Loading...
HomeMy WebLinkAboutS-044101-T EA MAM NEW Z&VC. PAIM -eft S" w log A L WOW SCAiE es Twe it OIL✓WATEft SEFARArOft OIL #AS r4W A I 7W A 0 F7UEN CAP � WALL TELE, vw" -- --- ._.-- _. -_ -_ -- - .....-- ..-..- ..-•- _,_�_ - 4449994 or CONCOM W" - 6--PYC eftow Cowan 2'0MR —S'WAIM W WTTW#AWffBrut LOGAN STREET SEE DETAIL •A• 3,49' COWN 0, ss ---------- m own--b w Lim C A A "C" CHANNEL 2r I. "C" CHANNEL f-LS. 'V'OKAN9,EL 29' M. "C" CHANNEL 29' LL. Section A-A secem SCALE %- r-O' &LIWATM SEPMATOR VAULT CONSTRUCTION NOTES I. SAW CUT AS NECESSARY EXISTING CONCRETE PAD OR REMOVE PAD AT JOINTS. 2. EXCAVATE MATERIAL AND REMOVE GAS TANK 3. INSTAL(, OILMATER SEPARATOR COMPLETE IN PLACE A. Fl ,'L EXCAVATED AREA WITH BACKFILL MATERIAL EQU,VkENT 70 64iK RUN GRAVEL CLASS A, AND COMPACT -0 AT LEAST 95%, OF M, IMUN DENSITY. 5. 5,'44 CUT A STRIP Of EXISTING CONCRETE SIDEWALK AND ASPHALT:C PAVEMENT AS NECESSARY TO EXCAVATE TRENCH FOR 6-INCH SERVICE TINE AND TIE TO EXISTING 6 -INCH SANITARY SEWER MAIN. 6- SACKFILL TRENCH iilTH BANK RUN GRAVEL CLASS A, OR EQUIVALENT AND COMPACT TO AT i-EAST 95.1 OF MAXIMUM DENSITY. 7. PATCH ASPHALTIC PAVEMENT AND CONCRETE SIDEWALK AND SLAB PER ,C!TY Of RFNTON STANDARDS A-14D REQUIREMENTS. 2 COUPLINSS eA 649 vcp 8(vcp-4 $IX 6" TEE DETAIL W SCALE- I*z I' OI w - k"we, awCUT sm CUT Ls rs' SIWIP I Ap cmvc. VRtVEW4Y SECTION A CONCRETE PATCH DETAIL Mr.$ 'AS 140)'FS SAU A'S "TO CUIIPA'�- 95', DEUS: 7y, 111116,.Tuif- L1�41.RFIF SIR:p FLOOR AND DRIVEWAY IH �,-�tjvSS T I - -SS 1 As-&j:11, 11 �1.113 a7l D4 5 1-."-87 G3HERAL NOTZS 6"& 8" ASTH C-14 EXTRA (CONCRETE) b.& 6- AsDt C-nw--65T (CIA'Y) 6'& 3" CLASS 24000 (ASBESI S CEm) 6"5 8- PVC D-aG34, SDR 35 WITH FLASTOkERIC JOINTS Azvo BEDDING TO TOP OF PIPE. ALL WORK MATEbJAUy SEIA.LL a IN CONFORMANCE WITh THE STANDARDS kl+L+ SPECIFICATIONS OF CITY Of RENMN AND APPLICABLE PORTION OF llliE: LATEST EDITION tYF ThE AP" STANDARDS AND SPECIFICATIGNS. hINIM' Th SLOPE FOR SIDE SEWER IS 21. ALL LOCATIONS Of EXISTZ%t. UTILITIES SilOWN A4„. Arr,,jXIAXATE, -ANU ShALL BE THE CONTRACI-Ok-S 5tESPON5IBX'--lTY Ta Tka, ANT, C&RRECT LOCATION SO AS TO AVOID DVLmGE UK IT Si ALL BE THE CONTRACTOk'S RESPONSIBI A-'L �jECESSAjSy TS pftIL),X To STARTING CL)NSTPUrLrT;1�r. ALL STORK ShALL BE ACCUMPLIb"D IN ACCOR ,4NCz; WLTzi ThE 6ASnLNGTU� IND I FUSTRIAL SAFETY AND liEALTh AUT (WlShA). INSPECTION 4V4L 34 ACOYA�'L!h;EEU 4X A fiL*�PR4SENTAIT-V, t.i Th�' CITY. Ir SHALL BE TU CvNTSAC-!,)tL-S WFONSIBILITY TO NOTIFY ThE CITY ADVANCE OF 5ACX.FILLl4G ALL CONSTRUCTION. voti SrREE, CkOSSIN46S ShALL St 5/6'- 141JUS CRUSiaFl) ((k K. L 9♦70 7-(:X1A&4 ENGWEZRS 2'�6 2,! 90t 7� NEWSION DATE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS REWON SOUM AMZDA OIL /WATER SEPAWOR 'Nan .407' DATE F;LE NO SCALE-- 64L-7-1 S�OK-----PAGE- DvM