CONSTRUCTI N OTES
- -_- SECONDARY
------------------
FLOW
"- -- A
-'
1. PIPE INVERT LEV TIONS TAKEN FROM PRELIMIN Y SITE
LOG DROPS
-- --- ---------
_,
PLAN, NEW LIF CH RCH, WEST SI E IMPROVEMENT S.
2. SEDIMEN LIMITS AND BASIN B TTOM ELEVATI S ARE
2H:ty
A HE CITY MAY ADJUST T E SEDIMENT MOVAL LIMITS
`
DEP AS NEEDED.
YPASS PIPE T
2 "CMP IE =121.1 t
`'�- `"'
%� /-- `—`'� -- --' —
`-' -
\
R t� VE S DIMENT TO BASE GRADES S 0 N
3. TEM CRARY BYPASS DAM SHALL BE WATER SO ASIN
0 o TO OF RIP -RAP
H D DIG IF NEEDED TO
0 SIDE SL E
ID NTIFY RIP R P.
CAN E D AND SEDIMENT CA IED 0 T.
.I. .
'i
\. . . . BOTTOM OF BASIN
�' : .APPX. EL" 113:
"`
��
NOT VEREXCAVATE SID
E SM OTH BUCKET,
SLOPES.
N TEETH.
4. ISH RESCUE I THE S IME ASIN SHALL OCCU
EDIATEL AFTE THE BY ASS DAM IS INSTAL ED.
,
I
I
UT ITY SEMEN
�`
�:\
DIME LIMITS APPROXI
ATE.
See Note
ACCESS BASIN
DOWN TFNIS`IQE
\ : \\ :
j' :
i
EDIME T DEPTH ABOUT
TO 5 F ET
24 "CMP BYPASS PIPE
LOCATION NOT VERIFIL�
\
� 2 � �
1 1
a r U)
3 0
2'x3' CON LVER
`� `
OVERFLOW
�IL
NO
- -- UTILITY EA .M
of
ACCESS,
FRO r
M IS
SID
24 "CMP BY ASS PIPE
LOCATION OT VERIFIED ' ��
36" CM INLETS
.
IE = 1/6.81
_ — — _ - -_ --
�'—
-- ___
O — _M� %fC��
__
1
1
—
BYPASS PIPE OUTLET
24" CMP
\=
`'
- - ..- .._.._.._.._._.
__
- '_ --
AC ESS
1
IE = 116.12
—�--_—
_ _ _
-C- GRAVEL
_ RCgp
36" CMP OU�LET
��
—. EL .(dry)
°
'-- -_ R' 169
IE
= 114.47
=116.8
est
(p
q
O
i
AS -BUILT NOTES
- 2009
8/10/09 UTILITY EASEMENT FROM NEW LIFE CHURCH
SEDIMENT BASIN CLEANING
DRAWING
1. POND BOTTOM WAS WET AND MUCKY.
KING CO. RECORDING #_2 ooq Loo3 oQO9'i6
EXCAVATOR STAYED
ON PAD OF SEDIMENT AND REMOVED MATERIAL TO APPX. EL 113
BY JUDGING THE
DEPTH SHOVEL WENT DOWN. APPROX 1000 CY REMOVED.
BOTTOM WAS TOO
MUCKY TO WALK ON AND SURVEY AFTER WORK WAS FINISHED.
D=
349701
a
AS -BUILT 2009 Cleaning
g
~� of W�y'ycp
RECOMMENDED
ti
i 1
Add 2009 As —Built notes DWC
9/24/)9
au�. `UM.
O.E.Co:
DC
NR°CN: MD law
AS NOTED HO OOZ W 1gm/1991
a ,} CITY OF
Dae
6/10/09
NOM. ME.
MADSEN CREEK SEDIMENT BASIN FIB
FOR APPROVAL
BY Daniel Carey 6/11/09
°"� DC
ONE INLIt
DATUM
CLEANING PROJECT 0R4�""`N°
CXFptF°'
onlawa. PLANS sru1PEO Sr.
DC / RS
+* wa . Planning/Building/Public
T AOT ME 04M
Works Dept.
P SEDIMENT BASIN
BY
RONALD a smAKA 0X:6/1/09 N0.
PE /29727 EMPIRES to/16/09
REVISION BY
DATE APPR
�r"v. RS
scuE nccO�INws
sir x aH' 2
0I3 * -3q- 70r
1
I D
-3419170
n
rn
--
cli
CL
°` Maas @n INSTALL TEMPORARY YP SAS
Or
DAM \RC
`� ° '
`\
0
?ek FOR C
DETAIL SON
` -\ AppX
'' �N ACC
ACCESS,
CALE 1 "= 20 Feet
'
-' `, ..
i
- - -- ----------- - - - - -�
FRO
\ THIS
IDE Z
_-----------
PROVIDE SECOND
1�
D
_0
�'�
L ----- _
IF NEEDED TO PUMP ` --
DAM AND
-- - - COLLECT \ - - --
X
TION NOTES
OPLAN,NEW
- - -- SEC
_____ ONDARY
_ -
FLOW
---
- -- A �' °° -°
RT ELEVATIONS TAKEN FROM PRELIMINARY SITE
LOG DROPS
-`'- --------- _°
IFE CHURCH, WEST SIDE IMPROVEMENTS.
LIMITS AND BASIN BOTTOM ELEVATIONS ARE
2H:iV
E CITY MAY ADJUST THE SEDIMENT REMOVAL LIMITS
AS NEEDED.
YPASS PIPE
2 "CMP E =121.1 t
°°
REMOVE SEDIMENT TO BASE GRADES SHOWN
3. TEMPORARY BYPASS DAM SHALL BE WATER TIGHT SO BASIN
`
i
OR TO TOP OF RIP -RAP ON SIDE SLOPES.
CAN BE DRAINED AND SEDIMENT CAN BE DRIED OUT.
. . .
(
�" i
HAND DIG IF NEEDED TO IDENTIFY RIP -RAP.
DO NOT OVEREXCAVATE SIDESLOPES.
BOTTOM OF BASIN j;
APPX. EL 113
USE SMOOTH BUCKET, NO TEETH.
4. FISH RESCUE IN THE SEDIMENT BASIN SHALL OCCUR
IMMEDIATELY AFTER THE BYPASS DAM IS INSTALLED.
UTILITY EASEMENT
:\
``,\
\/" " " " " " " " r
�.
SEDIMENT LIMITS APPROXIMATE.
See Note
ACCESS SIN
S
DOWN E\
�L J�, : ;
+
SEDIMENT DEPTH APPROX 4 TO 6 FEET.
t !
`
\ \
24 "CMP BYPASS PIPE
`� `�� ����61
LOCATION NOT VERIFI6j
�� .��� �!
"�
A \c�9 `. \� �.� C)
1220
`\
HYD
OSEE D AN STRAW MULCH
` g ` �� �� �� cb
\CC
3' °
DIST
RBE SLOP. AND ACCESS ROAD
o ! 1:
AFTE
BAS CL ING
ma
v\ : J
x
••
'
\ `� �� 12'x3' CONS. BOX CULVERT
OVERFLOW SPILLW Y
NO
UTILITY EASEMENT
See Note
\ F
ACCESS F
RO T S
!
a`M SID E
°
24 "CMP BY ASS PIPE \�� '�
\
LOCATION OT VERIFIED , \' E = 115.8 INLET —_
A4
BYPASS PIPE OUTLET
°
_ _
GRAV
O�
E4 =116.12
E1- ACL_L_ S
r
yEf.
_Ol/FRF(Ow,
`—..
ROAp �-
OM
36" CMP OU`I.ET ��
.�HANNEL.Cdry)
- -_—_ SR_ 9 —
IL =114.47
p
\: y , \
`
N
s
_.._
'moo Tys
`
.. - -
AS —BUILT NOTES
— 2009
UTILITY EASEMENT FROM NEW LIFE CHURCH 8/10/09
SEDIMENT BASIN CLEANING DRAWING
1, POND BOTTOM WAS WET AND MUCKY.
KING CO. RECORDING # 20091007000046
EXCAVATOR STAYED ON PAD OF SEDIMENT AND REMOVED MATERIAL TO APPX. EL 113
BY JUDGING THE
DEPTH SHOVEL WENT DOWN. APPROX 1000 CY REMOVED.
BOTTOM WAS TOO
MUCKY TO WALK ON AND SURVEY AFTER WORK WAS FINISHED.
�= 349703 2010 Cleaning
o
Q�oa
RECOMMENDED
FOR APPROVAL
q 7.
snrvtvm. �
o�D
,E,mrN.: ww ,em
xm¢oxru: MOP.,
AS NOTED CITY OF
a�
7/7/10
MADSEN CREEK SEDIMENT BASIN
9� q E�
RENTON
By 9
7_7 _ /o
FssroSAtE�o "
Dc I
,,,, «�_ � DA uM
CLEANING PROJECT „
a¢raaoDC RS
/
Wrl vw.scue I Planning /Building /Public Works Dept.
SEDIMENT BASIN
BY
E7wlRE$t0116r z�il —,
N0.
REVISION BY DATE APPR �„�p,�
sx iv
sccc cr:
x 2
RS
O'
------------------
- -�
_-
- Madse INSTALL TEMPORARY YP SAS DAM *-J,4E7_R
n Creek
0 SS `-
FOR
_ SEE DETAIL
SON
c `
Appk N ACCESS
Cn
n
-
SCALE 1 -- 20 Feet =
.
----
_..___ _._.._
----- -
✓ R0
- - - -- ----- -- -- ---- - - --- ` M THIS
` !
SDE D =
-
PROVIDE SECOND pqM
IE
_0
.. ..\.
- - - - --
-- NEEDED TO AND PUMP - -- _
- -- - -__ COLLECT
X
CONSTRUCTION NOTES
-__ SECONDARY
_____ FLOW
\
��
A _,
PIPE INVERT ELEVATIONS TAKEN FROM PRELIMINARY SITE
LOG DROPS -` -'- _ `� \ -'
PLAN, NEW LIFE CHURCH, WEST SIDE IMPROVEMENTS.
120
2. SEDIMENT LIMITS AND BASIN BOTTOM ELEVATIONS ARE
2H:7y
APPROX. THE CITY MAY ADJUST THE SEDIMENT REMOVAL LIMITS
`
AND DEPTHS AS NEEDED.
YPASS PIPE
2 "CMP IE =121.1
t
\. - - -- _
:� — - ` -_ ._776 -'- --� \ 'i
�`
/
REMOVE SEDIMENT TO BASE GRADES SHOWN
3. TEMPORARY BYPASS DAM SHALL BE WATER TIGHT SO BASIN
�� _ �
i 7,3` _ -, ��
OR TO TOP OF RIP RAP ON SIDE SLOPES.
CAN BE DRAINED AND SEDIMENT CAN BE DRIED OUT.
/
HAND DIG IF NEEDED TO IDENTIFY RIP -RAP.
\
\ BOTTOM OF BASIN r
DO NOT OVEREXCAVATE SIDESLOPES.
SMOOTH BUCKET, NO TEETH.
4. FISH RESCUE IN THE SEDIMENT BASIN SHALL OCCUR
APEX. EL 113 \ ;
USE
IMMEDIATELY AFTER THE BYPASS DAM IS INSTALLED.
UTILITY EASEMENT
C`� �V `V i rl
\
SEDIMENT LIMITS APPROXIMATE.
Ste Note
DOW T�nF I
\ \\
SEDIMENT DEPTH APPROX 4 TO 6 FEET.
LY ��''
2
24 "CMP BYPASS PIPE �� - VA��
LOCATION NOT VERIFIES
\ 1
O
120 �V /
/
I
oc
3 0 �
Fs
_
D
\
HYDR FED A D STRAW MULCH \p �\ _j
STUR D SL E AND ACCESS ROAD 9�
_X
i
J/
\
A ER B IN CL NING
12'x3' CONC. BOX CULVERT
OVERFLOW SPILLW Y
IE =117.86
NO ACC
UTILITY EASEMENT
See Note
ESS
`
P RO
rS
SIDE
O
(\V 24 "CMP BY ASS PIPE
>\ LOCATION OT VERIFIED ' �� 36" CMP INLET
�\ IE = 115.81
X.
9
BYPASS PIPE OUTLET
24' CMP \`� �� ��
.._.._.._.._._.._._ ---_ -_-�_ `-`- -_
GRAVE
��
p
�.
IE = 116.12 � _
-,..
_
�
O
( �
t. ��
oveRFCOw
—� ANNEf.. (dry)
OM
`'� SR—
36" CMP OUTLET Jj
–_ 16 9
N
IE = 114.47 ��
IF =116.8
SPILLWAY
est
ND
c) ' , ry
`,
�, `
0
UTILITY EASEMENT FROM NEW LIFE CHURCH
8/10/09
SEDIMENT BASIN CLEANING DRAWING
AS -BUILT NOTES
1. 2009 — POND BOTTOM
WAS WET AND MUCKY.
KING CO. RECORDING # 20091007000046
EXCAVATOR STAYED ON PAD OF SEDIMENT AND REMOVED MATERIAL TO APPX. EL 113
BY JUDGING THE DEPTH SHOVEL WENT DOWN. APPROX 1000 CY REMOVED.
BOTTOM WAS TOO MUCKY
TO WALK ON AND SURVEY AFTER WORK WAS FINISHED.
2. 2010 — POND CLEANED TO APPX EL 113.
BOTTOM WET, MUCKY
DUE TO WATER GETTING PAST DAM OR GROUNDWATER.
°
..... ...............................
�.
349705 2011 Cleaning
Qa
RECOMMENDED
FOR APPROVAL
sumkvso: scut:
°�1GN DC
vc¢ncv: xnw /
AS NOTED MORno"r" NpD 19.B''t QL CITY OF
°^�'
6/30/11
MADSEN CREEK SEDIMENT BASIN FlEDB00Ki
„� RENTON
roNnL�°
t
711x1(
BY Daniel Carey 6/30/10
°- Dc
Gx =_.x =" DATUM
CLEANING PROJECT
BMEOxEDi
DC RS
nr m« scuF Planning/Building/Public Woks Dept.
SEDIMENT BASIN 1
BY
NO. REVISION BY DATE APPR ^PPFOVEDR.S
it xor °xc wcx
scut nccoamxc+
sx[cr: x 2
-345
rn
M
N
IS
°LATE COVERING UPPER
1ALF OF INLET
M4011
1I,
36" CMP INLET IN BASIN
NTS
BOX CULVERT OVERFLOW CROSS - SECTION
(As Measured) NTS
t. -------- - - - - -- `
LOG DROPS -
120_
PIPE E7 16 �\ REMOV
IE =121.1 est 3 OR TO 1 \ ��
HAND
DO NO
r
BOTTOM OF BASIN
\ APPX. EL 113 \ I r USE S
_ SEDIME
DOWN Tl ISN E \ j I ,` SEDIME
LY
` \ /
l =
24 "CMP BYPASS PIPE
LOCATION NOT VERIFIED
C �G N
120 0
rn 0
O
\ HYDR EED A D STRAW MULCH
ISTUR D SL E AND ACCESS ROAD
A ER B IN CL NING
12'x3' CONS. BOX CULVERT
OVERFLOW SPILLWAY
IF = 117.86 rr
\ /
/ r
24 "CMP BY ASS PIPE '
LOCATION OT VERIFIED t �� 36" CMP INLET
IE = 115.81
HYDROSEED AREA (approx) - REVIEW EXTENT WITH CITY BEFORE APPLYING
/I "
RECOMMENDED
FOR APPROVAL
By Daniel Carey 6/30/11
BY
7„
CROSS - SECTION A -A SEDIMENT BASIN (Typical)
NTS
OHW
DEPTH APPROX
2 TO 4 INCHES
FLOW
CHANNEL
BOTTOM
114 4' WO.iw • ..R u_. '_.
SANDBAGS
TO SEAL EDGES
AND ANCHOR PLASTIC
F -
PLASTIC SHEETING
TO SEAL DAM
EXISTING INLET —
AND BYPASS PIPE
(IN FOREGROUND)
—2'
1
—2' TO 3'
CONCRETE BLOCKS, MEDIA BAGS,
OR OTHER MATERIAL TO FORM
BYPASS DAM
SECTION - TEMPORARY BYPASS DAM (Typical)
NTS
D- 349106 2011 Cleaning
�Eancu: xsw �seO
MdiQOMN: tU9 1983I1!i91 1
oEE�GNEO: AS NOTED �p �= CITY OF
°° RENTON
OMWN:
DC L� ONE INCH DATUM
OEMEF,OC / RS Al �"�s�"` Panning /Building /Public Works Dept.
IF Nor ONE INCH
N0. REVISION BY DATE APPR -,EO O: N. ..F.ING11
RS
E IIf • -. 111
CLEANING PROJECT
DETAILS
momI
6/30/11
FlEl➢BOON:
PAGE:
oiuxvNG No:
2
SAM or: 2
x
7
EAST ACCESS ROAD
WEST SIDE
APPX EL 122
126 -
-126
124 —
ACCUMULATED SEDIMENT
—124
DEPTH VARIES
122 -
--
/
�1V
-122
120 -
2H Typ.
-120
118 -
-118
116 -
-116
114—
24" CMP �
..' .... ... _....
-.:. ; - ..
; -.
—114
112—
BYPASS PIPE
LOG UNK
.: ...
R IP RAP LAYER
— 1 1 2
I
ry1 —FOOT THICK
110-
—110
BASIN BOTTOM
APEX EL 113
CROSS - SECTION A -A SEDIMENT BASIN (Typical)
NTS
OHW
DEPTH APPROX
2 TO 4 INCHES
FLOW
CHANNEL
BOTTOM
114 4' WO.iw • ..R u_. '_.
SANDBAGS
TO SEAL EDGES
AND ANCHOR PLASTIC
F -
PLASTIC SHEETING
TO SEAL DAM
EXISTING INLET —
AND BYPASS PIPE
(IN FOREGROUND)
—2'
1
—2' TO 3'
CONCRETE BLOCKS, MEDIA BAGS,
OR OTHER MATERIAL TO FORM
BYPASS DAM
SECTION - TEMPORARY BYPASS DAM (Typical)
NTS
D- 349106 2011 Cleaning
�Eancu: xsw �seO
MdiQOMN: tU9 1983I1!i91 1
oEE�GNEO: AS NOTED �p �= CITY OF
°° RENTON
OMWN:
DC L� ONE INCH DATUM
OEMEF,OC / RS Al �"�s�"` Panning /Building /Public Works Dept.
IF Nor ONE INCH
N0. REVISION BY DATE APPR -,EO O: N. ..F.ING11
RS
E IIf • -. 111
CLEANING PROJECT
DETAILS
momI
6/30/11
FlEl➢BOON:
PAGE:
oiuxvNG No:
2
SAM or: 2
x
7
r-
\
1
'
11
"..,.Madsen INSTALL TEMPORARY YPASS DAM ��ETRO
SS
\\ _ `
'-_,
(�
O
\�
"=
_C�eek FOR SON
SEE
SEE DETAIL
` =k
N ACCESS
O
SCALE 1 20 Feet =
'/�`
U)
'
- -- _ -
\ THIS
S DE S
PROVIDE SECOND
`
`_- --
F NEEDED ro - --
DAM AND PUMP, _
- -- - -- AND
COLLECT ` - - - -'
X
CONSTRUCTION NOTES
_
\�
� `'�
`�..
FLOW -�
` '`
- - -- - -------------- A _
1 . PIPE INVERT ELEVATIONS TAKEN FROM PRELIMINARY SITE
._
LOG DROPS
` _
---------
PLAN, NEW LIFE CHURCH, WEST SIDE IMPROVEMENTS.
�..`
` q-
- ------ -- - - -- �.`
1 20 -'
2. SEDIMENT LIMITS AND BASIN BOTTOM ELEVATIONS ARE
2H:1V
APPROX. THE CITY MAY ADJUST THE SEDIMENT REMOVAL LIMITS
AND DEPTHS AS NEEDED.
BYPASS PIPE INLEL
24 "CMP IE =121.1
est ���
1 1 6
/ `—
/
REMOVE SEDIMENT TO BASE GRADES SHOWN
3. TEMPORARY BYPASS DAM SHALL BE WATER TIGHT SO BASIN
OR TO TOP OF RIP -RAP ON SIDE SLOPES.
CAN BE DRAINED AND SEDIMENT CAN BE DRIED OUT.
/
HAND DIG IF NEEDED TO IDENTIFY RIP -RAP.
\
BOTTOM OF BASIN \\ I i
` APPX. EL 113 \ \ i
DO NOT OVEREXCAVATE SIDESLOPES.
USE SMOOTH BUCKET, NO TEETH.
4. FISH RESCUE IN THE SEDIMENT BASIN SHALL OCCUR
IMMEDIATELY AFTER THE BYPASS DAM IS INSTALLED.
\ /
UTILITY EASEMENT
\ \ `�
\\_1
\
SEDIMENT LIMITS APPROXIMATE.
SEDIMENT DEPTH APPROX 4 TO 6 FEET.
See Note
ACCESS BASIN DOWN
THIS SIDE ONLY
_
\ \2
24 "CMP BYPASS PIPE
�`
LOCATION NOT VERIFIED
2 _ \� -p i
\c�9 �a
O
/ �� �'
12U
'
G ,6 0)� /
�0 n
B��_
\
EED AND STRAW
MULCH
\
DISTURBED
\ DISTURBED SLOPE AND
ACCESS ROAD
\
\
AFTER BASIN CLEANING
\ \
x3' CONS. BOX CULVERT
J
OVERFLOW SPILLWAY
IE = 117.86
\
Y\ \ %
NO
UTILITY EASEMENT
See Note
ACCESS
F ROM r
o
IS SIDE
j
o
\�` I �
_
-
24 "CMP BY ASS PIPE ' \
��
--
LOCATION OT VERIFIED 1 36" CMP INLET
�\I IF = 115.81
O
c9._.._..
BYPASS PIPE OUTLET
24' CMP ;— \��
_.
._.._.._.._. —
GRA — `-
O�
IE = 116.12 \
._..- ,.._.._.._..
' - -_ �EL ACCESS_R�A
OVERFLOW CH
(�
CMP LEf
Ne<
_..
.._.. _. /dry._.._
`�
N
�� OVERFLOW
` E6= 114.47U
SPILLWAY
-'� -SR_
=116.8
`
est
-
ti0
N
m� cFSS
-
`\�� X090 `
UTILITY EASEMENT FROM NEW LIFE CHURCH 8/10/09
SEDIMENT BASIN CLEANING DRAWING
AS —BUILT NOTES
1. 2009 - POND BOTTOM
WAS WET AND MUCKY.
KING CO. RECORDING # 20091007000046
EXCAVATOR STAYED ON PAD OF SEDIMENT AND REMOVED MATERIAL TO APPX. EL 113
BY JUDGING THE DEPTH SHOVEL WENT DOWN. APPROX 1000 CY REMOVED.
BOTTOM WAS Too MUCKY
TO WALK ON AND SURVEY AFTER WORK WAS FINISHED.
2. 2010 - POND CLEANED
TO APPX EL 113.
BOTTOM WET, MUCKY
DUE TO WATER GETTING PAST DAM OR GROUNDWATER.
3. 2011 - POND CLEANED
TO APPX EL 113. BOTTOM WET, MUCKY DUE TO GROUNDWATER.
J.
Q° 0
D= 349107
2013 Cleaning
o
RECOMMENDED
FOR APPROVAL
�\�4�
sum o:
KRPCA3L NAVJ 1980
xoR¢oxrw xm HCC /i9si s T
ocs�cxeo� AS NOTED �p r— CITY OF
DC "'R
6/10/13
nE�nmoro
MADSEN CREEK SEDIMENT BASIN
aY Daniel Carey
6/10/13
Y�Fs(_•
_
'/0 —
�l �3
O.,
DC
"" °oc
RENTON
oxE xex DATUM
CLEANING PROJECT o�
/ Rs��
Punning /Dui ding /Public Works Dept.
SEDIMENT BASIN
BY
- NO.
REVISION BY DATE APPR w°emm:
�F NOT ONE INCH
wac ucoxoixcr
. or:
2
RS
X
D
-347
r`
rn
Nt
cy)
N
U)
PIPE INLET
IE =121.1 est
ALAI t I:UVtzKINU U V VLK
HALF OF INLET
1611 CMP
36" CMP INLET IN BASIN
NTS
LOG DROPS
- 91
V -5"
BOX CULVERT OVERFLOW CROSS - SECTION
(As Measured) NTS
' O
I
` V \ APP, . EL 113 _y
ACCESS BASIN DOWN\
THIS SIDE ONLY \\ W /
\ %
24 "CMP BYPASS PIPE
LOCATION NOT VERIFIED \ I
120 -
��
HYDROSEED AND STRAW MULCH
DISTURBED SLOPE AND ACCESS ROAD
AFTER BASIN CLEANING
N
24 "CMP BY ASS PIPE
LOCATION OT VERIFIED
OR TO
HAND [
i DO NO-
r
USE SI
I
i SEDIME
i I i SEDIME
I I
1 1
I I
N
= 1 1
I I
� I I
r 1
r 1
0
(I�
I II V
I
I
7t)0 0
<
mD7
r x
I X
I
I
it y
12'x3' CONS. BOX CULVEROVERFLOW SPILLWAY
IE = 117.86
'I I / 1
�: r
I 36" CMP INLET
IF = 115.81
i i
HYDROSEED AREA (approx) - REVIEW EXTENT WITH CITY BEFORE APPLYING
i
CROSS - SECTION A -A SEDIMENT BASIN (Typical)
NTS
CROSS - SECTION B -B
TEMPORARY DIVERSION DAM
UPSTREAM OF SEDIMENT BASIN
OHW
DEPTH APPROX
2TO4INCHES SANDBAGS
TO SEAL EDGES
AND ANCHOR PLASTIC
FLOW
CHANNEL PLASTIC SHEETING
BOTTOM TO SEAL DAM
-2'
f
/ 1 �2' T❑ 3'
CONCRETE BLOCKS, MEDIA BAGS,
OR OTHER MATERIAL TO FORM
EXISTING INLET BYPASS DAM
AND BYPASS PIPE
(IN FOREGROUND)
SECTION - TEMPORARY BYPASS DAM (Typical)
NTS
D- 349108
vENnrsi xnw lsae CITY OF
MORIZO NN 19IONIC 1 1
RECOMMENDED ,c�A I P o¢I�NEm AS NOTED �p �=-
FOR APPROVAL `S3 LENN DC 7�LATTOT�T
By Daniel Carey 6/10/13 g /P:1V RENT ON
DC I __ ONE INC�N
w13 CNECKEODC / R5 >*I N1�5 DATUM Planning /Building /Public Works Dept.
BY �P IF .ccoaolxeHr
N0. REVISION BY DATE APPR RS
2013 Cleaning
MADSEN CREEK SEDIMENT BASIN
CLEANING PROJECT
DETAILS
GQ; J] - 34 -`? ?o
NNI0NE1
PILE:
6/10/13
2
I
EAST ACCESS ROAD
WEST SIDE
APEX EL 122
126 —
—126
124—
ACCUMULATED SEDIMENT
—124
DEPTH VARIES
122 —
/
�iv
—122
120 —
2H Typ.
—120
118—
—118
116 —
�f
—116
114—
24" CMP J
—114
112—
BYPASS PIPE
Loc uNK
RIP —RAP LAYER
—112
�1 —FOOT THICK
110—
3'
— 1 1 0
BASIN BOTTOM
APPX EL 113
CROSS - SECTION A -A SEDIMENT BASIN (Typical)
NTS
CROSS - SECTION B -B
TEMPORARY DIVERSION DAM
UPSTREAM OF SEDIMENT BASIN
OHW
DEPTH APPROX
2TO4INCHES SANDBAGS
TO SEAL EDGES
AND ANCHOR PLASTIC
FLOW
CHANNEL PLASTIC SHEETING
BOTTOM TO SEAL DAM
-2'
f
/ 1 �2' T❑ 3'
CONCRETE BLOCKS, MEDIA BAGS,
OR OTHER MATERIAL TO FORM
EXISTING INLET BYPASS DAM
AND BYPASS PIPE
(IN FOREGROUND)
SECTION - TEMPORARY BYPASS DAM (Typical)
NTS
D- 349108
vENnrsi xnw lsae CITY OF
MORIZO NN 19IONIC 1 1
RECOMMENDED ,c�A I P o¢I�NEm AS NOTED �p �=-
FOR APPROVAL `S3 LENN DC 7�LATTOT�T
By Daniel Carey 6/10/13 g /P:1V RENT ON
DC I __ ONE INC�N
w13 CNECKEODC / R5 >*I N1�5 DATUM Planning /Building /Public Works Dept.
BY �P IF .ccoaolxeHr
N0. REVISION BY DATE APPR RS
2013 Cleaning
MADSEN CREEK SEDIMENT BASIN
CLEANING PROJECT
DETAILS
GQ; J] - 34 -`? ?o