HomeMy WebLinkAboutW-048309NOTES:
I. CONSTRUCTION SHALL CONFORM TO CITY OF RENTON REGULATION
AND STANDARDS FOR CONSTRUCTION OF EXTENSIONS REVISF5
JULY, 1976.
2. CONTRACTOR SHALL COORDINATE HIS WORK WITH CONSTRUCTION
TO BE PERFORMED BY THE CITY OF RENTON.
M ATL a:..
3. 8° MAIN, THE CITY WILL PAY COSTS IN EXCESS OF THE COST FOR A
4° MAIN. ^
4. 12" MAIN, COST SHARING PER LETTER DATED SEPT. 29, 1977.
..r. -- ;nom
i
3 -27 -79 !Yt % ✓J�, 3'L1 i8 J `T a 45$0—
APPROVED FOR CONSTRUCTION
k LEN
W-485 VICTORIA PARK 4
MATER DISTRIBUTION SYSTEM
d 3a -7e3
DATE
JOIN-' soo 7o07
GA ePT. 1977 ...
3