Loading...
HomeMy WebLinkAboutS-051315DURING BORING PROVIDE REMOVE AND REPLACE APPROX. 30 LF NEW JERSEY APPROX. LOCATION OF EXISTING PARKING LOT 3 �7 NEW CONCRETE SIDEWALK &CURBING BARRIER IN FRONT OF BORING LAUNCH /RECEIVING 36 L�� REQUIRED. SAW CUT EXISTING PAVEMENT BORING PIT PIT PAVEMENT AND CURBING 2 MATCH LINE STA 1 +75 SEE SHEET 24 MATCH LINE STA 1 +75 SEE SHEET 26 36 35 LF 30" STEEL J7 20 CASING PI RIM 32.03 i TEE RT 1 +41 HOUSE CB CB u o TEE ELEV. 26.96 CB a RIM 31.68 RIM 31.69 0 °�� TEE LT 1 +45 CONNECTION ELEV. 29.37 RIM 32.44 z o IE 30.08 SE 8" / IE 28.94 S 8" TEE ELEV. 26.98 VC 5.00 IE 30.19 NE 4" 345 FACTORY � O v z CB 1502 N MARION ST lb IE 29.13 N 8" CONNECTION ELEV. 29.52 ; 2-'&-,96 IE 30.19 E 4" w Y AVE N - o z v � c� RIM 33.42 1 ° POWER VAULT LTRAFFIC 6 "PVC 7.50 G o o IE 30 -09 W 4" o ° �� m _ ° a 17 Q IE 32.22 W 6" TRAFFIC SIGNAL I (0 2 -8 -96 J z ABANDON &PLUG ° m �' IE 30.67 NW 6" 3141 FA. TOR HAND HOLE � Z � oo EXISTING 8" SS Ln IE 30.77 NE 6" m VE N 18 - C _ - m vm c� CONC. CURB z w w UGP LE WEL x ��� CONC. WALK = LIGHT POLE o UI WITH TRAFFIC TRAFFI SSMH 54 STA 2 +65 -3 SIGNALS B HAND POLE W RIM 32.42 NEW 54" 0 MH W W Ld �j REMOVE AND REPLACE SS r I 26.04 NE S 24" O o 24 EXISTING TRAFFIC L L AB DONED J NEWWPMISMARY SEWER NEW 24 SANITARY SEWER ISLAND AN. EWER z +oo a+00 4 +00 rf mir, zn :too + +( MH m OOPS NEW CONC. SIDEWALK MH N Q RIM 32.49 S A 1 +82 G -4 AND CURBING REQUIRED pd RIM 32.75 FACTORY AVE N IE 26.07 E & W 24" D W 54" 0 MH 2 SAWCUT EXIST. PAVEMENT CENTER 27.57 N & S a ° � IE 26.77 S 8" 36 IE 27.96 E IE 26.56 NE AND CURBING G 2 z UGT UGP ® ® J SD MH _ MH TEL. J -BOX v > RIM 32.02 °O 00 T- RIM 32.34 r) TELEPHONE (n IE 29.29 NE 10" IE 29.90 NE MH 4" Y n m PROTECT EXISTING AND a Q RIM 32.79 c0 LcB w � VAULT w= wv� ABANDON EXIST. MH m > IE 29.34 S 1 3 - TRAFFIC SIGNAL IE 27.72 NE IE 27.17 W IE 29.37 SW . IE 25.88 N/S 24" IE 26.43 E 8' REMOVE AND REPLACE EXIST. STREET PAVEMENT a ° ° a NEW PAVEMENT &WALKS 0- RIM 33.32 =OUTSIDE OF LIMITS. n 1SD MH IE 31.97E 6" V) CONTRACTORS RESPONSIBILITY a RIM 32.32 IE 26.46 S & W lLnm 0 1- w cn Z VAULTS /HAND OLE �+ r LOCATIONS OF THE STORM DRAIN AND SANITARY SEWERS SHOWN HEREON ARE THE RESULT OF A SURVEY MADE BY 2 zo ° RIM 33.51 IE 28.94 N & S 10" TO REPLACE DAMAGED SURFACES IE 27.04 N cn BURIED TRAFFIC CABLE 3 E%PRES s /11/g7 0 c� z wwp -r7 -0ra 36 IE 30.51 W 6" 10 c 16 17 18 19 20 21 22 23 24 25 26 24° w SCHEDULE B EX. 1 SEWER REHABILITATION °J 1 359 FACTORY 353 FACTORY 351 FACTORY , 343 FACTORY 337 FACTORY � 329 FACTORY 325 FACTORY SANITARY AVE N AVE N AVE N AVE N AVE N AVE N AVE N SEE SHEET 35 I- PLAN SCALE 1" = 20' REFERENCE NOTE: Ot RECONNECT EXISTING SEWER SERVICE TO NEW BENCH MARK DANCE WITH 8 PVC SANITARY SEWER IN ACCOR N CHISELED SQUARE AT BACK OF WALK THE CITY OF RENTON STANDARD PLAN # BO 82, N Ljj AT NE QUADRANT INT. OF N. BROOKS DRAWING # BR 35. z o ~ w AND FACTORY J n w ELEV. -7.04 � o ..m 0000 U Ln Cf) N - into d - F-- Q w N N : ra- _ : N N N w - Q F- W N J �r F O - (n in �� �. f- r7 ° r r ° Boa w N w I n- x 1n1nrn x = d o a q1- 0 40 40 .............Q.. ....�� ....a.. ..o off.......- ........� °.. N 00°x N N Q NNN :E 0 ' NCO: mini NNN J MI W �J O d wi ^N : O Q ^ ^^ �Q x �v rD< w Z�vv w C.J UO r Z in w - - Z +N. mow: Z +N�`--"� : +fig _ 04(n < =.• p>�NM- _ EXISTING GRADE F- � ''1 � _ F -- "') e - - mod' J ' ' - ............... . (n N bzi n DD x000 NN Q�c NN00 �(nQ 0000 CO - 5 35 ..............a �.. ......... a ¢� :.. � .................... t=w <t w.. g....... - w x xH -www' Xe - www e~nz� www tnz n r www �wenmwww wcnm_ wtnm - -- REMOVE EXISTING 8" VCP SANITARY SEWER 0 30 ........................ - -- f-- ------------------------------------- - - - - -- ------------------------- _. 1 -------------- -- - ------------------------------------- - - - - -- ------- ---- - - --- - ----------------- -------- - - - - -- - - - - - - -- ---- ---------- - - - - -- I1. 1111 ---------------------- ---- - - - - -- ---- --- --------------------- - - - - -- . NEW 24" PVC SANITARY SEWER NEW .24 ": PVC. SANITARY. S .EWER ...:...................... 25 25 JEX....... ......... EXISTING 8" VCP SCHEDULE SANITARY SEWER 82 LF ® 0.2% 286.2 LF: ®0.08% �_O�f SANITARY REHABILIT PLUG EXISTING 8" (y WASy�S� 20 ....SHEET 35.. ..........:...........SANITARY SEWER ...:.. �Na _ tioz� 17084 e /ONAL E 1 +00 2 +00 3 +00 4 +00 5+00 E%PIBES 3/28/ II AS -BUILT CERTIFICATION a - I HEREBY CERTIFY THAT THE HORIZONTAL AND VERTICAL °o �+ r LOCATIONS OF THE STORM DRAIN AND SANITARY SEWERS SHOWN HEREON ARE THE RESULT OF A SURVEY MADE BY 23613 >'..� ME OR UNDER MY DIRECTION. �AAL LOO F.D. RINGEL L.S. 23613 DATE' /o Z z - 96 3 E%PRES s /11/g7 0 c� z wwp -r7 -0ra PROFILE SCALE 1" = 20' H 1" = 5' V S -0513 APPROVED: Ns 1