HomeMy WebLinkAboutD-21620Ain
u
a
3
3
s
15
CA ivtm co v0 10
1^J I�
PATCH PAYMENT I (SEE BEDDING /BACKFILL DETAIL)
N
TRENCH WIDTH PER APPROPRIATE
DETAIL PLUS 2' -0"
W ~ O.
W 0
::m.W W
ASPHALT CONCRETE PAVEMENT
Zw Z
Lu °' u;
LU
0-
W 3
m Co am
8
aZ J
NTS
p
cc Lu
W O Y
I-- y
in
PER SPECIAL PROVISION 5 -06.1 AT END OF EACH WORK DAY.
W
n�
0 s
3
w
E"t
2. THE FINAL SAWCUT JOINT SHALL BE A MINIMUM OF 1' BEYOND
1--I
'v E
,E
o�
s
3a
a
3. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL
3 $j
9 a I `•�
PAY LIMIT
TRENCH BACKFILL -
6' -0" FOR
12" SEWER AND 12 " -24" STORM PIPES
r-D•
T�
I
SEE DETAIL FOR STREET
RESTORATION REQUIREMENTS
SUBSEQUENT BACKFILL MATERIAL
(NATIVE IF O R R IMPORT PER SEC ENGINEER)
SECTION 9-03. 2(1C
(SELECT BACKFILL) OF THE SPECIAL PROVISIONS
PROPOSED 12" SEWER PIPE AND
24" AND 12" STORM PIPES
PIPE ZONE MATERIAL PER SECTION
9 -03.16 BEDDING MATERIAL FOR FLEXIBLE PIPE
EXCAVATION OF UNSUITABLE SOIL AND
BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY)
DEPTH AS APPROVED BY ENGINEER
MATERIAL SHALL MEET SECTION
9- 03.9(1) BALLAST
NOTES:
1. PROVIDE UNIFORM SUPPORT UNDER BARREL.
2. HAND TAMP UNDER HAUNCHES.
3: COMPACT PIPE ZONE MATERIAL TO 90% MINIMUM DENSITY
EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE
HAND TAMP. ONLY.
4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE
FLOW LINE IS MAINTAINED,
5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS
BEYOND PAY LIMIT'. OF TRENCH SHALL BE INCLUDED WITHIN
THE TRENCH EXCAVATION SAFETY SYSTEMS BID ITEM.
12" PVC SEWER AND 24 " -12" CPEP STORM PIPES
TYPICAL TRENCH BEDDING AND BACKFILL
o TYP
TRENCH
(SEE DETAILS)
a PAY LIMIT OF TRENCH
- SAWCUT FINAL JOINT
TYP. EACH SIDE
EXIST. ASPH. CONC. PAVEMENT, TYP.
- 8 CL 'B' ASPHALT CONCRETE PATCH
(NE 27th ST, KENNEWICK PL NE k ABERDEEN AVE NE)
4" CL 'B' ASPHALT CONCRETE PATCH
(NE 24th ST)
- 6" CRUSHED. SURFACING TOP COURSE
BACKFILL
t' -o•
T
T�}
I
PAY LIMIT
TRENCH BACKFILL
5 -0" FOR
18" O.D. HOPE k 28" O.D. HOPE
DUAL LINE TRENCH
SUBSEQUENT BACKFILL MATERIAL
(NATIVE IF APPROVED BY ENGINEER)
OR IMPORT PER SECTION 9- 03.i2(I)C
(SELECT BACKFILL) OF THE SPECIAL PROVISIONS
PROPOSED 18" O.D. HDPE SEWER AND
28" O.D. STORM HOPE MAINS
PIPE ZONE MATERIAL SHALL BE
PEA GRAVEL OR SAND
EXCAVATION OF UNSUITABLE SOIL AND
BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY)
DEPTH AS APPROVED BY ENGINEER
MATERIAL SHALL MEET SECTION
9- 03.9(1) BALLAST
NOTES:
1. PROVIDE UNIFORM SUPPORT UNDER BARREL.
2. HAND TAMP UNDER .HAUNCHES.
3. COMPACT PIPE. ZONE MATERIAL 70 90% MINIMUM DENSITY
EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE
HAND TAMP ONLY.
4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE
FLOW LINE IS MAINTAINED.
5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS
BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN
THE TRENCH EXCAVATION SAFETY SYSTEMS BID ITEM.
18 O.D. HDPE SEWER AND 28" O.D. HDPE STORM
TYPICAL TRENCH BEDDING AND BACKFILL
CONSTRUCTION NOTES
1. TRENCH SAFETY AND SHORING SHALL BE PER SECTION 7- 08.3(1)B OF THE SPECIAL
PROVISIONS. TRENCHES SHALL BE SEALED TO PREVENT ENTRY DURING NON - WORKING
HOURS.
2. VERTICAL CONTROL DATUM BASED ON NAVD 1988 (IN FEET)
3. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE DETERMINED BY THE
CONTRACTOR IN ADVANCE OF ANY CONSTRUCTION ACTIVITIES.
4. EXISTING PRIVATE IMPROVEMENTS SHALL BE TEMPORARILY RELOCATED AND
PERMANENTLY REPLACED TO ACCOMMODATE SERVICE CONSTRUCTION.
5. STATIONING SHOWN IN CENTERLINE OF ROADWAY OR SURVEY CONTROL LINES
AS DEFINED BY THE CONTROL POINTS.
6. ALL MANHOLES AND TYPE -2 CATCH BASINS SHALL HAVE LOCKING LIDS.
7. MATCH FINISH GRADE WITH ALL MANHOLE LIDS.
S. PROVIDE AS -BUILT INFORMATION SHOWING ALL INVERT AND RIM ELEVATIONS
OF MANHOLE AND CATCH .BASINS AND SIDE SEWER VERTICAL AND HORIZONTAL LOCATIONS.
9. INSTALL SEWER MAIN AND SERVICES A MINIMUM 2' FROM PARALLEL GAS LINES
WHERE CONFLICT OCCURS..
10. ALL CEMENT CONCRETE DRIVEWAYS AND ALLEY APPROACHES SHALL BE 6"
THICK. (IN ACCORDANCE WITH STANDARD PLAN #F006, DRAWING #FROIN).
11. REPLACE ALL DISTURBED CURB & GUTTERS IN ACCORDANCE WITH STANDARD
PLAN # F008, DRAWING # FROS AND STANDARD PLAN # F001 "CEMENT CONCRETE
CURB AND GUTTER."
12. REPLACE ALL DISTURBED SIDEWALK IN ACCORDANCE WITH STANDARD PLAN
If F007, DRAWING # FR02.
13. WHERE UTILITY PIPE LINE VERTICAL SEPARATION IS LESS THAN (1) ONE FOOT,
INSERT ETHAFOAM HS 600 PLANK -FOAM BOARD OR EQUAL AS CLEARANCE
SEPARATION.
14.. HORIZONTAL SURVEY CONTROL IS BASED ON THE MONUMENTS AT THE INTERSECTON
OF NE 28TH ST / JONES AVE NE AND NE 20TH ST / JONES AVE NE.
REFER TO THE COVER SHEET OF THESE CONSTRUCTIONS PLANS FOR THE RESPECTIVE
COORDINATES.
10' -0" FOR
16" C905 PVC k 24" C905 PVC
DUAL LINE TRENCH
d
c d °
S.D'
II <<II d I
24"
16"
6'
d
NOTES;
1. PROVIDE UNIFORM SUPPORT UNDER BARREL.
2. HAND TAMP UNDER HAUNCHES.
3. COMPACT PIPE ZONE MATERIAL TO 90% MINIMUM DENSITY
EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE
HAND TAMP ONLY.
4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE
FLOW LINE IS MAINTAINED.
5. ALL EXCAVATION AND BEDDING AND BACKFIt.I, MATERIALS
BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN
THE TRENCH EXCAVATION SAFETY SYSTEMS B10 ITEM.
16" C905 PVC SEWER AND 24" C905 PVC STORM
TYPICAL TRENCH BEDDING AND BACKFILL
SEE DETAIL #1 AND #2
FOR STREET RESTORATION REQUIREMENTS
SUBSEQUENT BACKFILL MATERIAL
(NATIVE IF APPROVED BY ENGINEER)
OR IMPORT PER SECTION 9- 03.12(1)C
(SELECT BACKFILL) OF THE SPECIAL PROVISIONS
PROPOSED 16" C905 PVC SEWER
AND 24" C905 PVC STORM MAIN
PIPE ZONE MATERIAL PER SECTION
9 -03.16 BEDDING MATERIAL FOR FLEXIBLE PIPE
EXCAVATION OF UNSUITABLE SOIL AND
BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY)
DEPTH AS APPROVED BY ENGINEER
MATERIAL SHALL MEET SECTION
9- 03.9(1) BALLAST
Dab-201620A sk...o•d
15' UTILITY EASEMENT
v�
TYPICAL T FOR
16" C905 PVC.' 24" C905 PVC AND 8" DI
SEE ABOVE DETAIL FOR BACKFILL ANQ BEDDING REQUIREMENTS
.413. 3-.21612o (_i::>--1&2-,4 So <." O_ly > SCANNED MAR 3 0 2000 To
PATCH PAYMENT I (SEE BEDDING /BACKFILL DETAIL)
m.
TRENCH WIDTH PER APPROPRIATE
DETAIL PLUS 2' -0"
6' -0" SIDE SEWERS
ASPHALT CONCRETE PAVEMENT
RESTORATION DETAIL
NTS
p
NOTES:
1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED
in
PER SPECIAL PROVISION 5 -06.1 AT END OF EACH WORK DAY.
THIS WORK IS INCIDENTAL TO ALL TRENCH RESTORATION WORK.
2. THE FINAL SAWCUT JOINT SHALL BE A MINIMUM OF 1' BEYOND
'.. THE UNDISTURBED EDGE OF THE TRENCH.
3. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL
BE CONSIDERED INCIDENTAL. TO OTHER ITEMS OF WORK.
4.. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE PERMANENTLY PATCHED
WITHIN (2) WEEKS OF COMPLETION OR WORK WITHIN THE ROADWAY AREA
UNLESS APPROVED BY THE ENGINEER.
w,wp- 27 -�6r
a7 -
t' -o•
T
T�}
I
PAY LIMIT
TRENCH BACKFILL
5 -0" FOR
18" O.D. HOPE k 28" O.D. HOPE
DUAL LINE TRENCH
SUBSEQUENT BACKFILL MATERIAL
(NATIVE IF APPROVED BY ENGINEER)
OR IMPORT PER SECTION 9- 03.i2(I)C
(SELECT BACKFILL) OF THE SPECIAL PROVISIONS
PROPOSED 18" O.D. HDPE SEWER AND
28" O.D. STORM HOPE MAINS
PIPE ZONE MATERIAL SHALL BE
PEA GRAVEL OR SAND
EXCAVATION OF UNSUITABLE SOIL AND
BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY)
DEPTH AS APPROVED BY ENGINEER
MATERIAL SHALL MEET SECTION
9- 03.9(1) BALLAST
NOTES:
1. PROVIDE UNIFORM SUPPORT UNDER BARREL.
2. HAND TAMP UNDER .HAUNCHES.
3. COMPACT PIPE. ZONE MATERIAL 70 90% MINIMUM DENSITY
EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE
HAND TAMP ONLY.
4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE
FLOW LINE IS MAINTAINED.
5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS
BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN
THE TRENCH EXCAVATION SAFETY SYSTEMS BID ITEM.
18 O.D. HDPE SEWER AND 28" O.D. HDPE STORM
TYPICAL TRENCH BEDDING AND BACKFILL
CONSTRUCTION NOTES
1. TRENCH SAFETY AND SHORING SHALL BE PER SECTION 7- 08.3(1)B OF THE SPECIAL
PROVISIONS. TRENCHES SHALL BE SEALED TO PREVENT ENTRY DURING NON - WORKING
HOURS.
2. VERTICAL CONTROL DATUM BASED ON NAVD 1988 (IN FEET)
3. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE DETERMINED BY THE
CONTRACTOR IN ADVANCE OF ANY CONSTRUCTION ACTIVITIES.
4. EXISTING PRIVATE IMPROVEMENTS SHALL BE TEMPORARILY RELOCATED AND
PERMANENTLY REPLACED TO ACCOMMODATE SERVICE CONSTRUCTION.
5. STATIONING SHOWN IN CENTERLINE OF ROADWAY OR SURVEY CONTROL LINES
AS DEFINED BY THE CONTROL POINTS.
6. ALL MANHOLES AND TYPE -2 CATCH BASINS SHALL HAVE LOCKING LIDS.
7. MATCH FINISH GRADE WITH ALL MANHOLE LIDS.
S. PROVIDE AS -BUILT INFORMATION SHOWING ALL INVERT AND RIM ELEVATIONS
OF MANHOLE AND CATCH .BASINS AND SIDE SEWER VERTICAL AND HORIZONTAL LOCATIONS.
9. INSTALL SEWER MAIN AND SERVICES A MINIMUM 2' FROM PARALLEL GAS LINES
WHERE CONFLICT OCCURS..
10. ALL CEMENT CONCRETE DRIVEWAYS AND ALLEY APPROACHES SHALL BE 6"
THICK. (IN ACCORDANCE WITH STANDARD PLAN #F006, DRAWING #FROIN).
11. REPLACE ALL DISTURBED CURB & GUTTERS IN ACCORDANCE WITH STANDARD
PLAN # F008, DRAWING # FROS AND STANDARD PLAN # F001 "CEMENT CONCRETE
CURB AND GUTTER."
12. REPLACE ALL DISTURBED SIDEWALK IN ACCORDANCE WITH STANDARD PLAN
If F007, DRAWING # FR02.
13. WHERE UTILITY PIPE LINE VERTICAL SEPARATION IS LESS THAN (1) ONE FOOT,
INSERT ETHAFOAM HS 600 PLANK -FOAM BOARD OR EQUAL AS CLEARANCE
SEPARATION.
14.. HORIZONTAL SURVEY CONTROL IS BASED ON THE MONUMENTS AT THE INTERSECTON
OF NE 28TH ST / JONES AVE NE AND NE 20TH ST / JONES AVE NE.
REFER TO THE COVER SHEET OF THESE CONSTRUCTIONS PLANS FOR THE RESPECTIVE
COORDINATES.
10' -0" FOR
16" C905 PVC k 24" C905 PVC
DUAL LINE TRENCH
d
c d °
S.D'
II <<II d I
24"
16"
6'
d
NOTES;
1. PROVIDE UNIFORM SUPPORT UNDER BARREL.
2. HAND TAMP UNDER HAUNCHES.
3. COMPACT PIPE ZONE MATERIAL TO 90% MINIMUM DENSITY
EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE
HAND TAMP ONLY.
4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE
FLOW LINE IS MAINTAINED.
5. ALL EXCAVATION AND BEDDING AND BACKFIt.I, MATERIALS
BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN
THE TRENCH EXCAVATION SAFETY SYSTEMS B10 ITEM.
16" C905 PVC SEWER AND 24" C905 PVC STORM
TYPICAL TRENCH BEDDING AND BACKFILL
SEE DETAIL #1 AND #2
FOR STREET RESTORATION REQUIREMENTS
SUBSEQUENT BACKFILL MATERIAL
(NATIVE IF APPROVED BY ENGINEER)
OR IMPORT PER SECTION 9- 03.12(1)C
(SELECT BACKFILL) OF THE SPECIAL PROVISIONS
PROPOSED 16" C905 PVC SEWER
AND 24" C905 PVC STORM MAIN
PIPE ZONE MATERIAL PER SECTION
9 -03.16 BEDDING MATERIAL FOR FLEXIBLE PIPE
EXCAVATION OF UNSUITABLE SOIL AND
BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY)
DEPTH AS APPROVED BY ENGINEER
MATERIAL SHALL MEET SECTION
9- 03.9(1) BALLAST
Dab-201620A sk...o•d
15' UTILITY EASEMENT
v�
TYPICAL T FOR
16" C905 PVC.' 24" C905 PVC AND 8" DI
SEE ABOVE DETAIL FOR BACKFILL ANQ BEDDING REQUIREMENTS
.413. 3-.21612o (_i::>--1&2-,4 So <." O_ly > SCANNED MAR 3 0 2000 To