Loading...
HomeMy WebLinkAboutS-051001CITY OF RENTON SCHEDULE A: COTTONWOOD LIFT STATION REPLACEMENT, WASTEWATER PROJECT NO. WWP -33 -0510 SCHEDULE B: LAKE WASHINGTON #2 LIFT STATION REPLACEMENT, WASTEWATER PROJECT NO. WWP -11 -2063 Designed By: RH2 ENGINEERING VICINITY MAP VICINITY MAP DRAWING INDEX > L___ ¢ 3rd ❑� 4o z LS___T � SCHEDULE A DRAWINGS ONLY SCHEDULE B DRAWINGS ONLY �9yc�Fz uj CD Q Q NE gad S Eoi� SHEET NO. DWG NO. DESCRIPTION FILENAME SHEET N0. DWG N0. DESCRIPTION FILENAME ¢ w �� 2nd ST 1 2 _ GENERAL INFORMATION CTNWD08 11 C11 EXISTING SITE PLAN & TESCP LKWSH02 C01 EXISTING SITE PLAN & TESCP CTNWD07 12 C12 PROPOSED SITE PLAN LKWSH03 N 40th ST Q N s1` O� WAY o M T. OLIVET > _ sT ��`� w CEMETERY ¢ 3 4 CO2 PROPOSED SITE PLAN CTNWD02 13 C13 STRUCTURAL PLAN AND DETAILS LKWSHIO UOi SEWER PROFILE & MANHOLE DETAILS CTNWD03 14 C14 STRUCTURAL DETAILS LKWSH07 ¢ N 38th ST o v -O g� Q \ LIBERTY o 5 CO3 STRUCTURAL PLAN CTNWD09 75 M71 MECHANICAL PLAN &DETAILS LKWSH06 w J SE 86th c¢n CEDAR w PARK RAVER \ PARK 6 7 C04 STRUCTURAL DETAILS CTNWDI2 16 E13 ONE LINE DIAGRAM LKWSH08 M01 MECHANICAL PLAN & DETAILS CTNWD11 17 E14 ELECTRICAL EQUIPMENT PLAN LKWSH09 N 37th o v NE 36th ST _ 'Q� 8 9 UO3 FIBERGLASS TANK DETAILS C1NWD06 E01 ONE LINE DIAGRAM CTNWDI4 N 36th ST N 35th ST � rzn > ¢ � � 10 E02 ELECTRICAL EQUIPMENT PLAN CTNWDIO N 34th ST N 34th ST z o DE DAI? rl N 33rd PL N NE 33rd ST cn ¢ �3p � 8p > o E D N 33rd ST N 32nd ¢ �$g Q w \g�4�s 0 SCHEDULE A &B DRAWINGS N 31st ST [::N 30th ST N 30th ST 405 NE 31st ST MAY CREEK SHEET NO. .DWG NO. DESCRIPTION FILENAME N 29ti1 ST �y RR Q'� 405 18 UO2 MISCELLANEOUS DETAILS CTNWD05 N 28th PL MAY CREEK PARK 19 E15 ELECTRICAL CONTROLS CTNWD04 N 28th ST NE 28th ST CITY OF RENTON 20 E16 TELEMETRY SYSTEM CTNWDI3 CITY OF RENTON COTTONWOOD LIFT STATION LOCATION 0 LAKE WASHINGTON #2 LIFT STATION LOCATION GENERAL NOTES METRO CONNECTION NOTES CONTACT PERSONNEL 1.) THE CONTRACTOR SHALL TAKE ALL NECESSARY SAFETY PRECAUTIONS TO PROTECT THE PUBLIC AND PREVENT NUISANCES WHILE PERFORMING CONSTRUCTION WORK ON THIS PROJECT. 1.) CONTRACTOR SHALL NOTIFY MR. RICH PUTNEY (684 -1291) AT LEAST TWO WORKING DAYS PRIOR TO CONSTRUC1ON IN THE VICINITY OF THE METRO INTERCEPTOR. 2.) THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACING, PROVIDE FOR NORMAL OPERATION, AND ALLOW ACCESS TO THE EXISTING LIFT STATIONS 2.) DURING CONSTRUCTION, NO DEBRIS SHALL BE ALLOWED TO ENTER METRO'S MANHOLE R10 -16 OR SEWER SYSTEM. CITY OF RENTON CITY OF RENTON MIKE BENOIT 277 -6206 DAVE CHRISTENSEN 277 -6212 UNTIL THE NEW LIFT STATIONS ARE OPERATIONAL AND HAVE BEEN APPROVED BY THE ENGINEER. 3.) THE METRO MANHOLE (R10 -16) SHALL BE UNLOADED ALL AROUND OR STRUCTURALLY SUPPORTED DURING CONSTRUCTION TO AVOID UNBALANCED CITY OF RENTON GARY MORRISON 235 -2585 3.) ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION SHALL CONFORM TO THE CONSTRUCTION DRAWINGS, TECHNICAL SPECIFICATIONS, U.B.C. SOILS LOADING. RH2 ENGINEERING DAN ERMN 869 -1488 (1988 EDITION), CITY OF RENTON STANDARD PLANS & SPECIFICATIONS, AND THE APWA /DOT STANDARDS SPECIFICATIONS (1991 EDITION). RH2 ENGINEERING TONY PARDI 869 -1488 4.) PLANS FOR DEWATERING ADJACENT TO METRO FACILITIES SHALL BE SUBMITTED TO MR. RICH PUTNEY FOR METRO REVIEW AND APPROVAL AT RH2 ENGINEERING DAVE DELLA 869 -1488 4.) ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY THE TRUE AND CORRECT LOCATION OF EXISTING LEAST FIVE WORKING DAYS PRIOR TO CONSTRUCTION. RH2 ENGINEERING MARK MILLER 869 -1488 UTILITIES TO AVOID DAMAGE OR DISTURBANCE. THE CONTRACTOR SHALL REPAIR ANY DAMAGED UTILITIES IMMEDIATELY. 5.) THE CONNECTION TO THE METRO MANHOLE (R10 -16) SHALL NOT BE BACKFILLED UNTIL IT HAS BEEN INSPECTED AND APPROVED BY METRO. RENTON POLICE REVISED TO CONFORM RENTON FIRE DEPT. 344 -4080 235 -2643 5.) A PRE - CONSTRUCTION CONFERENCE AND TWENTY -FOUR HOUR NOTICE WILL BE REQUIRED PRIOR TO STARTING CONSTRUCTION. TO CONSTRUCTION RECORDS RENTON BUILDING DEPT. JIM CHANDLER 235 -2540 6.) THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION, AND OBTAIN ALL BUILDING DEPARTMENT 6.) FIELD VERIFICATION OF THE LOCATION, DIAMETER, OR INVERT ELEVATION IS RECOMMENDED PRIOR TO CONSTRUCTION. �° FIRST AID 2V,_%G._ 14_?l 9N PUGET POWER y 911 SAM DI RE 235 -2947 INSPECTIONS DURING CONSTRUCTION. SOME OF THE INSPECTION WILL BE PERFORMED BY A REPRESENTATIVE OF THE CITY OF RENTON. 7.) THE NEW CONNECTION TO THE METRO MANHOLE (R10 -16) SHALL BE MADE BY CORE DRILLING INTO THE EXISTING MANHOLE AND USE'OF A RH2 ENGINEERING P.S. DAB PACIFIC N.W. BELL 345 -8972 THE CONTRACTOR SHALL N011FY THE REPRESENTATIVE 24 HOURS IN ADVANCE OF ANY BACKFILLING OF CONSTRUCTION. "KOR -N- SEAL" BOOT AS DISTRIBUTED BY P.I.P.E., INC. WA. NATURAL GAS DEPT. OF ECOLOGY TOM LING 235 -2464 649 -7000 7.) THE EXISTING LIFT STATIONA SHALL NOT BE TAKEN OUT OF SERVICE UNTIL THE NEW LIFT STATIONS HAVE BEEN COMPLETED, TESTED, AND APPROVED BY THE ENGINEER AND THE CITY OF RENTON. 8.) THE CONNECTION TO THE METRO MANHOLE (R10 -16) SHALL BE PLUGGED AND NOT PUT INTO SERVICE UNTIL THE TRIBUTARY SYSTEM HAS BEEN CLEANED, INSPECTED, TESTED, AND APPROVED BY THE CITY OF RENTON REPRESENTATIVE. DEPT. OF HEALTH 9 H. fLq�, T.C.I. STEVE DEEM 464 -7963 PHIL FISK 433 -3434 �F .A3y U.S. WEST JOE DAILY 235 -5857 8.) THE CONTRACTOR SHALL DETERMINE THE SCOPE, TYPE, SIZE, QUANTITY, METHOD OF INSTALLATION, OPERATION, AND REMOVAL OF THE DEWATERING SYSTEM NECESSARY TO KEEP THE EXCAVATION SITE DEWATERED TO STABILIZE THE SOILS FOR CONSTRUCTION. 9.) A COPY OF THESE CONDITIONS SHALL BE KEPT ON THE JOB SITE FOR USE BY THE CONTRACTOR. q" F METRO - ONE -CALL RICH PUTNEY 684 -1291 1 -800- 424 -5555 9.) THE CONTRACTOR SHALL DISCHARGE OF WATER FROM THE DEWATERING SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF STATE AND LOCAL REGULATIONS. SILT LADEN WATER SHALL NOT BE DISCHARGED FROM THE SITE INTO STREAMS, RIVERS, OR LAKES AT ANY TIME. e 16727 9 �o, I I., � l v SIGNED: A� NAL 07128194 �, ® I - EXPIRES 8/2/94 I A i 6 !& I t i iz i i