Loading...
HomeMy WebLinkAboutD-269020!rte � {' < 1 Fl ov t r t c � ks � f ! ■ a r cvfo r f r€ �t f r � i i � sl • € s ap 6" CSBC - t/ 12'TO 15' SEE PLAN ACCESS ROAD EL= 22.60' -- S =2.0% T. 23 N. R. t r t • tP ' • DR6 S ,' `'�.. 30 f DR 6�� \ �� /40k ` F ILEA c* 24 Vi 1 y r,.•/ • � s ( f� ,f f DR6 f i I f jj fj( 2S/ f • j if € 40 7 r� / • r F ! r /�. ' '.— „..1�- ..I�.ss. .,firms � . ' HVO ACCESS ROAD t , SEE SECTION rat �!- DR6 / , II J. DDS �V U .t° Ji ✓ /� ....rte ♦. -00 15” CLEANOUT if 3.51 AT END OF • COBBLES OVER PIPE c,,WITH STAKES AND PIPE SUPP4 1 ���K•iV1/?K•]�I•�� ' y x--12" CPEP " X '�I ` 3' MIN. VEGETATIVE 3' 3' FILTER STRIP NOTE 1. FOLLOWING CONSTRUCTION, VERIFY AND DEMONSTRATE THAT DESIGN FLOW OF 0.36 CFS IS EVENLY DISTRIBUTED ALONG THE ENTIRE LENGTH OF SLOTTED PVC DR6 AND DR6 SEE SPECIAL PROVISIONS. 9 10 FILE NAME C: XWorkXProjectW !seXBTJV0002Xdms02269XBTJV0002 DE DR 405- AB.dgn TIME 11:29:41 AM REGION STATE NO. DATE 8/19/2010 PLOTTED BY kxla 10 WASI DESIGNED BY E. ANDERS JOB NUMBER ENTERED BY L. JOHNSON CHECKED BY J. TORRIE AS -BUILT 716/10 JMS CONTRACT NO. PROD. ENGR. L. HODGSON IFC 2/3/09 MS C -7295 REGIONAL ADM. D. DYE REVISION DATE BY • • ILE 20.412 �l CONSTRUCTION GEOTEXTILE FOR SEPARATION FEMAID PROJ.NO. LOCATION NO. 41' ECOLOGY MIX BED SECTION A -A N.T.S. �C, 0• A 7 •VO of W Sys ! Z /0 DA E P.E. STAMP BOX F.G. 20.23 8" CLEANOUT AT END OF PIPE —\ 12" ECOLOGY MIX GRAVEL BACKFILL FOR DRAINS PERFORATED PVC UNDERDRAIN 8 110 SL-0.5% SEE DP5 1,14131 EallrelL DATE P.E. STAMP BOX 2' r 12' SEE PLAN ACCESS ROAD 1 A • • • • ♦ 1 • 1♦ • I1 a EL= 20.23 S =2.0% 3" TO 17" 6" T ?'r NOTE. SEE SHEET DD -10 FOR STAKING DATA. T T ,� 'Washington State Department of Transportation 40 Corridor Program e DATUM (NA VD) 88 0 25 50 SCALE IN FEET 1 1-405 1-5 TO SR1 69 STAGE I -WIDENING 2 SHEET 74 OF 392 SHEETS