANCE,IF IN THE OPINION OF THE ENGINEER SAID DEFECT IS DUE TO IMPERFECTION IN MATERIAL OR WORKMANSHIP.INCANDESCENT LAPS ARE NOT GUARANTEED,HOWEVERALL INCANDESCENT LAMPS SHALL BE IN OPERATING CONDITION AT THE TIME OF FINAL RESPONSIBILITY OF THE CONTRACTOR ACCEPTANCE OF THE PROJECT. RENTON PUBLIC 1.00 APLETE ALL WORT(SPECIFIED UNDER THESE SPECIFICATIONS AND DRAWINGS. PANELBOARDS: 2.COORDINATION WITH OTHER TRADES, I.CIRCUIT INDEX:FOR EACH BRANCH CIRCUIT PANELBOARD:PROVIDE ATYPEWRITTEN INDEX LISTING EACH CIRCUIT IN THE PANELBOARD BY NUMBER WITH ITS PROPER LOAD DESIGNATION.MOUNT WORKS I REFERTOALL DRAWINGS,SPECIFICATIONS,AND SHOP DRAWINGS PERTAINING TO EQUIPMENT CONTAINING ELECTRICAL COMPONENTS. WITH ATRANSPARENT PROTECTIVE COVER INA METAL FRAME INSIDE THE CABINET DOOR THE LISTING SHALL MATCH CIRCUIT BREAKER ARRANGEMENTS TYPICALLY WITH DOD NUMBERS ON THE /'� 4.FURNISH AND INSTALL ALL INCIDENTAL ITEMS NOT SPECIFICALLY SHOWN OR SPECIFIED WHICH REQUIRED BY GOOD PRACTICE TO PROVIDE THE COMPLETE SYSTEMS SPECIFIED. LEFT AND EVEN NUMBERS ON THE RIGHT. BUILDING D 2.ALL EOUWMENT SHALL BE BRACED TO WITHSTAND AVAILABLE FAULT CURRENT FROM UTILITY TRANSFORMER I.ALLMAONANDxENDIME IMPROVEMENTS 1.PLL MA7ERALS,EQUIPMENT.AND WORKMANSHIP SUBJECT TO INSPECTION AT ANYTIME By THE ENGINEER CORRECT ANY WORK,MATERIALS,OR EQUIPMENT NOT IN ACCORDANCE WITH THESE DISCONNECT SWITCHES: CONTRACT DgXJMENTS OR FOUND TO BE DEFICIENTOR DEFECTIVE INA MANNER SATISFACTORY TO THE ENGINEER AT NO ADDITIONAL COST TO THE OWNER 1.LABEL ALL DISCONNECT SWITCHES TO IDENTIFY THE LOAD CONTROLLED. 2.THROUGHOUT THIS CONTRACT,PROVIDE PROTECTION FOR MATERIALS AND EQUIPMENT AGAINST LOSS OR DAMAGE PROTECT EVERYTHING FROM THE EFFECTS OF WEATHER PRJORTO INSTALLATION,STORE ITEMS IN INDOOR DRY LOCATIONS.STORE IN INDOOR,HEATED,DRY LOCATION ITEMS SUBJECT TO CORROSION UNDER DAMP CONDITIONS,AND ITEMS CONTAINING INSULATION,SUCH AS CONTROLLERS,MOTORS,ETC. GROUNDING: 1.PROVIDE ALL GROUNDING FOR ELECTRICAL SYSTEMS AND EQUIPMENT AS REQUIRED BY CODES AND AS SPECIFIED HEREIN. 2 GROUNDING CONDUCTORS:PROVIDE AS REWIRED BY CODE AND AS SHOWN ON THE DRAWINGS.RUN GROUNDING CONDUCTORS INSIDE RACEWAYS PROVIDE SEPARATE GROUND CONDUCTOR AS CONSTRUCTED DRAWINGS: FROMSERVHCE GROUND TO THE ELEVATOR MOTOR CONTROLLER AND LAN GROUND BAR 3555 NE 2nd St I.PROVIDE ASSUILT DRAWINGS AS DIRECTED IN DIVISION I. B CONNECTION TO THE GROUND BUS: PROVIDE CONNECTIONS IN ACCORDANCE WITH THE CODES;INCLUDING BUT NOT LIMITED TO CONDUIT SYSTEM,SWITCHBOARD FRAAIES,SERVICE NEUTRAL 2,SUBMITTOTHE ENGINEER IN WRITING DETAILS OF ANY NECESSARY,PROPOSED DEPARTURES FROM THESE CONTRACT DOCUMENTS,AND THE REASONS THEREFOR SUBMIT SUCH REQUESTS AS AND ELECTRICALLY OPERATED EQUIPMENT AND DEVICES.NO DEVICE OR EQUIPMENT SHALL BE CONNECTED FOR ELECTRICAL SERVICE WHICH RASA NEUTRAL CONDUCTOR CONNECTED TO A Renton,WA SOON AS PRACTICABLE MAKE NO SUCH DEPARTURES WITHOUT WRITTEN APPROVAL OF THE ENGINEER GROUNDING CONDUCTOR OR TO THE FRAME WITHIN THE DEVICE OR EQUIPMENT. WARRANTY: RACEWAYS: 98056 1,PROVIDE A WRITTEN WARRANTY THAT THE DIVISION 16 WORK'FREE FROM ALL DEFECTS,CONTRACTOR SHALL REPLACE AND REPAIR TO THE SATISFACTION OF ME ENGINEER,PINY PARTS OF (.INSTALL EX POSED RACEWAYS AS HIGH AS POSSIBLE,ABOVE DUCTWORK PARALLEL OR AT RIGHT ANGLES TO BUILDING LINESRAGEWAYS SHALL BE SUPPORTED WITH HEAVYZIM,ONE-HOLE. THE INSTALLATION WHICH MAY FAIL WITHIN A PERIOD OF TWELVE(12)MONTHS AFTER PHYSICAL COMPLETION,PROVIDED THAT SUCH FAILURE IS DUE TO DEFECTS IN MATERIAL OR WONNANSHB`OR PRESSED STEEL STRAPS ON INTERIOR SURFACES.SUPPORT PENDPM-MOUNTED RACEWAYS ON 31WNCH ROD WITH PEARSHAPED HANGER OR TRAPEZE-TYPE HANGER WITH 3BMCH ROD FAILURE TO FOLLOW THE SPECIFICATIONS AND DRAWINGS. (MINIMUM)AND 1-1151NCH SQUARE PREFORMED CHANNEL AND PIPE CLAMPS.ALL FVMNGS MD SUPPORTS SHALL EE HOTOP GALVANIZED W EXTERIOR AREAS.PREFORMED CHANNEL M AREAS ABOVE SUSPENOEDCENNGS MAYBE STANDAROPAINIED FINISH.MULTIPLE CONDUIT RUNS SHALL BE GROUPED AND NEATLY RACKED ON TRAPEZE HANGERS. PERMITS b FEES: 2.ANCHOR TO METAL STUD STRUCTURES BY MEANS OF SHEET METAL SCREWS OR MANUFACTURED SPRING STEEL CLIPS.FASTEN INDIVIDUAL RACEWAY SUPPORTS TO STRUCTURAL WALLS OR PERM98 CONTRACTOR SHALL OBTPINPNDPAY FOR ALL LICENSES,PERMITS AND INSPECTIONS REQUIRED BYLAWS,ORDINANCES PAID RUES GOVERNING WORK SPECIFIED HEREIN.THE CONTRACTOR SLABS WITH STEEL EXPANSION SHELLS AND BOLTS.PROVIDE FLUSH CONCRETE INSERT FOR MULTIPLE RACEWAY SUPPORT SYSTEM.FASTEN TO ARCHITECTURAL OR MASONRY WALLS WITH TOGGLE 1. BOLTS OR MOLLEY SCREWS. SHALL ARRANGE FOR INSPECTION OF WORK BY THE INSPECTORS AND SHALL GIVE THE INSPECTORS ALL NECESSARY ASSISTANCE IN THEIR WORK OF INSPECTION. 3.INDEPENDENT SUPPORT:CONDUITS STALL NOT BE SUPPORTED FROM THE CEILING SUSPENSION SYSTEM,DUCTS,PIPES OR OTHER SYSTEMS FOREIGN TO THE ELECTRICAL INSTALLATION.THE Demo Rasa 2.THE CONTRACTOR SHALL CONSULT WITH AND FOLLOW THE REQUIREMENTSOFTHHE CITY OF ABERDEEN,GRAYS HARBOR PAID AND DIVEST COMMUNICATIONS AND SHALL COORDINATE ALL WORK ENTIRE ELECTRICAL INSTALLATION SHALL BE KEPT INDEPENDENT FROM PINY OTHER TRADE. WITH THEM. PERMIT SET SUBMITTALS: DIVISION 16•ELECTRICAL SPECIFICATIONS•CONTINUED 1.SUBMIT PRODUCT DATA FOR EACH ITEM SPECIFIED IN THESE SPECIFICATIONS.PRODUCT DATA SHALL INCLUDE ALL DISTRIBUTION EQUPMENT WITH VOLTAGE AND CONTINUOUS CURRENT RATING, SHORT CIRCUIT WITHSTAND RATING OF BUS,LIGHTING FIXTURES INCLUDING BALLAST AND LAMP INFORMATION.ALL WIRING DEVICES AND TRIM PLATES.POWER POLES AND CABLE TRAYS. BRANCH CIRCUITS: 1.BRANCH CIRCUITS SHALL BE NO.12 AWG MINIMUM,COLOR-COOED AS LISTED BELOW.HOME RUNS GREATER THAN 75 FEET TO FIRST OUTLET SHALL BE NO.1D MINIMUM.USE NO MECHANICAL PART 2.MATERIALS MEANS FOR PULLING WIRES,NO LUBRICANT EXCEPT IDEAL YELLOW 77 OR APPROVED SUBSTITUTE.MAKE NO SPLICES IN HOME RUNS.WIRNG FROM SEPARATE RACEWAY SYSTEMS SHALL NOT BE JOB NO. INTERMIXED IN COMMON JUNCTION BOXES. SUPPORTING DEVICES: 2.COLOR CONING REQUIREMENTS: Dvte Rerlvane ANQTMOLT,3-PHASE,4-WIRE SYSTEMS: 25$EPTEMEIER 201'j 1.MATERIAL:COLD-FORMED SUPPORTS PORTSWITH CORROSION-RESISTANT LOCATIONS REWIREALL WTH STEEL TOBE HOTHNPGTRAPEZEH PHASEA-BROWN 2.RACEWAY LCLAMSRCUCKTYPEHANGER FOR CLEWS HANGERS,RISER CLAMPS,STRAPS,THREADED CCLAMPS WITH RETAINERS,CEILING TRPPEZE HANGERS,WILL BRACKETS AND PHASEB-ORANGE SPHNGSTEELCLAMPS OR WCK•TYPE HANGER FIRING CONDUITS. ' 3.SLOTTED STEEL CHANNEL SUPPORTS:FLANGE EDGES TURNED TOWARD WES.9'16'DIAMETER SLOTTED HOLES AT MAXIMUM T SPACING IN WEI S. PHASEC-YELLOYI 4.EXPANSION ANCH ORS:CARBONSTEEL WEDGE OR SLEEVE TYPE.TOGGLE BOLTS:ALLSTEEL SPRINGHEAD TYPE NEUTRAL-WHITE . . . . . . . . . . . GROUND-GREEN 5.STAINLE55 STEEL AIRCRAFT CABLE:GABLE TO BE FURNISHED WITH LIGHTING FIXTURES. . ' WIRING i 121Y208-VOLT,3-PH/SE.4-W IRE SYSTEMS: ' r 1.SWITCHES: SWITCHES,HES,HE PHASE A-BLACK ' I.SERENEC SNAP STRAIGHT HEAVY AVT DUTY GRADE,TYPE FEDERAL SPEC,20 AMR NORM COLOR PHASE S-RED 3.RECERECEPTA:SE:FEED HROU HFTYP D ITHINTEGAL FEDERAL SPEC.,20 IGURANEPALNRPOSE=IVORY COLOR PHASE C•BLUE 3.GfCl RECEPTACLE:FEED THROUGH TYPE WITH INTEGRAL NEM4 W06 CONFIGURATION,Si6R DUPLEX RECEPTACLE. ' 4.WALL RATES:SINGLE AND MULTIPLE GANG TRIM PLATES TO MATCH DEVICE COLOR SMOOTH,PLASTIC IVORY COLOR NEUTRAL-WHITE S.MOTION DETECTORS:SEE LIGHTING PLANS AND DETAILS. GROUND-GREEN " . . . . . . . . . . BRANCH CIRCUIT PANELBOARDS: CONTROLS-BLACK WITH WIRE NUMBERS ON EACH CONDUCTOR . . . . . . . . . . . . . 1.EXISTING EQUIPMENT-SQUARE D. 3.PRASE BALANCING:CONTRACTOR SHALL CHECK LOAD ON EACH PHASE AT EACH PANEL AND SERVICE EQUIPMENT AND SHALL MARE THE NECESSARY CIRCUIT ADJUSTMENT TO ENSURE PROPER BALANCE OF LOAD ON ALL THREE PHASES. B.CIRCUIT BREAKERS SHALLBE THERMAL MAGNETIC TUPEQUIPPED WITH INDIVIDUALLY INSULATED,BRACED AND PROTECTED CONNECTORS.THE FRONT FACES ONSHALLBEIT EARL SHOWN Sheet Contents 4.YOLTAGE SEPARATION:LOW VINTAGE AND SIGNAL CONDUCTORS TO BE IN SEPARATE RACEWAYS BEFLUSHWIUEACHOTHER IAPOSMO BETWEEN INDIVIDUAL OFF.CIRCUIT BREAKER SHALL FIXEOTED SECURELY ONE PMELBOARO SUS. BREAKERS SHALL BE CLEARLY 1HOWN BY . . . . . THE BRFN(ER HANDLE TPYJNGAPOSmON BETWEEN ON PAID OFF.CIRW1i BREPXERB SHALL 6011ED 5EWPELY TO7HE PPNEl80ARD BUS.gftWRBPFAIXER$TO MATCH EXISTING. /L : : � 4.CIRCUIT DIRECTORY:A CIRCUIT DIRECTORY FRAME AND CARD WITH A TRANSPARENT PROTECTIVE PLASTIC COVERING SHALL BE PROVIDED ON THE INSIDE OF THE DOOR THE DIRECTORY CARD SWITCHING OF LIGHTING FIXTURES: S'PECIFICA'TIONS SHALL PROVIDE A WRITING SPACE AT LEAST 114'HIGH X 3'LONG OR EQUIVALENT FOR EACH CIRCUIT. 1.PROVIDE LOCAL SWITCHING OF All FIXTURES UNLESS INDICATED OTHERWISE.OCCUPANCY SENSORS TO BE PROVIDED IN ROOMS LESS THAN 300 SQUARE FEET PER WEC. DISCONNECT SWITCHES t' " 2.LIGHTING CONTROLS TO BE IN FULL COMPLIAN CE WITH THE WASHINGTON STATE ENERGY CODE : SHEET RCHES AND FUSES: 1.DISCONNECT SWATCHES TO BE'HEAVY DUTY'WIIH RATING AND SONG AS INDICATED ON DRAWINGS.PROVO FUSING AS REQUIRED.SWITCHES FOR MOTORS TO BE DUAL HORSEPOWER RATED w . . . . . AND FU RNISHED WITH DUAL-ELEMENT NS ES SIZED FOR THE PARTICULAR MOTOR IN STALLED TO PROVIDE MOTOR RUNNING OVER-CURRENT PROTECTION.SWITCH ENCLOSURES TO BE SUITABLE FOR TELEPHONEIDATA: ENVIRONMENT IN WHICH THEY ARE TO BE INSTALLED. 1.%-CON OUT(MIN INUMI FOR EACH TELFJDATA OUTLET(BY OWNER( 2.FUSES TO BE ONE-TIME CARTRIDGE,FERRULE OR DUAL ELEMIENT TYPE.FUSES TO BE SIZES AS RECOMMENDED BY EQUIPMENT MANUFACTURER PROVIDE THREE EXTRA FUSES FOR EACH SIZE OF 2.TELEPHONE AND DATA WIRING TO BE IN CONDUIT INSTALLED BY OWNER PROVIDE CAT5E CABLES,DEVICES,b TRIM PLATES- . . . . . . . . . . FUSE PROVIDED.TURN OVER TO OWNER 3.PROVIDE FACEPLATE WITH TELEPHONE I DATA JACK PER OWNERS REQUIREMENT. ' ' ' ' ' ' END OF DIVISION 16 Sheet No. . . . . . . . . . . . . . . �-40