Loading...
HomeMy WebLinkAboutS-0158113 k.- �t 4' %, .centered on Assembly 1 }° YY:semp for Speciol Stub and _ r t - -� and with dromline as Me•ro Line metro Manhole No ft02 20 I ='c Cieanout, Oeto,I fi' Tele Power Line (By others) PLAN VIEW SITE PLAN Jcu' air e: Mj ro CQfttlectlon Jp M,- Eiev iSee Note Sec. �. - - w' Flap valve Lake Bottom 4. 8' Dro,r Ppe 1 y7TE „ -4 p.Ck. h e es Res"dr ce °3 Mir, Elev 5' Y ymp'c F,yn„<i Na 3 4 4 C _ a, ._auol Fcr pees: e ^re n10 Mr: E!ev 164 - SIDE VIEW Check Valve As3embiv DETAIL "G` - DETAIL "H" t -. r - '-96'• Metro Pipe Ex,st•n;•j Metro E xiar in+g v-aUnd L I- nee Manhole, Ring, and LC NO y 0 P.oteCt from unbalanced soft foods. r_ �a See Note Besow. a, 1 I M ti w Ex.S,L,g Metre Manhole .r. 6 ..75 a 4, 38 6 30 1 25 E . 6' C ! 90' Be I � a � r min C.or ed hole - Pope t, be cut flush - - -. _.. Backf,lled with non - shrink grout . - Existing 120° Concrete Bedding on Metro Pipe - -- �• c 7 5 M ,- { O - -- -- 10 PLAN VIEW iW� F 7 y C ti A n n PLAN VIEW DETAIL I - 0 eau . SIDE VIEW - •-fit � kG`E Approval Reqjrr >d `cr Contractor s Proposed Method for Presecticn of G. / 6 "x 6 PE x F_ Sec Q ' Metro Connection Metro Manhole Against Unbalanced r n Reg�;a eG ,to•v• ..r.e- - _ _. t ater��, le:� nt0 J aE? poi! L.00ds 8 Co,crete Oran / o LI pipe ,,< P e „ _ ,Pr. ,- .- -,.�.�.�^Y..,•m.•ai*:: - ^ °.. i'. ,'. - - ' -- - l _ �� - ' --- -- -- -- -- -S I d Sewer w e r e Pt e ake Bottom ! r T _ YE x .:. r,.,• /7 n ° / y others) - .- / ° B ck Water VJ Yve Pipe Olympic f -cundr Na.3440 - C I T Y O F R E: N T O N ENGtNEERdNG DEPARTMENT Far Standa a G• ; 3 to,ox VIEW SIDE VIEW See e+ B. y i DETAILS G, N,I, & ,1 Sit. Cr.eck Valve Assy.r x CHECK ASSEMBLY -- SPECIAL Special Stub a C eanout nd snot! be No Scale as r a o�.. �t -:e,s No scale /''' STUB AND CLEANC1lIT —METRO CONNECTION DEStGNEO._I._G_.5.:- .- I FILE NO. -Lt -�- 270 �E TA IL 7ATE- ARP�_s,tgaz DRAWN- Qi._Rc_... ^ C CHECSCALE_SG_YN_WN vi�___lAS•L =_ NO REVISION 6Y I- APPR - CATE APPROVED_ LT_..e^2y���A�. � _. C 311E ?,OP 9 � c 0 4(` o M + �8' Drain P Pipe m m j N m Ln Cr- - - T _ _ t t + + g t Mirl o P B Burlington � }- - - y- J-T T - : -20" Steel Casing -Sewer l lay other sl Ni Alternate 4 48" Manhole Sections o o- _ -- 20 Metro Easement Jp M,- Eiev iSee Note Sec. �. - - w' Flap valve Lake Bottom 4. 8' Dro,r Ppe 1 y7TE „ -4 p.Ck. h e es Res"dr ce °3 Mir, Elev 5' Y ymp'c F,yn„<i Na 3 4 4 C _ a, ._auol Fcr pees: e ^re n10 Mr: E!ev 164 - SIDE VIEW Check Valve As3embiv DETAIL "G` - DETAIL "H" t -. r - '-96'• Metro Pipe Ex,st•n;•j Metro E xiar in+g v-aUnd L I- nee Manhole, Ring, and LC NO y 0 P.oteCt from unbalanced soft foods. r_ �a See Note Besow. a, 1 I M ti w Ex.S,L,g Metre Manhole .r. 6 ..75 a 4, 38 6 30 1 25 E . 6' C ! 90' Be I � a � r min C.or ed hole - Pope t, be cut flush - - -. _.. Backf,lled with non - shrink grout . - Existing 120° Concrete Bedding on Metro Pipe - -- �• c 7 5 M ,- { O - -- -- 10 PLAN VIEW iW� F 7 y C ti A n n PLAN VIEW DETAIL I - 0 eau . SIDE VIEW - •-fit � kG`E Approval Reqjrr >d `cr Contractor s Proposed Method for Presecticn of G. / 6 "x 6 PE x F_ Sec Q ' Metro Connection Metro Manhole Against Unbalanced r n Reg�;a eG ,to•v• ..r.e- - _ _. t ater��, le:� nt0 J aE? poi! L.00ds 8 Co,crete Oran / o LI pipe ,,< P e „ _ ,Pr. ,- .- -,.�.�.�^Y..,•m.•ai*:: - ^ °.. i'. ,'. - - ' -- - l _ �� - ' --- -- -- -- -- -S I d Sewer w e r e Pt e ake Bottom ! r T _ YE x .:. r,.,• /7 n ° / y others) - .- / ° B ck Water VJ Yve Pipe Olympic f -cundr Na.3440 - C I T Y O F R E: N T O N ENGtNEERdNG DEPARTMENT Far Standa a G• ; 3 to,ox VIEW SIDE VIEW See e+ B. y i DETAILS G, N,I, & ,1 Sit. Cr.eck Valve Assy.r x CHECK ASSEMBLY -- SPECIAL Special Stub a C eanout nd snot! be No Scale as r a o�.. �t -:e,s No scale /''' STUB AND CLEANC1lIT —METRO CONNECTION DEStGNEO._I._G_.5.:- .- I FILE NO. -Lt -�- 270 �E TA IL 7ATE- ARP�_s,tgaz DRAWN- Qi._Rc_... ^ C CHECSCALE_SG_YN_WN vi�___lAS•L =_ NO REVISION 6Y I- APPR - CATE APPROVED_ LT_..e^2y���A�. � _. C 311E ?,OP 9