HomeMy WebLinkAboutD-205711N
L0
O
N
N
N
I
a.
N
LANDSCAPING PLAN
i
i
i
i�
D
HYDROSEED
BARE AREAS
(APPROX)
1 18dd As —BuAt Starnp, Not Clewing Points DWiC 9/13A)4 SUNTM
Re vie Plant Materials Dwc 920 04 coc
oc
NO. REVISION BY DATE APPR
RS
FtOLL I 9t7
PLANT MATERIAL LIST Q REVISED MATERIAL, ouAwTin
SYMBOL NAME
DOUGLAS SPIRAEA
SNOWBERRY
VINE MAPLE
SPIRAEA DOUGLASII
SYMPHORICARPOS ALBUS
ACER CIRCINATUM
RED STEM DOGWOOD CORNUS STOLONIFERA
NATIVE WILLOWS, PACIFIC WILLOW, ETC.
TYPE MATERIAL
SHRUB 18 "- 24" STOCK 4'0.C.
SHRUB 18 "- 24" STOCK 4'0.C.
SHRUB `� STOCK 8'0.C.
18" - 24"
CUTTINGS, 1/2" TO 1" DIA. 24" O.C.
18" - 24"
CUTTINGS, 1/2" TO In DIA 24" O.C.
18" - 24"
QUANTITY
15 12
12
6
15
0 15
LOCATION
APPROX EL 113 TO 115
APPROX EL 113 TO 115
APPROX EL 113 TO 115
ABOUT EL 112
ABOUT EL 112
24"
SECOND SHRUBS
FIRST SHRUBS Appx.24" FROM
Appx.24" FROM FIRST SHRUBS
CUTTINGS (Where Shown)
24"
CUTTINGS TOP OF BERM
Appx.18* FROM 18" EL 115.17 a x.
WATER SURFACE
LINER EL 113.17 (appx.)
LOW WATER SURFACE
(LATE SUMMER)
Appx. EL 111.4
r \
y
F-
w
0
d
m
0
0
TREE OR SHRUB INSTALLATION
NOTES
1. INSTALL NEW PLANTS 4' ON CENTER
2. DO NOT DIG INTO PVC LINER
nmL.
AS NOTED
�ON am
���
v sa ON ss"
semis occum mIr
F I;t 31.��
dRCITY OF
RENTON
Pionning /Building /Public Works Dept.
CAUTION - LINER MAY BE WITHIN 1 FOOT
OF SURFACE ON SIDE SLOPE
PLANTING DETAIL
/2\ ADDED DETAIL
- ?rlS�II
awa��a Paws WNM s~:
WMD A sswu► M410M
R 40727 Off! 1"/ m
RECOMMENOEC
FOR APPROVAL
By Daniel Carey 8/29/04
BY
6/20/04
MAPLEWOOD CREEK SEDIMENT BASIN
2004 MAINTENANCE PROJECT "°`
LANDSCAPING 4
SCMWID MR 2 2 amm.QW7 �: 4
4 IDI-121015171014
•
r�