Loading...
HomeMy WebLinkAboutS-051349AIM 11 I00 ENI ',1 A111 I if,[ 1 C J �I i ,!� . `M A ly I1Y IIJ 1. IU,12 ;i RIGID PAVEMENT W/ ASPHALT CONCRETE Si,I cEA'CE EXISTING ASPHALT CONCRETE W/ PCC BASE / 71 N I S 36 CfiMENT CONCR(Tf PATCH MINIMUM 5" THICK 1 O X CON(: 1R i . 15 & hRl l'e WAlti AVFMI N° 1HICK FOR SID(WAI. S pf / CCIMPACTELI CRUSHED S'URf "ACING TOP COURSC EX. ASPHALT CONCRETE 6" MIN. SURFACI COURSE CEMENT CONCRETE PAVEMENT EXISTING CONCRETE 2 N.T.S. 36 ASPHALT CONC. (_V MIN.) REPLACEMENT PATCH TO BE 1" THICKER THAN PREVIOUSLY NA_ JD1,- I,G.TS- �E T`_- MISC. ALLEY & PARKING LOT PATCHING 3 N T S 36 EX. ASPHALT CONCRETE (>3" THICK) 6" MIPa CR SURFACIN„ COURSE Iwwp.a ? -ollJ MIN, 4" ASPHALT CONCRETE (2 LIFTS) 7 FAA. JOIN' MUST /-FAA. SAW -CUT �..----- -- - - - - -- ' -GRINC Er.. ASPH6__ >� CONTROL DENSITY ELL ARTERIAL STREET PATCHING 4 N.T S. 36 SEE SECTION 7 -18 AND 2 -09 FOR PATCHING AN'- B4C ' 2. ALL 'BENCHES IN ARTERIAL STREET AREAS L BF _FD I P ' ,E_, WITH TEMPORARY ASPHALT AT THE END OF EACH FORK C '-ES IF PV SSION IS GRANTED TO DO OTHERWISE BY THE CITY ENGINEER AND TRAFFIC FNCNEER 3. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE PERM7,.NENTLY PA -SHED WITHIN (2) WEEKS OF COMPLETION OF WORK WITHIN THE ROADWAY ARET_ 4, SAW CUTS ON CONCRETE PAVEMENTS SHALL BE MADE NO MORE THAN ON HALF THE DEPTH OF THE EXISTING SLAB. SHALT c C SECTION A —A SECTION B —B BUMP W8 -1 VD( ` S 'v5 3C ',5D- ,o. CNE POST. ?ACA To BACK, SPEED BUMP MARKING & SIGNING DETAIL s UNLESS -TER WISE SPECIFED N �1 FILL 1 1/2:1 UNLESS OTHERWSE SPECIFIED r 3 TH ;lCF .� S5, B A.Sy --_T i 2 UFTS P Or H i`-2- TOP ClG*JFISE R ICx, `., -4' BASE C0JRSE RCC/ AC ALLEY PAVEMENT (15 e T r ROLL 157 16 1 S -0513 RECOi11,1EIRDED FOR APPF.UVHL 7 -z7 -9s FOR PAVEMENT RESTORATION I - SEE DETAIP.S 36 THRRU 36 HEREIN - — - — �.A' 5• MIPJ_ CRUSHED SURFACING T 20�. —PIPE BEDDING MATERIAL i AS SP'ECFED IN 7- 17.3(1)B FOUNDA N MATERIAL G_A.SS A AS DIRECT, _D BY P G'NL�R L VF EP F ICA /A TED FPO A HE- TPENCH ,SHAT L PF REMOVED, HAUL FD L t PO. c.J XrAVA T10fi SNAI L Bt PE °LACED WITH FO ''DATIOII, BFQDING A ACX 2L VL TEPiALS AS SHOWN 11, 'PENCH BACKFIE1 DETAIL AND r_0VPACTED T ACCOPDAICE WITH SPECIFICATIONS 2 L 7"FP,CHE5 7PI POADV /AY APFAS SHALL BE BACKFILLED AND PATCHED ff FVPOPAPY ASPHALT AT END OF EACH WORK DAY, (ALLEY TO BE BA i _ctb.7 STORM & SANITARY SEWER TRENCH BACKFILL DETAIL 7 N. T S. 36 SHEET NOTES I. VEP77CAL CONTROL DATUM BASED ON USC&GS 2, U77LI TY CPO5SING LOCATIONS AND ELFVA TIONS SHALL BE DETERMINED BY THE CONTRACTOR IN ADVANCE OF ANY CONSTRUCTION ACT7W77ES. 3 EXISTING PRIVATE IMPROVEMENTS SHALL BE TEMPORARILY RELOCATED AND PERMANENTLY REPLACED TO ACCOMODATE SERVICE CONSTRUCTION. 4- STA 17ONING SHOWN IN CENTERLINE OF ROADWAY AS DEFINED BY THE CONTROL POINTS. 5. MATCH FINISH GRADE WITH ALL MANHOLE LIDS. 6. PROVIDE AS -BUILT INFORMA IION SHOWAIG ALL INVERT AND RIM ELEVA 770NS, AND SIDE SEVER LOCATIONS. 7. INSTAL SEWER MAIN AND SERWCES A MINIMUM 2" FROM PARALLEL GAS LINES VREPE CONFLICT OCCURS. 8. ALL CEMENT CONCRETE DRIVEWAYS AND ALLY APPROACHES SHALL BE 9` TRICK (IN ACCORDANCE VAIN STANDARD PLAN # F006, DRAWING I FROTW 9. REPLACE AL DISTURBED CURB & CUTTERS IN ACCORDANCE WITH STANDARD PLAN # FOOB, DRAWING ,f FP05 AND STANDARD PLAN #TTOO1 "CEMENT CONCRETE CURB AND GUT7ER " 10. REPLACE ALL D(SiiRBED SIDEWALK IN ACCORDANCE WITH STANDARD PLAN If F007, DRAWING ,2' FR62. 11 WHERE UTILITY PIPE LINE VERTICAL SEPAP,A77ON IS LESS THAN (1) ONE_FOOT, iNSEPT ETHAFOAM HS 600 FLANK -FOAM BOARD OR EQUAL AS CLEARANCE SEPAPA TION. Oft 34D HA VINS , COLLIER WAGE - LI IGTONE ASSOC ., INC. 010 STO4ENAY N. SEATT E. WA 98103 -8090 (206) 632 -2664 . w�. c n510N DAT c"m, 3/2e /$7 CITY OF RENTON DEPARTMENT OF PUBLIC WORKS CENTRAL RENTON SEWER REPLACEMENT DETAILS DESIGNED- R�EB DALE: 6/27/95 FILE NAME DRA4N L1F'F'I .. CHECKED. SCALE AS NOTED FlEn ac K APPROVED. SHEET. 36 OF: 37 Tm