MEK: In some installati�s, shear bar slats in pier tops my am be presenit.
DRAW NGS PREPARED AT
r
NO. 1 DATE DMI11MON OF HVISION BY
OPEN HOLES- GRIT BLAST YES ❑ NO K
SHOP PAINT - K! 0
PAINT CONTACT SURFACES YES NO
PITTSBURGH --DES MOINES STEEL CO.
ENGINEERS- FABRICATORS - CONTRACTORS
PITTSBURG, PA. WARREN, PA. BRISTOL, PA. BALTIMORE, MD
BIRMINGHA-M, ALA. DES MOINES, IOWA PROVO, UTAH
STOCIGIONI,CAUF. SANTA CLARA, CALIF. FRESNO, CALIIF.
7-
BY ATE
DRAWN
I �-7_ � 9 DRAWING NO.
OiECKED 'T3 CONTRACT NO. -:f -
BILL PAGE
DWRIETIMS FM DRt MKING UU0491L COLVA OR RIZR BAN
Do not scaie any dmaing. Check all dimensions on. the ground. If
FIATES FM zM
any dimensions do wat check, do not proceed until they have been
verified or corrected... These foundations are designed for bearing
an good. firm natural earth; clean, dry sand; firm clay; or other
Unless the specifications or drawings indic&te otherwise, the following pro-
*oil having a safe bearing capacity of 4,S00#j*q.ft. under dead load
cadure should be used for 1 dry-packing undor base plates:
plus live lead, and 6,00Wsq.ft. under dead lmd plays live lead p`m
Material furnished and placed by P-OK Erection c -raw. Thoroughly mix I part
earthquake lozad-K. If the *oil at the bottom of the emavation is not
cement an4-24 parts sand, by volutes, adding gLIX enough water to make this
equal to the above requirements, if it is am of an nUorm, bearing
value, or if there are say stream or swoosst mar by which
material siold or hold shape when pressed firmly in hand. Do not six =ore
s-414— -F the foundations, eansult ang i
your neer
than will be wed in 30 minutes.
or as before proceeding as we assume no responsibility for the safe
bearing value of the soil. Pew piers nowlithically except as
Thoroughly clam and dampen well tte surfaces of the pier top and shear bar
noted, Bottom slab of riser pier my be poured Independently if
slots. Base plates shall be levelea an shims or was and anchor bolt nots
prope.rly keyed to the rest of the pier and dowels are mod as shown.
tightened.
Do rAot porn-it weight of concrete to pall anchors eat of p0aition
using "all amounts of this material at a time, firmly park it around shear
while pouring. Build top of all column piers and riser pier to
the olamtious shown an Drawing 91. The top portions of piers to
bars, if any, by means of homer and ram. Use natal bar for ram.
/A lawk V below the proposed ground level shall be finished pocath
Any saall holes soy be trawaled *var with awtar 48 SOM &6 possible
After shear bar slats. if any, - hne been filled sad &ck , we hastier and
after the forms are removedbase
ran to peak under the base plate, working from shas bars, if any, outward.
When at least one third of the area wader "the base plates, where there are
Concrote mi:xture to be Psi at 28 UyX'
so @him. has been packed. when dry pack reaches *him. anchor nuts should -
'VW
complete dry -packing and tighten
be loosmed 1/2 turn and shims remOredr than co
RoWercing bars shall be of • intarmediate grade steel A.S.T.M. 4305
anchor nuts.
deforned.
Using a trowel, fors material vertically around edge of be** plate. With a
All reinforcing steel to be fabricated in accordance with American
whisk broom or paint brush, dampen well the surface, and dust with I part
sand and I part cemmt mixture. Travel edge to smooth finish, brushing an
Concrete Institute Handal - latast addition. 900 hOOks shall be -
"D11
water as needed.
made around a spool having a =Lal diameter of 8 rod dimatorn
"d".
fallow] this same procedure for beveled edges, and all ezposed S;alAces. if
shear bar slate extend through chanferred edges of concrete pier top.
ov _j
Won
A TASK WALL wV)! B& 7 IU 1=11 ULTU UNTIL ANNZ D R&S 'U
POW PROVO
P-M Subcontractor
P-W SvbcqotrwzM'r
P-M Subcontractor
Provo Shwa
F-M Subcontractor
P-M Field Crew
MEK: In some installati�s, shear bar slats in pier tops my am be presenit.
DRAW NGS PREPARED AT
r
NO. 1 DATE DMI11MON OF HVISION BY
OPEN HOLES- GRIT BLAST YES ❑ NO K
SHOP PAINT - K! 0
PAINT CONTACT SURFACES YES NO
PITTSBURGH --DES MOINES STEEL CO.
ENGINEERS- FABRICATORS - CONTRACTORS
PITTSBURG, PA. WARREN, PA. BRISTOL, PA. BALTIMORE, MD
BIRMINGHA-M, ALA. DES MOINES, IOWA PROVO, UTAH
STOCIGIONI,CAUF. SANTA CLARA, CALIF. FRESNO, CALIIF.
7-
BY ATE
DRAWN
I �-7_ � 9 DRAWING NO.
OiECKED 'T3 CONTRACT NO. -:f -
BILL PAGE