Loading...
HomeMy WebLinkAboutD-349703n rn -- cli CL °` Maas @n INSTALL TEMPORARY YP SAS Or DAM \RC `� ° ' `\ 0 ?ek FOR C DETAIL SON ` -\ AppX '' �N ACC ACCESS, CALE 1 "= 20 Feet ' -' `, .. i - - -- ----------- - - - - -� FRO \ THIS IDE Z _----------- PROVIDE SECOND 1� D _0 �'� L ----- _ IF NEEDED TO PUMP ` -- DAM AND -- - - COLLECT \ - - -- X TION NOTES OPLAN,NEW - - -- SEC _____ ONDARY _ - FLOW --- - -- A �' °° -° RT ELEVATIONS TAKEN FROM PRELIMINARY SITE LOG DROPS -`'- --------- _° IFE CHURCH, WEST SIDE IMPROVEMENTS. LIMITS AND BASIN BOTTOM ELEVATIONS ARE 2H:iV E CITY MAY ADJUST THE SEDIMENT REMOVAL LIMITS AS NEEDED. YPASS PIPE 2 "CMP E =121.1 t °° REMOVE SEDIMENT TO BASE GRADES SHOWN 3. TEMPORARY BYPASS DAM SHALL BE WATER TIGHT SO BASIN ` i OR TO TOP OF RIP -RAP ON SIDE SLOPES. CAN BE DRAINED AND SEDIMENT CAN BE DRIED OUT. . . . ( �" i HAND DIG IF NEEDED TO IDENTIFY RIP -RAP. DO NOT OVEREXCAVATE SIDESLOPES. BOTTOM OF BASIN j; APPX. EL 113 USE SMOOTH BUCKET, NO TEETH. 4. FISH RESCUE IN THE SEDIMENT BASIN SHALL OCCUR IMMEDIATELY AFTER THE BYPASS DAM IS INSTALLED. UTILITY EASEMENT :\ ``,\ \/" " " " " " " " r �. SEDIMENT LIMITS APPROXIMATE. See Note ACCESS SIN S DOWN E\ �L J�, : ; + SEDIMENT DEPTH APPROX 4 TO 6 FEET. t ! ` \ \ 24 "CMP BYPASS PIPE `� `�� ����61 LOCATION NOT VERIFI6j �� .��� �! "� A \c�9 `. \� �.� C) 1220 `\ HYD OSEE D AN STRAW MULCH ` g ` �� �� �� cb \CC 3' ° DIST RBE SLOP. AND ACCESS ROAD o ! 1: AFTE BAS CL ING ma v\ : J x •• ' \ `� �� 12'x3' CONS. BOX CULVERT OVERFLOW SPILLW Y NO UTILITY EASEMENT See Note \ F ACCESS F RO T S ! a`M SID E ° 24 "CMP BY ASS PIPE \�� '� \ LOCATION OT VERIFIED , \' E = 115.8 INLET —_ A4 BYPASS PIPE OUTLET ° _ _ GRAV O� E4 =116.12 E1- ACL_L_ S r yEf. _Ol/FRF(Ow, `—.. ROAp �- OM 36" CMP OU`I.ET �� .�HANNEL.Cdry) - -_—_ SR_ 9 — IL =114.47 p \: y , \ ` N s _.._ 'moo Tys ` .. - - AS —BUILT NOTES — 2009 UTILITY EASEMENT FROM NEW LIFE CHURCH 8/10/09 SEDIMENT BASIN CLEANING DRAWING 1, POND BOTTOM WAS WET AND MUCKY. KING CO. RECORDING # 20091007000046 EXCAVATOR STAYED ON PAD OF SEDIMENT AND REMOVED MATERIAL TO APPX. EL 113 BY JUDGING THE DEPTH SHOVEL WENT DOWN. APPROX 1000 CY REMOVED. BOTTOM WAS TOO MUCKY TO WALK ON AND SURVEY AFTER WORK WAS FINISHED. �= 349703 2010 Cleaning o Q�oa RECOMMENDED FOR APPROVAL q 7. snrvtvm. � o�D ,E,mrN.: ww ,em xm¢oxru: MOP., AS NOTED CITY OF a� 7/7/10 MADSEN CREEK SEDIMENT BASIN 9� q E� RENTON By 9 7_7 _ /o FssroSAtE�o " Dc I ,,,, «�_ � DA uM CLEANING PROJECT „ a¢raaoDC RS / Wrl vw.scue I Planning /Building /Public Works Dept. SEDIMENT BASIN BY E7wlRE$t0116r z�il —, N0. REVISION BY DATE APPR �„�p,� sx iv sccc cr: x 2 RS