Loading...
HomeMy WebLinkAboutS-051003LEGEND 48" DIA. SADDLE MANHOLE ST EXISTING STORM DRAIN SS EXISTING SANITARY SEWER — T T — ABANDONED UNDERGROUND TELEPHONE SERVICE CONDUIT W EXISTING WATER MAIN O3 EXISTING CONTOURS P P — ABANDONED UNDERGROUND POWER SERVICE CONDUIT PERMANENT PIPELINE EASEMENT — - — -- — — PERMANENT LIFT STATION EASEMENT -------- - - - - -- NEW POWER AND TELEMETRY CONDUIT STA. 1 +45.6, 13.9' RT OS ORIGINAL EASEMENT NEW SANITARY GRAVITY SEWER OR FORCE MAIN 11144' VERTICAL BEND (MJxMJ) - - - - - ®— NEW SANITARY SIDE SEWER — — CONSTRUCTION BASELINE O7 — CONSTRUCTION LIMITS NEW WATER SERVICE 11144' VERTICAL BEND (MJxMJ) e e NEW 6" WIDE X 2" HIGH ROUNDED ASPHALT BERM RIGHT —OF —WAY O9 — CENTERLINE OF ROADWAY NEW ASPHALT PAVEMENT AREA - 48" DIA. INTERMEDIATE MANHOLE ELECTRICAL LEGEND POWER CABINET, , SEE DWG NO. E02. ❑ 2 POWER AND CONTROL CONDUITS F3 EXISTING TRANSFORMER " ® CONTROL BOX & YARD LIGHT, STA. 1 +63.1, 26.4' RT, SEE DWG. NO. E02, DETAIL C. O5 NEW UNDERGROUND POWER SERVICE FROM EXISTING PUGET POWER TRANSFORMER — REFER TO SPECIFICATION, "POWER SERVICE AND METERING." 52 50 � 48 46 44 42 40 38 36 MEAN HIGH WATER MARK REVISED TO CONFORM' TO CONSTRUCTION RECORDS �il1r,� 10 /zfe RH2 ENGINEERING P.S. ' D,<TE NOTES: 1.) 00 NOT DISTURB EXISTING TREES, EXCEPT ONE AS NOTED ON PLAN. 2.) CONTRACTOR TO INSTALL DEWATERING SYSTEM AS NECESSARY TO PROTECT EXISTING AND AND PROPOSED SYSTEMS DURING CONSTRUCTION. 3.) EXISTING LIFT STATION AND ASSOCIATED PIPING ARE TO REMAIN OPERATIONAL UNTIL UNTIL NEW LIFT STATION HAS BEEN TESTED AND IS APPROVED FOR OPERATION. 4.) ONCE NEW LIFT STATION IS OPERATIONAL, PLUG EXISTING FORCE MAIN AT METRO CONNECTION. CLEAN OUT EXISTING FORCE MAIN, INFLUENT PIPE, AND LIFT STATION PER SPECIFICATIONS. 5.) TRAFFIC CONTROL TO BE INSTALLED AND MAINTAINED PER CITY AND STATE REQUIREMENTS. PROVIDE ACCESS TO RIVIERA APTS. AND OFFICE BUILDING AT ALL TIMES. 6.) MAINTAIN MINIMUM 18 INCHES OF VERTICAL CLEARANCE BETWEEN WATER SERVICE PIPING AND SANITARY SEWER PIPING AT ALL LOCATIONS. 7.) UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTRACTOR TO VERIFY LOCATION, AVOID DISTURBANCE, ANCE AND REPAIR DAMAGES TO EXISTING UTILITIES. 8.) PROPOSED ASPHALT PAVEMENT AREA SHALL BE GRADED TO SLOPE AT 1% TOWARD LIFT STATION WET WELL. TOP OF ASPHALT SHALL BE SET 2' HIGHER THAN THE EXISTING PAVEMENT AREA TO PREVENT STORM WATER RUNOFF FROM ENTERING THE PROPOSED PAVEMENT AREA.. PROVIDE A SMOOTH TRANSITION BETWEEN PAVEMENT AREAS. 9.) STATIONS AND OFFSETS INDICATED ARE TO CENTER OF.ITEM UNLESS NOTED OTHERWISE. BASELINE SHALL BE ESTABLISHED AND MAINTAINED BY CONTRACTOR. 10.) REMOVE ABANDONED ELECTRICAL AND TELEPHONE WIRE FROM CONDUIT. r NEW LI STATION AND VALVE VAULT WIT MECHANIC AND ELECTRI L EMS` (13) N YRAMIDAL}� / ROUND G L PARKING AREA Rol O mD C� ,^S S a � n4 I��'• IT s` '+ ':T' 1 X14. ;.'i ,i » , r > 4 .:, I z ...... _. i ..: ar. `4 ...E >. .. ..s.. At i Ir I , a 4: � r . , '� }T . r ,•x .s _�, �,. al ra . a � . rte C, w 12 II �. .. .��i', 2 � � `sh r .... " �.. �` a.: '� `•g,,w,P e Sir i,., > €%.,.,. ; :19 �: 4 �. \ < �� nvrxM"r "r..'t ' : � .. �J , ^,: EWER~; ND..., NEC,1�T0:.. •o � � a;; a.'4 a T, t � � a<:..�.,< � # �,�a � �:.�^� c 4 s'�.;F. x m *, 'c,c< . m EEMETRY AND r TELEPH CABLE ROUTED OV HEAD 800' TO J NCTION BOX \ N ® 11 1 SURVEY DATA 1� STA. 1528 +90.35 P.T. PK NAIL NEXT TO MONUMENT Z R = 2000.00 L — 70.37 DELTA - T- 00' -57" TAN = 35.19 Z3 STA. 1528 +19.98 A4 STA. 1528 +19.98, 200.00' LT. SITEWORK A 20'x40' ASPHALT PAVEMENT AREA �B (13) 6' TALL PYRAMIDALIS SPACED AT 4' -0" O.C. SEWER LEGEND O7 48" DIA. SADDLE MANHOLE STA. 1+30.0, 15.2' LT O2 40 L.F. 8" DIA. D.I. PIPE O3 12' DIA. NEW SEWER LIFT STATION STA. 1 +57.3, 18.5' RT O4 MECHANICAL VALVE VAULT STA. 1 +45.6, 13.9' RT OS 16 L.F. 4" DIA. D.I. PIPE O6 11144' VERTICAL BEND (MJxMJ) STA. 1 +28.0, 8.5' RT, Elev = 37.6' O7 53 L.F. 4" DIA. D.I. PIPE ® 11144' VERTICAL BEND (MJxMJ) STA. 0 +80.6, 10.2' LT, Elev = 47.8' O9 12 L.F. 4" DIA. D.I. PIPE 10 48" DIA. INTERMEDIATE MANHOLE STA. 0 +67.5, 12.5' LT 11 8" DIA. D.I. GRAVITY SEWER 12 CONNECTION TO METRO SEWER SYSTEM AT MIT R10 -16, STA. 0 +17.1, 11.2' RT, Elev = 45.04' 13 6" DIA. PVC SIDE SEWER PIPE, LENGTHS AND BENDS AS NECESSARY 14 6" DIA. SIDE SEWER CLEANOUT s S ° .S /O SCHEDULE A ONLY CITY OF RENTON — 1992 LIFT STATION IMPROVEMENTS SCHEDULE A: COTTONWOOD L.S. REPLACEMENT OwG NO. JOB NO. SCHEDULE B: LAKE WASHINGTON L.S. #2 REHABILITATION CO2 1277.20 PROPOSED SITE PLAN MLM FIRE 10/20/92 CTN WD02 DAD DRE 1" = 10' AUG 09, 19-9j-10T-3-1 20 IY I I I I I AI I I I A I I I I I I - I - A I A I I I A I I I Ii ) I I I I A