Loading...
HomeMy WebLinkAboutS-178305m .Ij 0 W I _ SEC. 3 TWIN. 23 N., R. 5 E. S 88. 02'27" G 2-554.21' 412 ID cq W J 5 d H E- v ry O O Y o 0 _ — °' ss CLEAN our , >— '?o �r rCHECKL FOR C OMPLIANC E. . vSUJ PHASE 11 .Date'`{ -iz -5j F o an Date I o k lit' iq 6 Da -._. -Tt u F 00' 12 UNIT APA1.T7v.:Ja1hTT / FAMILY BUILDING 11 - d / J [� FF a 412.00' . RI44 EL = 413.50' . R MS�LMH413.08' GENERAL NO TES Z dNV EL = 405.271 INV EL = 404'83' 8" OUT INV EL = 404 93' 6" IN - Zi ~ ALL WORTS SHALL BE IN ACCORDANCE WITH THE STANDARDS AN SPECIFICATIONS OF CITY OF RENTON AND APPLICABLE PORTION OF THE LATEST EDITION OF RE APWA STANDARDS AND SPECIFICATIONS. cv D 111' 08' 02.. . F i4P VAL %R = 33.00' MINIMUM SLOPE FOR SIDE SEWER IS 2.00% _ BY /. J L = 64.01' ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROX_PfATE,. AND IT SHALL WA °T�`T. Un�tiY 03 H \ " 1 BE THE CONTRACTOR'S RESPONSIBLITY TO VERIFY THE TRUI AND CORRECT LOCATIONS 5.28.40 1'7 SO AS TO AVOID DAMAGE, OF DISTURBANCE. Flo. N CASE IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY Tr' SECURE ALL NECESSARY I J PERMITS PRIOR TO STARTING CONSTRUCTION. STA. 1 +56.26'+ 15, W -2� 7. 'L.. - ;'0n $ 5.10.67 �': �pO ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH WASHINGTON IN'DUSTRAIL SSMHa2 / _ 1 .00W -2 RIM EL =,41G.02' I STA. 0+15 W- 2,15'LT SAFTY AND HEALTH ACT (WISHA). INV = 406.07' B "nUT 1 . 158LF 8 "� P S = 2.�8% 758. / SSMH, 1 48" W n INV EL = 808.17' 6 ". N RIM EL = 410.67' INSPECTION WILL BF. ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY. IT ' I INV EL = 403.42' OUT.; 22 s8 C.O. S = Pz� ✓.orc SEw�Q SHALL BE THE CONTRACTOR'S RESPOCSIBILITY TO NOTIFY THE CITY IN ADVANCE TOPE . = 416.0 I 00 INV EL = 403.57' IN OF BACKFILLING ALL CONSTRUCTION. BACKFILL FOR STREET CROSSINGS SHALL I.E. = 408.61' \ - 1 I I - BE 5/8" MINUS CRUSHED ROCK. - • .I. '' ( I INV E 4 .O O - A / 'Q - BEDDING SHALL BE PEA GRAVEL 6" OVER AND UNDER PIPE. Z 5 t `.1 I ,Q aM o W Z W Z I _ STREET RESTORATION SHALL BE PER SHT. 2 OF 3 OF STORM DRAINAGE PLANS. 6' /OE S£Wk?iR 5 "� I STA. 4.67, 30' RT 0 1 O pa I 6" PVQC ss CLEAN our ss C o. 70P EC. - 4/6.0 � � i I � , I� iI PHASE fl NO 1. E. - 4I oo - PRIVATE 8" SIDE SEWER FROM STA 1+12.5 ip — I — TO LOT 2 OF PROPOSED SUNSET PARK tf I SHORT PLAT IS SHOWN ON SHEET C3A AS BUILT CITY FILE N0. 10 -3 -4 . STA 4 W-1 --V 040 158. .! FF a 4/6.00. -- _ I o Z \ W I _ % I w: e NOTE: APPLICANT SHALL HAVE EXISTING SEWER MAIN TV'D FOR CITYS REVIEW. IF REPAIR /S REI UIRED, APPLICANT SHALL REPAIR :0 THE SATISFACTION OF ' C\{ THE CITY OF RENTON PRIOR TO TURNING OVER TO THE - CITY. QI .�_ "_ \ ___ PIPELINE SHALL BE SUCCESSFULLY TESTF_D IN ACCORDANCE WITH CITY OF ' 24 RENTON TESTING CRITERIA IN THE PRESENCE OF A CITY INSPECTOR PRIOR TO ACCEPTANCE BY THE CITY. _ STA. 3 +78, 43' Rr I SS CLEAN OUT 12 UNIT AJ 4RTMET'"T � � II 6" PV �I — _ 40, PHASE u ATr' ULT% BL'l- T)ING 4.. 9 FF`a 410.00' ss C. 0. (7 ' �(Eod Al 70P EL. =4. J,exi' i I.I\.y� r s�eay 1 I AS - QUILT "PLANS WERE PREPARED BY // =.O' I.E. = 40 .00 I I I RI SE F= J J OUMA ENG.INNERS FROM FIELD SURVEY «ie RIM EL- 408.31' T. e�tj\� H. ICI INV EL \ ` / -' -- - --- - . .40,O.IS' 8' OUT SAO. S 7 vO INV EL 4. IN 4,4 Ss C.o. ffs a 409:$0' /J I e EX 38.0`± 1 II �® "ti, ® •1 \b af N 813• 48' 21" W 11 Alo 240.20' 409 v,,; -,HL INE 3+37,50 ..m4 { 9 I . 1 9 Ir . i Y i"- 0 7l_. _ - _. r. _Y" .. 5.... F i ., _.�.. 'Y � .. _ h y Y "➢r K • . �RVISIO�NS Er U ° a Z W 2 m a I vJ / S 4 h JOB No. 647- 001 -901 D }rF•_p MT DRAWN OT -- comr. _ -- _ CHECKS; MT DATE - ,.'ANUARY," 1991. C5'-OF C/O.. SHEETS