Loading...
HomeMy WebLinkAboutS-014405L.I.D. SANITARY SEWER,�Q,.. LID 267 ENGINEERING COULEE SLEAD'S UNIVERSAL PARKER ALLISON T* E McDONOUGH DI ORIO KING CAMPBELL ESTIMATE CONST CO. SEPTIC SYSTEMS UTILITY CONTRS. CONST. CO. INC. CONST. INC. CONST. CO. CONST. CO. CONST CO. CONST. CO. RENTON, WASH. 7750 CORLISS N. 2520 E. 9Gt` 2345 N. 187" ST 20333 15"AVE. N.E. 9917 PORTLAND A. 22705 -74*` PL. W. 13249-NORTHRUP WY. 2821 - S. 200" 4521 S. BOND ST. 2702 -50". N. E. APRIL 21, 1970 SEATTLE, 98103 TACOMA, 98495 SEATTLE, 98133 SEATTLE, 98155 TACOMA, 98445 EDMONDS, 98020 BELLEVUE, 98004 SEATTLE, 98188 SEATTLE, 98118 TACOMA , 98422 ITEM QUANTITY UNIT TOTAL PRICE TOTAL UNIT TOiAI TOTAL UNIT T ®TAL UNIT TOTAL R CE TOTAL pR C TOTAL PR E TOTAL UNIT TOTAL PRIC TOTAL PRICE FURNISH t PLACE 8° 8100 L.F. 750 60,750-00 6.10 49,410.00 6.23 50,463.00 6.90 55,890.00 6.35 51,435.00 7.10 57,510-00 6.85 55485.60 6.25 50,625.00 8M 64,800.00 13.90 1 12 590.00 12.10 98,010,06 CONC. R. J. PIPE FURNISH * PLACE G" 3735 L.F. 5.00 18, 675.00 5.00 18,675-00 3.25 12, 138.75 4.00 14, 940, 00 490 18, 301.50 4.90 18,301-50 4.80 17, 928.00 5.25 19, 608.75 5.00 18, 675.00 5.00 18, 675.00 8.10 30, 253.50 CONC. R.J. PIPE FURNISH 4 PLACE 135 EACH 5.00 675.00 5.20 702.00 6.00 810.00 3.00 405.00 5.00 675.00 15.00 2,025.00 4.80 648.00 12.00 1,620,00 )0.W 1,350.00 5.00 675.00 10.00 1,350.00 8 "x 6" CONC. TEES _ FURNISH -� PLACE 9 EACH 5.00 45.00 5.00 45.00 6.00 _ 54.00 3.00 27.00 5.00 45.00 12.00 108.00 4.80 43.20 10.00 90.00 10.00 90,00 5.00 45.00 8.50 76.50 6"KG" CONIC. TEES FURNISH 4 PLACE 300 L.F. 10.00 3,000.00 8.67 21601.00 8.00 2,400.00 7.00 2,100.00 8.00 2,400.00 9.00 2,700.00 7.78 2,334,00 8.00 2,400.00 15.00 4,500.00 18.00 5,400,00 13.50 4,050,00 81, C.I. PIPE FURNISH t PLACE "' S85 L.F. 9.00 _ 5,265.00 6.83 3,995.55 6.00 3,510.00 6.00 3,510.00 7.00 4,095.00 8.50 4,972.50 -4.90 2,866.50 7.00 4,095.00 10.00 5,850,00 11.00 6,435.00 12.50 -7,312.50 6 C.I. PIPE FURNISH t PLACE _ 2 ONLY 60.00 120.00 65.00 130.00 75.00 1.50.00 35.00 70,00 60.00 120.00 85.00 170.00 104.65 209.30 115.00 230.CO 50.00 100,00 115.00 230,00 83,95 167.70 8"X6" C.I. TEES FURNISH � PLACE 6 ONLY 50.00 300.00 50.00 _ 300.00 70.00 420.00 30,00 180.00 50.00 300.00 78.00 468.00 89.55 537.30 100.00' 600.00 50.0 300.00 105. 630.00 67.55 405.30 6"x6" C.I. TEES FURNISH 4 PLACE 8" 7 ONLY 56.00 350.00 60.00 420.00 90.00 630.00 40.00 280.00 50,00 350.00 75.00 525.00 80,00 560.00 60.00 420,60 50-00 350.00 56, 350.00 61.35 429.45 TRANSITION COUPLING FURNISH 4 PLACE 6" 1 ONLY 50.00 50.00 35.00 35.00 80.00 80.00 35.00 35.00 50.00 50.00 70.00 70.60 60.00 60.00 50-cc 50.00 50.00 50.00 50.00 50.00 41.50 41.50 i TRANSITION COUPLING FURNISH 4 PLACE STD. I ONLY 450.00 450.00 450.00 450.00 400.00 400.00 375. 13C 375.00 600.00 600.00 325Lb 325.00 495.00 495.00 50040 500.00 550.Ct 55040 500.00 500.00 400.00 400.00 54" MANHOLE FURNISH 4 PLACE STD. P-6 ONLY 400.00 10,400.00 400.00 10,400.00 360.00 936.00 425.00 11,050,00 50O-CG 13,000.00 300.00 7,800.00 443.00 11,518.00 550. 14,300.00 500-00 13,000.00 500.00 13,000.00 45O.on 11,700.00 46" MANHOLE FURNISH N PLACE STD 7ONLY 800. 5,600.00 600.00 4,200.00 700.00 4,900.00 250. 1,750.00 900 -M 6,300,00 100. 4,900.00 995.0 6,965.00 1,050. 7,350,00 300-CC 2,100.00 6Cb.00 4,200.00 % 5. 6,755.00 DROP MANHOLE FURNISH 4 PLACE 4 ONLY 125.00 500.00 100.00 400.00 95.00 380.00 150.00 600.00 150.00 600.00 90.00 360.00 120.Cb 480,00 150.00 600,00 250.0 1,600.00 150, 600.00 150, 600,00 STD. LAMPHOLE CHANNELING OF 5 ONLY 125.00 625.00 90.00 450.00 75.00 375.00 50.00 250.00 150.00 _ 750.00' 150-CO 750.00 90.00 450.00 15.00 375.00 75. 375.00 IX.X 500. co 80.E 400.00 EXISTING MANHOLE FURNISH 4 PLACE 2500 TON 2.80 7,000.00 1.00 2,500,00 3.50 8,750.00 1.00 2,500-00 3.00 7,500.00 4.65 11,625.00 3.90 9,750.00 2.50 6,250.00 4.00 10,000.00 4.00 (0 000.00 3.50 8,750.00 BEDDING GRAVEL _ FURNISH 4 PLACE 7600 CU.YD. 2.75 20,900.00 1.60 12, 160.00 1.60 12, 160.00 3.00 22,800.00 2.50 19,060.00 ).85 14,060.00 2.20 16,720.00 2.50 19,000,00 4.00 30,400,00 0.01 76.00 3.00 22,800.00 SELECT TRENCH SACKFILL FURNISH 6 PLACE 100 TON 10.00 1,000,00 10.00 1,000.00 10.00 1,000.00 12.00 1,200.00 20.00 _ 2,000.00 13.50 1,350.00 14,25 1,425.00 30.00 3,000.00 20.00 2,600,00 15.00 (,500.00 10.00 1,000.00 COLD MIX SUB -TOTAL 1 135,705.00 107, 873.55 107,980.75 117,962-00 127, `121.50 28,020-00 12.6, 474.30 131,113.75 155, 490.00 175, 456.00 194, 501.45 5.0% SALES TAX 6,785.25 5,393.68 5,399.03 5,898.10 6,376.08 6,401.00 6,423.72 6,555.69 7,774.50 6,772.80 9,725.07 To TA L $ 142,490.25 $ 1 13,267.23 -$ 113,379.78 1 $ 123,860.10 $ 133,897.58 134,421.00 $ 134,898.02 $ 137,669,44 $ 163,264.50 $ 184,228.80 $ 204,226.52 5 -144 12 -3--3